General Decision Number.doc
DOC document 299 KB Posted
- Attached to
- Tuttle Marsh Project FR4546 Reconstruction
- Solicitation number
- AG-54A4-S-09-0004
About this file
Wage Rates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tuttle Marsh bid set 1-05-09.pdf | ||
| solicitation.doc | DOC document | |
| Submittal register for Tuttle Puddle 2009.xls | XLS spreadsheet | |
| kr_return.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MI080007 01/23/2009 MI7
Superseded General Decision Number: MI20070007
State: Michigan
Construction Types: Highway (Highway, Airport & Bridge xxxxx and Sewer/Incid. to Hwy.)
Counties: Michigan Statewide.
Modification Number Publication Date
0 02/08/2008
1 03/07/2008
2 03/21/2008
3 04/11/2008
4 05/02/2008
5 06/06/2008
6 06/13/2008
7 06/20/2008
8 07/11/2008
9 07/18/2008
10 07/25/2008
11 09/05/2008
12 10/17/2008
13 11/07/2008
14 11/28/2008
15 12/19/2008
16 01/16/2009
17 01/23/2009
CARP0004-004 06/01/2007
LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES:
Rates Fringes
Carpenter; piledriver............$ 28.88 15.48
CARP0004-005 06/01/2007
DOES NOT INCLUDE LIVINGSTON COUNTY (Townships of Brighton, Deerfield, Genoa, Hartland, Osceola and Tyrone); MACOMB, MONROE, OAKLAND, SANILAC, ST. CLAIR AND WAYNE COUNTIES:
Rates Fringes
Carpenter; piledriver............$ 26.42 10.20
FOOTNOTE:
DIVER: to be paid one and one-half (1-1/2) times the regular journeyperson rate.
ELEC0017-005 06/02/2008
HURON COUNTY; INGHAM COUNTY (Townships of Leroy, Locke, Wheatfield, White Oak and Williamson); LAPEER COUNTY; LENAWEE
COUNTY (Townships of Clinton and Macon); LIVINGSTON COUNTY
(Townships of Brighton, Conway, Genoa, Green Oak, Hamburg, Handy, Hartland, Howell, Iosco, Marion, Oceola and Putnam);
MACOMB COUNTY; MONROE COUNTY (Townships of Ash, Berlin, Dundee, Exeter, Frenchtown, Ida, London, Milan, Monroe, Raisinville and
Summerfield); OAKLAND, ST. CLAIR, SANILAC AND TUSCOLA COUNTIES;
WASHTENAW COUNTY (Townships of Ann Arbor, Augusta, Bridgewater, Dexter, Freedom, Lima, Lodi, Northfield, Pittsfield, Salem, Saline, Scio, Superior, Webster, York and Ypsilanti); AND WAYNE
COUNTY:
Rates Fringes
Line Construction
Groundman/Driver............$ 24.51 4.80+25.75%
Journeyman Signal Tech......$ 33.31 4.80+25.75%
Journeyman Specialist.......$ 38.31 4.80+25.75%
Operator A..................$ 28.20 4.80+25.75%
Operator B..................$ 26.34 4.80+25.75%
Classifications
Journeyman Specialist: Refers to a crew of only one person working alone.
Operator A: Shall be proficient in operating all power equipment including: Backhoe, Excavator, Directional Bore and Boom/Digger truck.
Operator B: Shall be proficient in operating any 2 of the above mentioned pieces of equipment listed under Operator A.
ELEC0876-001 06/02/2008
REMAINDER OF STATE:
Rates Fringes
Line Construction
Cable splicer...............$ 33.85 4.75+28.75%
Light equipment operator/groundman/truck driver/groundman (winch, A frame, diggers when used for distribution line truck and used for distribution work, distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under)................$ 21.42 4.75+28.75%
Line technician.............$ 32.51 4.75+28.75%
Operator/groundman
(digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 24.45 4.75+28.75%
Truck driver/groundman(trucks with winch or boom or dump, other than distribution work)..........$ 20.39 4.75+28.75%
FOOTNOTE: Operators of 5/8 yard, rated capacity, backhoe or over; and operators of 25 ton, rated capacity, crane or over; and operators of heavy duty tension or pulling machinery on 345 KV and above: to receive the journeyman line technician rate of pay.
ENGI0324-003 06/01/2008
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LENAWEE, LIVINGSTON, MACOMB,
MIDLAND, MONROE, MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO,
PRESQUE ISLE, ROSCOMMON, SAGINAW, ST. CLAIR, SANILAC,
SHIAWASSEE, TUSCOLA, WASHTENAW AND WAYNE COUNTIES:
Rates Fringes
Power Equipment Operators -
Steel Erection:
GROUP 1....................$ 42.07 17.30
GROUP 2....................$ 43.07 17.30
GROUP 3....................$ 40.57 17.30
GROUP 4....................$ 41.57 17.30
GROUP 5....................$ 39.07 17.30
GROUP 6....................$ 40.07 17.30
GROUP 7....................$ 38.80 17.30
GROUP 8....................$ 39.80 17.30
GROUP 9....................$ 38.35 17.30
GROUP 10....................$ 39.35 17.30
GROUP 11....................$ 37.62 17.30
GROUP 12....................$ 38.62 17.30
GROUP 13....................$ 37.26 17.30
GROUP 14....................$ 38.26 17.30
GROUP 15....................$ 36.62 17.30
GROUP 16....................$ 29.81 17.30
GROUP 17....................$ 28.40 17.30
GROUP 18....................$ 35.57 17.30
FOOTNOTE:
Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Engineer when operating combination of boom and jib
400' or longer
GROUP 2: Engineer when operating combination of boom and jib
400' or longer on a crane that requires an oiler
GROUP 3: Engineer when operating combination of boom and jib
300' or longer
GROUP 4: Engineer when operating combination of boom and jib
300' or longer on a crane that requires an oiler
GROUP 5: Engineer when operating combination of boom and jib
220' or longer
GROUP 6: Engineer when operating combination of boom and jib
220' or longer on a crane that requires an oiler
GROUP 7: Engineer when operating combination of boom and jib
140' or longer
GROUP 8: Engineer when operating combination of boom and jib
140' or longer on a crane that requires an oiler
GROUP 9: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level)
GROUP 10: Tower crane & derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler
GROUP 11: Engineer when operating combination of boom and jib
120' or longer
GROUP 12: Engineer when operating combination of boom and jib
120' or longer on a crane that requires an oiler
GROUP 13: Crane operator; job mechanic and 3 drum hoist and excavator
GROUP 14: Crane operator on a crane that requires an oiler
GROUP 15: Hoisting operator; 2 drum hoist and rubber tired backhoe
GROUP 16: Compressor or welder operator
GROUP 17: Oiler
GROUP 18: Forklift and 1 drum hoist
ENGI0324-004 05/01/2008
Rates Fringes
Power Equipment Operators -
Steel Erection:
ALLEGAN, BARRY, BERRIEN,
BRANCH, CALHOUN, CASS,
EATON, HILLSDALE, IONIA,
KALAMAZOO, KENT, LAKE,
MANISTEE, MASON, MECOSTA,
MONTCALM, MUSKEGON,
NEWAYGO, OCEANA, OSCEOLA,
OTTAWA, ST. JOSEPH, VAN
BUREN
GROUP 1....................$ 28.74 16.75
GROUP 2....................$ 28.49 16.75
GROUP 3....................$ 27.99 16.75
GROUP 4....................$ 22.89 16.75
GROUP 5....................$ 21.24 16.75
GROUP 6....................$ 18.64 16.75
ANTRIM, BENZIE,
CHARLEVOIX, EMMET, GRAND
TRAVERSE, KALKASKA,
LEELANAU, MISSAUKEE AND
WEXFORD COUNTIES:
GROUP 1....................$ 28.74 16.75
GROUP 2....................$ 28.49 16.75
GROUP 3....................$ 27.49 16.75
GROUP 4....................$ 22.59 16.75
GROUP 5....................$ 20.94 16.75
GROUP 6....................$ 18.14 16.75
FOOTNOTES:
Crane operator with main boom and jib 300' or longer: $1.50 additional to the group 1 rate. Crane operator with main boom and jib 400' or longer: $3.00 additional to the group
1 rate.
Certified Crane Operator Premiums:
a) Swing Boom Truck Operator over 12 tons-$.50 per hour
b) Hydraulic Crane Operator 75 tons and under-$.75 per hour
c) Hydraulic Crane Operator over 75 tons-$1.00 per hour
d) Lattiee Boom Crane Operator-$1.50 per hour
PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Crane Operator with main boom & jib 400', 300', or
220' or longer. Tower Crane Operator with CCO certification for combined length of mast and boom 220' or longer.
GROUP 2: Crane Operator with main boom & jib 140' or longer, Tower Crane(Operators without CCO certification, or less than 220' length) Gantry Crane; Whirley Derrick.
GROUP 3: Regular Equipment Operator, Crane, Dozer, Loader, Hoist, Straddle Wagon, Mechanic, Grader and Hydro Excavator.
GROUP 4: Air Tugger (single drum), Material Hoist Pump 6" or over, Elevators, Brokk Concrete Breaker.
GROUP 5: Air Compressor, Welder, Generators, Conveyors
GROUP 6: Oiler and fire tender
ENGI0324-005 09/01/2008
Rates Fringes
Power equipment operators -underground construction
(includes sewer):
ALCONA, ALLEGAN, ALPENA,
ANTRIM, ARENAC, BARRY,
BAY, BENZIE, BERRIEN,
BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN,
CLARE, CLINTON, CRAWFORD,
EATON, EMMET, GLADWIN,
GRAND TRAVERSE, GRATIOT,
HILLSDALE, HURON, INGHAM,
IONIA, IOSCO, ISABELLA,
JACKSON, KALAMAZOO,
KALKASKA, KENT, LAKE,
LEELANAU, LENAWEE,
MANISTEE, MASON, MECOSTA,
MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY,
MUSKEGON, NEWAYGO, OCEANA,
OGEMAW, OSCEOLA, OSCODA,
OTSEGO, OTTAWA, PRESQUE
ISLE, ROSCOMMON, SAGINAW,
SANILAC, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 2....................$ 22.58 16.80
ALCONA, ALLEGAN, ALPENA,
ANTRIM, ARENAC, BARRY,
BAY, BENZIE, BERRIEN,
BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN,
CLARE, CLINTON, CRAWFORD,
EATON, EMMET, GLADWIN,
GRAND TRAVERSE, GRATIOT,
HILLSDALE, HURON, INGHAM,
IONIA, IOSCO, ISABELLA,
JACKSON, KALAMAZOO,
KALKASKA, KENT, LAKE,
LEELANAU, LENAWEE,
MANISTEE, MASON, MECOSTA,
MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY,
MUSKEGON, NEWAYGO, OCEANA,
OGEMAW, OSCEOLA, OSCODA,
OTSEGO, OTTAWA, PRESQUE
ISLE, ROSCOMMON, SAGINAW,
SANILAC, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 3....................$ 22.08 16.80
ALCONA, ALLEGAN, ALPENA,
ANTRIM, ARENAC, BARRY,
BAY, BENZIE, BERRIEN,
BRANCH, BAY, CALHOUN,
CASS, CHARLEVOIX,
CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, EATON, EMMET,
GLADWIN, GRAND TRAVERSE,
GRATIOT, HILLSDALE, HURON,
INGHAM, HURON, INGHAM
IONIA, IOSCO, ISABELLA,
JACKSON, KALAMAZOO,
KALKASKA, KENT, LAKE,
LEELANAU, LENAWEE,
MANISTEE, MASON, MECOSTA,
MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY,
MUSKEGON, NEWAYGO, OCEANA,
OGEMAW, OSCEOLA, OSCODA,
OTSEGO, OTTAWA, PRESQUE
ISLE, ROSCOMMON, SAGINAW,
SANILAC, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 1....................$ 27.47 16.80
ALCONA, ALLEGAN, ALPENA,
ANTRIM, ARENAC, BARRY,
BAY, BENZIE, BERRIEN,
BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN,
CLARE, CLINTON, CRAWFORD,
EATON, EMMET, GLADWIN,
GRAND TRAVERSE, GRATIOT,
HILLSDALE, HURON, INGHAM,
IONIA, IOSCO, ISABELLA,
JACKSON, KALAMAZOO,
KALKASKA, KENT, LAKE,
LEELANAU, LENAWEE,
MANISTEE, MASON, MECOSTA,
MIDLAND, MISSAUKEE,
MONTCALM, MONTMORENCY,
MUSKEGON, NEWAYGO, OCEANA,
OGEMAW, OSCEOLA, OSCODA,
OTSEGO, OTTAWA, PRESQUE
ISLE, ROSCOMMON, SAGINAW,
SANILAC, SHIAWASSEE, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 4....................$ 21.80 16.80
GENESEE, LAPEER,
LIVINGSTON, MACOMB,
MONROE, OAKLAND, ST.
CLAIR, WASHTENAW AND WAYNE
COUNTIES:
GROUP 1....................$ 29.18 16.80
GROUP 2....................$ 24.45 16.80
GROUP 3....................$ 23.72 16.80
GROUP 4....................$ 23.15 16.80
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backfiller tamper; Backhoe; Batch plant operator
(concrete); Clamshell; Concrete paver (2 drums or larger);
Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;
Endloader; Gradall (and similar type machine); Grader;
Mechanic; Power shovel; Roller (asphalt); Scraper
(self-propelled or tractor drawn); Side boom tractor (type
D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator; Hydro
Excavator
GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;
Pump (1 or more - 6-in. discharge or larger - gas or diesel- powered or powered by generator of 300 amperes or more - inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller);Vac Truck
GROUP 3: Air compressors (600 cfm or larger); Air compressors
(2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);
Maintenance person; Pump (2 or more-4-in. up to 6-in.
discharge-gas or diesel powered - excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger - gas or diesel powered)
GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine
(self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to
4-in. discharge, if used 3 hours or more a day, gas or diesel powered - excluding submersible pumps); Roller
(other than asphalt); Stump remover; Trencher (service);
Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type); Water wagon and Extend-a boom forklift
ENGI0324-006 06/01/2008
Rates Fringes
Power equipment operators:
(AIRPORT, BRIDGE & HIGHWAY
CONSTRUCTION)
GENESEE, MACOMB, MONROE,
OAKLAND, WASHTENAW AND
WAYNE COUNTIES:
GROUP 1....................$ 27.81 16.80
GROUP 2....................$ 21.08 16.80
GROUP 3....................$ 22.38 16.80
GROUP 4....................$ 20.52 16.80
GENESEE, MACOMB,
MONROE,OAKLAND, WASHTENAW
and WAYNE COUNTIES:
GROUP 5....................$ 20.35 16.80
STATEWIDE (Excluding
Genesee, Macomb, Monroe, Oakland, Washtenaw and
Wayne Counties):
GROUP 1....................$ 27.81 16.80
GROUP 2....................$ 20.93 16.80
GROUP 3....................$ 22.23 16.80
GROUP 4....................$ 20.37 16.80
GROUP 5....................$ 20.05 16.80
FOOTNOTE:
Crane premiums: Swing boom truck operator over 12 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt plant operator; Crane operator (does not include work on bridge construction projects when the crane operator is erecting structural components); Dragline operator; Shovel operator; Locomotive operator; Paver operator (5 bags or more); Elevating grader operator; Pile driving operator; Roller operator (asphalt); Blade grader operator; Trenching machine operator (ladder or wheel type); Auto-grader; Slip form paver; Self-propelled or tractor-drawn scraper; Conveyor loader operator (Euclid type); Endloader operator (1 yd. capacity and over);
Bulldozer; Hoisting engineer; Tractor operator; Finishing machine operator (asphalt); Mechanic; Pump operator (6-in.
discharge or over, gas, diesel powered or generator of 300 amp. or larger); Shouldering or gravel distributing machine operator (self- propelled); Backhoe (with over 3/8 yd.
bucket); Side boom tractor (type D-4 or equivalent or larger); Tube finisher (slip form paving); Gradall (and similar type machine); Asphalt paver (self- propelled);
Asphalt planer (self-propelled); Batch plant
(concrete-central mix); Slurry machine (asphalt); Concrete pump (3 in. and over); Roto-mill; Swinging boom truck (over
12 ton capacity); Hydro demolisher (water blaster);
Farm-type tractor with attached pan
GROUP 2: Screening plant operator; Washing plant operator;
Crusher operator; Backhoe (with 3/8 yd. bucket or less);
Side boom tractor (smaller than D-4 type or equivalent);
Sweeper (Wayne type and similar equipment); Vacuum truck operator; Batch plant (concrete dry batch)
GROUP 3: Grease Truck
GROUP 4: Air compressor operator (600 cu. ft. per min or more); Air compressor operator (two or more, less than 600 cfm); Wagon drill operator; Concrete breaker; Tractor operator (farm type with attachment)
GROUP 5: Boiler fire tender; Oiler; Fire tender; Trencher
(service); Flexplane operator; Cleftplane operator; Grader operator (self-propelled fine-grade or form (concrete));
Finishing machine operator (concrete); Boom or winch hoist truck operator; Endloader operator (under 1 yd. capacity);
Roller operator (other than asphalt); Curing equipment operator (self-propelled); Concrete saw operator (40 h.p.
or over); Power bin operator; Plant drier operator
(asphalt); Vibratory compaction equipment operator (6 ft.
wide or over); Guard post driver operator (power driven);
All mulching equipment; Stump remover; Concrete pump (under
3-in.); Mesh installer (self- propelled); Tractor operator
(farm type); End dump; Skid steer
ENGI0324-007 05/01/2008
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
Rates Fringes
Power Equipment Operators -
Steel Erection:
Compressor, welder and forklift....................$ 24.11 16.47
Crane operator, main boom
& jib 120' or longer........$ 27.86 16.47
Crane operator, main boom
& jib 140' or longer........$ 28.11 16.47
Crane operator, main boom
& jib 220' or longer........$ 28.36 16.47
Mechanic with truck and tools.......................$ 28.86 16.47
Oiler and fireman...........$ 22.81 16.47
Regular operator............$ 27.36 16.47
Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.
Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)
ENGI0324-008 10/01/2008
Rates Fringes
Power equipment operators -sewer relining:
GROUP 1.....................$ 27.82 11.35
GROUP 2.....................$ 26.29 11.35
SEWER RELINING CLASSIFICATIONS
GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system
GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems
ENGI0325-010 05/01/2008
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
Rates Fringes
Power equipment operators -underground construction:
Crane operator, main boom
& jib 120' or longer........$ 27.46 16.47
Crane operator, main boom
& jib 140' or longer........$ 27.71 16.47
Crane operator, main boom
& jib 220' or longer........$ 27.96 16.47
GROUP 1.....................$ 26.96 16.47
GROUP 2.....................$ 23.71 16.47
GROUP 3.....................$ 23.13 16.47
GROUP 4.....................$ 22.19 16.47
Mechanic with truck and tools.......................$ 28.46 16.47
FOOTNOTES: Swing boom truck operator over 15 tons: $.50 per hour additional. Hydraulic crane operator 75 tons and under: $.75 per hour additional. Hydraulic crane operator over 75 tons: $1.00 per hour additional. Lattice boom crane operator: $1.50 per hour additional. Crusher pit, shafts and tunnel workers: $2.00 per hour additional.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Regular equipment operator, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, concrete pump, excavator, milling and pulverizing machines, scraper
(self-propelled and tractor drawn), welder
GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems
GROUP 3: Air compressor, conveyor, concrete saw, farm tractor
(without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person
GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer
Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.
Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)
* ENGI0325-011 10/01/2008
Rates Fringes
Power equipment operators -hazardous waste removal:
(GENESEE, LAPEER, LIVINGSTON,
MACOMB, MONROE, OAKLAND, ST.
CLAIR, WASHTENAW AND WAYNE
COUNTIES:)
LEVEL A:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.38 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.68 16.75
GROUP 1....................$ 31.73 16.75
GROUP 2....................$ 27.50 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 32.70 16.75
LEVEL B AND C:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.43 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.73 16.75
GROUP 1....................$ 30.78 16.75
GROUP 2....................$ 26.55 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, pwer shovel operator.......$ 31.75 16.75
LEVEL D WHEN CAPPING
LANDFILL:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.88 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.18 16.75
GROUP 1....................$ 29.23 16.75
GROUP 2....................$ 25.00 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 29.58 16.75
LEVEL D:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.13 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.43 16.75
GROUP 1....................$ 29.48 16.75
GROUP 2....................$ 25.25 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.45 16.75
Power equipment operators -hazardous waste removal:
(REMAINDER OF STATE:)
LEVEL A:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.67 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.97 16.75
GROUP 1....................$ 30.22 16.75
GROUP 2....................$ 25.62 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.99 16.75
LEVEL D WHEN CAPPING
LANDFILL:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.17 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.47 16.75
GROUP 1....................$ 27.52 16.75
GROUP 2....................$ 23.13 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.49 16.75
LEVEL D:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.42 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.72 16.75
GROUP 1....................$ 27.77 16.75
GROUP 2....................$ 23.38 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 28.74 16.75
LEVELS B AND C:
Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.61 16.75
Engineer when operating crane with boom and jib or leads 220' or longer....$ 31.93 16.75
GROUP 1....................$ 29.07 16.75
GROUP 2....................$ 24.68 16.75
Regular crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator......$ 30.04 16.75
HAZARDOUS WASTE REMOVAL CLASSIFICATIONS
Group 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader,heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slope paver, trencher, ultra high pressure waterjet cutting tool system, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment
(self-propelled), well drilling rig and hydro excavator
GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon
ENGI0325-012 05/01/2008
Rates Fringes
Power equipment operators -gas distribution and duct installation work:
MACOMB, MONROE, OAKLAND,
ST. CLAIR, WASHTENAW AND
WAYNE COUNTIES:
GROUP 1....................$ 25.98 16.75
GROUP 2....................$ 25.85 16.75
GROUP 3....................$ 24.72 16.75
GROUP 4....................$ 24.15 16.75
STATEWIDE (does not include Macomb, Monroe, Oakland, St. Clair, Washtenaw and Wayne
Counties):
GROUP 1....................$ 25.07 16.75
GROUP 2-A..................$ 24.97 16.75
GROUP 2-B..................$ 24.75 16.75
GROUP 3....................$ 23.97 16.75
GROUP 4....................$ 23.47 16.75
SCOPE OF WORK: The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work," starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.
DEFINITION OF GROUPS: MACOMB, MONROE, OAKLAND, ST. CLAIR,
WASHTENAW AND WAYNE COUNTIES:
GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd.
capacity or greater).
GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2
yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck
(with powered boom), tractor (wheel type other than backhoe or front endloader).
GROUP 3: Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day) and trencher(service).
GROUP 4: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator.
STATEWIDE (does not include Macomb, Monroe, Oakland, St.
Clair, Washtenaw and Wayne Counties):
GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe
(over 1/2 yd. capacity), grader (Caterpillar 12 equivalent or larger)
GROUP 2-A: Trencher(except service), backhoe (1/2 yd.
capacity or less)
GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or more), dozer (D-4 equivalent or larger), endloader (1 yd.
capacity or larger), pump (1 or 2 six-inch or larger), side boom (D-4 equivalent or larger)
GROUP 3: Backfiller, boom truck (powered), concrete saw (20 hp or larger), dozer (less than D-4 equivalent), endloader
(under 1 yd. capacity), farm tractor (with attachments), pump (2 - 4 under six-inch capacity), side boom tractor(less than D-4 equivalent), tamper (self-propelled), trencher service and grader maintenance
GROUP 4: Oiler, grease person and hydrostatic testing operator
IRON0008-007 06/01/2008
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
Rates Fringes
IRONWORKER (Metal Building
Erection)........................$ 22.70 6.60
IRONWORKER: Reinforcing and
Structural
General contracts
$10,000,000 or greater......$ 26.13 18.72
General contracts less than $10,000,000............$ 23.69 18.72
IRON0008-011 06/01/2008
ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,
IRON, KEWEENAW, LUCE, MACKINAC MARQUETTE, MENOMINEE, ONTONAGON
AND SCHOOLCRAFT COUNTIES:
Rates Fringes
IRONWORKER (Metal Building
Erection)........................$ 22.70 6.60
IRONWORKER: Reinforcing and
Structural
Contracts $10,000,000 or more........................$ 26.13 18.72
Contracts less than
$10,000,000.................$ 23.69 18.72
IRON0025-002 06/01/2008
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND,
MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE,
ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA,
WASHTENAW AND WAYNE COUNTIES:
Rates Fringes
Ironworkers:
Fence erector...............$ 21.73 20.20
Ornamental, structural, precast erector.............$ 28.93 26.45
Reinforced..................$ 26.74 23.15
Siding & decking............$ 21.51 19.22
IRON0025-024 06/01/2008
ALCONA, ALPENA, ARENAC, BAY, CHEBOYGAN, CLARE, CLINTON,
CRAWFORD, GENESEE, GLADWIN, GRATIOT, HURON, INGHAM, IOSCO,
ISABELLA, JACKSON, LAPEER, LIVINGSTON, MACOMB, MIDLAND,
MONTMORENCY, OAKLAND, OGEMAW, OSCODA, OTSEGO, PRESQUE ISLE,
ROSCOMMON, SAGINAW, SANILAC, SHIAWASSEE, ST. CLAIR, TUSCOLA,
WASHTENAW AND WAYNE COUNTIES:
Rates Fringes
Ironworkers:
Machinery mover, rigger and machinery erector.......$ 27.64 27.69
IRON0055-005 06/01/2008
LENAWEE AND MONROE COUNTIES:
Rates Fringes
Ironworkers:
Metal fences and guardrails.$ 19.75 14.45
Pre-engineered metal buildings, siding and decking.....................$ 23.28 14.45
All other work..............$ 28.00 14.45
FOOTNOTES:
Work in tunnels and caissons under pressure: $.50 per hour additional. Work on furnaces, kilns or similar type units with a temperature of 125 degrees F. or over: $1.00 per hour additional.
IRON0292-003 06/01/2008
BERRIEN AND CASS COUNTIES:
Rates Fringes
Ironworkers:
Cad Welder..................$ 24.00 16.46
Ironworker..................$ 23.50 16.46
IRON0340-001 01/01/2007
ALLEGAN, ANTRIM, BARRY, BENZIE, BRANCH, CALHOUN, CHARLEVOIX,
EATON, EMMET, GRAND TRAVERSE, HILLSDALE, IONIA, KALAMAZOO,
KALKASKA, KENT, LAKE, LEELANAU, MANISTEE, MASON, MECOSTA,
MISSAUKEE, MONTCALM, MUSKEGON, NEWAYGO, OCEANA, OSCEOLA,
OTTAWA, ST. JOSEPH, VAN BUREN AND WEXFORD COUNTIES:
Rates Fringes
Ironworkers:
Reinforcing and structural..$ 24.00 11.59
LABO0005-006 10/01/2008
Rates Fringes
Laborers - hazardous waste abatement: (ALCONA, ALPENA, ANTRIM, BENZIE, CHARLEVOIX, CHEBOYGAN, CRAWFORD, EMMET, GRAND TRAVERSE, IOSCO, KALKASKA, LEELANAU, MISSAUKEE, MONTMORENCY, OSCODA, OTSEGO, PRESQUE ISLE
AND WEXFORD COUNTIES:)
Levels A, B or C............$ 19.01 9.60
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 18.01 9.60
Laborers - hazardous waste abatement: (ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON, IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE, ONTONAGON AND SCHOOLCRAFT
COUNTIES:)
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 22.18 10.35
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.18 10.35
Work performed over 5 ft.
outside the building:
Levels A, B or C...........$ 20.44 9.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 19.44 9.80
Laborers - hazardous waste abatement: (ALLEGAN, BARRY, BERRIEN, BRANCH, CALHOUN, CASS, IONIA COUNTY (except the city of Portland);
KALAMAZOO, KENT, LAKE,
MANISTEE, MASON, MECOSTA,
MONTCALM, MUSKEGON, NEWAYGO,
OCEANA, OSCEOLA, OTTAWA, ST.
JOSEPH AND VAN BUREN
COUNTIES:)
Levels A, B or C............$ 20.57 9.88
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 19.57 9.88
Laborers - hazardous waste abatement: (ARENAC, BAY, CLARE, GLADWIN, GRATIOT, HURON, ISABELLA, MIDLAND, OGEMAW, ROSCOMMON, SAGINAW
AND TUSCOLA COUNTIES:)
Levels A, B or C............$ 21.86 9.75
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 20.86 9.75
Laborers - hazardous waste abatement: (CLINTON, EATON
AND INGHAM COUNTIES; IONIA
COUNTY (City of Portland);
LIVINGSTON COUNTY (west of
M-151 (Oak Grove Rd.), including the City of
Howell):)
All work performed
Levels A, B or C...........$ 21.70 9.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 20.70 9.80
Laborers - hazardous waste abatement: (GENESEE, LAPEER
AND SHIAWASSEE COUNTIES:)
Levels A, B or C............$ 22.28 9.88
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D...............$ 21.88 9.88
Laborers - hazardous waste abatement: (HILLSDALE, JACKSON AND LENAWEE COUNTIES:)
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 22.36 9.90
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.36 9.90
Work performed over 5 ft.
outside the building:
Levels A, B or C...........$ 22.96 9.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.96 9.80
Laborers - hazardous waste abatement: (LIVINGSTON COUNTY
(east of M-151 (Oak Grove
Rd.) and south of M-59, excluding the city of
Howell); AND WASHTENAW
COUNTY:)
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 27.21 11.34
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 26.21 11.34
Work performed over 5 ft.
outside the building:
Levels A, B or C...........$ 23.02 9.74
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 22.02 9.74
Laborers - hazardous waste abatement: (MACOMB AND WAYNE
COUNTIES:)
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 27.44 12.13
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 26.44 12.13
Work performed over 5 ft.
outside the building:
Levels A, B or C...........$ 22.96 12.51
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.96 12.51
Laborers - hazardous waste abatement: (MONROE COUNTY:)
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 27.28 11.92
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 26.28 11.92
Work performed over 5 ft.
outside the building line:
Levels A, B or C...........$ 22.96 9.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 21.96 9.80
Laborers - hazardous waste abatement: (Oakland County and the North East portion of
Livingston County bordered by
M-151 (Oak Grove Road) on the
West and M-59 on the South.)
Level A, B, C...............$ 27.44 12.13
Level D.....................$ 26.44 12.13
Laborers - hazardous waste abatement: (SANILAC AND ST.
CLAIR COUNTIES:)
All work performed 5 feet outside the building
Levels A, B or C...........$ 21.30 9.80
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 20.30 9.80
Work performed inside the building and up to and including 5 ft. outside the building:
Levels A, B or C...........$ 25.83 11.38
Work performed in conjunction with site preparation not requiring the use of personal protective equipment;
Also, Level D..............$ 24.83 11.38
LABO0259-001 09/01/2008
Rates Fringes
Laborers - tunnel, shaft and caisson:
MACOMB, OAKLAND AND WAYNE
COUNTIES:
GROUP 1....................$ 21.81 12.51
GROUP 2....................$ 21.92 12.51
GROUP 3....................$ 21.98 12.51
GROUP 4....................$ 22.16 12.51
GROUP 5....................$ 22.41 12.51
GROUP 6....................$ 22.74 12.51
GROUP 7....................$ 16.02 12.51
STATEWIDE (Except Macomb, Oakland and Wayne
Counties):
GROUP 1....................$ 22.32 9.80
GROUP 2....................$ 22.41 9.80
GROUP 3....................$ 22.51 9.80
GROUP 4....................$ 22.67 9.80
GROUP 5....................$ 22.93 9.80
GROUP 6....................$ 23.24 9.80
GROUP 7....................$ 15.51 9.80
SCOPE OF WORK: Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction.
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas) and watchman
GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar machine, material mixer, fence erector and guard rail builder
GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.)
GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point
GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.)
GROUP 6: Dynamite and powder
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0334-001 09/01/2008
Rates Fringes
Laborers - open cut:
ALCONA, ALLEGAN, ALPENA,
ANTRIM, ARENAC, BARRY,
BAY, BENZIE, BERRIEN,
BRANCH, CALHOUN, CASS,
CHARLEVOIX, CHEBOYGAN,
CLARE, CRAWFORD, EMMET,
GLADWIN, GRAND TRAVERSE,
GRATIOT AND HURON
COUNTIES; IONIA COUNTY
(EXCEPT THE CITY OF
PORTLAND); IOSCO,
ISABELLA, KALAMAZOO,
KALKASKA, KENT,
LAKE,LEELANAU, MANISTEE,
MASON, MECOSTA, MIDLAND,
MISSAUKEE, MONTCALM,
MONTMORENCY, MUSKEGON,
NEWAYGO, OCEANA, OGEMAW,
OSCEOLA, OSCODA, OSTEGO,
OTTAWA, PRESQUE ISLE,
ROSCOMMON, SAGINAW, ST.
JOSEPH, TUSCOLA, VAN BUREN
AND WEXFORD COUNTIES:
GROUP 1....................$ 19.17 9.80
GROUP 2....................$ 19.30 9.80
GROUP 3....................$ 19.41 9.80
GROUP 4....................$ 19.48 9.80
GROUP 5....................$ 19.60 9.80
GROUP 6....................$ 16.82 9.80
GROUP 7....................$ 15.16 9.80
ALGER, BARAGA, CHIPPEWA,
DELTA, DICKINSON,
GOGEBIC, HOUGHTON, IRON,
KEWEENAW, LUCE, MACKINAC,
MARQUETTE, MENOMINEE,
ONTONAGON AND SCHOOLCRAFT
COUNTIES:
GROUP 1....................$ 19.40 9.80
GROUP 2....................$ 19.54 9.80
GROUP 3....................$ 19.67 9.80
GROUP 4....................$ 19.72 9.80
GROUP 5....................$ 19.77 9.80
GROUP 6....................$ 17.15 9.80
GROUP 7....................$ 15.26 9.80
CLINTON, EATON, GENESEE,
HILLSDALE AND INGHAM
COUNTIES; IONIA COUNTY
(City of Portland);
JACKSON, LAPEER AND
LENAWEE COUNTIES;
LIVINGSTON COUNTY (west of
M-151 Oak Grove Rd.);
SANILAC, ST. CLAIR AND
SHIAWASSEE COUNTIES:
GROUP 1....................$ 20.26 9.80
GROUP 2....................$ 20.40 9.80
GROUP 3....................$ 20.52 9.80
GROUP 4....................$ 20.57 9.80
GROUP 5....................$ 20.71 9.80
GROUP 6....................$ 18.01 9.80
GROUP 7....................$ 15.16 9.80
LIVINGSTON COUNTY (east of
M-151 (Oak Grove Rd.));
MONROE AND WASHTENAW
COUNTIES:
GROUP 1....................$ 21.73 10.14
GROUP 2....................$ 21.84 10.14
GROUP 3....................$ 21.96 10.14
GROUP 4....................$ 22.03 10.14
GROUP 5....................$ 22.18 10.14
GROUP 6....................$ 19.48 10.14
GROUP 7....................$ 16.12 10.14
MACOMB, OAKLAND AND WAYNE
COUNTIES:
GROUP 1....................$ 21.66 12.51
GROUP 2....................$ 21.77 12.51
GROUP 3....................$ 21.82 12.51
GROUP 4....................$ 21.90 12.51
GROUP 5....................$ 21.96 12.51
GROUP 6....................$ 19.41 12.51
GROUP 7....................$ 16.03 12.51
SCOPE OF WORK:
Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut constructon work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under
Tunnel, Shaft and Caisson work.
OPEN CUT LABORER CLASSIFICATIONS
GROUP 1: Construction laborer
GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, guard rail builder, headwall, seawall, breakwall, dock builder and fence erector
GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g., wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person
GROUP 4: Trench or excavating grade person
GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits)
GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work
GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.
LABO0465-001 06/01/2008
Rates Fringes
Laborers: (does not include hazardous waste abatement;
tunnel, shaft & caisson; or open cut construction)
ALCONA, ALPENA, ANTRIM,
ARENAC, BENZIE,
CHARLEVOIX, CHEBOYGAN,
CLARE, CRAWFORD, EMMET,
GLADWIN, GRAND TRAVERSE,
IONIA, IOSCO, ISABELLA,
KALKASKA, KENT, LAKE,
LEELANAU, MANISTEE, MASON,
MECOSTA, MISSAUKEE,
MONTCALM, MONTMORENCY,
NEWAYGO, OCEANA, OGEMAW,
OSCEOLA, OSCODA, OSTEGO,
OTTAWA, PRESQUE ISLE,
ROSCOMMON AND WEXFORD
GROUP 1....................$ 20.67 10.02
GROUP 2....................$ 20.88 10.02
GROUP 3....................$ 21.17 10.02
GROUP 4....................$ 21.61 10.02
GROUP 5....................$ 21.23 10.02
GROUP 6....................$ 21.66 10.02
ALL COUNTIES IN THE UPPER
PENINSULA OF MICHIGAN
GROUP 1....................$ 20.67 10.02
GROUP 2....................$ 20.88 10.02
GROUP 3....................$ 21.17 10.02
GROUP 4....................$ 21.61 10.02
GROUP 5....................$ 21.23 10.02
GROUP 6....................$ 21.66 10.02
ALLEGAN, BARRY, BAY,
BERRIEN, BRANCH, CALHOUN,
CASS, CLINTON, EATON,
GRATIOT, HILLSDALE, HURON,
INGHAM, JACKSON,
KALAMAZOO, LAPEER,
LENAWEE, LIVINGSTON,
MIDLAND, MUSKEGON,
SAGINAW, SANILAC,
SHIAWASSEE, ST. CLAIR, ST.
JOSEPH, TUSCOLA AND VAN
BUREN COUNTIES:
GROUP 1....................$ 21.42 10.02
GROUP 2....................$ 21.62 10.02
GROUP 3....................$ 21.86 10.02
GROUP 4....................$ 22.21 10.02
GROUP 5....................$ 22.08 10.02
GROUP 6....................$ 22.42 10.02
GENESEE, MACOMB, MONROE,
OAKLAND, WASHTENAW AND
WAYNE COUNTIES:
GROUP 1....................$ 23.72 9.57
GROUP 2....................$ 23.85 9.57
GROUP 3....................$ 24.03 9.57
GROUP 4....................$ 24.11 9.57
GROUP 5....................$ 24.32 9.57
GROUP 6....................$ 24.62 9.57
LABORER CLASSIFICATIONS
GROUP 1: Asphalt shoveler or loader; asphalt plant misc.;
burlap person; yard person; dumper (wagon, truck, etc.);
joint filling laborer; miscellaneous laborer; unskilled laborer; sprinkler laborer; form setting laborer; form stripper; pavement reinforcing; handling and placing (e.g., wire mesh, steel mats, dowel bars); mason's tender or bricklayer's tender on manholes; manhole builder;
headwalls, etc.; waterproofing,(other than buildings) seal coating and slurry mix, shoring, underpinning; pressure grouting; bridge pin and hanger removal; material recycling laborer; horizontal paver laborer (brick, concrete, clay, stone and asphalt); ground stabilization and modification laborer; grouting; waterblasting; top person; railroad track and trestle laborer; carpenters' tender; guard rail builders' tender; earth retention barrier and wall and
M.S.E. wall installer's tender; highway and median installer's tender(including sound, retaining, and crash barriers); fence erector's tender; asphalt raker tender;
sign installer; remote control operated equipment.
GROUP 2: Mixer operator (less than 5 sacks); air or electric tool operator (jackhammer, etc.); spreader; boxperson
(asphalt, stone, gravel); concrete paddler; power chain saw operator; paving batch truck dumper; tunnel mucker (highway work only); concrete saw (under 40 h.p.) and dry pack machine; roto-mill grounds person.
GROUP 3: Tunnel miner (highway work only); finishers tenders;
guard rail builders; highway and median barrier installer;
earth retention barrier and wall and M.S.E. wall installer's (including sound, retaining and crash barriers); fence erector; bottom person; powder person;
wagon drill and air track operator; diamond and core drills; grade checker; certified welders;curb and side rail setter's tender.
GROUP 4: Asphalt raker
GROUP 5: Pipe layers, oxy-gun
GROUP 6: Line-form setter for curb or pavement; asphalt screed checker/screw man on asphalt paving machines.
PAIN0022-002 07/01/2008
HILLSDALE, JACKSON AND LENAWEE COUNTIES; LIVINGSTON COUNTY
(east of the eastern city limits of Howell, not including the city of Howell, north to the Genesee County line and south to the Washtenaw County line); MACOMB, MONROE, OAKLAND, WASHTENAW
AND WAYNE COUNTIES:
Rates Fringes
PAINTER..........................$ 25.06 14.75
FOOTNOTES: For all spray work and journeyman rigging for spray work, also blowing off, $0.80 per hour additional
(applies only to workers doing rigging for spray work on off the floor work. Does not include setting up or moving rigging on floor surfaces, nor does it apply to workers engaged in covering up or tending spray equipment. For all sandblasting and spray work performed on highway bridges, overpasses, tanks or steel, $0.80 per hour additional. For all brushing, cleaning and other preparatory work (other than spraying or steeplejack work) at scaffold heights of fifty (50) feet from the ground or higher, $0.50 per hour additional. For all preparatorial work and painting performed on open steel under forty (40) feet when no scaffolding is involved, $0.50 per hour additional. For all swing stage work-window jacks and window belts-exterior and interior, $0.50 per hour additional. For all spray work and sandblaster work to a scaffold height of forty (40) feet above the floor level, $0.80 per hour additional. For all preparatorial work and painting on all highway bridges or overpasses up to forty (40) feet in height, $0.50 per hour additional. For all steeplejack work performed where the elevation is forty (40) feet or more, $1.25 per hour additional.
PAIN0312-001 06/01/2008
EXCLUDES: ALLEGAN COUNTY (Townships of Dorr, Fillmore, Heath, Hopkins, Laketown, Leighton, Manlius, Monterey, Overisel, Salem, Saugatuck and Wayland); INCLUDES: Barry, Berrian, Branch, Calhoun, Cass, Hillsdale, Kalamazoo, St. Joseph, Van
Buren
Rates Fringes
Painters:
Brush and roller............$ 20.80 10.25
Spray, Sandblast, Sign
Painting....................$ 22.00 10.25
PAIN0845-003 05/10/2008
CLINTON COUNTY; EATON COUNTY (does not include the townships of
Bellevue and Olivet); INGHAM COUNTIES; IONIA COUNTY (east of
Hwy. M 66); LIVINGSTON COUNTY (west of the eastern city limits of Howell, including the city of Howell, north to the Genesee
County line and south to the Washtenaw County line); AND
SHIAWASSEE COUNTY (Townships of Bennington, Laingsbury and
Perry):
Rates Fringes
PAINTER..........................$ 23.88 9.77
FOOTNOTES: Work on vinyl, spray, blow-off, blast-all blasting including water blasting, lead, all epoxy, and high rate:
$.85 per hour additional.
PAIN0845-015 05/10/2008
MUSKEGON COUNTY; NEWAYGO COUNTY (except the Townships of
Barton, Big Prairie, Brooks, Croton, Ensley, Everett, Goodwell, Grant, Home, Monroe, Norwich and Wilcox); OCEANA COUNTY; OTTAWA
COUNTY (except the townships of Allendale, Blendone, Chester, Georgetown, Holland, Jamestown, Olive, Park, Polkton, Port
Sheldon, Tallmadge, Wright and Zeeland):
Rates Fringes
Pai…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .