Revised Schedule of Items

View the file

Other files

File Type Posted
REVISED LK EATON BOARD WALKS.pdf PDF
Modification 01_Lake Eaton Board Walks.pdf PDF
RFP_Lake Eaton Boardwalks.docx DOCX document
LAKE EATON BOARDWALKS SHEETS 1-3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

Ocala National Forest Lake Eaton Sinkhole Boardwalk and Deck Rehabilitation

METHOD OF UNIT

ITEM NO. DESCRIPTION MEASURE UNIT QUANTITY PRICE TOTAL

BASE BID:

1. Lake Eaton Sinkhole

a. Remove and dipose of the existing wood decking and steps. Install 2”x6” rough sawn pressure treated lumber for the new decking and 2”X12” treads for steps.

(See drawings for details)

S.F. A.Q. 2415 $_________ $__________

b. Remove and dispose of the existing railing. Install new railing as shown on the drawings. Replace existing 4”x4” or 6”X6” post as needed.

L.F. A.Q. 825 $_________ $__________

c. Remove and replace the existing 2’ wide X 15’ long bench.

L.S. EA 1 $_________ $__________

d. Remove and replace the existing 2’ wide X 11’ long bench.

2. Lake Eaton Loop Trail A existing wood decking. Install 2”x6” rough sawn pressure trated lumber for the new decking and 2”X12” treads for steps

S.F. A.Q. 1177 $_________ $__________ shown on the drawings. Replace existing 4”x4” or 6”X6” post as needed.

L.F. A.Q. 371 $_________ $__________

3. Lake Eaton Loop Trail B

2”x6” rough sawn pressure treated lumber for the new decking.

S.F. A.Q. 1302 $_________ $__________ shown on the drawings. Replace existing 4”x4” or 6”X6” post as needed.

L.F. A.Q. 320 $_________ $__________

2’ wide X 11’ long bench.

d. Remove and replace the existing 2’ wide X 8’ long bench.

4. Lake Eaton Loop Trail C

2”x6” rough sawn pressure treated lumber for the new decking.

S.F. A.Q. 1280 $_________ $__________ shown on the drawings. Replace existing 4”x4” or 6”X6” post as needed.

L.F. A.Q. 375 $_________ $__________

2’ wide X 10’ long bench.

5. Install new 2”x6” P.T. rough sawn beam as needed. Work shall include all materials and labor for removal of existing material and installation of new material.

L.F. A.Q. 130 $_________ $__________

6. Install new 2”x8” P.T. rough sawn beam as needed. Work shall include all materials and labor for removal of existing material and installation of new material.

L.F. A.Q. 130 $_________ $__________

7. Install new 2”x12” P.T. rough sawn beam as needed. Work shall include all materials and labor for removal of existing material and installation of new material.

L.F. A.Q. 130 $_________ $__________

8. Install new 2”x12” P.T. rough sawn Step stringer as needed. Work shall include all materials and labor for removal of existing material and installation of new material.

L.F. A.Q. 130 $_________ $__________

9. Install new 6”x6” rough sawn posts as needed. Work shall include all materials and labor.

L.F. A.Q. 130 $_________ $__________

10. Install new 4”x4” rough sawn posts as needed. Work shall include all materials and labor.

L.F. A.Q. 130 $_________ $__________

TOTAL $__________

L.S. = Lump Sum L.F. = Linear Feet EA = Each S.F. = Square Feet A.Q. = Actual Quantities