Atch 1 Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amend 02.pdf | ||
| amend 10001.pdf | ||
| AG-4660-S-12-0005.docm | DOCM document | |
| ATch 4 Past performance questionaire_.doc | DOC document | |
| ATCH 3 experience Questionaire.doc | DOC document | |
| ATch 5 Additional Requirements.doc | DOC document | |
| ATCH 2 DOL Wage Rates.mht | MHT file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mechanical Herbicide Application—IDIQ--Savannah River AG-4660-S-12-0005
ATTACHMENT 1
MECHANICAL HERBICIDE BROADCAST APPLICATION SPECIFICATIONS
USDA – FOREST SERVICE – SAVANNAH RIVER SITE
SPECIFICATIONS INDEX:
| C.1 |
| GENERAL SPECIFICATIONS |
| C.1.1. |
| SCOPE OF CONTRACT |
| C.2 |
| DEFINITIONS |
| C.3 |
| GOVERNMENT FURNISHED PROPERTY AND SERVICES |
| C.4 |
| PERFORMANCE REQUIREMENTS SUMMARY |
| C.5 |
| TECHNICAL SPECIFICATIONS REQUIREMENTS |
| C.6 |
| EQUIPMENT TECHNICAL SPECIFICATIONS REQUIREMENTS |
| C.7 |
| SAFETY / EQUIPMENT REQUIREMENTS |
| C.8 |
| INSPECTION AND ACCEPTANCE |
| C.9 |
| QUALITY CONTROL PLAN |
| C.10 |
| METHOD OF MEASUREMENT AND PAYMENT |
| C.11 |
| EXAMPLE FORMS – INSPECTION / INSTRUCTION / COMPUTATION |
C.1 GENERAL SPECIFICATIONS:
| C.1.1. |
| Scope of Contract: This contract is for performing site preparation and mid story release by means of mechanical ground broadcast herbicide applications with Government-Furnished herbicides at the Savannah River Site, New Ellenton SC on Department of Energy lands in accordance with the specifications and clauses contained or referenced herein. The contractor shall possess a valid South Carolina state commercial pesticide applicators license. The contractor shall furnish all labor, materials, supervision, transportation, equipment, and supplies (including safety), except for Government furnished material, supplies, or equipment identified in Specifications C.3 Government Furnished Property and Services. When it is determined by the Contracting Officer (CO) that the original areas, or portions thereof, are unsuitable or unavailable for performance of the specified work the CO reserves the right to delete areas or to substitute, at the contract price, the same type and amount of work (+ / - 5 %) in other areas similar in topography and conditions within the Savannah River Site boundaries. |
| C.1.2. |
| Description and Location: All contract treatment areas are located within the boundaries of the Savannah River Site, Aiken, Allendale, and Barnwell Counties, South Carolina. Descriptions of the areas to be treated are as follows: |
Item No. 0001 – Site Preparation: Cutover timber units and brush fields.
Each area will vary with vegetation, brush, number of standing trees, logging slash density, and cut tree stumps that vary in height.
Item No. 0002 – Red Cockaded Woodpecker, Endangered Species, (RCW) Mid / Understory Control: Mature longleaf pine plantations, each area will vary with vegetation, brush, number of standing trees, logging slash density, and possible cut tree stumps that vary in height.
Item No. 0003 – Red Cockaded Woodpecker, Endangered Species, (RCW) Mid / Understory Control – Designated Area(s): Mature longleaf pine plantations, each area will vary with vegetation, brush, number of standing trees, logging slash density, and possible cut tree stumps that vary in height.
Item No. 0004 – Seed Production Mid – Understory Control: Mature longleaf pine plantations. Each area will vary with vegetation, brush, number of standing trees, logging slash density, and possible cut tree stumps that vary in height.
Unforeseen hazards also may be encountered within the treatment areas such as, but not limited to, unmarked open wells, ditches, gullies, and steep slopes. The Forest Service highly recommends that the contractor inspect each designated treatment site before beginning work.
| C.1.3. |
| Protection of Designated Reserve Tree(s), RCW Cavity Tree(s), RCW Tree(s), and Seed Production Tree(s): The contractor shall be assessed ($50) per skinned or damaged Designated Reserve tree(s), RCW Cavity tree(s), RCW tree(s), and Seed Production tree(s). Contractor may be directed by COTR to protect trees of any type, whether paint marked, flagged, or neither. |
Item 0001.
Designated Reserve Tree(s)
Pine and hardwood trees marked with a painted continuous band, a half band, or a single stripe on opposite sides of same tree. The paint color is either blue or orange. These trees can be in groups or inclusions. Trees with paint mark “X” are not protected.
Item 0002. RCW Cavity Tree(s) / RCW Tree(s).
Pine with a DBH of (10) inches or greater. RCW tree(s) are not marked with a double band of paint at breast height. Only RCW cavity tree(s) are marked with a double band of white paint.
Item 0003. RCW Cavity Tree(s) / RCW Tree(s).
Pine with a DBH of (10) inches or greater. RCW tree(s) are not marked with a double band of paint at breast height. Only RCW cavity tree(s) are marked with a double band of white paint.
Item 0004. Seed Production Tree(s). Longleaf pine with a DBH of (10) inches or greater. *All trees within the seed production areas meeting this specification are considered Seed Production tree(s).
| C.1.4. |
| The contractor is required to possess a valid South Carolina state commercial pesticide applicator’s license category (2) Forest Pest Control, and shall be present on the work site all times when herbicides are being applied. |
| C.1.5. |
| The contractor shall submit to the COTR a plan of operations within (5) days after receiving a work order showing the intended treatment schedule, and may not have more than two incomplete unaccepted sites being worked at the same time. |
| C.1.6. |
| Supervision: The contractor shall designate, in writing, at least one English-speaking supervisor for each crew. The supervisor shall be at the work site at all times when herbicides are being applied. |
| C.1.7. |
| Boundaries: Boundaries of areas to be worked are marked with three painted stripes or flagged with ribbon. Protected areas within marked boundaries will also be marked with three painted stripes or flagged with ribbon. |
| C.1.8. |
| The contractor shall adhere to all warnings, precautions, and general information printed on the herbicide label(s) and material safety data sheet(s) by the manufacturers at all times, including, if applicable, the Worker Protection Standard covered by Title 40 CFR Part 170. |
| C.1.9. |
| Road Access / Power Line(s): The contractor may access the treatment areas from the primary site and forest roads, indicated on project maps. The contractor shall not block access roads with equipment. The contractor shall remain a distance of (25) feet away from power lines when performing operations. |
| C.1.10. |
| Locked Gates: In cases where treatment areas are behind locked gates, the contractor shall close and lock gates after entering or exiting each gate. |
| C.1.11. |
| Protection of Improvement(s): The contractor shall take every precaution necessary to prevent damage to any improvement(s) within the contract area(s). The contractor shall be required to promptly repair any damaged improvement(s) caused by the contractor’s operations. Roads and trails shall be kept free of logs, slash, and debris. Access guidelines will be provided by the COTR / Inspector(s). |
| C.1.12. |
| Protection of Soil: Contractor shall use every precaution necessary to prevent the contamination of soil due to the spills of petroleum products (oils and fuels), ethylene glycol (coolant), and other chemicals or harmful materials. Contractor shall also be responsible for reporting all spills of the afore mentioned materials immediately to the USFS – SR Coordination Center (Dispatch Office), and COTR / Inspector(s). The contractor shall also be responsible for the excavation and disposal of all soils contaminated by the contractor’s operations. The contractor shall take contaminated soils to a certified state operated landfill capable of accepting the type contaminated soil. A receipt of acceptance for the contaminated soil must be presented to the Contracting Officer, COTR and Environmental Coordinator. |
| C.1.13. |
| Chemical Transportation / Storage: The contractor shall transport herbicides, adjuvants, and surfactants used in this contract only in accordance with the label instructions and approved Forest Service, Savannah River procedures for the safe transportation of chemicals. Primary chemical storage shall be at the Forest Service, Savannah River headquarters pesticide storage building (building 760 – 9G). The contractor shall be required to store pesticides, adjuvants and spray surfactants / over - night on the work sites. Storage must have the ability to be secured on site, posted as a “Pesticide Storage Area” and must be approved by the Forest Service prior to use. Example; enclosed highway cargo trailer chained and locked to a suitable non-moveable object. A maximum amount of 110 gallons of herbicide can be removed from the pesticide storage building and stored on the work site at a time (this does not include spray adjuvants / surfactants or spray pattern indicators). No unlocked herbicide or adjuvant containers full or partially full shall be left unattended. |
| C.1.14. |
| The contractor shall maintain a daily record of the amount and location of chemical(s) used each day on an herbicide application instruction form. The contractor shall also maintain a daily record of work down time, due to weather conditions (rain, winds) and equipment failure. |
| C.1.15. |
| Contractor shall not transport skidder / sprayer applicator with herbicide mixture in spray tank. Spray tank shall be empty prior to moving to a new work site unless approved in advance by the COTR / Inspector(s). |
| C.1.16. |
| Contractor shall clean equipment only in areas designated by the COTR / Inspector(s). The contractor shall clean application equipment of herbicides and residues before moving to a new area and applying a different type herbicide / tank mixture if so instructed by the COTR / Inspector(s). |
| C.1.17. |
| Contractor shall triple-rinse and puncture, or cut (on three sides) all empty chemical containers at the site of application return them to Forest Service headquarters, and dispose of them in the trash dumpsters. |
| C.1.18. |
| All trash, rubbish and debris generated by the contractor's operation shall be |
removed from each work area and disposed of properly, in order for work to be accepted.
| C.1.19. |
| Adverse Site Conditions: If unanticipated problem sites are encountered due to high water table or other uncontrollable factors such as rain, wind, high temperatures and low humidity the COTR / Inspector(s) will direct the contractor to treat (spray) these sites when conditions are favorable. |
C.2 DEFINITIONS:
Contract Time. All calendar days allowed for completion of contract work. Includes all days of the week including weekends and holidays.
Task / Work Order(s). Written notice to the contractor specifying treatment areas
(location maps included), chemical rates to be applied per/acre, and contract time allotted in calendar days for the work to be completed.
Contracting Officer’s Technical Representative (COTR) / Inspector(s). The COTR / Inspector(s) are the on - site contract administrator for the Contracting Officer (CO). The duties and responsibilities of the COTR / Inspector(s) are defined in the letter of designation issued by the Contracting Officer.
Delivery Point. The point identified for delivery of Government furnished Property and
Services. If there are multiple points for delivery of various items, it will be so noted.
Compartment / Stand. The Savannah River Site forest is identified as timber compartments, within compartments are smaller areas identified as stands.
Example: Compartment 52 Stand 10 (30) Acres.
Remote Field Workers and Contractor Tracking System. The USFS – SR
Coordination Center, (Fire Dispatch Office), tracks all field going personnel utilizing a site grid system. Example: NE – E5. During off shift hours Savannah River Site Operations Center (SRSOC) tracks and notifies USFS-SR employees, contractors, researchers and other cooperator personnel through radio, cell phone, and alphanumeric pagers.
GPS. Global Positioning System. A system of satellites, computers, and receivers that is able to determine the latitude and longitude of a receiver on earth by calculating the time difference for signals from different satellites to reach the receiver.
AGPS. A technology that uses an assistance server to cut down the time needed to determine a location using GPS.
Quality Assurance. The actions taken by the Government to assess the contractor’s results to determine that they meet contract requirements. The methods for quality assurance is described in the Quality Assurance Surveillance Plan (QASP).
Quality Control (QC). Those actions taken by a contractor to control the production of outputs to ensure that they conform to the contract requirements. The methods for inspecting for quality control are described in the Contractor’s Quality Control Plan.
Pesticide / Herbicide. Pesticide(s) are chemicals that control, prevent, destroy, or regulate pests. Herbicide(s) are pesticides that kill or control plants.
Pesticide / Herbicide Prescription. Description of the chemical(s), additive(s), surfactant(s), and rates to be applied; Example of a standard tank mix: – (1.0 gallon hexazinone per / acre) – (38.0 oz. triclopyr per acre) – (.64 oz. – tracer dye per gallon of spray mixture) – (.64 oz. – surfactant per gallon of spray mixture).
MSDS. Material safety data sheet(s), contains important information on a chemical’s properties.
PPE. Personal Protective Equipment.
Chemical Spill Kit(s). Necessary equipment required for containing small chemical spills of (50) gallons or less.
Tree Drip Line. The line extending vertically from the exterior edge of a tree’s live crown to the ground.
Protected / Buffered Areas. Areas flagged, marked out with paint, stand boundary lines, or improvements (test wells, roads, main road systems) that are to be protected from pesticides during the contractor’s operations. Protected areas to be buffered from pesticides shall be identified on each stand treatment instruction map.
Designated Reserve Tree(s). Pine or hardwood trees identified by either orange or blue paint, or flagging. These trees can be in clumps, groups, or inclusions.
DBH. Diameter measured in inches at breast height.
Red Cockaded Woodpecker (RCW). Endangered woodpecker species protected under
Federal law.
RCW Cavity Tree(s). Any tree containing a RCW nest or roost, marked with a double band of white paint at breast height, and typically metal tagged with an identification number.
RCW Tree(s). Pine tree, in RCW area, with DBH of (10) inches or greater.
Seed Production Trees. All longleaf pine trees, in seed production area, with a DBH of (10) inches or greater.
Site Preparation. Eliminating unwanted vegetation, woody plants, and trees from cutover timber stands or brush fields preceding pine / hard wood regeneration. Prescribed coverage is 100% of stand.
RCW Mid /Understory Control. Eliminating the layer of foliage (vegetation, woody plants / trees) intermediate in height between the canopy and ground that deprive nutrients and moisture from the desired species of trees. Prescribed coverage is 100% of stand.
RCW Mid /Understory Control - Designated Area(s). Eliminating the layer of foliage (vegetation, woody plants / trees) intermediate in height between the canopy and ground that deprive nutrients and moisture from the desired species of trees. An identified location further defined by a prescribed coverage that is between 30% and 100%.
Example: Compartment 52 Stand 10 (30) Acres is to receive 15 acres of coverage evenly spaced in strips across the stand.
Seed Tree Production Mid /Understory Control. Eliminating the layer of foliage (vegetation, woody plants / trees) intermediate in height between the canopy and ground that deprive nutrients and moisture from the desired seed trees. Prescribed coverage is 100% of stand.
C.3 GOVERNMENT FURNISHED PROPERTY AND SERVICES:
Property and services that will be provided by the Government are as follows:
| Item(s) |
| Description |
| Where, When, How |
C.3.1. Treatment schedule.
| Area location identification, acre(s), chemical(s) and rate(s) required to be applied per /acre. |
| Provided with task order(s). |
| C.3.2. Project map(s). |
| Location map(s) of treatment area(s). |
| Provided with task order(s). |
| C.3.3. Stand treatment instruction map(s). |
| Map(s) consisting of detailed instructions, identifying areas that are to be protected / buffered. |
| Provided with task order(s). |
C.3.4. Access behind locked gate(s).
| Government shall provide access through road closures (locked gates) with detailed instructions. |
| During the contract period, Contractor shall be required to sign for gate key(s). |
| C.3.5. Pesticide label(s) / material safety data sheet(s) - MSDS. |
| Chemical(s) used during contract, labeling and material safety data sheets. |
| Provided with task order(s). |
| C.3.6. Pesticide(s), surfactant(s), and other additive(s). |
| Forestry use herbicide(s), non – ionic surfactant(s), water based tracer dye(s), drift retardant(s), and anti-foaming agents. |
| As required, building 760 – 9G. |
C.3.7. Pesticide application treatment forms.
| To be completed by contractor, detailing each pesticide application, location, chemical rate(s), application date(s). |
| Provided with task order(s). |
C.3.8. Eye Wash Station(s).
Portable eye wash station(s) capable of supplying water to flush the eyes for (15) minutes.
As required, building 760 – 9G.
| C.3.9. Chemical Spill Kit(s). |
| Kit capable of containing (50) gallons. |
| During the contract period, building 760 – 9G. |
| C.3.10. D.O.E. Site pagers. |
| D.O.E. Site pager(s) for site emergency notification. |
| Provided at pre work meeting. |
| C.3.11. FM Site Radio. |
| Radio permits communication with FS/SR Operations Center. |
| Provide with task order. |
| C.3.12. |
| Chemicals may be signed out and returned by the contractor during normal working hours 8:00 am - 4:00 pm, Monday - Friday, excluding Federal holidays at the USDA Forest Service, Savannah River pesticide storage building. Any deviations from the statement above are subject to the COTR’s approval on a case by case basis. There shall be a 30-minute grace period for both parties, (Contractor and the Government). The contractor shall be assessed the hourly pay rate, (loss time) for the COTR / Inspector(s) assigned to meet the contractor, if the contractor arrives after the 30 – minute grace period expires, for the time the COTR or Inspector(s) wait for the contractor to arrive. If the contractor notifies the COTR or Inspector(s), either prior to the required time to meet or during the 30-minute grace period that the contractor will be unable to meet the COTR / Inspector(s) at the time requested, the contractor will not be assessed a deduction. Deductions will be made from the contractor’s invoice, as submitted for any charges under this provision. COTR or Inspector(s) may leave after the 30 minute grace period, if the contractor has not contacted them. When the contractor requests the COTR or Inspector(s) to be available for herbicide sign out and subsequent application of herbicides on weekends or holidays and fails to arrive, the contractor shall be assessed two hours for the COTR or Inspector(s) at the current overtime or holiday pay rate. The COTR or Inspector(s) will leave after the 30 minute grace period during weekends or holidays. The contractor shall be responsible for loading and transporting chemicals to and from the work sites. |
| C.3.13 |
| The contractor shall be allowed to obtain water for his / her operations from the water station located at the Forest Service headquarters with permission from the Fire Management Officer or Dispatch Center Manager. Water may also be obtained from other open use water stations located on the Savannah River Site. |
The Forest Service cannot guarantee a provided water source for the contractor. Water for the contractor’s spray solution is not considered a Government furnished service or property. The contractor shall not be allowed to use water from any ponds, lakes, creeks, rivers, or flowing streams on site, or off site.
C.4 PERFORMANCE REQUIREMENTS SUMMARY:
The following describes the major items in the contract with the incentives and deductions for the work described. If the contractor meets the standards for each item no deductions will be made and the contractor will receive a positive performance evaluation. If standards are not met by the contractor, corrective action will be taken, the Government may assess actual damages, and provide adverse performance evaluation.
| Work Statement |
| Performance Standard |
| Government Method of Assessment |
| Acceptable Quality Level |
| Deductions for failing to meet Standards |
Protection of Designated Reserve Tree(s), RCW Cavity Tree(s) RCW Trees, and Seed Production Tree(s).
Section
C.1.3.
| Protect Designated Reserve Tree(s) / RCW Cavity Tree(s), RCW Trees, and Seed Production Tree(s) from being damaged with equipment. |
| COTR and Inspector(s) shall conduct periodic inspections. |
| 100% |
| Contractor shall be assessed $50 per skinned or damaged Designated Reserve Tree(s). RCW Cavity Tree(s), RCW Tree(s), and Seed Production Tree(s). |
Herbicide Application
Inspection and Acceptance:
Section(s)
C.8
C.8.2.
Herbicide(s), shall be evenly applied over the designated areas within (+ / -) 5 % at specified rates to be acceptable.
| COTR and Inspector(s) shall conduct periodic visual inspections, review contractor’s computer application reports and records. |
| 95% |
| Applications below 5 % of the specified rates; the contractor shall be required to reapply the deficit amount of chemical(s) evenly over the designated area(s) if instructed by the COTR, without adjustment in contract time or additional compensation. |
Herbicide Application
Inspection and
Acceptance:
Section(s)
C.8.
C.8.3.
Herbicide(s), shall be evenly applied over the designated areas within (+ / -) 5 % at specified rates to be acceptable.
| COTR and Inspector(s) shall conduct periodic visual inspections, review contractor’s computer application reports and records. |
| 105% |
| Applications over 5 % of the specified rates: The contractor shall be assessed the value of the chemical(s) over applied at the Government’s cost. |
C. 5 TECHNICAL SPECIFICATION REQUIREMENTS:
GENERAL APPLICATION INSTRUCTION FOR ITEM(S) No. 0001 - 0004:
| C.5.1. |
| Method of treatment shall be a broadcast spray. Herbicides to be applied by the |
contractor shall be standard forestry type use, foliar and or soil active, tank mixed with a non - ionic surfactant. Water based tracer dye and drift control spray adjuvant(s) may also be required. The contractor shall be directed to apply herbicides, individually, or as a combination together with clean water to produce a spray solution. A minimum of (50) gallons of spray mixture shall be required per acre. Each designated treatment area will require a specific herbicide prescription that will be specified on each task order. The Forest Service reserves the right to change the herbicide prescriptions as issued on the work order if it is determined by the COTR that a more appropriate herbicide prescription is desirable at the time of application. All herbicide(s), adjuvant(s), additive(s), and spray mixtures shall be applied with an articulated rubber-tired skidder, equipped with AGPS (Assisted Global Positioning System) with parallel swathing option, light bar guidance system, mapping computer capable of producing shapefiles, spray control computer, solution, and speed meters, all capable of working in conjunction together to meet the required spray rates per acre. Spray mixtures shall be applied from nozzles mounted at a fixed position to produce a minimum spray swath of (35) feet and no greater than (55) feet, even in distribution.
| C.5.2. |
| The contractor shall apply herbicide(s) evenly over the entire designated treatment area(s) within (+ / -) 5% of the specified prescribed application rates. |
| C.5.3. |
| All herbicides (spray mixtures) shall be thoroughly agitated for (5) minutes prior to, and during application. |
| C.5.4. |
| The contractor shall be required to demonstrate the sprayer equipment calibration for the COTR / Inspector(s), prior to start of operations, and shall be spot-checked periodically during the course of the contract. The contractor shall be instructed to recalibrate the sprayer equipment if needed, by the COTR / Inspector(s) in order to comply with the specified application rates. The COTR / Inspector(s) shall observe the contractor during the herbicide loading and mixing, and inspect the contractor’s treatment use records daily to ensure that all safety and technical specifications are being followed. |
| C.5.5. |
| Protected /Buffer Areas: Herbicides shall not be applied within (25) feet of test wells or waste sites identified or unidentified, on maps and designated on the ground with ribbon. When applying soil active herbicides, the contractor shall maintain buffer areas of (20) feet from boundary line tree drip zones, around stand boundaries and designated hardwood inclusions. When applying foliar type herbicides, the contractor shall apply adjacent to stand boundaries or as directed by the COTR / Inspector(s). Protected and areas to be buffered from pesticides shall be identified on each stand treatment instruction map. |
| C.5.6. |
| The contractor shall not apply herbicides when wind speeds exceed (10) miles per hour, or within (120) feet of any body of water. The contractor shall cease application at anytime spray drift is apparent, regardless of wind speed. When applying highly volatile herbicides, all applications shall cease, when temperatures are (90) degrees F. or greater and accompanied with humidity less than (30%), due to evaporation and possible drift damage. The contractor shall suspend herbicide application prior to and during periods of rainfall or to a timeline as directed by COTR / Inspector(s). The contractor shall allow ample drying time for target vegetation after rain, dew, or as directed by the COTR / Inspector(s). |
C.5.7. Items No. 0001 – 0004 Application Instructions:
| Item(s) |
| Application Instructions |
| 0001 – Site Preparation Herbicide Broadcast |
| *Protected and areas to be buffered from herbicides shall be identified on each stand treatment instruction map. |
*Spray applicator shall be calibrated / adjusted, to apply herbicide mixtures evenly over the designated area(s), at the specified rate(s) required. Prescribed coverage is 100% of stand.
*Contractor shall avoid damaging designated Reserve trees, inclusions, or any protected trees, damage to undesirable trees and brush is acceptable.
| 0002 – RCW Mid – Under Story Control |
| *Protected and areas to be buffered from herbicides shall be identified on each stand treatment instruction map. |
*Spray applicator shall be calibrated / adjusted, to apply herbicide mixtures evenly over the designated area(s), at the specified rate(s) required. Prescribed coverage is 100% of stand.
*Contractor shall exercise care when operating within RCW areas and shall not cause unnecessary damage when navigating equipment through plantations.
*Contractor shall not damage RCW cavity tree(s).
*Contractor shall avoid damaging RCW tree(s), (10) inches or greater DBH.
*Contractor shall avoid damaging other protected trees (i.e. reserve trees) that may be present in stand.
*Damage to undesirable vegetation for pine tree(s) less than (10) inches DBH, hard wood(s), and brush is acceptable.
| 0003 – RCW Mid – Under Story Control Designated Area(s) |
| *Protected and areas to be buffered from herbicides shall be identified on each stand treatment instruction map. |
*Spray applicator shall be calibrated / adjusted, to apply herbicide mixtures evenly over the designated area(s), at the specified rate(s) required. Prescribed designated area coverage is 100%; this designated area will be 30% to 100% of the total stand area.
*Contractor shall exercise care when operating within RCW areas and shall not cause unnecessary damage when navigating equipment through plantations.
*Contractor shall not damage RCW cavity tree(s).
*Contractor shall avoid damaging RCW tree(s), (10) inches or greater DBH.
*Contractor shall avoid damaging other protected trees (i.e. reserve trees) that may be present in stand.
*Damage to undesirable vegetation, for pine tree(s) less than (10) inches DBH, hard wood(s), and brush is acceptable.
0004 – Seed Production Mid – Under Story Control
*Protected and areas to be buffered from herbicides shall be identified on each stand treatment instruction map.
*Spray applicator shall be calibrated / adjusted, to apply herbicide mixtures evenly over the designated area(s), at the specified rate(s) required. Prescribed coverage is 100% of stand.
*Contractor shall not cause unnecessary damage to seed production trees when navigating equipment through Seed Production plantations.
*Seed trees are longleaf pine with a DBH of (10) inches or greater.
*Damage to non-seed production trees is acceptable for pine tree(s) less than (10) inches DBH, hard wood(s), and brush.
C.6. EQUIPMENT TECHNICAL SPECIFICATIONS REQUIREMENTS:
The contractor shall furnish the following equipment for the performance of this contract. The CO may order the removal and replacement of any unsatisfactory equipment.
| C.6.1. |
| Articulated Rubber – Tired Skidder: Net power rating of at least (120) HP, an operating weight of at least (20,000) lbs, equipped with a protective canopy, blade, guards, seatbelt(s), proper mufflers, fire - extinguisher in serviceable condition, and free of oil and fuel leaks. |
| C.6.2. |
| Spray Applicator / Tank: Spray applicator shall be equipped with AGPS (Assisted Global Positioning System) with parallel swathing option, light bar guidance system, mapping computer, spray control computer, solution, and speed meters, all capable of working in conjunction together to meet the required spray rates per acre. Spray applicator shall have an adequate protective cage guarding spray tank, all plumbing, and free of leaks. Spray tanks shall be stainless steel, aluminum, fiberglass, plastic or plastic – lined steel only. Spray tank shall be labeled providing content information. |
| C.6.3. |
| Transport(s): Transporting equipment shall be in dependable, serviceable condition, equipped with lights in working order, a fire extinguisher in serviceable condition, and capable of safely transporting required equipment over woods, gravel, and paved roads. Tires, including spares, shall be in good, serviceable condition with proper inflation. Loading ramps shall be required and shall be capable of safely supporting the weight of the equipment being moved. The contractor shall tie down all equipment with chains and binders prior to transport. |
| C.6.4. |
| Water Transportation (Nurse Tank): Nurse tanks shall be in dependable, safe, serviceable condition, and capable of supplying clean, fresh water for the spraying operation. Nurse tanks shall be labeled with a “Non – Potable Water” sign. Herbicides shall not be mixed in nurse tanks. |
C.7. SAFETY / EQUIPMENT REQUIREMENTS
| C.7.1. |
| The contractor shall furnish transportation and safety equipment for each employee including personal protective equipment (PPE) in accordance with OSHA requirements. The following is not all-inclusive. Contractor shall ensure that each employee wears the PPE specified by OSHA, the herbicide label(s), and the material safety data sheet(s) when working. |
| C.7.2. |
| The contractor shall furnish all labor. The minimum labor force required on each application site when pesticide(s) are being applied shall be one equipment operator applicator, and one mixer handler. When loading / unloading equipment from transport trailers, contractor shall have one equipment operator and one spotter (e.g. mixer handler can be spotter). The minimum manning requirements are for safety considerations. |
| C.7.3. |
| The contractor shall provide and maintain a “Safety Work Plan”, approved in advance by the Forest Service at the work site, accessible to all employees. |
| C.7.4. |
| The contractor shall comply with the USDA Forest Service, Savannah River’s "Remote Field Worker and Contractor Tracking System,” which aids in case of an emergency, such as severe weather, fire, personal injury, or other threats. The contractor may be provided a radio so he/she can report the contractor’s location to Savannah River Operations Center (SRSOC) before 7:00 am and after 5:30 pm. |
| C.7.5. |
| Training: The contractor shall provide documentation that each employee has received the proper training in the safe use of pesticides to ensure compliance with OSHA Standard 29 CFR. |
| C.7.6. |
| Handling and Application of Herbicides: The contractor shall assure that all |
personnel handling herbicides have appropriate protective clothing and equipment as recommended on the herbicide label(s) and MSDS.
| C.7.7. |
| The contractor shall provide documented training to each employee who is required to use personal protective equipment (PPE). This training shall be in compliance with OSHA Standard 29 CFR 1910.132-140, Subpart I. |
| C.7.8. |
| The contractor shall maintain current herbicide label(s) and MSDS for all chemicals being applied on each application site and be made accessible to all employees. |
| C.7.9. |
| Chemicals shall not be transported in the vehicle's passenger compartment, nor shall they be stored around food, clothing, or drinking water. |
| C.7.10. |
| Contractor shall not allow personnel to ride in the back of any vehicles (with or without chemicals). |
| C.7.11. |
| Herbicide Spill(s): Should a herbicide spill occur during the course of the |
contractor’s operations that cannot be handled safely without endangering personnel or causing further contamination to the environment, the contractor shall be required to follow the “USDA Forest Service – Savannah River Spill
Prevention, Control and Containment Procedure” dated June 2010. The contractor shall immediately notify the COTR / Inspector(s). The contractor bears all costs of damages, clean up, disposal and decontamination. The
Government reserves the right to determine the appropriate means for proper clean up and disposal of spilled herbicide(s).The contractor shall be responsible for providing written documentation to the Contracting Officer, COTR and Environmental Coordinator for any information requested concerning any herbicide spill.
C.7.A. SAFETY EQUIPMENT REQUIREMENTS:
| 7.A.1. |
| 8” lace-up, leather boots. |
| 7.A.2. |
| Hard hat(s). |
| 7.A.3. |
| Neoprene gloves (while handling chemicals). |
| 7.A.4. |
| Eye protection (safety glasses with side shields). |
| 7.A.5. |
| Hearing protection if noise level of equipment is such that OSHA requires hearing protection. |
| 7.A.6. |
| Change of clothing. |
| 7.A.7. |
| Means of communication(s) FM hand held two - way radio, cellular phone, DOE site pager to remain on site with each crew at all times. |
DOE site pager(s) C.3.10. - Government Furnished Property.
| 7.A.8. |
| First aid kit that is approved for the crew(s) size. |
| 7.A.9. |
| Operable 5 lb. ABC type fire extinguisher for each vehicle and skidder(s). |
| 7.A.10. |
| Wash water and soap, wash water separate from drinking water, and labeled. |
| 7.A.11. |
| Portable eye wash station capable of supplying enough water to flush |
the eyes for (15) continuous minutes at each work site at all times.
C.3.8. – Government Furnished Property.
| 7.A.12. |
| Chemical Spill Kit(s) capable of containing (50) gallons. |
C.3.9. – Government Furnished Property.
| 7.A.13. |
| Shovel(s). One useable shovel for each operation machine (skidder) |
on the work site.
| C.8. |
| INSPECTION AND ACCEPTANCE: Inspection of the work performed |
under this contract shall be made by the COTR / Inspector(s) as the contractor's work progresses. The contractor shall be required to provide shapefile information from the on board computer system and herbicide use records for actual quantities applied for each designated area treated. Acceptable shapefiles include AutoCAD 2000 ASCII DXF, dBASE, Esri Shapefiles, Esri File
Geodatabase, MapInfo MIF, Microsoft Access MDB, Trimble SSF and DDF data format extensions for FME. Esri shapefiles are preferred.
| C.8.1. |
| Herbicide(s) and spray mixtures shall be evenly applied over the designated areas within (+ / -) 5 % at specified rates to be acceptable. |
| C.8.2. |
| Applications below (5 %) of the specified rates: The contractor may be required to reapply the deficit amount of chemical(s) evenly over the designated area(s) if instructed by the COTR without adjustment in contract time or additional compensation. |
| C.8.3. |
| Applications over (5 %) of the specified rates: The contractor may be assessed the value of the chemical(s) over applied at the Government’s cost. |
| C.9 |
| QUALITY CONTROL PLAN: The contractor shall provide and maintain a Quality Control Plan covering service under this contract that is acceptable to the Government. The contractor shall be required to submit completed application records for each treated site when completed to the COTR / Inspector(s). All records of chemicals applied shall be maintained and made available to the Government, upon request, during contract performance. Example Form C.11.1. |
C.10. METHOD OF MEASUREMENT AND PAYMENT:
| C.10.1. |
| Method of Measurement: All acreage to be treated was determined with the Global Positioning System and for the purpose of this contract is considered actual acreage. |
| C.10.2. |
| Basis of Payment: 100% Payment shall be made for the actual number of acres satisfactorily completed and accepted at the specified application rates |
(+ / -) 5 % Section(s) C.8. – C.8.3. / Section C.11. – Example Form C.11.2.
C.11 EXAMPLE(S):
C.11.1. Herbicide Application Instruction / Inspection Field - Computation Form - Ground Mechanical Broadcast (liquid).
C.11.2. Herbicide Application Inspection / Computation Form.
C.11.3. Treatment Instruction Map.