ATT 1 BID SCHEDULE.docx

DOCX document 27 KB Posted

Attached to
Catawba Falls Parking Lot Construction Federal contract opportunity
Solicitation number
AG-4568-S-11-0060
Issued by
Department of Agriculture Forest Service

About this file

ATT1 BID SCHEDULE

View the file

Other files for this federal contract opportunity

Other files attached to Catawba Falls Parking Lot Construction, newest first.
File Type Posted
Revised Page 15.pdf PDF
PreBid Mtg Signin.pdf PDF
AMD 003_SF30.pdf PDF
PHASE I BID SCHEDULE REVISED 8_23_2011.docx DOCX document
Revised Page 6.pdf PDF
AMD 002_SF 30.pdf PDF
AMD001 SF30.pdf PDF
ATT5 Experience Questionnaire.docx DOCX document
RFP SF1442.pdf PDF
ATT 2 DB WAGES.docx DOCX document
ATT4_Drawings.pdf PDF
RFP_body.docx DOCX document
ATT3 SPECS.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRANDFATHER RANGER DISTRICT

CATAWBA FALLS RECREATION AREA

TRAILHEAD PARKING LOT CONSTRUCTION

PHASE I

BID SCHEDULE

*Pay Item Description Quantity Unit Unit Price Amount

1.MOBILIZATION & BONDING1LS$
(Not to exceed 7.5% of total bid)
2.CLEARING & GRUBBING1LS$
Including disposal

3. SURVEY & LAYOUT 1 LS $

4.ROADWAY/ PARKING LOT1LS$
Excavation & Disposal
5.SOIL REINFORCING FABRIC3,300SY$$
(overlapping is incidental to quantity shown)
6.6” THK. ROADWAY BASE1,300TONS$$
NC DOT approved ABC stone

7. ROCK DUST SURFACING 16 TONS $ $

8.24” DIA. DRAINAGE CULVERT80LF$$
9.TRAFFIC SIGNS11EA$$
10.2-UNIT VAULT TOILET1LS$
Includes solar fans

11. 4” THK. CONCRETE SIDEWALK 426 SF $ $

12.WOODEN WHEEL STOPS30EA$$
13.6x6 P.T. DELINEATOR POSTS11EA$$
14.3-PANEL BULLETIN BOARD1LS$
Complete incl. concrete foundation

15. GARBAGE CONTAINERS 2 EA $ $

*Pay Item Description Quantity Unit Unit Price Amount

16.EROSION & SEDIMENTATION
Control

A. SILT FENCE 1,550 LF $ $

B. 1RST. STAGE DRAINAGE 1 LS $

DITCH/POND Construction

C. 2ND. STAGE DRAINAGE 1 LS $

DITCH/POND/RAIN GARDEN

Construction

D. SEEDING & MULCHING 1 LS $

TOTAL PRICE $

ATTACHMENT 1

File details come from the government source that posted it. Updated .