S-17-2_SF-18.rtf
RTF text file 550 KB Posted
- Attached to
- Trail Maintenance
- Solicitation number
- AG-55N9-S-17-0002
About this file
SF-18 REQUEST FOR QUOTES
Text of this file
Construction RFQ
AG-55N9-S-17-0002
IRD Trails Maintenance
REQUEST FOR QUOTATION mac Melissa Conn This template is for a stand alone construction project less than $150,000 (not an IDIQ) In order to post this document to FBO without the comments showing, you need to go to Review, comments, delete all comments, save. Fill in the necessary sections of the SF-18. You could also use an SF-1442 as your solicitation and award form. (rather than SF-18 and OF-347)
PAGE OF PAGES
(THIS IS NOT AN ORDER)
THIS RFQ
IS
IS NOT A SMALL BUSINESS SET- ASIDE
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-55N9-S-17-0002
02/23/2017 837294
UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY
6. DELIVER BY (Date) WAYNE NATIONAL FOREST 13700 US Hwy 33, Nelsonville, OH
SEE SECTION F
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
FOB DESTINATION
NAME
TELEPHONE NUMBER
OTHER (See Schedule)
AREA CODE
NUMBER
9. DESTINATION
KATHI BARBER
753-0906
a. NAME OF CONSIGNEE
8. TO:
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the MARCH 24, 17 4:30 P.M. EST JMA- Johnson, Melissa A -FS Enter date and time quote is due submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
IRONTON RANGER DISTRICT
TRAIL MAINTENANCE
Enter pricing on schedule of items: Attach.
J1 This project is 100% set-aside for small businesses .Email quotes ARE acceptable. Reference Request No. (block 1) in the Subject line and send to: kjbarber@fs.fed.us
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT
NUMBER
PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE
c. COUNTY
AREA CODE
d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER
NSN 7540-01-152-8084
Previous edition not usable 18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
| CONSTRUCTION RFQ | SOL NO |
| UNIT | |
| PROJ NAME | |
| PAGE 1 of 28 |
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
Schedule of Items mac Melissa Conn Insert your schedule of items
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
See Attachment J1
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows:
_______________________________________________________________. mac Melissa Conn Include this statement below the schedule of items.
NOTES:
There is a requirement for payment protections (Irrevocable Letter of Credit (ILC) or payment bond) if quote is over $35,000. The payment bond or ILC will be for 100% of the award price. See Section I for additional information. There is no bid guarantee required.
Contractor must be registered www.sam.gov to be considered. THIS IS A FREE REGISTRATION.
There is NO pre-quote meeting mac Melissa Conn If there is a pre-bid, put info in here in addition to the clause in the solicitation. . Contractors should visit the sites independently.
There is a requirement to submit a technical proposal mac Melissa Conn If you are requiring them to submit information for evaluation purposes, make note of it here with your offer. See Section L & M for preparation instructions.
e. Award will be made to one contractor mac Melissa Conn If you want to award to more than one contractor (ie: by item) make note of it here. . You must submit pricing for all items, including any option items and/or option years.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract mac Melissa Conn Enter scope of project here.
The Forest Service (FS) has a requirement for a Best Value Service Contract for IRD ORV Trail Maintenance on the Wayne National Forest. The FS anticipates award of one contract, Firm-Fixed Priced for the Ironton Ranger District as described in the Schedule. The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits (when and if required), coordination with utilities, transportation, and incidentals necessary to perform trail maintenance and other associated minor maintenance directly related to trail activities. The desired outcome is in strict accordance with the standards attached to the solicitation and adherence to the contract awarded from this solicitation. The Statement Of Work shall consist of completing the ordered tasks (Defined in Section 5) to the Acceptable Quality Level (AQL) required in Section 6. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract. If awarded you must have enough resources to accomplish all activities during the designated performance period.
Project Location mac Melissa Conn Enter project location with driving directions here
The projects are in the Ironton Ranger District, with the majority of work being performed in the Lawrence, Gallia, and Scioto counties and minor amounts possibly being performed in Nobel, Vinton and Jackson counties.
Price Range
The Government's estimate is:
between $100,000 and $150,000.
mac Melissa Conn Choose 1. Estimate shouldn’t exceed the SAT on an RFQ)
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988) mac Melissa Conn If you are attaching the specs in Section J, include this clause. If pasting specs into Section C, you can delete this clause
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) mac Melissa Conn If you have any attachments (drawings, wage determinations, etc in Section J, include this clause
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.1 Sustainable Acquisitions mac Melissa Conn If the specs/statement of work don’t already address biobased, epa, recycled, etc, include something like this. Tailor to the type of project and products. This is required for construction projects The Contractor shall comply with FAR Part 23 Sustainable Acquisition Policy and all associated laws, rules, regulations, and executive orders referenced therein. Contracts that include the supply of products and for the acquisition of services (including construction) that include the supply of products, require that the products provided are—
(1) Energy-efficient (ENERGY STAR® or Federal Energy Management Program (FEMP)-designated); (applicable if FAR Clause 52.223-15 is included)
(2) Water-efficient; (applicable if FAR Clause 52.223-15 is included)
(3) Biobased; (applicable if FAR Clause 52.223-2 is included)
(4) Environmentally preferable (e.g., EPEAT®-registered, or non-toxic or less toxic alternatives); (applicable if FAR Clause 52.223-13,14, or 16 are included)
(5) Non-ozone depleting; (applicable if FAR clause 52.223-11,12,20, or 21 are included), and/or
(6) Made with recovered materials (EPA-Designated products) (applicable if FAR clause 52.223-9 or 17 is included).
(b) The required products in the contract actions for services include products that are—
(1) Delivered to the Government during performance;
(2) Acquired by the contractor for use in performing services at a Federally-controlled facility; or
(3) Furnished by the contractor for use by the Government.
SAFETY AND HEALTH mac Melissa Conn If the specs don’t address safety, include something like this. Construction projects should require a written safety plan.
1.1 SUMMARY
A. References: In addition to publications referenced in the Contract and FAR 52.236-13, the following Code of Federal Regulations (CFR) publications designate and define hazardous materials and conditions, and establish procedures for handling these materials and conditions.
1. 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards.
2. 29 CFR, Part 1926: OSHA Construction Industry Standards.
3. 40 CFR, Part 61: National Emission Standards for Hazardous Air Pollutants.
4. 40 CFR, Part 261: Environmental Protection Agency (EPA) Characteristics of Hazardous Waste.
5. 40 CFR, Part 761, EPA Polychlorinated Biphenyls (PCBs), Manufacturing, Processing, Distribution in Commerce and Use Prohibitions.
B. Acquisition of Publications: Referenced CFR publications may be purchased from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402.
1.2 SAFETY MEETING
A. Prior to commencing construction, representatives of the Contractor, including the Superintendent, shall meet with the Government to review the Contract's safety and health requirements.
B. The Contractor's safety and health program shall be reviewed, and implementation of safety and health provisions pertinent to the Work shall be discussed.
1.3 COMPLIANCE WITH REGULATIONS
A. Contractor Responsibility: The Contractor shall assume full responsibility and liability for compliance with all applicable codes, standards and regulations pertaining to the health and safety of personnel during execution of the Work. The Contractor shall have written safety and health programs in compliance with 29 CFR Parts 1910 and 1926.
1.4 SUBMITTALS
A. Safety and Health Programs: The Contractor shall submit, for approval, copies of the project safety and health programs, as applicable to the work scope, or required as a result of the safety meeting, including but not necessarily limited to the following:
1. Occupational Noise Exposure.
2. Fall Protection.
3. Personnel Protective Equipment.
4. Control of Hazardous Energy.
5. Electrical Safety Related Work Practices.
6. Lead.
7. Respirator Protection.
8. Confined spaces.
9. Heavy Equipment Operation
PART 2 - PRODUCTS
2.1 PERSONNEL PROTECTIVE EQUIPMENT
A. Special facilities, devices, equipment and similar items used by the Contractor in execution of the Work shall comply with 29 CFR Part 1910, Subpart I and other applicable regulations.
PART 3 - EXECUTION
3.1 EMERGENCY SUSPENSION OF WORK
A. In accordance with FAR 52.236-13, when the Contractor is notified by the Government, of noncompliance with safety or health provisions of the Contract, the Contractor shall immediately, correct the unsafe or unhealthy condition. In accordance with FAR 52.236-13 if the Contractor fails to comply promptly, all or part of the Work will be stopped by Government notice. The Contractor shall not be allowed any extension of time or compensation for damages in connection with a work stoppage for unsafe or unhealthy conditions.
3.2 PROTECTION OF PERSONNEL
A. The Contractor shall take all necessary precautions to prevent injury to the public, occupants, or damage to property of others.
3.3 ENVIRONMENTAL PROTECTION
A. Dispose of solid, liquid and gaseous contaminants in accordance with local codes, laws, ordinances and regulations.
B. Comply with applicable federal, state and local noise control laws, ordinances and regulations, including but not limited to 29 CFR 1910.95 and 29 CFR 1926.52.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) mac Melissa Conn Use optional under SAT. Recommend in all RFQ’s.
SECTION F--DELIVERIES OR PERFORMANCE
52.242-14 Suspension of Work (APR 1984) mac Melissa Conn Use in all construction RFQ’s
52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984) P PCxx **NOTE** [USE IF THE COMPLETION DATE IS EXPRESSED AS A SPECIFIC CALENDAR DATE, COMPUTED ON THE BASIS OF THE CONTRACTOR RECEIVING THE NOTICE TO PROCEED BY A CERTAIN DAY; FILL IN THE BLANKS]
The Contractor shall be required to (a) commence work under this contract within 5 [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 6/30/17. [The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.] The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by_3/27/17 [Contracting Officer insert date]. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer. JMA- Johnson, Melissa A -FS This is the paragraph associated with Alt 1. If you don’t need this, delete it and take the Alternate I off the clause label
SECTION G--CONTRACT ADMINISTRATION DATA
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
G.1 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE mac Melissa Conn Use if you plan to designate a COR. This isn’t a required clause but it does help the contractor understand the COR role vs the CO role.
The contracting Officer will designate a Contracting Officer's Representative(COR) at the time of award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
On all matters that pertain to the contract terms the contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the contracting officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal for a contract claim.
G.3 INVOICING
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted online via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Your company must register at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account in order to submit an invoice on this project.
G.4 FINAL PAYMENT - RELEASE OF CLAIMS
The Government shall pay the final amount due the Contractor under this contract after—
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed invoice; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.
RELEASE OF CLAIMS
To be submitted by contractor with final invoice
Contract Number:
For and in consideration of payment and pursuant to the terms of the contract cited above, the government of the United States, its officers, agents, and employees are hereby released and discharged from all liabilities, demands, obligations, and claims arising under or by virtue of said contract.
Signature: ________________________________
Printed Name: ________________________________
Title: ________________________________
Company: ________________________________
Date: ________________________________
G.5 CONTRACTOR CERTIFICATION
Contractor will submit certification with every progress invoice
CONTRACTOR CERTIFICATION
Page of Unit (Region, Forest, District) Project:
Contract No.
Name and Address of Contractor:
Invoice No.
Invoice Date:
I hereby certify, to the best of my knowledge and belief, that--
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
(Name)
(Title)
(Date)
G.6 INCIDENTAL PAYMENT ITEMS JMA- Johnson, Melissa A -FS Include if applicable.
The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 EQUIPMENT CLEANING mac Melissa Conn Insert your forest’s clause on equipment cleaning
All soil moving equipment shall be thoroughly cleaned to make it free of soil, noxious weed seeds, vegetative matter or other debris that could contain or hold seeds prior to being delivered to the project site. Equipment shall be considered free of soil, noxious weed seeds and other such debris when a visual inspection by the C.O.R., prior to the equipment being delivered to the site, does not disclose such material present. Disassembly of equipment components is not required. The Contractor shall notify the Forest Service at least five (5) working days prior to moving each piece of soil moving equipment onto the project site, unless otherwise agreed.
The Contractor shall thoroughly clean all soil moving equipment prior to moving them off a project site or between work areas on a project site that are known to be infested with noxious weed species of concern and other work areas, if any, that are free of noxious weed species of concern. Areas known to be infested with specific noxious weed species of concern to the Forest Service shall be noted in the Schedule of Work. The Contractor and the Forest Service shall agree on the methods of cleaning, location for the cleaning and control of off-site impacts, if any.
When new areas of infestation of noxious weeds of concern to the Forest Service are identified on the project site by either the Forest Service or Contractor they shall be promptly reported to the other party.
H.2 Contractor Performance Assessment Reporting System JMA- Johnson, Melissa A -FS Insert if you want
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System (CPARS). Although the expected amount of this project is below the automatic reporting threshold, an evaluation may be entered into the CPARS system at the Contracting Officer’s discretion.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/" http://www.acquisition.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.204-10 | Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2016) mac Melissa Conn Use if greater than $30,000 Requires contractor to report subcontract information to http://www.fsrs.gov |
| 52.204-13 | System for Award Management Maintenance (OCT 2016) mac Melissa Conn If Using 204-7 (req to register in SAM) |
| 52.204-18 | Commercial and Government Entity Code Maintenance (JUL 2016) UFS USDA Forest Service Use if including 204-16 |
| 52.204-19 | Incorporation by Reference of Representations and Certifications (DEC 2014) |
| Protecting the Government's Interest when Subcontracting mac Melissa Conn Include if over $35,000 with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) (Applicable if contract exceeds $35,000) |
| 52.209-10 | Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) |
| 52.211-18 | Variation in Estimated Quantity (APR 1984) mac Melissa Conn Use in all RFQ’s if any variation in quantities on the schedule of items is authorized. (ie: if quantities are estimated). It says if the actual quantity varies more than 15%, than an equitable adj can be made to the unit price. |
| 52.219-6 | Notice of Total Small Business Set-Aside (NOV 2011) mac Melissa Conn Use if setting aside for small businesses only. Otherwise delete.. Use alt I if SBA has granted a non-manufacturers waiver. Use alt II if FPI is included in competition. |
| 52.219-28 | Post-Award Small Business Program Representation. (JUL 2013) mac Melissa Conn Use if over MICRO |
mac Melissa Conn for set aside to EDWOSB or WOSB concerns eligible under the WOSB Program in those NAICS codes in which SBA has determined that women-owned small business concerns are underrepresented or substantially underrepresented in Federal procurement, as specified on SBA’s Web site at http://www.sba.gov/WOSB.
| If setting aside for EDWOSB or WOSB. 52.222-3 | Convict Labor (JUN 2003) mac Melissa Conn Use if over micro | |
| 52.222-6 | Construction Wage Rate Requirements (MAY 2014) | |
| 52.222-7 | Withholding of Funds (MAY 2014) | |
| 52.222-8 | Payrolls and Basic Records (MAY 2014) | |
| 52.222-9 | Apprentices and Trainees (JUL 2005) | |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) | |
| 52.222-11 | Subcontracts (Labor Standards) (MAY 2014) | |
| 52.222-12 | Contract Termination - Debarment (MAY 2014) | |
| 52.222-13 | Compliance with Construction Wage Rate Requirements and Related Regulations (MAY 2014) | |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) | |
| 52.222-15 | Certification of Eligibility (MAY 2014) | |
| mac Melissa Conn Use if over $2000 52.222-20 | Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014) mac Melissa Conn If furnishing supplies over $15,000 | |
| 52.222-21 | Prohibition of Segregated Facilities (APR 2015) | |
| mac Melissa Conn Use if including clause 52.222-26 52.222-26 | Equal Opportunity (SEP 2016) JMA- Johnson, Melissa A -FS Include if > $10,000 | |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (APR 2015 tac teresacorse Use if including clause 52.222-26 ) | |
| 52.222-36 | Equal Opportunity for Workers with Disabilities (JUL 2014) mac Melissa Conn Use If > $15,000 | |
| 52.222-50 | Combating Trafficking in Persons (MAR 2015) mac Melissa Conn Use in all solicitations | |
| 52.222-55 | Minimum Wages Under Executive Order 13658 (DEC 2015) JMA- Johnson, Melissa A -FS Use if including 222-6 | |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (MAY 2011) mac Melissa Conn Use if performance is on a federal facility | |
| 52.223-18 | Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) mac Melissa Conn Use in all solicitations and contracts | |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) mac Melissa Conn Use in all RFQ’s | |
| 52.226-1 | Utilization of Indian Organizations and Indian Owned Economic Enterprises (June 2000) mac Melissa Conn Use if there is subcontracting opportunities for Indian owned businesses and there are funds to pay the incentive associated with using them. Incentive is 5% of the subcontract amount | |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) mac Melissa Conn Use in all construction RFQ’s | |
| 52.228-2 | Additional Bond Security (OCT 1997) (Applicable if contract exceeds $35,000) | |
| 52.228-5 | Insurance – Work on a Government Installation (JAN 1997 tac teresacorse Use if >SAT, OPTIONAL UNDER SAT ) | |
| 52.228-11 | Pledges of Assets (JAN 2012) (Applicable if contract exceeds $35,000) | |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (MAY 2014) (Applicable if contract | exceeds $35,000) |
| 52.228-14 | Irrevocable Letter of Credit (NOV 2014) (Applicable if contract exceeds $35,000) | |
| mac Melissa Conn Use if bonds are required (required over $35,000) 52.232-5 | Payments Under Fixed-Price Construction Contracts (MAY 2014) mac Melissa Conn Use for all fixed price construction contracts | |
| 52.232-17 | Interest (MAY 2014) mac Melissa Conn Use in all > SAT. Optional below SAT. Says what interest rate we will charge the contractor if he ends up owing us money. | |
| 52.232-23 | Assignment of Claims (MAY 2014) mac Melissa Conn Use if over $3000 | |
| Prompt Payment for Construction Contracts (MAY 2014) |
| 52.232-33 | Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) | |
| 52.232-39 | Unenforceability of Unauthorized Obligations (JUN 2013) | |
| 52.232-40 | Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) | |
| 52.233-1 | Disputes (MAY 2014) Alt 1 (DEC 1991) | |
| 52.233-3 | Protest After Award (AUG 1996) | |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) | |
| mac Melissa Conn Use in all construction RFQ’s 52.236-2 | Differing Site Conditions (APR 1984) mac Melissa Conn Use is optional under SAT. Use if there is a possibility of encountering subsurface conditions that may be different than normally expected. | |
| 52.236-5 | Material and Workmanship (APR 1984) mac Melissa Conn Use in all RFQ’s. Says workmanship will be professional and materials will be new. | |
| 52.236-6 | Superintendence by the Contractor (APR 1984) mac Melissa Conn Use is optional under SAT. Use if requiring the contractor’s superintendent to be on-site at all times that work is being performed | |
| 52.236-7 | Permits and Responsibilities (NOV 1991) mac Melissa Conn Use in all RFQ’s. Says contractor is responsible for all permits needed. | |
| 52.236-8 | Other Contracts (APR 1984) mac Melissa Conn Use is optional under SAT. Use if there may be other contracts going on in the vicinity of this contract. | |
| 52.236-9 | Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) mac Melissa Conn Use is optional under SAT. Use if there is a potential for damage to gov’t or private property during the performance of this contract. | |
| 52.236-10 | Operations and Storage Areas (APR 1984) mac Melissa Conn Use is optional under SAT. Use if you need to limit contractor activities to areas approved by the CO, if damage may occur to roadways or sidewalks, and/or temporary structures may be built. | |
| 52.236-11 | Use and Possession Prior to Completion (APR 1984) mac Melissa Conn Use is optional under SAT. Use if the gov’t will take possession of any of the work before completion of the entire project. | |
| 52.236-12 | Cleaning Up (APR 1984) mac Melissa Conn Use is optional under SAT. Use if there is a potential for an accumulation of waste material at the site during the job. | |
| 52.236-13 | Accident Prevention (NOV 1991) ALT 1 (NOV 1991) mac Melissa Conn Use is optional below SAT. Says contractor must comply with OSHA regs for safety. Use with alt 1 if project is especially dangerous and requires a written safety plan. | |
| 52.236-17 | Layout of Work (APR 1984) mac Melissa Conn Use if contractor is responsible for on the ground layout of work (ie: staking, grades, etc) | |
| 52.236-21 | Specifications and Drawings for Construction (FEB 1997) mac Melissa Conn Use is optional under SAT. Use if drawings are provided or requested as part of the contract | |
| 52.243-5 | Changes and Changed Conditions (APR 1984) mac Melissa Conn Use in all const RFQ’s < SAT. | |
| 52.244-6 | Subcontracts for Commercial Items (NOV 2016) mac Melissa Conn Use in all RFQ’s except those for commercial items. | |
| 52.245-1 | Government Property - Alt 1 (APR 2012) mac Melissa Conn Use in competitive fixed price contracts where gov’t property is provided. Alt 1 says contractor is responsible for loss of that property | |
| 52.245-9 | Use and Charges (APR 2012) mac Melissa Conn Use if using 52.245-1, Include in Section H any charges associated with using gov’t property | |
| 52.246-21 | Warranty of Construction (MAR 1994) P PCxx Use in Fixed Price construction contracts if requiring a warranty of contractors work. **NOTE** [USE ALTERNATE I IF BRAND NAME AND MODEL SPECIFIED] | |
| 52.249-1 | Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) | mac Melissa Conn Use in all Const RFQ’s |
| 52.249-10 | Default (Fixed-Price Construction) (APR 1984) mac Melissa Conn Use is optional under SAT but recommend using in all RFQ’s. |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 452.232-70 | Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $35,000) mac Melissa Conn Use if including clause 52.232-5 |
| 452.236-72 | Use of Premises (NOV 1996) mac Melissa Conn Use in all construction RFQ’s |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) mac Melissa Conn Use if work is in an area where historic sites may be encountered |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) mac Melissa Conn Use if there is a need to minimize erosion. |
| 452.236-76 | Samples and Certificates (FEB 1988) mac Melissa Conn Use in all RFQ’s |
| 452.236-77 | Emergency Response (NOV 1996) mac Melissa Conn Use in all construcation RFQ’s |
52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) JMA- Johnson, Melissa A -FS Use when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system except for COTS
(a) Definitions. As used in this clause– “Covered contractor information system” means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
“Federal contract information” means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public websites) or simple transactional information, such as necessary to process payments.
“Information” means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
“Information system” means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
“Safeguarding” means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
52.215-8 Order of Precedence—Uniform Contract Format mac Melissa Conn This clause is not required for construction and not required under SAT but it does help clear up issues during the administration of the contract if there are discrepencies. Delete if you don’t want it. (OCT 1997) Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(a) The Schedule (excluding the specifications).
(b) Representations and other instructions.
(c) Contract clauses.
(d) Other documents, exhibits, and attachments.
(e) The specifications.
52.225-9 Buy American Act-Construction Materials (MAY 2014) mac Melissa Conn Include in all const RFQ’s. Specify materials that are exempt from the Buy American Act in (b)2
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
___________________NONE_____________________________
[Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material
Domestic construction material
Item 2:
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
52.228-13 Alternative Payment Protections (JUL 2000) mac Melissa Conn Use if contract is expected to be between $35,000 to $150,000. Insert the types of payment protections that are allowed in (a). There is a specific format for ILC’s. See clause 52.228-14. Surety’s for payment bonds need to be on the Treasury list of acceptable sureties. http://www.fms.treas.gov/c570/index.html" http://www.fms.treas.gov/c570/index.html
See FAR 28.102-1 for all payment protections options that you can choose from (Applicable to contracts greater than $35,000 and less than or equal to $150,000)
(a) The Contractor shall submit one of the following payment protections ____Payment Bond___________________________________________ ____Irrevocable Letter of Credit__________________________________________
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within _10__ days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
FAR 52.252-6 Authorized Deviations in Clauses mac Melissa Conn Include in all RFQ’s
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any [Department of Agricuture Regulation ] (48 CFR __4___) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
AGAR 452.228-71 Insurance Coverage. (NOV 1996) Alt 1 (NOV 1996) mac Melissa Conn \\Use if including 52.228-5 in section I , use of both clause is optional below SAT. Use Alt 1 if you want to require them to have general liability insurance too.
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
Alternate I (NOV 1996). As prescribed in 428.310, substitute the following paragraph (b), when additionally the contractor must have property damage liability coverage:
(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(2) The Contractor shall have property damage liability insurance shall be required in the amount of ____*___ per occurrence.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
J1 - Schedule of Items & Scope of Work J2 - Performance Work Statement and Quality Assurance Plan: Trails Maintenance J3 - Davis Bacon Wage Determination (02/17/2017 OH2) J4 - IRD ORV Trail System Maps J5 - Trail Clearing Typical J6 - USFS Standard Specifications for Construction and Maintenance of Trails http://www.fs.fed.us/recreation/programs/trail-management/trailplans/index.shtml J7 - State DOT Specifications (2013 – as applicable – by reference) http://www.dot.state.oh.us/Divisions/ConstructionMgt/OnlineDocs/Pages/2013-Online-Spec-Book.aspx J8 - Special Project Specifications for Construction and Maintenance of Trails J9 - Technical Questionnaire
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND
OTHER STATEMENTS OF OFFERORS OR RESPONDENTS
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) PROVISIONS
52.204-8 Annual Representations and Certifications (OCT 2016) mac Melissa Conn Indicate NAICS and size standards. Select appropriate clausesert the SBA office address where the contractor is located.station, planting, and ot (a)
(1) The North American Industry classification System (NAICS) code for this acquisition is 237990 [insert NAICS code].
(2) The small business size standard is $36.5 Million [insert size standard].
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award…
This is the start of the file's text. The full file is on GovTribe.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .