Smith_Marital_Trust_WRP_S-15-0005_Amend_1.pdf

PDF 383 KB Posted

Attached to
WRP Restoration - Clarendon County
Solicitation number
AG-4639-S-15-0005
Issued by

About this file

Amendment No. 1

View the file

Other files

File Type Posted
Smith_Marital_Trust_WRP-Amend_2.pdf PDF
Smith_Marital_Trust_WRP-_Specs_ _Drawings2.doc DOC document
Smith_Marital_Trust_WRP.pdf PDF
SC1-Clarendon_County.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

PAGE

OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE

DATE

6-8-15

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.

(If applicable)

6. ISSUED BY CODE

USDA, Natural Resources Conservation Service Strom Thurmond Federal Building 1835 Assembly Street, Room 950 Columbia, SC 29201

7. ADMINISTERED BY CODE

(If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR

(No., street, county, State and ZIP code)

X

9A. AMENDMENT OF

SOLICITATION NO.

AG-4639-S-15-0005

9B. DATED (SEE ITEM 11)

6-3-15

10A. MODIFICATION OF

CONTRACT/ORDER NO.

CODE FACILITY CODE 10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X_ The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers ___ is extended X_ is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14

ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment adds two gates that are needed to prevent access to the site.

Performance time is increased by two calendar days. Total performance time is changed from 40 to 42 calendar days (See 52.211-10, page 6 of 29).

Replace pages 2, 3, and 22 of 29 with the attached pages, dated 6-8-2015.

The attached specifications and drawings are hereby made a part of this solicitation.

- Add CS92, Field Fence, 3 pages.

- Add MS591, Field Fencing Material, 2 pages.

- Add Gate detail drawings, page 6 of 7 and 7 of 7.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Faith Tillman, Contracting Officer

15B. CONTRACTOR/OFFEROR

15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

(signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7501-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. 1 AG-4639-S-15-0005 6-8-2015

B - SUPPLIES OR SERVICES AND PRICES/COSTS

This solicitation requires a price be submitted for all line items, failure to do so will disqualify the quote.

Line Item

Description Spec.

No.

Quantity Unit Unit Price Extended Amount

Mobilization

Job

$ XXXXXXXX

Construct Ditch Plugs

Construct Swales

Construct Potholes

Seeding Upland Species

1 *

Acre

Seeding Wetland Species

1.5 *

Acre

Construct Gates

Each

TOTAL QUOTE

Quantities marked with an * above are estimated quantities and the clause FAR 52.211-18, Variation in Estimated Quantity, applies.

ONE AWARD FOR THE AGGREGATE OF ALL ITEMS WILL BE MADE AS A RESULT OF THIS

SOLICITATION

Date Bid Prepared: _______________________________

Company Name: _________________________________

Address: _______________________________________

Name of Person Preparing Bid (printed): __________________________________

Name (signature): _____________________________

Fax: (_____) ___________________ Email Address: ________________________

Cell Phone: (_____) _____________ Office Phone: (_____) ___________________

Amendment No. 1 AG-4639-S-15-0005

C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

DESCRIPTION OF WORK

The work to be performed under this contract on the Smith Marital Trust Wetland Reserve Program easement in Clarendon County, South Carolina is:

1. Construct two ditch plugs.

2. Construct two swales by filling existing ditches.

3. Construct two potholes.

4. Seed approximately 0.5 acres of upland native species on constructed ditch plugs.

5. Seed approximately 1.5 acres of wetland native species on depression areas of constructed potholes and swales.

6. Furnish and install 2 gates at the locations specified.

AGAR 452.211-72 Statement of Work/Specifications. (Feb 1998) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

(End of clause)

AGAR 452.211-73 Attachments to Statement of Work/Specifications. (Feb 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

(End of clause)

Amendment No. 1 AG-4639-S-15-0005

PART III—LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

J - LIST OF ATTACHMENTS

ATTACHMENT TITLE NUMBER

OF PAGES

Attachment 1 Construction Specifications

Spec No. 2 Clearing and Grubbing 2 Spec No. 5 Pollution Control 3 Spec No. 6 Seeding 5

Spec No. 8 Mobilization and Demobilization 8 Spec No. 11 Removal of Water 2 Spec No. 21 Excavation 4 Spec No. 23 Earthfill 6 Spec No. 92 Field Fence 3 Material Specifications Spec No. 591 Field Fencing Materials 2

Attachment 2 Drawings NO.

Location Map 1 Site Map 2 Ditch Plug Detail 3

Swale Typical Cross Section 4 Pothole Typical Cross Sections 5

Gate Brace Detail 1 6 Gate Brace Detail 2 7

Attachment 3 Wage Determination SC150001 dated 01/02/2015 4

Construction Specification 92—Field Fence

1. Scope The work shall consist of furnishing and installing field fence, including gates and fittings.

2. Material Material for field fence shall conform to the requirements of Material Specification 591. All wooden posts shall be of the same species, when available.

3. Setting posts Concrete or wood posts shall be set in holes and backfilled with earth except where otherwise specified. Wood posts may be driven when approved by the engineer. Steel posts shall be driven unless otherwise specified.

Holes for installing fence posts shall be at least 6 inches larger than the diameter or side dimension of the posts.

Earth backfill around posts shall be thoroughly tamped in layers not thicker than 4 inches and shall completely fill the posthole up to the ground surface. Concrete backfill around posts shall be rodded into place in layers not thicker than 12 inches and shall completely fill the posthole to the surface of the ground. Backfill, either earth or concrete, shall be crowned-up around posts at the ground surface.

No stress shall be applied to posts set in concrete for a period of not less than 24 hours following the development of a firm set of the concrete.

4. Corner assembly Unless otherwise specified in Section 11, corner assemblies shall be installed at all points where the fence alignment changes 15 degrees or more.

5. End panels End panels shall be built at gates and fence ends.

6. Pull post assembly Pull post assembly (bracing within a section of straight fence) shall be installed at the following locations:

a. In straight fence sections, at intervals not to exceed 700 feet.

b. At any point where the vertical angle described by two adjacent reaches of wire is upward and exceeds 10 degrees (except as provided in section 11 of this specification).

c. At the beginning and end of each curved fence section.

7. Attaching fencing to posts The fencing shall be stretched and attached to posts as follows:

a. The fencing wire or netting shall be placed on the side of the post opposite the area being protected except for installation along curved sections.

b. The fencing wire or netting shall be placed on the outside for installation along curved sections.

c. The fencing wire or netting shall be fastened to each end post, corner post, and pull post by wrapping each horizontal strand around the post and tying it back on itself with not less than three tightly wound wraps.

d. The fencing wire or netting shall be fastened to wooden line posts by means of steel staples.

Woven-wire fencing shall be attached at alternate horizontal strands. Each strand of barbed wire shall be attached to each post. Steel staples shall be driven diagonally with the grain of wood and at a slight downward angle and shall not be driven so tightly as to bind the wire against the post.

e. The fencing wire or netting shall be fastened to steel or concrete line posts with either two turns of 14 gauge galvanized steel or iron wire or in accordance with recommendations provided by the post's manufacturer.

f. Wire shall be spliced by means of a Western Union splice or by suitable splice sleeves applied with a tool designed for that purpose. The Western Union splice shall have no less than eight wraps of each end about the other. All wraps shall be tightly wound and closely spaced. Splices made with splice sleeves shall have a tensile strength no less than 80 percent of the strength of the wire being spliced.

8. Stays Stays shall be attached to the fencing at the spacing outlined in section 11 or as shown on the drawings to ensure maintenance of the proper spacing of the fence wire strands.

9. Crossings at depressions and watercourses Where fencing is installed parallel to the ground surface, the line posts subject to upward pull shall be anchored.

a. If the fence wire or netting is installed parallel to the ground surface, the line posts subject to uplift shall be anchored by means of extra embedment or by special anchors as detailed on the drawings.

b. If the fence wire is installed with the top wire straight and parallel to the ground surface on either side of the depression, extra length posts shall be used to allow normal post embedment. Unless otherwise specified, excess space between the bottom of the fence and the ground shall be closed with extra strands of barbed wire or with netting.

10. Measurement and payment

Method 1—The length of each type and kind of fence is measured to the nearest foot along the profile of the fence, including gate openings. Payment for each type and kind of fence is made at the contract unit price for that type and kind of fence. Such payment constitutes full compensation for completion of the work, including fabricating and installing gates.

Method 2— The number of each size and type of gate installed is determined. Payment is made at the contract unit price for that type and size of gate. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.

All methods—The following provisions apply to all methods of measurement and payment.

Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 11 of this specification.

11. Items of work and construction details Items of work to be performed in conformance with this specification and construction details are:

A. Bid Item 7, Construct Gates

1. This item shall consist of furnishing materials and construction of two gates.

The gates shall be installed with all necessary hardware at the location marked in the field by the NRCS Inspector.

2. The gates shall be constructed of 19 gauge tubular steel with 6 horizontal tubes with 2 vertical brace tubes in the center. The gates shall be similar to Tractor Supply Company Catalog Number 3603069 or AgriSupply Company Catalog Number 31250.

3. A single span brace assembly shall be constructed on both sides of the gate on the hinge side and latch side. The single span brace assembly is shown in Drawing 6 of 7 with further details shown in Drawing 7 of 7.

4. Wood posts shall be minimum 6 inches in diameter at the smallest end, minimum 8 feet long, and shall be treated to a minimum retention of 0.4 pcf CCA. Wood horizontal brace posts shall be minimum 4 inches in diameter at the smallest end, minimum 8 feet long, and shall be treated to a minimum retention of 0.4 pcf CCA.

5. Staples used to fasten wire to wood posts shall be 1-1/2 inches or 2 inches long, 8 or 9 gauge, hot dipped galvanized staples with cut points or barbs. Bright galvanized or aluminum staples will not be accepted.

6. Clearing and grubbing is made subsidiary to this bid item. See Construction Specification 2 for details. All compensation for the clearing and grubbing necessary to install the gates shall be included in the bid price for Bid Item 7, Gate.

7. Pollution control is made subsidiary to this bid item. See Construction Specification 5 for details. All compensation for pollution control during installation of the gates shall be considered as included in the bid price for Bid Item 7, Gate.

8. Removal of water is made subsidiary to this bid item. See Construction Specification 11 for details. All compensation for removal of water during installation of the gates shall be considered as included in the bid price for Bid Item 7, Gate.

9. Measurement and Payment shall be by Method 2 as described in Section 10 above. All compensation for installing the gates shall be considered as included in the bid price for Bid Item 7, Gate.

- END OF CONSTRUCTION SPECIFICATION 92 –

Material Specification 591—Field Fencing Material

1. Scope This specification provides the minimum quality requirements for the material used in the construction of field fences.

2. Wire gauge When the size of steel wire is designated by gage number, the diameter shall be as defined for U.S. Steel Wire Gauge.

3. Fencing Fencing material shall conform to the requirements of ASTM A 121 for barbed wire, ASTM A 116 for woven wire, ASTM A 390 for poultry fence or netting, and ASTM A 854 for high-tensile wire. Barbed wire and woven wire shall be class 3 zinc coated unless otherwise specified. High-tensile wire shall have type I zinc coating unless otherwise specified.

4. Stays, fasteners, and tension wire Stays and fasteners shall conform to the requirements of the appropriate ASTM for the fencing material specified unless otherwise specified. Tension wires shall have a tensile strength not less than 58,000 pounds per square inch. Stays, fasteners and tension wire shall have class 3 zinc coating as specified in ASTM A 641.

5. Wood fence posts and braces Unless otherwise specified, wood posts shall be of black locust, red cedar, osage orange (Bois d’Arc), redwood, pressure treated pine, or other wood of equal life and strength. At least half the diameter or diagonal dimension of red cedar or redwood posts shall be in heartwood. Pressure treatment shall conform to Material Specification 585, Wood Preservatives and Treatment. The posts shall be sound, new, free from decay, with all limbs trimmed substantially flush with the body. All posts shall be substantially straight throughout their full length.

Wood braces shall be of wood material equal to or better than construction grade Douglas fir. Wood braces shall be pressure treated in conformance with Material Specification 585.

6. Steel fence posts and braces Steel fence posts and braces shall conform to the requirements of ASTM A 702 for steel fence posts and ASTM A 53 for bracing pipes. Posts with punched tabs for fastening the wires shall not be installed.

7. Concrete fence posts Concrete fence posts shall be manufactured to the specified requirements of size, shape, and strength.

8. Panel gates Panel gates shall be the specified types, sizes, and quality and shall include the necessary fittings required for installation. The fittings shall consist of not less than two hinges and one latch or galvanized chain for fastening. Latches shall be of such design that a padlock may be used for locking. All fittings shall not be of lesser quality than the gate manufacturer's standard.

9. Wire gates Wire gates shall be the type shown on the drawings, constructed in accordance with specifications, at the locations, and to the dimensions shown on the drawings. The material shall conform to the kinds, grades, and sizes specified for new fence, and shall include the necessary fittings and stays.

10. Staples Staples required to secure the fence wire to wood posts shall be 9-gauge galvanized wire with a minimum length of 1.5 inches for soft woods and a minimum length of 1 inch for close-grain hardwoods.

11. Galvanizing All iron and steel fencing material, except as otherwise specified, shall be zinc coated by the hot dip process meeting the requirements of Material Specification 582. Clips, bolts, and other small hardware may be protected by electro-deposited zinc or cadmium coating.

- END OF MATERIAL SPECIFICATION 591 -

Sol-15-0005_Amend 1(Pg1)
Sol-15-0005_Amend 1(Pg2)
Sol-15-0005_Amend 1(Pg3)
Sol-15-0005_Amend 1(Pg22)
Sol-15-0005_Amend 1(Specs & Drawings)

File details come from the government source that posted it. Updated .