ATTACHMENT 5 - FS Supplements Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT_7_-_Wage_Determination__AG-4670-S-17-0012.txt | TXT text file | |
| ATTACHMENT_6_-_Figure_101-1_for_FS_Supp_Spec_FPO3.PDF | ||
| ATTACHMENT_3_-_Drawings.PDF | ||
| ATTACHMENT_1a_-_Schedule_of_Items_-_electronic_version.xlsx | XLSX spreadsheet | |
| ATTACHMENT_2_-_Specifications.docx | DOCX document | |
| ATTACHMENT_1b_-_Schedule_of_Items_-_manual_version.xlsx | XLSX spreadsheet | |
| AG-4670-S-17-0012__SF-1442.PDF | ||
| ATTACHMENT_4_-_Map.docx | DOCX document | |
| AG-4670-S-17-0012_body.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION AND SPECIAL PROJECT SPECIFICATION LIST
| Sale Na me |
| ree Sales Roads Re-Constr |
| Road Number |
| 725 |
| 737 |
| 744 |
| 744A |
| 7448 |
| Road Na me |
| uble Spri |
| Wier FilE |
| Rich Mtr |
| zard Ro |
| dlev Branch |
| Termi Miles (From) |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| Termi Miles (To) |
| 1.07 |
| 0.77 |
| 1.325 |
| 0.8 |
| C orR |
| R |
| R |
| R |
| R |
| R |
| Traffic Service Leve l |
| I |
| J |
| H |
| I |
| J |
| Maintenance Leve l |
| 3 |
| 2 |
| 3 |
| 2 |
| 1 |
Standard Specificat ion For Construction of Roa ds and Bridges on Federal High wa y Pro jec t
FP-03
| Quarry Location |
| Blair |
Standard Spec or La t es t Revision Soecificatio ns that are referenced bv other
| 11X11 de |
| notes ao11licable standard specs. or special |
Standard Spec 2..0 _0_3_
I
| 101- 150 | |
| II | II |
| Apply | |
| To | |
| All | |
| :=ontracts |
| 8 |
| 8 |
| 8 |
| 4 |
| 8 |
| 40 |
| 40 |
| 56 |
| 5 |
| 4 |
| 16 |
| 16 |
| 16 |
| 8 |
| 8 |
| 3 |
| 1 |
| 2 |
| 4 |
| 4 |
| 4 |
| 1 |
| 4 |
| 16 |
| 8 |
| 3 |
AG-4670-S-17-0012
ATTACHMENT 5
FS SUPPLEMENTS SPECIFICATION FPO3
744A 744B Roa d Name tble Spr· iller Fili Rich Mt1 zzard Re clley Bra Termi Miles ( Fro m1 Termi Miles (To) 1.07 0.77 1.325 0.8 R R R R R
FM& S
Specific La tes t Revis ion
FM&S SPECIAL PROJECT SPECIFICATION LIST
Sale Na me ee Sales Roads Re-Const Road Nu mber 725 C or R Specificati ons t hat are refe renced bv other "X" d eno t e s a oo licable standard soecs. or soecial
FMS201
*I** SEE SPS TABLE OF CONTENTS FOR SUPPLEM ENTAL SPECIFICATION
FS SUPPLEMENTS SPECIFICATION FP03 AP THREE SALES ROAD RE-CONSTRUCTION
Table of Contents
| Table of Contents | 1 |
| Preface | 3 |
| 101 -Terms, Format, and Definitions | 3 |
| 101.01 Meaning of Terms | 3 |
| 101.01 Meaning of Terms | 3 |
| 101.3 Abbreviations | 3 |
| l 01.04 Definitions | 4 |
| 101.4 Definitions | 7 |
| 102 - Bid, Award, and Execution of Contract | 8 |
| l 02 Bid, Award, and Execution of Contract. | 8 |
| 103 - Scope of Work | 8 |
| Deletions | 8 |
| 104 - Control of Work | 8 |
| Deletions | 8 |
| 104.06 Use of Roads by Contractor | 8 |
| 105 - Control of Material | 9 |
| 105.02 Material Sources | 9 |
| 105.02(a) Government-provided sources | 9 |
| 105.05 Use of Material Found in the Work | 9 |
| 106 - Acceptance of Work | 9 |
| 106.07 Delete | 9 |
| 107 - Legal Relations and Responsibility to the Public | 10 |
| 107.5 Responsibility for Damage Claims | 10 |
| 107.6 Contractor' s Responsibility for Work | 10 |
| 107.8 Sanitation, Health , and Safety | 10 |
| Legal Relationship of the Parties | 10 |
| Environmental Protection | 10 |
| l 08 - Prosecution and Progress | 11 |
| Delete | 11 |
| - Measurement and Payment | 12 |
| 109 Deletions | 12 |
| 109.02 Measurement Terms and Definitions | 12 |
| 151 - Mobilization | 13 |
| 155 - Schedules for Construction Contracts | 13 |
| 155 Delete | 13 |
| 204 - Excavation and Embankment | 13 |
| 204.11 Compaction | 26 |
| 249 - Composite Road Construction | 27 |
| 301 - Untreated Aggregate Courses | 31 |
| 301 Title Change | 32 |
| 301.05 Compacting | 32 |
| 602 - Culve11sand Drains | 33 |
| 602.03 General. | 33 |
| 625 - Tutf Establishment | 33 |
| 625.05 Watering | 33 |
| 625.07 Seeding. (a) Dry method | 33 |
| 625.07 Seeding. (b) Hydraulic method | 33 |
| Table 625-1. Fe1tilizer Application Rate | 33 |
| 633 - Permanent Traffic Control | 34 |
| 633.03 General | 34 |
| 718 - Traffic Signing and Marking Material. | 34 |
| 718.05 Aluminum Panels | 34 |
Preface
Delete all but the first paragraph and add the following:
Preface_wo_03_15_2 004_m
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
IOI.OO_nal_us_07_25 _2005
101.0 l_nal_us_O1_22 _2009
101.1 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.0 l_nat_us_O1_ 22_2009
101.1 Meaning of Terms
Delete all references to the FAR (Federal Acquisition Regulations) in the specifications.
101 .03 _ nat_us_06_16_2006
101.3 Abbreviations.
Add the following to (a) Acronyms:
American Forest and Paper Association Mine Safety and Health AdministrationAFPA MSHA NIST NESC WCLIB
National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
Milepost Part Per Million
101.4 _nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of ltems.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the " purchaser".
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some pa1ticular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway , buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--"Equitable adjustment," as used in the Federal Acquisition Regulations, or "construction cost adjustment," as used in the Timber Sale Contract, as applicable.
Change--"Change" means "change order" as used in the Federal Acquisition Regulations, or "design change" as used in the Timber Sale Contract.
Design Quantity--"Design quantity" is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term "Con tract Quantities".
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items , quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1-Illustration of road (See Attachment 6)
101.04 Definitions .
Delete the following definitions: Contract Modification Day
Notice to Proceed Solicitation
102 - Bid, Award, and Execution of Contract
I 02 .0 0 _nat_us_02_16_ 2005
102 Bid, Award, and Execution of Contract
Delete Section I 02 in its entirety.
103 - Scope of Work
I 03.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_20 06
Deletions
Delete Sections 104.01, 104 .02, and 104.04.
I04.06_nat_us_02_17 _ 2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitation s and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02 Material Sources.
I 05 .02_nat_us_Ol_l 8_2007
105.02(a) Government -provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05 Use of Material Found in the Work.
105.05_nat_us_05_12_2004
Delete 105.05 {a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the prope1ty of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07 _nat_us_05_11_2004
10 6.07 Delete Delete subsection 106 .07.
107 - Legal Relations and Responsibility to the Public
107.5 Responsibility for Damage Claims.
Delete the entire subsection .
10 7 .0 5 _nat_us_0 5_ l l_2004
107.6 Contractor's Responsibility for Work.
Delet e the following from the first paragraph. "except as provided in Subsection 106.07".
l07.06_nat_us_06_16_2006 l07.08_nat_us_03_29_2005
107.8 Sanitation, Health, and Safety
Delete the entire subsection.
107.9 Legal Relationship of the Parties.
Delete the entire subsection.
l07.09_nal_us_06_l6_2006
107.10 Environmental Protectio n.
I07 . 10_ nat_us_06_l6_2006
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative repo1t form no later than 24 hours after the initial repo1t and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress l08.00_nat_us_02_ 16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00 _n at_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.6 Pricing of Adjustments.
109.7 Eliminated Work.
109.8 Progress Payments.
109.9 Final Payment.
109.02_nat_us_06_ I 6_2 006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
"(b) Cubic yard" to "(c) Cubic yard" . Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, l,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
151 - Mobilization
151. 03 _ nat_us_08_05_2005
151.03 Payment
Delete the entire subsection and add the following:
151.03 Payment
Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
155 - Schedules for Construction Contracts
155.00 _nat_ us_05 _ 11_2 004
155 Delete.
Delete Section 155 in its entirety.
204 - Excavation and Embankment
204.00 _ nat_us_03_26_2009
Replace Section 204 in its entirety with the following: Description
204.1 This work consists of excavating material and constructing embankments. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.2 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and be1ms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
Material
204.3 Conform to the following Subsections:
| Backfill material |
| 704.03 |
| Select borrow |
| 704.07 |
| Select topping |
| 704.08 |
| Topping |
| 704.05 |
| Unclassified borrow |
| 704.06 |
| Water |
| 725.0l |
Construction Requirements
204.4 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.
204.5 Reserved.
204.6 Roadway Excavation. Excavate as follows:
(a) General. Do not disturb material and vegetation outside the construction limits. Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation. Dispose of unsuitable or excess excavation material according to Subsection 204.14.
At the end of each day's operations , shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Retrieve material deposited outside of the clearing limits as directed by the CO. Place unsuitable material in designated areas.
(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11
(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
204.7 Subexcavation. Excavate material to the limits designated by the CO. Take cross sections according to Section t 52. Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to Subsection 204.11.
204.8 Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity.
Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.9 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:
(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower p01tion of the embankment. Limit the layer thickness to the minimum depth necessary to supp01t the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.
204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes flatter than 1V:l.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
Where placing embankment on one side of abutments, wing walls, piers, or culve1t headwalls, compact the material using methods that prevent excessive pressure against the structure.
Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so compacted embankment material is at the same elevation on both sides of the structure .
Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer according to Subsection 204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12-inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually according to (c) below. Place sufficient earth and smaller rocks to fill the voids. Compact each layer according to Subsection 204.11 before placing the next layer.
(c) Individual rock fragments and boulders. Place individual rock fragments and boulders greater than 24 inches in diameter as follows:
(1) Reduce rock to less than 48 inches in the largest dimension.
(2) Distribute rock within the embankment to prevent nesting.
(3) Place layers of embankment material around each rock to a depth not greater than that permitted by (b) above. Fill all the voids between rocks.
(4) Compact each layer according to Subsection 204.11 before placing the next layer.
(d) Embankment outside of roadway prism. Where placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.
204.11 Compaction. Compact the embankment using one of the following methods as specified:
(a) Compaction A. Use AASHTO T 27 to determine the amount of material retained on a Number 4 sieve. If there is more than 80 percent retained on the No. 4 sieve use procedure (1).
If there is 50 to 80 percent retained on the No. 4 sieve use procedure (2). If there is les s than 50 percent retained on the No. 4 sieve use procedure (3).
(1) Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
(b) Eight roller passes of a 20-ton compression-type roller.
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
· For each additional 6 inches or fraction thereof, increase the number of roller passes in (a) above by four passes.
· For each additional 6 inches or fraction thereof, increase the number of roller passes in (b) and (c) above, by eight passes.
(2) Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2 percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to
(1) above.
(3) Classify the material according to AASHTO M 145. For material classified A-1 or A- 2-4, dete1mine the maximum density according to AASHTO T 180, method D. For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction . Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required , use AASHTO T 224 to correct for coarse particles.
(b) Compaction B. Place material by end dumping to the mm1mum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller " walks out" of the layer. Make at least three complete passes.
(c) Compaction C. Place material by end dumping to the m1mmum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
204.12 Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter. Maintain all ditches in an open condition and free from leaves, sticks, and other debris.
Fmm furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow.
204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:
(a) Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. Slope rounding is not required on tolerance class D though M roads.
If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition .
(b) Stepped slopes. Where required by the contract, construct steps on slopes of 1 ½V: lH to 1V:2H. Construct the steps approximately 18 inches high. Blend the steps into natural ground at the end of the cut. If the slope contains nonrippable rock outcrops, blend steps into the rock. Remove loose material found in transitional area. Except for removing large rocks that may fall, scaling stepped slopes is not required.
(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.
(d) Finishing. Finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.Ensure that the subgrade is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed .
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until there is no visible evidence of fm1her consolidation.
(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.
204.14 Disposal of Unsuitable or Excess Material. Dispose of unsuitable or excess material at designated sites or legally off of the project.
When there is a pay item for waste, shape and compact the waste material in its final location. Do not mix clearing or other material not subject to payment with the waste material.
204.15 Acceptance. See Table 204-1 for sampling and testing requirements.
Material for embankment and conserved topsoil will be evaluated under Subsections I 06.02 and 106.04.
Excavation and embankment construction will be evaluated under Subsections 106.02 and 106.04. Clearing and removal of obstructions will be evaluated under Sections 201 and 203.
Measurement
204.16 Measure the Section 204 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
(a) Roadway excavation. Measure roadway excavation in its original position as follows:
(1) Include the following volumes in roadway excavation:
(a) Roadway prism excavation;
(b) Rock material excavated and removed from below subgrade in cut sections;
(c) Unsuitable material below subgrade and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;
(d) Ditches, except furrow ditches measured under a separate bid item; (e) Topsoil;
(I) Borrow material used in the work when a pay item for borrow is not shown in the bid schedule;
(g) Loose scattered rocks removed and placed as required within the roadway;
(h) Conserved material taken from stockpiles and used in Section 204 work; and
(i) Slide and slipout material not attributable to the Contractor's method of operation.
(2) Do not include the following in roadway excavation:
(a) Overburden and other spoil material from borrow sources;
(b) Overbreakage from the backslope in rock excavation;
(c) Water or other liquid material;
(d) Material used for purposes other than required;
(e) Roadbed material scarified in place and not removed;
(/) Material excavated when stepping cut slopes;
(g) Material excavated when rounding cut slopes;
(h) Preparing foundations for embankment construction;
(i) Material excavated when benching for embankments;
(j) Slide or slipout material attributable to the Contractor's method of operation;
(k) Conserved material taken from stockpiles constructed at the option of the Contractor; and
(l) Material excavated outside the established slope limits.
(3) When both roadway excavation and embankment construction pay items are shown in the bid schedule, measure the following as roadway excavation only:
(a) Unsuitable material below subgrade in cuts and unsuitable material beneath embankment areas when a pay item for subexcavation is not shown in the bid schedule;
(b) Slide and slipout material not attributable to the Contractor's method of operations; and
(c) Drainage ditches, channel changes, and diversion ditches.
(b) Unclassified borrow, select borrow, and select topping. When measuring by the cubic yard measure in its original position. If bon-ow excavation is measured by the cubic yard in place, take initial cross-sections of the ground su1face after stripping overburden. Upon completion of excavation and after the borrow source waste material is returned to the source, retake cross-sections before replacing the overburden.
Do not measure borrow excavation used in place of excess roadway excavation.
(c) Embankment construction. Measure embankment construction in its final position. Do not make deductions from the embankment construction quantity for the volume of minor structures.
(1) Include the following volumes in embankment construction:
(a) Roadway embankments;
(b) Material used to backfill subexcavated areas, holes, pits, and other depressions;
(c) Material used to restore obliterated roadbeds to original contours; and
(d) Material used for dikes, ramps, mounds, and berms.
(2) Do not include the following in embankment construction:
(a) Preparing foundations for embankment construction;
(b) Adjustments for subsidence or settlement of the embankment or of the foundation on which the embankment is placed; and
(c) Material used to round fill slopes.
(d) Rounding cut slopes. Measure rounding cut slopes horizontally along the centerline of the roadway if a pay item for slope rounding is included in the bid schedule. If a pay item for slope rounding is not included in the bid schedule slope rounding will be considered subsidiary to excavation .
(e) Waste. Measure waste by the cubic yard in its final position. Take initial cross-sections of the ground surface after stripping over burden. Upon completion of the waste placement, retake cross-sections before replacing overburden.
(f) Slope scaling. Measure slope scaling by the cubic yard in the hauling vehicle.
Payment
204.17 The accepted quantities will be paid at the contract price per unit of measurement for the Section 204 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Table 204-1 Sampling and Testing Requirements
Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Topping
(704.05) & unclassified borrow (704.06) Measured and tested for conformance (106 .04) Classification
Moisture- density
Compaction
AASHTOM 145
AASHTO T 180,
method D(I' or T 99, method co> AASHTO T 310 or other approved procedures I per soil type l per soil type but not Jess than I per I per 6000 yd2 but not less than I per layer Processed material before incorporating in work
In-place Yes, when requested
Before using in work
Before placing next layer
| Select borrow |
| Measured and tested |
| Classification |
| - |
| AASHTOM 145 |
| I per soil type but |
| Processed |
| Yes when requested |
Before using
| (704.07 & Select |
| for confromance |
| not less than I for |
| material |
in work
| topping (704.08) |
| (106.04) |
| each day of |
| before |
| production |
| incorporating |
| Gradation |
| - |
| AASHTOT27 |
| " |
| " |
Liquid limit
AASHTOT89
Moisture-
AASHTO T 180,
I per soil type but density
| method D(l) or T 99 , |
| not less than I per |
method C(1)
| Compaction |
| - |
| AASHTO T 3 IO or |
| I per 6000 yd2 but |
| In-place |
Before
| other approved |
| not Jess than I per |
placing next
| procedures |
| layer |
layer
(I) Minimum of 5 points per proctor
Table 204-1 (continued) Sampling and Testing Requirements
| Material or Product |
| Type of Acceptance (Subsection) |
| Characteristic |
| Category |
| Test Methods Specifications |
| Sampling Frequ ency |
| Point of Sampling |
Split Sample Reporting Time
| Earth embankment (204.11, |
| Measured and tested for conformance |
| Classification |
| - |
| AASHTO M 145 |
AASHTO T 180 ,
method ,D(1) or T 99, method c<•>
AASHTO T 310 or other approved procedures
| I per soil type |
| Source of Material |
| Yes, when requested |
Before using in work
| Compaction A) |
| (106.04) |
Moisture-
1 per soil type but not density
Iess than 1 per
13, 000 yd'
Compaction
I per 3500 yd2 but not less than I per layer
In-place
Before placing next layer
Top of subgrade (204. J 1 Compaction A)
| Measured and tested fo r conformance (106.04) |
| Compaction |
| - |
| AASHTO T 310 o r |
other approved procedures
| 1 per 2500 yd2 |
| In-place |
| - |
| Before placing next layer |
( I) Minimum of 5 points per proctor.
Table 204-2 Construction Tolerances
Tolerance Class <•l
| A |
| B |
| C |
| D |
| E |
| F |
| G |
| H |
| I |
| J |
| K |
| L |
| M |
Roadbed width (ft)
+0.5
+0.5
+1.0
+1.0
+ l. O
+ 1.0
+ 1.5
| +1.0 |
| +2.0 |
| +2.0 |
| +2.0 |
| +2.0 |
| +2.0 |
Subgrade
| elevation |
| ±0.1 |
| ±0.2 |
| ±0.2 |
| ±0.5 |
| ±0,5 |
| ± 1.0 |
| ±1.0 |
| ±1.5 |
| ±2.0 |
| ±3.0 |
| ±2,0 |
| ±3.0 |
| (c) |
(ft)
Centerline alignment (ft)
±0 .2
±0.2
±0.5
±0.5
±1.0
±1.0
±1.5
±1.5
±2.0
±, 3 0
±3,0
±5.0
(c)
Slopes,
| excavation, and embankment |
| ±3 |
| ±5 |
| ±5 |
| ±5 |
| ±5 |
| ±5 |
| ±10 |
| ±10 |
| ±10 |
| ±10 |
| ±20 |
| ±20 |
| ±20 |
(0/4 e IA (b)\
N I::,,-c:1"'
,0._...
i:0
V, (a) Maximum allowable deviation from construction stakes and drawings.
(b) Maximum allowable deviation from staked slope measured from slope stakes or hinge points.
(c) Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of Jess than 80 feet when the algebraic difference in the grade change is less than IO percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to JO percent. The center line grade is not to exceed 20 percent in JOO feet of length.
204.11 Compaction.
Delete the first paragraph and replace it with the following:
For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller "walks out" of the layer. Make at least three complete passes.
249 - Composite Road Construction
249.00_0116_us _03_31_200 5
Description
249.1 This work consists of clearing and grubbing, excavation and embankment, and removal of all construction slash including designated trees. During excavation and embankment, excavate and use borrow material; excavate drainage; shape the roadway, including approaches, turnarounds, ditches, and drainage dips; and place all excavated material, regardless of nature. Perform erosion control by furnishing and placing seed, fertilizer, mulch, and tackifer. Construct the roadway in conformance with the dimensions shown on the plans or designated by the CO.
Materials
249.2 Ensure that materials meet the requirements specified in the following section and subsection:
Seeding and Mulching Stabilizing Emulsion Tackifers
713.02
Construction Requirements
249.3 Clearing and Disposal. Protect construction stakes and construction control markers. Remove or treat all trees, snags, downed timber, brush, and stumps within the clearing limits according to the following specifications:
(a) Merchantable Timber. Treat according to Subsection 201.06
(b) Unmerchantable Timber. Treat according to Subsection 203.05 Method (i)
(c) Large Construction Slash. Treat construction slash larger than 3 inches in diameter and longer than 3 feet by one or more of the following methods, as shown on the plans:
(1) Method A. Incorporate construction slash in the embankment.
(2) Method B. Windrow construction slash inside the clearing limits . When slash is windrowed, place it approximately parallel to the roadway outside the toe of the fill slope.
(3) Method C. Scatter construction slash outside the roadway without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will remain in place and are not on top of one another.
(4) Method D. Construct piles that are free of soil, with smaller slash well mixed with larger slash. Buck unmerchantable logs into lengths less than 18 feet prior to placement in piles .
(5) Method E. Sidecast construction slash into the area below the roadway . Slash my be sidecast beyond the lower clearing limit not to exceed 10 feet.
(6) Method F. Bury construction slash within the roadway limits. Construct mats in layers and cover the mats with at lea s t 18 inches of rock and soil.
(7) Method G. Construct piles of construction slash in the areas designated on the ground. Construct the piles so that burning does not damage standing trees. Burn the piles until all the material remaining in the pile is charred or ash.
(8) Method H. Bury the construction slash outside the roadway the locations designated on the ground. Construct mats in layers, and cover the mats with at least 18 inches of rock and soil. Slope the final surface to drain.
(9) Method J. Construct a debris mat of construction slash under the road subgrade. Use tree limbs, tops cull logs, split stumps, wood chunks, and other debris to form a mat. Place stumps upside down and blended into the mat.
Small Construction Slash. Construction slash less than 3 inches in diameter and less than 3 feet long may be incorporated into embankments so long as the material is distributed so that it does not result in concentrations or matting.
Immediately remove slash deposited in stream courses.
Fell all dead trees outside the clearing limits that lean toward the road and are sufficiently tall to reach the roadbed. Fell hazard or unstable live trees designated on the ground outside the clearing limits before felling timber in the immediate clearing vicinity.
Leave stump heights less than I foot or one-third of the stump diameter whichever is greater, measured on the side adjacent to the highest ground. Leave felled trees outside the clearing limits in place.
249.4 Pioneering. Do not undercut the final back slope during pioneer operations. Deposit material inside the roadway limits. Do not restrict drainage.
249.5 Grubbing. Grub within the specified limits. Stumps outside the grubbing limits remain if cut no higher than 1 foot or one-third of the stump diameter, whichever is greater, above the original ground, measured on the uphill side, unless otherwise designated. Grub stumps that will protrude through the subgrade or have less than 6 inches of cover.
249.6 Excavation and Embankment. Construct the roadway to conform to the typical sections shown on the plans. Protect backslopes from being undercut. Embankment may be placed by side casting and end dumping.
Locate and use borrow material, and remove and treat unsuitable or excess material, as designated.
Place rocks that are too large to be incorporated in the embankment outside the traveled way on the downhill side such that they will not roll, obstruct drainage, or hinder roadbed use and maintenance.
Leave slopes that are to be seeded in a roughened condition.
Shape and finish the roadbed to the condition ordinarily accomplished by a crawler tractor with dozer blade to provide drainage of surface water. Do not permit individual rocks to protrude more than 4 inches above the subgrade of the roadbed. A motor grader finish is not required.
Observe a width tolerance of(+) 18 inches for the traveled way.
249.7 Erosion Control. Perform erosion control measures, including seeding. Use methods and applications rates, and types of seed, fe1iilizer, mulch, and tackifer, as specified in Section 625. Apply materials uniformly to the areas to be treated..
Measurement
249.8 Measure the Section 249 items listed in the bid schedule according to Subsection 109.02.
Payment
249.9 The accepted quantities will be paid at the contract price per unit of measurement for the Section 249 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
301 - Untreated Aggregate Courses
301.OO_ nat_us_03_03_2005
301 Title Change.
Change the title to: Section 301 Aggregate Courses
301.05_n at_us_05_17_2005
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs , headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(l ).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(l).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least I 00 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301 - Untreated Aggregate Courses
301.00_nal_us_03_03 _2005
301 Title Change.
Change the title to: Section 301 Aggregate Courses
301.05_nat_us_05_17_2005
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(l).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.1l(a)(l).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service , Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 18 0, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.10 Payment
Delete the following:
adjusted according to Subsection 106.05
602 - Culverts and Drains
301. IO_nat_us_03_03_2005
602.03 General.
602.03_nat_us_09_06_2005
Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.
625 - Turf Establishment
625.05 Watering.
Delete the entire subsection
625.0S_nat_us_03_30_2005
625.07 Seeding. (a) Dry method .
625.07_nat_us_02_25_2005
Remove the last sentence "Light ly compact the seedbed within 24 hours after seeding."
625.07 Seeding. (b) Hydraulic method.
Apply fertilizer conforming to Subsection 713.03 at the rates shown in Table 625-1. Fertilize areas inaccessible to hydro-type equipment by hand.
Table 625-1. Fertilizer Application Rate. SEE DRAWINGS I Type I Quantity per Slurry Unit lbs lbs
Apply the seed mixture at the rate of _ _
_ _ kilograms of live seed per _
(hectare/slurry unit). Include a tracer material consisting of either wood fiber mulch or grass cellulose fiber mulch to provide visible evidence of uniform application . Add the tracer to the slu rry at a rate of (400 pound per acre or I00 pound per slurry unit). Seed areas inaccessible to hydro-type equipment by hand.
633 - Permanent Traffic Control 633.03_nat_us_0 3_03_2005
633.03 General.
Delete the subsection and add the following:
Furnish traffic control devices and guide signs according to the MUTCD, approved USDA-FS and state supplements, the current edition of USDA-FS EM-7100-15 Sign and Poster Guidelines for the Forest Service, and Standard Highway Signs published by FHWA. Submit the sign list for approval before ordering.
718 - Traffic Signing and Marking Material
718.05_nat_us_08 _05 _2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
FM&S 201.1
PART 1 - SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 -DESCRIPTION -Heavy Brushing or Mowing
A. SCOPE OF CONTRACT- Contractor shall furnish all labor, equipment, materials, tools, transportation, supplies (including safety), supervision, and perform all work necessary for heavy brushing, and or mowing in accordance with these specifications and drawings. The work consists of mechanical and hand heavy brushing on road right-of-ways as designated in the plan and figure I02-1.
C.2 - GENERAL SPECIFICATIONS
A. ROAD STRUCTURE DEFTNITIONS - Graphic definitions of road structural terms are shown in THE ORAWINGS.
C. PUBLIC SAFETY AND TRAFFIC CONTROL - The Contractor shall exercise caution and care while pursuing the work to prevent unnece ssary conflict with, or potential hazard to road users.
The Contractor shall post warning signs with flags on each end of the section of road being worked. Signs shall be of the size, quantity and colors as required in the current edition of the "Manual of Uniform Traffic Control Device s", (MUTCD).
This is the start of the file's text. The full file is on GovTribe.