ATT3_CEF PLANS.pdf
PDF 696 KB Posted
- Solicitation number
- AG-4568-S-09-0039
- Issued by
-
Department of Agriculture Forest Service
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amd_002.rtf | RTF text file | |
| Amd001_Plans.pdf | ||
| Amd_001.rtf | RTF text file | |
| ATT5 REPS AND CERTS.doc | DOC document | |
| ATT1 DAVIS BACON WAGES.doc | DOC document | |
| ATT4_EXPERIENCE QUESTIONNAIRE.doc | DOC document | |
| PG 2_Schedule of ITems Bid Sheet.pdf | ||
| ATT3_Crossett EF Map.PDF | ||
| ATT3_CEF SPS.pdf | ||
| CONSTRUCTION_RFP.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U N ITtD STATES D tP AR TM EN T CF- AGR ICU LTU R E
FOREST STRVI C[ RTGICN B
CU ACH ITA N ATI CN AL FCR EST
JISSITVILLI RANGTR DISTRICT
CROSSETT EXPTRIMENTAL FORTST
9.7 5 M ILES RTCON STRU CTI ON
INDEX OF SHEETS
SHEET DESCRIPTION
1 TITLE SHEET, INDEX OF SHEETS, & VICINITY MAP
2 EXPERIMENTAL FOREST WORK MAP
3 TYPICAL TEMPLATE SECTION
4 TYPICAL CULVERT I NSTALLATION DETAILS
SUMMARY OF QUANTITIES
6 AGGREGATE & PC CSP QUANTITIES
7 RIPRAP DETAILS
I STEP BEVEL DETAILS
I n ta l l s Johnsv i l l e
I
4 r . f x^ fcH i t (
(lOCr t Os I lu, w"*on
- . . t i ' Ee r f r n 1
. i , ; . ' . a
"'-.--.i.-.'-:!
.lunction Citir
CROSSEn EXPERIMENTAL
FOREST ENGINEER DATE
. l l , \ / t i . , , r ,_ : - f , )I, D / ' ( ;r . v i \
SUPERVISOR TE
TITLESHT.DWG
DISTRICT RANGER DATE FO ST
f
IS]IOJ'dX] r-:ss0r3 sltlHS tvtol w wN vllHcvno
(1) Road CEF Roads
Item Number Description Method of Measurement
Units of Measurement
Quantity
151.01 Mobilization LSQ L.S. 1
157.07 Bales, wheat hay CQ Each 80
203.01 Removal of culverts CQ Each 16
204.02 Roadway excavation, compaction
method B, finishing method A
CQ C.Y. 445
251.01-2 Placed riprap, class 2, method A CQ C.Y. 88
251.16 Geotextile, type IV-D CQ S.Y. 156.00
301.13-10 Crushed agg., type surface, grade class 4, compaction A
CQ Ton 1931.85
303.11 Road reconditioning, roadbed, compaction method A
CQ Mi. 9.75
602.53-24x18 24" span, 18" rise, PCCSP arch, .064" thick, method B
AQ L.F. 30
602.53-42x29 42" span, 29" rise, PCCSP arch, .079" thick, method B
AQ L.F. 96
602.53-49x33 49" span, 33" rise, PCCSP arch, .079" thick, method B
AQ L.F. 136
602.63-48 48" PCCSP, .079" thickness, method B
AQ L.F. 110
602.63-60 60" PCCSP, .064" thickness, method B
AQ L.F. 176
625.28 Seeding, fertilizing, and mulching, hydraulic or dry method
LSQ L.S. 1
| CEF PLANS.pdf |
| CEF 8 STEP BEVEL (1).pdf |
| CEF PLANS |
| CEF 4 CUL TYPICAL (1).pdf |
| CEF PLANS |
| CEF 6 SUMMERY (1).pdf |
| CEF PLANS |
| CEF 4 ROAD TYP SECTION (1).pdf |
| CEF PLANS |
| page 5.pdf |
| Binder2 |
| File0001 |
| page 3 |
| page 4 |
| page 5 |
| page 6 |
| page 7 |
| page 8 |
File0001
File details come from the government source that posted it. Updated .