Attachment 00- Schedule of Items

View the file

Other files

File Type Posted
SF-30_Amendment_03.pdf PDF
Amendment_02-_S-16-0016.pdf PDF
Amendment_01.pdf PDF
Attachment_01_Wages.docx DOCX document
Sol._Body_AG-4568-S-16-0016.rtf RTF text file
Attachment_02._SOW_pdf.pdf PDF
SF-1442.pdf PDF
Attachment_04_Experience_Questionaire.doc DOC document
Attachment_03_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Davidson River Campground

Hemlock Loop 8-unit Bath-house Construction

Method of *Pay Item Description Measurement Quantity Unit Unit Price Amount

1. MOBILIZATION & BONDING LSQ 1 LS $________

(Not to exceed 5% of total bid)

2. DEMOLITION & DISPOSAL:

A. Removal and disposal of LSQ 1 LS $________ designated trees (cut stumps flush w/ ground)

B. Misc. demolition and disposal LSQ 1 LS $________ to include drinking fountain, water valves, sewerline and relocation of barrier boulders

C. Demolition and disposal of LSQ 1 LS $________ existing bath-house

3. SITE UTILITIES:

A. New UG electrical service to AQ 250 LF $_____ $_______ camping sites #24 & #26 in 1-1/2” PVC elect. Conduit

B. New UG electrical service to AQ 180 LF $_____ $_______ Bath-house in 2-1/2” PVC electrical conduit

C. New 6” dia. PVC sewerline AQ 40 LF $_____ $_______ to new Bath-house

D. New 2” dia. HDPE waterline AQ 35 LF $_____ $_______ to new Bath-house

4. NEW 8-UNIT BATH-HOUSE LSQ 1 LS $________

construction incl. perimeter sidewalks

5. EROSION & SEDIMENTATION CONTROL:

A. Installation of Silt Fence AQ 100 LF $______ $________

B. Seeding, fertilizing & Mulching LSQ 1 LS $________

TOTAL BASE BID PRICE $______

AG-4568-S-16-0016

NFNC Pisgah Ranger District Davidson River Campground Hemlock Loop Bath House Replacement

Attachment 00

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the base bid items shown, and no additional payment will be made.

ADD ALTERNATE BID:

6. CONSTRUCTION OF PARKING SPACE & RELATED:

A. Placement of 6” depth AQ 35 TON $_____ $_______ compacted ABC stone base including excavation & grading

B. Placement of 2” depth AQ 15 TON $_____ $_______ compacted bituminous surfacing

C. Installation of Handicapped LSQ 1 LS $_______ Sign per construction drawings

D. Installation of Bike Rack LSQ 1 LS $_______ per construction drawings

E. Parking Space Stripping LSQ 1 LS $_______ per construction drawings

TOTAL ADD ALT. BID PRICE $_____