PHASE I BID SCHEDULE REVISED 8_23_2011.docx

DOCX document 28 KB Posted

Attached to
Catawba Falls Parking Lot Construction Federal contract opportunity
Solicitation number
AG-4568-S-11-0060
Issued by
Department of Agriculture Forest Service

About this file

Revised ATT1 Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Catawba Falls Parking Lot Construction, newest first.
File Type Posted
PreBid Mtg Signin.pdf PDF
AMD 003_SF30.pdf PDF
Revised Page 15.pdf PDF
Revised Page 6.pdf PDF
AMD 002_SF 30.pdf PDF
AMD001 SF30.pdf PDF
ATT 2 DB WAGES.docx DOCX document
ATT4_Drawings.pdf PDF
RFP_body.docx DOCX document
ATT 1 BID SCHEDULE.docx DOCX document
ATT3 SPECS.docx DOCX document
ATT5 Experience Questionnaire.docx DOCX document
RFP SF1442.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-4568-S-11-0060

AMENDMENT 0003

GRANDFATHER RANGER DISTRICT

CATAWBA FALLS RECREATION AREA

TRAILHEAD PARKING LOT CONSTRUCTION

PHASE I

BID SCHEDULE

REVISED DATE 8/23/2011

BASE BID ITEMS:

*Pay Item Description Quantity Unit Unit Price Amount

1.MOBILIZATION & BONDING1LS$
(Not to exceed 7.5% of total bid)
2.CLEARING & GRUBBING1LS$
Including disposal

3. SURVEY & LAYOUT 1 LS $

4.ROADWAY/ PARKING LOT1LS$
Excavation & Disposal
5.SOIL REINFORCING FABRIC3,300SY$$
(overlapping is incidental to quantity shown)
6.6” THK. ROADWAY BASE1,300TONS$$
NC DOT approved ABC stone

7. ROCK DUST SURFACING 16 TONS $ $

8. 18” DIA. DRAINAGE CULVERT 80 LF $ $

9.TRAFFIC SIGNS11EA$$
10.WOODEN WHEEL STOPS30EA$$
11.6x6 P.T. DELINEATOR POSTS11EA$$
12.3-PANEL BULLETIN BOARD1LS$
Complete incl. concrete foundation

13. GARBAGE CONTAINERS 2 EA $ $

14.EROSION & SEDIMENTATION
Control

A. SILT FENCE 1,550 LF $ $

B. 1RST. STAGE DRAINAGE 1 LS $

DITCH/POND Construction

C. 2ND. STAGE DRAINAGE 1 LS $

DITCH/POND/RAIN GARDEN

Construction

D. SEEDING & MULCHING 1 LS $

TOTAL BASE BID PRICE $

ADD ALTERNATE BID ITEMS:

*Pay Item Description Quantity Unit Unit Price Amount

1 .2-UNIT VAULT TOILET1LS$
(Installation only)

2. 4” THK. CONCRETE SIDEWALK 426 SF $ $

TOTAL ADD ALTERNATE BID PRICE $