REPORT OF GEOTECHNICAL EXPLORATION
Big Oak Cove Culvert Replacement
Cherokee National Forest
Monroe County, Tennessee
Prepared For:
USDA Forest Service
Prepared By:
AMEC Environment & Infrastructure, Inc.
July 31, 2012
Cherokee National Forest, Monroe County, TN AMEC Project 6163120182, Phase 04
Page ii
TABLE OF CONTENTS
Page
LIST OF FIGURES ........................................................................................................... iii LIST OF APPENDICES .................................................................................................... iv EXECUTIVE SUMMARY ................................................................................................... v
1.0 INTRODUCTION
2.0 OBJECTIVES OF EXPLORATION
3.0 SCOPE OF EXPLORATION
4.0 PROJECT INFORMATION AND SITE CONDITIONS
5.0 SITE GEOLOGY
6.0 SUBSURFACE CONDITIONS
7.0 GROUND-WATER CONDITIONS
8.0 FOUNDATION RECOMMENDATIONS
9.0 EARTHWORK RECOMMENDATIONS
9.1 GENERAL SITE PREPARATION
9.2 EXCAVATION
9.3 GROUND WATER MANAGEMENT
9.4 PERMANENT SLOPE RECOMMENDATIONS
9.5 COMPACTED FILL
10.0 BASIS OF RECOMMENDATIONS
FIGURES
APPENDICES
Page iii
LIST OF FIGURES
Figure 1 Site Location Map
Figure 2 Boring Location Plan
Page iv
LIST OF APPENDICES
Appendix A Site Photographs
Appendix B Key to Symbols and Descriptions, Test Boring Records, Subsurface Fence
Diagram and Core Photographs
Page v
EXECUTIVE SUMMARY
AMEC was selected by the Forest Service to perform a geotechnical exploration for the Big Oak Cove Culvert Replacement Project in the Cherokee National Forest along Beaverdam Bald Road in Monroe County, Tennessee. The objectives of our exploration were to characterize subsurface conditions at the subject site and provide recommendations regarding foundation support and site preparation for the proposed project.
The Forest Service plans to replace the existing 4-foot diameter corrugated metal culvert at Big Oak Creek along Beaverdam Bald Road, approximately 0.6 miles from its intersection with Clarks Creek Road. We understand it is proposed to replace the existing culvert with a bottomless aluminum box culvert.
The exploration consisted of drilling two borings to depths of about 31.6 and 34.9 feet (one boring on each side of the existing group of culverts). The borings were extended at least 15 feet into relatively sound bedrock prior to termination. Hollow-stem augers, NW casing advancer and NQ rock coring were used to advance the borings. Standard penetration testing was performed in the overburden soils in conjunction with the augering and casing advancer. Primary findings of our geotechnical exploration are summarized following:
· The borings typically encountered fill and alluvial soils overlying bedrock. Fill was encountered in Borings B-1 and B-2 to estimated depths of about 2 and 4 feet, respectively. The fill was generally composed of brown silt with gravel and sand and dark gray and grayish brown gravel with silt and sand. Standard penetration test (SPT) N-values in the fill ranged from 9 to 25 blows per foot (bpf) indicating very stiff silty soil consistencies and loose to firm consistencies for the gravelly soils.
· Beneath the fill, alluvial soils and likely alluvial soils were encountered in Borings B-1 and B-2 to estimated depths of about
15.8 and 15 feet respectively. The alluvial soils were generally composed of dark gray gravel with silt, sand, cobbles and boulders.
SPT N-values in the alluvium ranged from 14 bpf to 50 blows for 0.2 inches, indicating soil consistencies ranging from firm to very dense. The very dense consistencies reflect boulders or cobbles in the sample interval.
· Sandstone underlies the overburden soils at the site. The sandstone is fine to coarse grained/conglomeratic and slightly metamorphosed with trace local siltstone. The sandstone is generally medium strong to weak where weathering is more developed. In local highly weathered zones the sandstone is very weak. The color of the fresh sandstone is gray to dark gray. Where weathering is more developed the sandstone is dark brown to black. Core recoveries generally ranged from 38 to 100 percent with RQD values ranging from 0 to 80 percent.
Page vi
· Ground water was encountered in Borings B-1 and B-2 at a depth of about 7.2 (about elevation 992 feet) and 10.8 feet (about elevation 988 feet), respectively, at the time of drilling. The creek levels entering and exiting the culvert were at about 995 and 993 feet, respectively based on the provided site topography. We anticipate ground-water levels will generally mirror water levels in the creek.
· Given the apparent depth to bedrock at the site (bedrock was encountered in Borings B-1 and B-2 at depths of about 16 and 15 feet, respectively, which is 10+ feet below the creek bed), we recommend supporting the new bottomless culvert structure on “shallow” strip foundations bearing on the firm to dense alluvial gravels underlying the site with consideration of the scour potential.
Past Forest Service experience has indicated the scour depth is 3 to 4 feet below the creek bed. Therefore, we recommend the foundations for the culvert structure be founded at elevation 990 feet, which is about 3 feet below the creek bed at the existing culvert outlet. In addition, we understand the sides of the culvert will be armored with 6- to 12-inch boulders and the span of the new bottomless culvert is several feet wider than the creek bed, which should reduce the scour potential. Strip/spread foundations bearing on the firm to dense alluvial gravels may be sized for a maximum allowable bearing pressure of 4,000 pounds per square foot (psf).
· The foundations will bear about 3 to 5 feet below the stream bed level and dewatering of the foundation excavations will be required to construction the foundations. The stream or portions of the stream will likely require diverting and/or “pumping around” and foundation excavations may require protection with diversion/coffer dams. It is anticipated ground-water control can be provided using sumps and cutoff trenches outside the perimeters of foundation excavations. We recommend the ground-water levels be lowered and maintained at a depth of at least one foot below foundation excavation bottoms during construction.
· We anticipate the fill and alluvial materials encountered in the borings can be excavated for the most part with conventional earthmoving equipment (i.e., backhoes, trackhoes, loaders, scrapers and dozers). Removing larger boulders may be facilitated by breaking boulders into smaller pieces using hydraulic and/or pneumatic hammers.
This summary is only an overview and should not be used as a separate document or in place of reading the entire report, including the appendices.
1.0 INTRODUCTION
This report presents the findings of our subsurface exploration recently performed for the Big Oak Cove Culvert Replacement Project in the Cherokee National Forest in Monroe County, Tennessee. Our services, as authorized through Contract Number AG-43ZP-C-12-0005, Order AG-4756-D-0040, were provided in general accordance with our proposal for the Big Oak Cove Culvert Replacement Geotechnical Exploration Rev. 1, dated May 24, 2012.
2.0 OBJECTIVES OF EXPLORATION
The objectives of our exploration were to characterize subsurface conditions at the subject site and provide recommendations regarding foundation support and site preparation for the subject project. An assessment of site environmental conditions or an assessment for the presence or absence of pollutants in the soil, bedrock, surface water, or ground water of the site was beyond the proposed objectives of our exploration.
3.0 SCOPE OF EXPLORATION
The scope of our exploration was based on our proposal, Big Oak Cove Culvert Replacement Geotechnical Exploration Rev. 1, dated May 24, 2012. This geotechnical scope of work was generally based on a request for proposals from the Forest Service provided in an email dated May 23, 2012. The scope of the exploration for the project is summarized following:
· Drilling two test borings designated B-1 and B-2 to depth of about 31.6 and 34.9 feet, respectively. The borings were extended at least 15 feet into relatively sound bedrock prior to termination. The borings were augered to refusal (the point at which the soil drilling equipment could not effectively penetrate the material encountered), which occurred at shallow depths of about 2.1 and 1.5 feet. The borings were then extended to through alluvial materials including cobbles and boulders to depths of about 13.8 and 11 feet using a NW casing advancer. After which, NQ rock coring techniques were used to advance the borings to their termination depths.
· Standard penetration tests were performed in conjunction with the augering and while using the casing advancer.
· Ground water measurements at the time of drilling.
· Backfill of the soil test borings with a mix of auger cuttings and hole-plug (bentonite clay chips).
· Preparing this geotechnical report summarizing the exploration results and providing our recommendations regarding foundation support and site preparation for the subject project site.
The drilling and sampling were performed in general accordance with ASTM. The drilling was performed on July 12, 2012. The equipment used consisted of CME Model 55 track-mounted drill rig equipped with an automatic hammer. The borings were advanced in the overburden soils using hollow-stem augers (where practical) in general accordance with ASTM D 1452 and a NW casing advancer. Refusal materials were cored in general accordance with ASTM D 2113 using a NQ-size core barrel. Rock recovery and rock quality designation (RQD) were measured and recorded in general accordance with ASTM D 6032.
Standard penetration tests (SPTs) were generally conducted on about 2½-foot vertical intervals to the auger refusal depths. SPT was performed in general accordance with ASTM D 1586.
Ground-water levels were measured during drilling in each boring. Upon completion of drilling, the test borings were backfilled to the existing ground surface with a combination of auger cuttings and bentonite chips.
We had originally proposed to perform a limited laboratory testing program consisting of five moisture content tests, one Atterberg limits determination and one gain grain size analysis. We generally did not obtain soil samples suitable for testing. Therefore, no laboratory testing was performed.
Subsurface conditions encountered in the borings are presented on the Test Boring Records in Appendix A.
4.0 PROJECT INFORMATION AND SITE CONDITIONS
Project information was provided to us by Mr. Gary Hubbard, P.E., with the Forest Service in a Request for Proposals included in an email dated May 23, 2012. Subsequently, we were provided an existing topographic site of the project site. The Big Oak Cove Creek crossing is located in the Cherokee National Forest along Beaverdam Bald Road about 0.6 miles from its intersection with Tellico River Road in Monroe County, Tennessee. The latitude and longitude of the crossing are 35°15’31.89” North and 84°05’21.43” West. The general site location is shown on Figure 1. The topography in the project vicinity is mountainous.
The Forest Service plans to replace the existing 4-foot diameter corrugated metal culvert at the Big Oak Cove Creek crossing. We understand it is proposed to replace the existing culvert with a bottomless aluminum box culvert.
Beaverdam Bald Road typically traverses a forrested hill/mountain side. Beaverdam Bald Road is a gravel road. The culvert crossing is in a drainage feature in the bend of a sharp curve of the road. The project area is wooded. The creek bed is about 10 feet wide in the general crossing area. Water was flowing in the creek bed while we were on-site and was typically less than 1-foot deep. Materials exposed in the stream bed consisted of sand, gravel, cobbles and boulders. Selected photographs of the site are provided in Appendix A.
5.0 SITE GEOLOGY
Bulletin 58, Tennessee Division of Geology (1958), shows the Great Smoky conglomerate formation underlies the project site. The bedrock of the Great Smoky conglomerate consists primarily of greywacke sandstone and conglomerate in thick graded beds, with partings of slate between many of the layers. The bedrock cored at the site consisted of fine to coarse grained/conglomeratic, slightly metamorphosed sandstone consistent with the Great Smoky conglomerate formation.
6.0 SUBSURFACE CONDITIONS
Subsurface conditions in the proposed project area were explored with two test borings designated B-1 and B-2 as previously noted. AMEC in conjunction with the Forest Service selected the test borings locations. The locations were established at accessible locations to the drill rig. The locations were established in the field by AMEC personnel by measuring distances from on-site landmarks. Ground surface elevations at the boring locations were obtained by plotting the boring locations on the existing topographic site plan of the site provided by the Forest Service. The boring locations and boring ground surface elevations are shown on the Boring Location Plan, Figure 2 and on the Test Boring Records in Appendix B, respectively, and should be considered approximate based on their method of establishment.
Subsurface conditions encountered at the boring locations are shown on the Test Boring Records. The Test Boring Records represent our interpretation of the subsurface conditions, based on the field logs and visual examination of the samples by one of our geologists and/or geotechnical engineers. The lines designating the interfaces between various strata on the Test Boring Records represent the approximate interface locations.
The borings typically encountered fill and alluvial soils overlying bedrock. Fill is material that has been transported to its current location by human activity. Alluvial soils are soils that have been transported to their present location by water. Brief descriptions of the materials encountered in the borings are provided in the following subsections. Detailed descriptions of the materials encountered in each boring are presented on the Test Boring Records.
Fill was encountered in Borings B-1 and B-2 to estimated depths of about 2 and 4 feet, respectively. The fill was generally composed of brown silt with gravel and sand and dark gray and grayish brown gravel with silt and sand. Standard penetration test (SPT) N-values in the fill ranged from 9 to 25 blows per foot (bpf) indicating very stiff silty soil consistencies and loose to firm consistencies for the gravelly soils.
Beneath the fill, alluvial soils and likely alluvial soils were encountered in Borings B-1 and B-2 to estimated depths of about 15.8 and 15 feet respectively. The alluvial soils were generally composed of dark gray gravel with silt, sand, cobbles and boulders. SPT N-values in the alluvium ranged from 14 bpf to 50 blows for 0.2 inches, indicating soil consistencies ranging from firm to very dense. The very dense consistencies reflect boulders or cobbles in the sample interval.
Sandstone underlies the overburden soils at the site. The sandstone is fine to coarse grained/conglomeratic and slightly metamorphosed with trace local siltstone. The sandstone is generally medium strong to weak where weathering is more developed. In local highly weathered zones the sandstone is very weak. The color of the fresh sandstone is gray to dark gray. Where weathering is more developed the sandstone is dark brown to black. Core recoveries generally ranged from 38 to 100 percent with RQD values ranging from 0 to 80 percent. The core recoveries and RQD values for each individual core run are shown on the respective Test Boring Records in Appendix B. Photographs of core recovered are also provided in Appendix B.
7.0 GROUND-WATER CONDITIONS
Ground water was encountered in Borings B-1 and B-2 at a depth of about 7.2 (about elevation 992 feet) and 10.8 feet (about elevation 988 feet), respectively, at the time of drilling. The creek levels entering and exiting the culvert were at about 995 and 993 feet, respectively based on the provided site topography. For safety reasons, the borings were backfilled promptly;
consequently, long-term measurements for the presence or absence of ground water were not obtained.
Fluctuations in the ground-water level occur because of variation in rainfall, evaporation, construction activity, surface run-off, and other site-specific factors such as fluctuation of water levels in the stream. We anticipate ground-water levels will generally mirror water levels in the creek.
8.0 FOUNDATION RECOMMENDATIONS
Given the apparent depth to bedrock at the site (bedrock was encountered in Borings B-1 and B-2 at depths of about 16 and 15 feet, respectively, which is 10+ feet below the creek bed), we recommend supporting the new bottomless culvert structure on “shallow” strip foundations bearing on the firm to dense alluvial gravels underlying the site with consideration of the scour potential. Past Forest Service experience has indicated the scour depth is 3 to 4 feet below the creek bed. Therefore, we recommend the foundations for the culvert structure be founded at elevation 990 feet, which is about 3 feet below the creek bed at the existing culvert outlet. In addition, we understand the sides of the culvert will be armored with 6- to 12-inch boulders and the span of the new bottomless culvert is several feet wider than the creek bed, which should reduce the scour potential.
Strip/spread foundations bearing on the firm to dense alluvial gravels may be sized for a maximum allowable bearing pressure of 4,000 pounds per square foot (psf). We recommend an un-factored, ultimate coefficient of friction between gravel and concrete of 0.5 for resistance of footing lateral loads. We expect total and differential settlements will be 1 inch and ¾ of an inch or less, respectively, for the anticipated loading and foundation conditions.
The foundations will bear about 3 to 5 feet below the stream bed level and dewatering of the foundation excavations will be required to construction the foundations. The stream or portions of the stream will likely require diverting and foundation excavations may require protection with coffer dams. Excavation side slopes will need to be sloped/cut-back or shored in accordance with OSHA requirements. These items are discussed further in the Earthworks Section of this report.
We recommend individual strip foundations be a minimum 18 inches wide for ease of construction and to avoid a local punching failure of the foundations in the foundation soils. We recommend a qualified geotechnical engineer observe the foundation excavations before placement of reinforcing steel and concrete to verify bearing conditions at the foundation subgrade level appear capable of supporting the design bearing pressure. The foundation bearing areas should be level or suitably benched and free of loose materials, ponded water and debris. Loose bearing materials should be re-compacted or undercut and replaced as recommended by the geotechnical engineer based on field conditions at the time of construction.
9.0 EARTHWORK RECOMMENDATIONS
Following are general earthwork considerations and recommendations.
9.1 GENERAL SITE PREPARATION
We understand the existing culvert will be demolished/removed prior to the installation of the new structure. Excavations created below subgrade levels during the demolition should be backfilled with compacted soil or aggregate fill placed in accordance with the recommendations of this report.
We recommend proofrolling subgrades for roadways and areas to receive compacted fill (if practical) as discussed below to identify soft subgrade areas. Any topsoil, vegetation, debris, and surface soil containing organic material should be stripped from construction areas and disposed of properly. After demolition and any stripping, and after proposed grades are achieved in cut areas, exposed subgrades should be proofrolled where practical.
Proofrolling should be done after a suitable period of dry weather to avoid degrading an otherwise acceptable subgrade. Proofrolling should be performed with a heavily loaded dump truck or with similar approved construction equipment. The proofrolling equipment should make at least four passes over each section, with the last two passes perpendicular to the first two where practical.
We recommend exposed subgrades and proofrolling operations be observed and documented by qualified geotechnical personnel. We recommend actual subgrade stabilization requirements, if deemed necessary, be determined at the time of site preparation, based on observations of the subgrade and the stability of the subgrades as determined during proofrolling or other methods determined at time of construction. Loose, soft, organic, highly plastic, excessively wet soils that pump, rut, or wave during site grading or proofrolling operations should be removed or stabilized.
If soft soils are encountered in roadway areas, they are typically mitigated by undercutting the soft soils to expose competent soils and then backfilling with compacted fill to plan subgrade levels or by undercutting poor subgrade soils to some depth and then placing a high-modulus geotextile, geogrid and/or layer of aggregate to establish a stable platform upon which to backfill with compacted fill.
During the excavation and grading, positive surface drainage should be maintained to prevent the accumulation of water. Pumping from sumps may be required in undercut excavations. If the exposed subgrade becomes excessively wet or frozen, or if conditions different from those described previously in this report are encountered, a qualified geotechnical engineer should be consulted. Wet weather, freeze/thaw, and construction activity can all contribute to subgrade degradation. The contractor should perform final subgrade preparations shortly before roadways are to be constructed.
Fine-grained silty soils that may be encountered near the ground surface will not support construction traffic as they get wet. Therefore, where these soils are encountered the contractor should anticipate additional subgrade stabilization will be required during and shortly after wet periods to repair fine-grained soil subgrade areas damaged by construction traffic.
9.2 EXCAVATION
9.1.1 Excavation/Difficult Excavation
We anticipate the fill and alluvial materials encountered in the borings can be excavated for the most part with conventional earthmoving equipment (i.e., backhoes, trackhoes, loaders, scrapers and dozers). Removing larger boulders may be facilitated by breaking boulders into smaller pieces using hydraulic and/or pneumatic hammers.
The sandstone at and near the bedrock surface is variably weathered. The more weathered rock encountered near the bedrock surface can likely be ripped using a larger trackhoe. The more competent sandstone would likely require the use of hydraulic and/or pneumatic hammers to facilitate excavation.
9.2.2 Construction Slopes and Temporary Excavation Support
Temporary excavations should be constructed (sloped or shored) in accordance with OSHA requirements. The alluvial soils underlying the site are generally gravels with silt, sand, cobbles and boulders. Foundation excavations will extend below the stream and ground-water levels.
We classify the soils in the borings as “C” soils in accordance with OSHA. Where it is desired to not slope back excavation sides, temporary shoring will be required to protect excavations.
Again, shoring should be constructed in accordance with OSHA requirements.
9.3 GROUND WATER MANAGEMENT
The foundations will bear about 3 to 5 feet below the stream bed level and dewatering of the foundation excavations will be required to construction the foundations. The stream or portions of the stream will likely require diverting and/or “pumping around” and foundation excavations may require protection with diversion/coffer dams.
It is anticipated ground-water control can be provided using sumps and cutoff trenches outside the perimeters of foundation excavations. We recommend the ground-water levels be lowered and maintained at a depth of at least one foot below foundation excavation bottoms during construction.
9.4 PERMANENT SLOPE RECOMMENDATIONS
We do not anticipate the project will include any new significant slopes. We generally recommend permanent slopes less than 20 feet high in competent alluvial soils or properly compacted fill placed in accordance with our recommendations be constructed at 2.5H:1V or flatter. We recommend higher or steeper slopes, hill side fills and slopes where structures will be located adjacent to the crest or toe be evaluated further with the necessary additional exploration and testing as required.
Permanent cut and fill slopes should be seeded and mulched or receive a surface revetment such as riprap to prevent erosion. Surface drainage ditches or swales should be constructed at the crests and toes of the slopes to control surface water.
9.5 COMPACTED FILL
Backfill for the culvert/structure should be in accordance with the manufacturer’s recommendations. Our general compacted fill recommendations follow.
Fill soils should be compacted in loose lifts not more than 8 inches thick to at least 98 percent of the standard Proctor maximum dry density (ASTM D 698). The upper 24 inches of fill beneath roadways should be compacted to at least 100 percent of standard Proctor maximum dry density.
As a general rule the moisture content should be maintained within +2 to -3 percentage points of the optimum standard Proctor moisture content. The actual soil used in the compacted fill may dictate narrower or broader required moisture content limits to achieve required compaction levels. This may require contractors to dry or wet soils prior to placement.
Where subgrades are below ground-water levels or are wet and free water is present, an interval of compacted clean-graded stone will need to be placed to a point above water levels to allow placement of the compacted soil fill in the “dry”. A filter/separation fabric should be placed on the clean-graded stone prior to placing soil fill.
We recommend fill soils have a plasticity index (PI) of 30 or less and a standard Proctor maximum dry density of no less than 90 pounds per cubic foot (pcf). Fill soils should also be free of organics, debris and deleterious materials and fragment sizes with dimensions greater than 5 inches. The on-site soils minus larger cobbles and the boulders appear suitable for reuse as compacted fill with proper moisture conditioning.
Well before filling operations are scheduled to begin, the proposed fill soil should be tested to determine if the proposed soil is acceptable and for quality control during fill placement. Testing should include maximum dry density, optimum moisture content, natural moisture content, plasticity and grain size distribution.
If surface soils become excessively wet or frozen, fill operations should be halted and we should be consulted for guidance. A qualified engineering technician should observe fill placement and verify specified compaction levels are achieved through field density testing. The frequency of in-place density testing during fill placement will depend on the configuration of the project and volume of fill being placed.
10.0 BASIS OF RECOMMENDATIONS
The recommendations provided herein are based on the subsurface conditions and on project information provided to us; they apply only to the specific project and site discussed in this report. If the project information section in this report contains incorrect information or if additional information becomes available, you should convey the corrected or additional information to us and retain us to review our recommendations. We will then modify them if the new information has rendered them inappropriate for the proposed project.
Regardless of the thoroughness of a field exploration, there is always a possibility that conditions between boring locations will differ from those at specific boring locations, and that conditions will not be as anticipated by the designers or contractors. In addition, the construction process may itself alter subsurface conditions. Therefore, experienced geotechnical personnel should observe and document the construction procedures used and the conditions encountered. Unanticipated conditions and inappropriate procedures will be reported to the design team, along with recommendations to solve the problems created. We recommend AMEC be retained to provide this service, based upon our familiarity with the subsurface conditions and the intent of the recommendations.
Our exploration services include storing the collected samples and making them available for inspection for a period of 30 days. The samples are then discarded unless you request otherwise.
FIGURES
APPENDIX A
SITE PHOTOGRAPHS
Photograph 1 – Looking generally west across project site.
Photograph 2 – Looking generally north from the site down Beaverdam Bald Road.
Photograph 3 – Looking generally east-southeast up Beaverdam Bald Road.
Photograph 4 – Creek bed.
Photograph 5 – Existing culvert inlet.
Photograph 6 – Existing culvert outlet.
APPENDIX B
KEY TO SYMBOLS AND DESCRIPTIONS
TEST BORING RECORDS
SUBSURFACE FENCE DIAGRAM
CORE PHOTOGRAPHS
GROUP
SYMBOLS
TYPICAL NAMES
GROUP
SYMBOLS
Dense
Undisturbed Sample 1.5-2.0 = Recovered (ft) / Pushed (ft)
31 - 50
Over 50
Very Loose
UNDISTURBED SAMPLE ATTEMPT
Reference: The Unified Soil Classification System, Corps of Engineers, U.S. Army Technical Memorandum No. 3-357, Vol. 1, March, 1953 (Revised April, 1960)
0 - 2
3 - 4
Very Stiff
Over 50
Boulders
U.S. STANDARD SIEVE SIZE
GRAVEL
11 - 20
DOLOMITE
TOPSOIL
ASPHALT
FILL
KEY TO SYMBOLS AND
DESCRIPTIONS
Stiff
Medium
3/4"
Coarse
SANDSTONE
SHALE
RESIDUUM - Stiff to very hard
RESIDUUM - Soft to firm
Cobbles
CONCRETE
No.40
Very Dense
No.10 No.4
Water Table at time of drilling
Very Hard
21 - 30
Firm
12"
Split Spoon Sample
Loose
No. of BlowsRelative Density
5 - 10
Fine
Consistency
Fine
SUBSOIL
3"
ALLUVIUM
COLLUVIUM
LIMESTONE
0 - 4
5 - 8
No Sample
Rotary Drill
AUGER BORING
BOUNDARY CLASSIFICATIONS: Soils possessing characteristics of two groups are designated by combinations of group symbols.
Crandall Sampler
Pressure Meter
9 - 15
SILTSTONE
Correlation of Penetration Resistance with Relative Density and Consistency
SILT & CLAY
31 - 50
16 - 30
Very Soft
Soft
Firm
Auger Cuttings
Dilatometer
No Recovery
Water Table after 24 hours
Rock Core 60-100 = RQD / Recovery
SAND & GRAVEL
No. of Blows
Hard
No.200
Coarse
SILT OR CLAY
SAND
Very Firm
TYPICAL NAMES
LIMESTONE/SHALE - Limestone with shale interbeds
COAL
AMEC Environment & Infrastructure, Inc.
9725 Cogdill Road
Knoxville, Tennessee 37931 865-671-6774 Fax: 865-671-6254
VERY STIFF TO STIFF, BROWN, SILT WITH SOME
GRAVEL AND SAND - FILL
(SAMPLE 2 DRIVEN ALONG SIDE A BOULDER)
AUGER REFUSAL AT 2.1', BEGAN USING NW CASING
ADVANCER
FIRM TO VERY DENSE, VERY DARK
GRAYISH-BROWN, GRAVEL WITH SILT, SAND, AND A
BOULDER, AND SOME COBBLES - ALLUVIUM
(SAMPLE 3 DRIVE CUT SHORT AS SAMPLER
LEADING-OFF ALONG BOULDER)
(1' BOULDER ENCOUNTERED FROM DEPTH OF
ABOUT 7.8' TO 8.8')
DENSE TO FIRM, LIGHT TO DARK YELLOW-BROWN
AND DARK GRAYISH-BROWN, GRAVEL WITH SILT,
SAND AND COBBLES - ALLUVIUM
TERMINATED NW CASING ADVANCER, BEGAN NQ
CORING
COARSE GRAVEL WITH COBBLES - ALLUVIUM
SANDSTONE: FINE TO COARSE GRAINED /
CONGLOMERATIC, SLIGHTLY METAMORPHOSED
AND WITH TRACE LOCAL SILTSTONE. GRAY TO
VERY DARK GRAY; DARK BROWN TO BLACK WHERE
WEATHERING IS MORE DEVELOPED. MEDIUM
STRONG TO WEAK WHERE WEATHERING IS MORE
DEVELOPED. THICKLY BEDDED, FRESH TO HIGHLY
WEATHERED.
NOTE:
FROM DEPTH OF 15.8' TO 17.7: SLIGHTLY TO
MODERATELY WEATHERED
FROM DEPTH OF 20.8' TO 21.0': HIGHLY TO
COMPLETELY WEATHERED ZONE
FROM DEPTH OF 27.4' TO 29.4': SLIGHTLY TO HIGHLY
WEATHERED. LIKELY CORE LOSS.
CORING TERMINATED AT 31.6'
7-11-9
20-10-5
9/0.4
5-5-9
8-50/0.2
10-16-16
7-13-11
0-60
79-96
50-100
25-68
SPT-1
SPT-2
SPT-3
SPT-4
SPT-5
SPT-6
SPT-7
RC-1
RC-2
RC-3
RC-4
REMARKS:
SEE KEY SYMBOL SHEET FOR EXPLANATION OF
SYMBOLS AND ABBREVIATIONS BELOW.
st n d rd
SOIL TEST BORING RECORD
FINES (%)
SPT (bpf)
T Y P E
999.0
994.0
989.0
984.0
979.0
974.0
969.0
964.0
959.0
954.0 0 10 20 30 40 50 60 70 80 90 100
DRILLED:
I D E N T
SAMPLESE
L E V
(ft)
SOIL CLASSIFICATION
AND REMARKS
10 20 30 40 50 60 70 80 90 100
PL (%) NM (%) LL (%)
N-COUNT
L E G E N D
STANDARD PENETRATION RESISTANCE TESTING
PERFORMED USING AN AUTOMATIC HAMMER.
BORING NO.: B-1
D E P T H
(ft)
THIS RECORD IS A REASONABLE INTERPRETATION OF
SUBSURFACE CONDITIONS AT THE EXPLORATION
LOCATION. SUBSURFACE CONDITIONS AT OTHER
LOCATIONS AND AT OTHER TIMES MAY DIFFER.
INTERFACES BEWEEN STRATA ARE APPROXIMATE.
TRANSITIONS BETWEEN STRATA MAY BE GRADUAL.
PROJECT:
PROJ. NO.:
Driller : Tri-State
Logged By: JCM
Checked By: TL
Big Oak Cove Culvert Replacement
July 12, 2012
6163-12-0182.04
S O
IL
.G
P J
L A
W G
IB
B
.G D
T
/3
/1
FIRM, DARK GRAY, GRAVEL WITH SILT - FILL
AUGER TO 1.5', BEGAN NW CASING AT 1.5'
LOOSE, DARK GRAYISH BROWN, GRAVEL WITH SILT
AND SAND - FILL
VERY DENSE TO DENSE, DARK GRAY, GRAVEL WITH
SILT, SAND, COBBLES, AND BOULDERS - ALLUVIUM
NOTE: BOULDER FROM DEPTH OF 4.0' TO 5.3;
BOULDER FROM DEPTH OF 5.4' T 6.2'
TERMINATED CASING ADVANCER AT 11.0'; BEGAN
NQ CORING
GRAVEL - ALLUVIUM
SANDSTONE: FINE TO COARSE GRAINED. GRAY TO
BLACK. MEDIUM STRONG TO LOCALLY VERY WEAK.
THICK BEDDED. FRESH TO LOCALLY HIGHLY
WEATHERED. LIKELY SLIGHTLY METAMORPHOSED.
NOTE:
FROM DEPTH OF 16.2' TO 21.2' HIGHLY FRACTURED
AND MODERATELY TO HIGHLY WEATHERED ZONE
FROM DEPTH OF 22.0' TO 22.25; FRACTURED ZONE
FROM DEPTH OF 30.3' TO 31.1' LIKELY ZONE OF CORE
LOSS
FROM DEPTH OF 31.1' TO 31.8' MODERATELY TO
HIGHLY WEATHERED ZONE
FROM DEPTH OF 31.45' TO 31.8' FRACTURED ZONE
CORING TERMINATED AT 34.9'
12-17-8
7-4-5
50/0.1
13-11-46
15-20-20
16-37
0-38
78-100
80-85
72-87
SPT-1
SPT-2
SPT-3
SPT-4
SPT-5
RC-1
RC-2
RC-3
RC-4
RC-5
REMARKS:
SEE KEY SYMBOL SHEET FOR EXPLANATION OF
SYMBOLS AND ABBREVIATIONS BELOW.
st n d rd
SOIL TEST BORING RECORD
FINES (%)
SPT (bpf)
T Y P E
998.5
993.5
988.5
983.5
978.5
973.5
968.5
963.5
958.5
953.5 0 10 20 30 40 50 60 70 80 90 100
DRILLED:
I D E N T
SAMPLESE
L E V
(ft)
SOIL CLASSIFICATION
AND REMARKS
10 20 30 40 50 60 70 80 90 100
PL (%) NM (%) LL (%)
N-COUNT
L E G E N D
STANDARD PENETRATION RESISTANCE TESTING
PERFORMED USING AN AUTOMATIC HAMMER.
BORING NO.: B-2
D E P T H
(ft)
THIS RECORD IS A REASONABLE INTERPRETATION OF
SUBSURFACE CONDITIONS AT THE EXPLORATION
LOCATION. SUBSURFACE CONDITIONS AT OTHER
LOCATIONS AND AT OTHER TIMES MAY DIFFER.
INTERFACES BEWEEN STRATA ARE APPROXIMATE.
TRANSITIONS BETWEEN STRATA MAY BE GRADUAL.
PROJECT:
PROJ. NO.:
Driller : Tri-State
Logged By: JCM
Checked By: TL
Big Oak Cove Culvert Replacement
July 12, 2012
6163-12-0182.04
S O
IL
.G
P J
L A
W G
IB
B
.G
1,000
1,005
0 2 4 6 8 10 12 14 16 18 20 22
1,000
1,005 0 2 4 6 8 10 12 14 16 18 20 22
7-11-9
20-10-5
9/0.4 5-5-9
8-50/0.2
10-16-16
7-13-11
0-60
79-96
50-100
25-68
B-1 12-17-8
7-4-5
50/0.1
13-11-46
15-20-20
16-37
0-38
78-100
80-85
72-87
B-2
Borehole North
Position
Left, Front
Right, Front
Left, Back
Right, Back
DISTANCES:
Beginning
Ending
VIEWING ANGLES (degrees):
Horizontal
Vertical
Distance Along Baseline
DATE PLATE
East Elev.
999.0
998.5
East
6163-12-0182.04
31.6
34.9
PROJECT #
North
13772
13757
13772
13757
Big Oak Cove Culvert Replacement
SUBSURFACE FENCE DIAGRAM A - A'
E le v a ti o n
Depth
B-1
B-2
13758
13772
Jul 12
0.0
0.0
SEE KEY SYMBOL SHEET FOR EXPLANATION
OF SYMBOLS AND ABBREVIATIONS
S E
C T
IO
N
.G
P J
F A
G W
G N
.G
| Page |
| LIST OF FIGURES |
| LIST OF APPENDices |
| EXECUTIVE SUMMARY |
| 1.0 INTRODUCTION |
| 2.0 OBJECTIVES OF EXPLORATION |
| 3.0 SCOPE OF EXPLORATION |
| 4.0 PROJECT INFORMATION AND SITE CONDITIONS |
| 5.0 SITE GEOLOGY |
| 6.0 SUBSURFACE CONDITIONS |
| 7.0 GROUND-WATER CONDITIONS |
| 8.0 FOUNDATION RECOMMENDATIONS |
| 9.0 EARTHWORK RECOMMENDATIONS |
| 9.1 GENERAL SITE PREPARATION |
| 9.2 EXCAVATION |
| 9.1.1 Excavation/Difficult Excavation |
| 9.2.2 Construction Slopes and Temporary Excavation Support |
| 9.3 GROUND WATER MANAGEMENT |
| 9.4 PERMANENT SLOPE RECOMMENDATIONS |
| 9.5 COMPACTED FILL |
10.0 BASIS OF RECOMMENDATIONS