Addendum_RevisedSchedule_of_Items.docx
DOCX document 16 KB Posted
- Attached to
- US 33 Bypass Revegetation on Wayne NF Federal contract opportunity
- Solicitation number
- AG-56A1-S-17-0006
About this file
Revised Schedule of Items - must be submitted with your offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum_Specifications_DIVISION_02.pdf | ||
| AG-56A1_S-17-0006_Amdmt_0002.pdf | ||
| Addendum_Drawings_Sheet_2.pdf | ||
| PrebidConferenceNotesFBO.pdf | ||
| AG-56A1_S-17-0006_Amdmt_0001.pdf | ||
| Specifications.pdf | ||
| Drawings_Signed_-_03062017.pdf | ||
| SF24-Bid_Bond_2016.pdf | ||
| AG-56A1-S-17-0006_Solicitation.pdf | ||
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-56A1-S-17-0006
WNF US-33 Bypass Reveg
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS US-33 (Revised for Amendment 002)
Item No.
Description
Pay Unit
| Method of Measurement |
| Est. Quantity |
| Unit Price |
| Total Price |
Mobilization
LUMP SUM
LSQ
ALL
Traffic Control
LUMP SUM
Soil Erosion & Sediment Control
LUMP SUM
| 4 |
| Preparatory Grading |
| Acre |
| CQ |
| 6 |
Riprap Channel Protection, ODOT Type C
Ton
AQ
Furnishing and Placing Topsoil, 6" Depth
CY
CQ
| 7 |
| Agricultural Lime |
| Ton |
| CQ |
| 30 |
Soil Amendments and Fertilizer, Hydraulic Method (2-step)
Acre
Seeding, Hydraulic Method (2-step), Government Furnished Seed
Acre
Flexible Growth Medium, Flexterra HP-FGM, Hydraulic Method (2-step)
Acre
Straw Wattles, 9" diameter, biodegradable
LF
AQ
Existing Conditions
LUMP
SUM
TOTAL
Contractor Notes:
1. Contractor must be registered in www.sam.gov in order to submit an offer on this project. THIS IS A FREE REGISTRATION.
2. There is a pre-bid meeting scheduled, see Section L.
3. This is a construction project which has bonding requirements, see Section I for details.
4. Award will be made to one contractor. You must submit pricing for all items.
5. CQ- Contract Quantity, LSQ – Lump Sum Quantity, AQ – Actual Quantity. See specifications for definitions.
File details come from the government source that posted it. Updated .