AMnedment_01__Attachment_4_Drawings_Complete_Revised_7_09_2015.pdf
PDF 25 MB Posted
- Attached to
- Houston Dam Removal Federal contract opportunity
- Solicitation number
- AG-4670-S-15-0105
- Issued by
- Department of Agriculture Forest Service
About this file
Revised Attach 4 Drawings dated 7/9/2015
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amendment_1.pdf | ||
| Attach_2_HOUSTON_and_SANTEETLAH_SPECS.doc | DOC document | |
| Attach_6_DOL_NC68.txt | TXT text file | |
| Solicitation_SF_1442.doc | DOC document | |
| Attach_4_Houston_Drawings_Complete.pdf | ||
| Attach_1_SCHEDULE.pdf | ||
| Attach_3_Site_Location.pdf | ||
| Attach_7__Experience_Questionaire.doc | DOC document | |
| Road_Construction_RFQ.docx | DOCX document | |
| Attach_5_SUBMITTALS__Houston_Santeetlah.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL FORESTS IN NORTH CAROLINA
NANTAHALA NATIONAL FOREST
NANTAHALA RANGER DISTRICT
HOUSTON DAM REMOVAL PROJECT
AND STREAM RESTORATION
SHEET NO CONTENT
1 COVER SHEET
CONSTRUCTION NOTES
EXISTING CONDITIONS - DAM AREA
GRADING PLAN & LIMIT7
PROJECT LOCATION & AERIAL
STREAM AND DAM PROFILES WITH BORING LOCATIONS
CORE BORINGS MAP
STORMWATER, EROSION AND POLLUTION CONTROL PLAN
LOG VANE, BEAVER DAM SIMULATION & CROSS VANE
TOE WOOD/SOD MAT (BANKFULL BENCH)
EROSION CONTROL MEASURES - 1
EROSION CONTROL MEASURES - 2
DEWATERING PLAN
STREAM RESTORATION STRUCTURES
- VICINITY MAP -
GEORGIA
N
O
R
T
H
C
A
R
O
L
I
N
A
S
O
U
T
A
R
O
L
I
N
A
NORTH CAROLINA
HIGHLANDS
FRANKLIN
CASHIERS
LAKE
GLENVILLE
SCALY
MOUNTAIN
PROJECT SITE
P
I
N
E
R
E
K
R
D
Whiteside
Mountain
Buck C r e e k
R o a d
EQUIPMENT & OPERATOR AND STRUCTURAL STONE SPECIFICATIONS
STORMWATER DETAILS_1
STREAM CROSS SECTION A - A' & TYPICAL STREAM SECTION
LANDSCAPE PLAN
2 PROJECT CONTEXT & WATERSHED
BREACH PLAN
STORMWATER DETAILS_2
TYPICAL DEWATERING DETAILS
TYPICAL PLANTING PLAN DETAILS
SHEET NO CONTENT
S1 COVER SHEET
S2 EXISTING CONDITIONS
S3 CONSTRUCTION NOTES
S4
S5
TRAFFIC MAINTENANCE PLANS6
MATERIAL STORAGE AREA MAP
Date
RECOMMENDED BY: Mike Wilkins
APPROVED BY: Kristin Bail
RECOMMENDED BY: Lynn L. Hicks
REGION 8
U.S.D.A. FOREST SERVICE
NATIONAL FORESTS IN N.C.
Recreation, Engineering Heritage Staff Officer - National Forests in North Carolina
NANTAHALA NATIONAL FOREST
District Ranger - Nantahala Ranger District
Forest Supervisor - National Forests in North Carolina
Date
Date
Date
DESIGNED BY: James Barry Jones
Assistant Forest Engineer - National Forests in North Carolina
PROJECT CONTEXT & WATERSHED
SCALE: 1" = 1200'
600'
0'
600' 1200'
N O
R T
H
NATIONAL FORESTS IN NORTH CAROLINA
NANTAHALA NATIONAL FOREST - NANTAHALA RANGER DISTRICT
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
PROJECT LOCATION & AERIAL
SCALE: 1" = 60'
30'
0'
30' 60'
NORTH
NATIONAL FORESTS IN NORTH CAROLINA
NANTAHALA NATIONAL FOREST - NANTAHALA RANGER DISTRICT
HOUSTON DAM REMOVAL
GENERAL NOTES:
1. FOR THIS PROJECT STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL
HIGHWAY PROJECTS AND SPECIAL PROJECT SPECIFICATIONS WILL BE USED, HEREINAFTER REFERRED TO
AS FP-03 SPEC.
2. STORAGE OF ALL EQUIPMENT ON SITE WILL BE AT THE CONTRACTOR'S RISK AND AT A LOCATION
APPROVED BY THE CONTRACTING OFFICER.
3. CONSTRUCTION EQUIPMENT SHALL BE CONFINED TO THE DISTURBED POND AREA, UNLESS OTHERWISE
APPROVED BY THE CONTRACTING OFFICER.
4. ALL EXCAVATION IS CONSIDERED TO BE UNCLASSIFIED.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE TO NATIONAL FOREST ROADS DUE TO
TRANSPORTATION OF CONTRACTORS EQUIPMENT AND OR MATERIALS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR DIVERSION OF WATER DURING CONSTRUCTION AS REQUIRED;
CONTRACTOR SHALL FOLLOW BMP'S TO ENSURE QUALITY.
7. EACH CULVERT'S LOCATION, LENGTH AND SKEW SHALL BE FIELD VERIFIED BY THE CONTRACTOR AND
APPROVED BY THE CONTRACTING OFFICER PRIOR TO ORDERING.
8. WOODY MATERIAL CUT DURING CULVERT INSTALLATION SHALL BE SCATTERED OUTSIDE
THE CLEARING LIMITS.
9. EXISTING CULVERTS TO BE REMOVED ARE THE PROPERTY OF THE CONTRACTOR AND SHALL
BE REMOVED FROM NATIONAL FOREST LANDS AND DISPOSED OF PROPERLY.
10. FILL SLOPE= 1.5:1, CUT SLOPE=1:1, OR AS STAKED BY THE CONTRACTING OFFICER OR AS
SHOWN ON THE PLANS.
11. WOODY MATERIAL GREATER THAN 2" IN DIAMETER OR LONGER THAN 3' SHALL NOT BE
INCORPORATED INTO CONSTRUCTED FILLS.
12. DEPTHS OF SILT MATERIAL SHOWN ON THE PLANS ARE ESTIMATED SOIL DEPTHS.
13. ALL RIPRAP SHALL BE PLACED BY HAND OR MACHINE, NOT SIDE CAST OR END DUMPED.
14. ALL PERMANENT SIGNS SHALL BE SECURED WITH TAMPER-RESISTANT HARDWARE APPROVED
BY THE CONTRACTING OFFICER.
15. PRIOR TO ANY EXCAVATION, CALL "NORTH CAROLINA ONE-CALL CENTER" AT 1-800-632-4949 OR 8-1-1.
16. THE CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL INCLUDING TEMPORARY SIGNING AND
PROTECTION OF THE PUBLIC. SIGNAGE BEYOND THOSE SHOWN ON THE DRAWING MAY BE REQUIRED.
17. TRAFFIC CONTROL SIGNS SHALL CONFORM TO MUTCD SPECIFICATIONS.
18. ALL DRAINAGE STRUCTURES CONSTRUCTED/RECONSTRUCTED/RECONDITIONED SHALL BE
CONSTRUCTED/RECONSTRUCTED/RECONDITIONED TO DRAIN.
19. ALL STAKES AND FLAGGING IN THE FIELD THAT WERE USED FOR PROJECT IMPLEMENTATION SHALL BE
GATHERED & REMOVED FROM FOREST LAND BY THE CONTRACTOR PRIOR TO FINAL ACCEPTANCE OF THE
PROJECT. THIS WORK IS CONSIDERED PART OF MOBILIZATION AND NO SEPARATE PAYMENT T WILL BE MADE.
20. A TRAFFIC PLAN OF TRUCKS ENTERING HIGHWAY WILL BE REQUIRED TO BE COORDINATED WITH NCDOT AND
A PERMIT FOR A TRAFFIC PLAN MAY BE REQUIRED BY NCDOT.
GENERAL NOTES: PAY ITEMS
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL SURVEY STAKES AND MONUMENTS, QUALITY
CONTROL, AND SAMPLING AND TESTING, NO SEPARATE PAYMENT WILL BE MADE.
2. CLEARING REQUIRED FOR CONSTRUCTION, RECONSTRUCTION, MAINTENANCE, INSTALLATION OF OUTLET
DITCHES, CULVERT INSTALLATIONS AND RIPRAP PLACEMENT IS INCIDENTAL TO THAT WORK REQUIREMENT
AND NO SEPARATE PAYMENT WILL BE MADE.
3. IF A CONCRETE DAM CORE IS ENCOUNTERED, THE CONTRACTOR SHALL DISPOSE OF THE MATERIAL
PROPERLY. THIS MATERIAL WILL NOT BE ALLOWED IN THE STOCK PILE LOCATION AND CONTRACTOR
SHOULD CHECK WITH THE LOCAL LANDFILL FOR NECESARRY PERMISSIONS.
EROSION AND SEDIMENT CONTROL:
1. EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE INSTALLED PRIOR TO BEGINNING EARTH
DISTURBING ACTIVITIES IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN.
ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES MAY BE REQUIRED BY
CONTRACTING OFFICER.
2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE
SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN
NO CASE MORE THAN 14 DAYS AFTER WORK HAS CEASED.
3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY SEVEN +7) DAYS OR
AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS ONE-HALF +1/2) INCH. DAMAGED OR
INEFFECTIVE DEVICES SHALL BE REPAIRED OR REPLACED.
4. CONTRACTOR SHALL PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE
REQUIRED TO CONTROL SOIL EROSION DURING ROAD CONSTRUCTION.
5. SEDIMENT SHALL BE REMOVED FROM BEHIND TEMPORARY SILT FENCING WHEN THE DEPTH OF
SEDIMENT REACHES 6 INCHES.
6. ALL DISTURBED AREAS WHERE EARTH IS EXPOSED SHALL BE CLEANED, GRADED SMOOTH,
SHAPED TO DRAIN, AND SEEDED.
7. SEE SUPPLEMENTAL SPECIFICATION 713 - "ROADSIDE IMPROVEMENT MATERIAL" FOR SEED &
FERTILIZER MIXTURE. WHEN SECTION 625 IS NOT INCLUDED IN THE BID SCHEDULE, SEEDING IS
CONSIDERED INCIDENTAL TO OTHER WORK AND THERE WILL BE NO SEPARATE PAYMENT. REPAIR
SEEDING IF INITIAL SEEDING DOES NOT ESTABLISH SATISFACTORY COVER TO CONTROL EROSION, REPAIR WASHES, PREPARE SOIL, SEED AND MULCH AS BEFORE.
8. ALL TEMPORARY SEDIMENT CONTROL MEASURES AND PRACTICES SHALL BE REMOVED WITHIN
TWO (2) MONTHS AFTER THE FOREST SERVICE HAS ACCEPTED THE PROJECT.
CONSTRUCTION NOTES
HOUSTON DAM REMOVALHOUSTON DAM REMOVAL
AND STREAM RESTORATION
EQUIPMENT AND OPERATOR SPECIFICATIONS
A. Manner of Construction - Excavation will be done in a manner which will minimize sedimentation in the stream channel. Silt fence will be installed downstream of the construction area to reduce the risk of sediment entering the stream.
B. Equipment Operator Performance - Equipment operators shall be experienced and competent in the use of the equipment to which they are assigned. They shall be expected to demonstrate a level of proficiency with the equipment which enables them to be productive in all aspects of stream restoration work. Equipment operators shall be experienced in the construction of Rosgen designed structures; including the cross vane, J-hook vane, and Toe-wood/Sod mat.
C. Operators will be instructed by the construction inspector as to the desired result of construction activities. Operators will be responsible for determining how best to use equipment to achieve the desired results. Chain saw operators will be required to cut trees, limbs and root masses as necessary to facilitate the removal and placement of debris in the stream.
D. Environmental Considerations - Earth moving equipment will cross and operate in the stream flow only when necessary and only when directed to do so by the construction inspector. Equipment shall be new or of low hours and be maintained to prevent fuel, oil and lubricant spills in the vicinity of the stream. Refueling, repairs and lubrication will be performed at a safe distances from the stream and only at locations approved by the construction inspector where water is controlled by runoff control measures.
E. Safety Considerations - At work sites, where equipment will be operated on Forest Roads, flagman shall be stationed to warn oncoming traffic of congestion. Construction road signs shall be in place and a means of removing sediment, mud or rocks from roadways shall be established. The contractor will be responsible for the implementation of these measures.
F. Equipment Specifications Hydraulic Excavator:
Track mounted, hydraulic powered.
Excavator:
Min weight - 30,000 lbs Min. Reach - 22 feet Min Digging Depth - 20 feet Min Bucket size - 1.0 Cu Yd.
Min 115 HP Equipped with hydraulic thumb, with experienced operator as described above.
(More than 1 excavator may be required. Unit price bid should be for one excavator for one hour of running time).
IN-STREAM STRUCTURES SPECIFICATIONS
Structure Stone Description The work covered by this section consists of furnishing, stockpiling, placing and maintaining approved stone to be utilized to construct rock and log vanes, root wad structures, the step-pool structures, stream crossings, sediment and erosion control measures for use in locations as directed by the Designer. The quantity of stone may be increased, decreased, or eliminated entirely at the direction of the Designer.
Such variations in quantity will not be considered as alterations in the details of construction or a change in the character of the work.
Structure Stone, cont.
Materials Stone for Coarse Aggregate, No. 57 Stone, "Rip Rap-Class B", and "Boulder" shall consist of blasted stone or other stone approved by the Designer. The stone shall be sound, tough, dense, resistant to the action of air and water, and suitable in all other respects for the purpose intended.
All stone shall meet the approval of the Designer. While no specific gradation is required, the various sizes of the stone shall be equally distributed within the required size range. The size of an individual stone particle will be determined by measuring its long dimension.
Acceptance Criteria for Stone:
No more than 5 percent of the material furnished can be less than the minimum size specified, more than 10 percent of the material can exceed the maximum size specified. Boulders shall be relatively flat on either side in the same dimension, preferably the long dimension.
Construction The Contractor shall place stone, in locations shown on the construction plans to the thickness, widths, and lengths as shown on the construction plans or directed by the Designer. All stone shall be placed neatly and uniformly with an even surface to form an in-stream structure or a sediment and erosion control device or in accordance with the construction plans and special provisions, and shall meet the approval of the Designer.
Method of Measurement The quantity of stone required to construct the structures or sediment and erosion control measures detailed in these special provisions will be incidental to those bid items. However, field conditions may warrant the need for additional stone greater than the quantity specified or detailed for each bid item. The quantity of stone that has been incorporated into the project, as directed or approved by the Designer, which exceeds 110% of the quantity required for each bid item will be measured by weight. Measured by weight will require the quantity to be weighed in trucks on certified platform scales. Stone that was previously stockpiled for other bid items will not be measured a second time for this provision.
CLASS
REQUIRED STONE SIZES (INCHES)
Minimum Average Maximum
Boulder
36" x 20" x 12"
20 36 42
EQUIPMENT & OPERATOR
AND STRUCTURAL STONE SPECIFICATIONS
HOUSTON DAM REMOVAL
EXISTING CONDITIONS - DAM AREA
& DRAINED LAKE VIEWS
HOUSTON DAM REMOVAL
STORMWATER, EROSION AND
POLLUTION CONTROL PLANHOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 30'
15'
0'
15' 30'
N O
R T
H
SCALE: 1" = 30'
15'
0'
15' 30'
N O
R T
H
BREACH PLAN
CORE BORINGS MAP &
DRAINED LAKE VIEWS
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 30'
15'
0'
15' 30'
N O
R T
STREAM AND DAM PROFILES
WITH BORING LOCATIONS
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
Not to Scale
AND STREAM RESTORATION
STORMWATER DETAILS - 1
AND STREAM RESTORATION
STORMWATER DETAILS - 2
LOG VANE, BEAVER DAM SIMULATION
& CROSS VANE
HOUSTON DAM REMOVAL
TOE WOOD/SOD MAT (BANKFULL BENCH)
HOUSTON DAM REMOVAL
EROSION CONTROL MEASURES - 1
HOUSTON DAM REMOVAL
EROSION CONTROL MEASURES - 2
HOUSTON DAM REMOVAL
DEWATERING PLAN
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 60'
30'
0'
30' 60'
NORTH
TYPICAL DEWATERING DETAILS
HOUSTON DAM REMOVAL
STREAM CROSS SECTION A - A'
& TYPICAL STREAM SECTION
SCALE: 1" = 30'
15'
0'
15' 30'
A A'
N
O
R
T
STREAM RESTORATION STRUCTURES
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 60'
30'
0'
30' 60'
LANDSCAPE PLAN
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 60'
30'
0'
30' 60'
TYPICAL PLANTING PLAN DETAILS
MATERIAL STORAGE AREA MAP
SCALE: 1" = 2000'
1000'
0'
1000' 2000'
N O
R T
H
NATIONAL FORESTS IN NORTH CAROLINA
NANTAHALA NATIONAL FOREST - NANTAHALA RANGER DISTRICT
HOUSTON DAM REMOVAL
AND STREAM RESTORATION
SCALE: 1" = 200'
50' 0' 50' 100'
N O
R T
H
SCALE: 1" = 30'
0' 20' 30'
N O
R T
10'
S1
SANTEETLAH CREEK DAM REMOVAL
AND FISH LADDER REMOVAL
S6
Date
RECOMMENDED BY: Mike Wilkins
APPROVED BY: Kristin Bail
RECOMMENDED BY: Lynn L. Hicks
Recreation, Engineering Heritage Staff Officer - National Forests in North Carolina
District Ranger - Nantahala Ranger District
Forest Supervisor - National Forests in North Carolina
Date
Date
Date
DESIGNED BY: James Barry Jones
Assistant Forest Engineer - National Forests in North Carolina
TEMPORARY WASTE &
EQUIPMENT STORAGE AREA
EXISTING GUARDRAIL
STEEPLY SLOPED TERRAIN
NOTE:
TEMPORARY CONSTRUCTION
ACCESS ROUTE TO BE
OBLITERATED BY
CONTRACTOR WHEN
PROJECT IS COMPLETE.
(NO ACCESS)
NOTE:
DIMENSIONS SHOWN
ARE APPROXIMATE ONLY.
S2
S6
SCALE: 1" = 50'
25'
0'
25' 50'
N O
R T
H
AND FISH LADDER REMOVAL
S3
AND FISH LADDER REMOVAL S6
DAM ELEVATION
V A
R I E
S
VARIES
APPROXIMATELY 200 FT.±
VARIES
VARIES
A
V E
R A
G E
NOT TO SCALE
VARIES
18" REINFORCED
CONCRETE
STRUCTURE
A
V E
R A
G
I G
H T
V
A R
I E
S
W
I T
H
T
E R
R A
I N
S4
SANTEETLAH CREEK DAM REMOVAL
AND FISH LADDER REMOVAL
S6
S5
AND FISH LADDER REMOVAL S6
DRAWINGS
NOT TO SCALE
W3-4 W21-1a
36" x 36" MIN. 36" x 36" MIN.
BE PREPARED
TO STOP
TRUCKS
HAULING
LW21-15
36" X 36" MIN.
S6
S6
HOUSTON & SANTEETLAH CREEK DAM REMOVAL
AND STREAM RESTORATIONS
| Revised sheet 7 |
| Drawings Complete 7_09_2015 |
| Drawings Complete |
| SHT-1 |
| SHT-2 |
| SHT-3 |
| -SHT-4 |
| SHT-5 |
| SHT-6 |
| SHT-8 |
| 9 |
| SHT-10 |
| 11 |
| 12 |
| 13 |
| SHT-14 |
| SHT-15 |
| SHT-16 |
| SHT-17 |
| SHT-18 |
| SHT-19 |
| SHT-20 |
| SHT-21 |
| SHT-22 |
| SHT-24 |
| SHT-S1 |
| SHT-S2 |
| SHT-S3 |
| SHT-S4 |
| SHT-S5 |
| SHT-S6 |
Sht 23