Section B - Revised Schedule of Items.pdf
PDF 10 KB Posted
- Solicitation number
- AG-4419-S-10-0588
About this file
Section B - Revised Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit 1 - Drawings.pdf | ||
| Pre-Bid Meeting Notes Q A.pdf | ||
| SF30 - Amendment 1.pdf | ||
| Attachment 2 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Section B - Schedule of Items.pdf | ||
| Attachment 1 - Plans and Specifications rev1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SLICKROCK TRAIL BRIDGE
AARA PROJECT CIM - 0811 -08T
CHEOAH RANGER DISTRICT, PISGAH, NF
SCHEDULE OF ITEMS
METHOD OF UNIT TOTAL
DESCRIPTION MEASURE UNIT QUANTITY COST COST
Mobilization LSQ LS 1 $
Soil Erosion and Pollution Control LSQ LS 1 $
Removal of Structures and LSQ LS 1 $ Obstructions
Stacked Rock Sill Support AQ CY 7.0 $
Substructure Complete LSQ LS 1 $
Superstructure Complete LSQ LS 1 $ Grading ABC
Seeding, Method (Dry Method a) CQ AC 0.1 $ $
Total Cost All Items $
NOTE:
Any work shown on the drawings or required by the specifications for which there is no bid shall be considered incidental to a related bid item and no additional payment will be made.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted by CQ, designating Contract Quantity.