Statement of Work - Fence

View the file

Other files for this federal contract opportunity

Other files attached to Fence Construction - Van Zandt County, Texas, newest first.
File Type Posted
AG-4D90-S-16-0031_Amendment1.pdf PDF
Van_Zandt_CO__Fence_Construction1_site_showing_notes.doc DOC document
Fence_Design_Sheet.pdf PDF
382_Quality_Control_Plan_for_Fence_2016.pdf PDF
Maps.pdf PDF
382_Fence_Specification-Revised-2014.pdf PDF
Solicitation_AG-4D90-S-16-0031.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Natural Resources Conservation Service

STATEMENT OF WORK

FENCE (382)

Texas - Zone 4

May 2010 1

These deliverables apply to this individual practice. For other planned practice deliverables refer to those specific Statements of Work.

INSTALLATION

Deliverables

1. Pre Installation conference with client and contractor.

2. Verification that client has obtained required permits.

a. Prior to construction of fence, a utility check sheet must be completed to make sure all underground utilities are avoided. The producer/contractor must call 1-800-344-8377

(1-800-DIGTESS).

3. Staking and layout according to plans and specifications including applicable layout notes.

4. Installation inspection (according to inspection plan as appropriate).

a. Actual materials used (Part 512, Subchapter D Quality Assurance Activities, 512.33)

b. Inspection records

5. Facilitate and implement required design modifications with client and original designer.

6. Advise client/NRCS on compliance issues with all federal, state, tribal, and local laws, regulations and NRCS policies during installation.

7. Certification that the installation process and materials meets design and permit requirements.

CHECK OUT

Deliverables

1. As-Built documentation.

a. Extent of practice units applied

b. Drawings

c. Final quantities

2. Certification that the installation meets NRCS standards and specifications and is in compliance with permits (NEM Subpart A, 505.03 (c) (1)).

3. Exit conference with client and contractor.

REFERENCES

• NRCS Field Office Technical Guide (eFOTG), Section IV, Conservation Practice Standard - Fence,

• NRCS National Engineering Manual (NEM).

• NRCS National Environmental Compliance Handbook

• NRCS Cultural Resources Handbook