Amendment - Specification 610001.pdf
PDF 1 MB Posted
- Attached to
- Cane Creek - Wade Hunter Bridge Federal contract opportunity
- Solicitation number
- AG-4741-S-TN-10-28
About this file
SF-30 - Amendment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract - Wade Hunter.xls | XLS spreadsheet | |
| Abstract - Wade Hunter.xlsm | XLSM spreadsheet | |
| 04-14-10 Site Showings(questions and answers).docx | DOCX document | |
| SF-30 - Site Showing -Wade Hunder.pdf | ||
| SF-30 - Amendment 2 - Wade Hunter.pdf | ||
| SF-30 - Amendment 1 - Wade Hunter - AG-4741-S-10-28.pdf | ||
| Solicitation -Wade Hunterl 500-999 FAC2005-38.doc | DOC document | |
| All_Plans_Wade_Hunter_03222010.pdf | ||
| Solicitation - Lynn School 500-999 FAC2005-38.doc | DOC document | |
| AllSpecs_WadeHunterRdBr_03152010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT 10 CODE IPAGE OF PAGES
1 I 2
2. AMENDMENT /MODIFICAITON NO. 3. EFFECTIVE UAT~ 4. KEQUISITION/PUKCHASE KEQ. NO. IS. PROJECT NO. (If applicble)
Amendment Apr 19, 2010
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE I
USDA-NRCS
675 U.S. Courthouse, 801 Broadway Nashville, TN 37203
8. NAME AND ADDRESS OF CONTRACTOR (No; street, county, State and ZIP Code) '- ~
9A. AMENDMENT OF SOLICIATION NO.
[g see.Block 14, below
9B. DATED (SEE ITEM 11)
lOA. MODIFICATION OF CONTRACT/ORDER NO.
e lOB. DATED (SEE ITEM 13)
CODE IFACILITY CODE
11. THIS ITEM ONLY ._. TO II __ :SOL._. "11\0 I"~
lEI The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers o is extended, lEI is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning __ 1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer
~~e;~dri,~gr1wt,s sr~~i~~~PWo'i'r6 t~~ '6'3g~ig~ h"6~~r\ll ~~\~~~eSf,~~ded each telegram or letter makes reference to the solicitation and this
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
n (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDERCHECK ONE IA. THIS CHANGEOJ:lDER1S ISSUED PURSUANTTO:
NO.IN ITEM lOA.
D B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.1 03(b).
(such as changes in paying office, n C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TOAul1-IORITY OF:
D D. OTHER (Specifji type of madification and authority)
E. IMPORTANT: Contractor [J is not, lEI is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OFAMENDMENT/MODIFICAfION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment applies to the following Cane Creek solicitations:
AG-4741-S-10-32 - Paris Road Bridge AG-4741-S-10-31 - Grimes Road Bridge
AG-4741-S-10-29 - Jones Road Bridge AG-4741-S-10-28 - Wade Hunter Bridge
SEE Page 2 of 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or lOA, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Patty Lane, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
Amendment Page 2 of2
Construction Specification 61 - Rock Riprap is changed as follows:
Item 8. a. (2) add paragraphs e and f, below:
e. Within 14 calendar days of the determination of the apparent low bidder by the Contracting officer (typically the bid opening date), the apparent low bidder shall provide to the Contracting Officer a written copy of the rock test results for the tests required by Material Specification 523 for Rock Type 1 and a written certification letter that the rock material in a designated area of the source meets specifications. The rock material supplied shall be obtained from the designated tested area unless the Contractor provides additional testing and certifications for new areas. The Contractor shall conduct additional tests and provide written certifications within 14 days of a request for additional testing by the Contracting Officer.
f. Within 2 calendar days of the determination ofthe apparent low bidder by the Contracting Officer, the apparent low bidder shall designate to the Contracting Officer, in writing, the source and specific intemallocation from which rock material shall be obtained and provide the Engineer free access to collect samples for testing.
File details come from the government source that posted it. Updated .