FBO Bid Results.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
B&B LC Wetland Restoration Program (WRP) Construction Project, Jefferson County, WI
Solicitation number
AG-5F48-S-11-0007
Issued by

View the file

Other files

File Type Posted
Site Visit Participant List.docx DOCX document
Plans - Drawings.pdf PDF
Price Schedule Section B.docx DOCX document
Solicitation Offer and Award-Standard Form 1442 Section A.pdf PDF
Solicitation Sections C through M.docx DOCX document
WI19_dvb.mht MHT file
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Savoy

Bid Results for WRP Construction - B&B (Jefferson County)
AG-5F48-S-11-0007, due 5/6/11 at 2pm CST
Wetland Restoration Project: (includes: new ditch construction; excavate 7 shallow water scrapes; ditch plug; tile exploration; tile removal; install culvert; install eroson control mat and stone tracking pad; seed disbured areas
Line ItemBjoin LimestoneSieglerValia ExcavatingPetraszak ExcavatingHerr Construction
Unit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmount
1 - Mobiliztn/ Demobilztn$1,000$1,250$1,000$1,000$1,500
2 - Tile Exploration - 3450 ft$1.25$4,312.50$1.00$3,450$1.00$3,450$1.00$3,450$3.00$10,350
3 - Tile Removal - 7620 ft$1.00$7,620$1.00$7,620$2.00$15,240$1.0000$7,620$3.00$22,860
4 - Common Excavation$21,500$29,000$18,500$44,000$26,000
5 - 30" Diameter CMP Culvert - 50 ft$70.34$3,517$45.00$2,250$100.00$5,000$50.00$2,500$64.00$3,200
6 - Erosion Control Mat - 1750 sq. yd.$2.00$3,500$0.90$1,575$5.00$8,750$1.714$3,000$2.50$4,375
7 - Site Erosion Control$650$850$500$300$1,800
8 - Disturbed Area Seeding - 24.8 acres$342.74$8,499.96$300$7,440$250$6,200$322.58$8,000$403.50$10,006.80

Total $50,599.46 $53,435 $58,640 $69,870 $80,091.80

Line ItemMoll ConstructionSolutions 101 LLCKinas Excavating
Unit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmountUnit PriceAmount
1 - Mobiliztn/ Demobilztn$2,000$7,000$7,050
2 - Tile Exploration - 3450 ft$1.05$3,622.50$1.25$4,312.50$3.36$11,592
3 - Tile Removal - 7620 ft$1.00$7,620$2.00$15,240$3.91$29,794.20
4 - Common Excavation$53,165$60,000$115,500
5 - 30" Diameter CMP Culvert - 50 ft$50.00$2,500$55.00$2,750$74.00$3,700
6 - Erosion Control Mat - 1750 sq. yd.$1.75$3,062.50$3.50$6,125$2.63$4,602.50
7 - Site Erosion Control$1,000$1,500$4,400
8 - Disturbed Area Seeding - 24.8 acres$365.00$9,052$408$10,118.40$383$9,498.40

Total $82,022 $107,045.90 $186,137.10

File details come from the government source that posted it. Updated .