AG-435H-S-13-0022.pdf

PDF 673 KB Posted

Attached to
Tumbling Creek Culvert Replacement, Chattahoochee National Forest Federal contract opportunity
Solicitation number
AG-435H-S-13-0022
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

solicitation package

View the file

Other files for this federal contract opportunity

Other files attached to Tumbling Creek Culvert Replacement, Chattahoochee National Forest, newest first.
File Type Posted
Amdt_1_Tumbling_Ck.pdf PDF
attendees_tumbling_creek_culvert_showing.pdf PDF
Wage Determination GA1.pdf PDF
Bid Bond_SF 24.pdf PDF
Technical Proposal Format.docx DOCX document
SupSpecs FS-22 culverts replacement.pdf PDF
FS-22 culverts replacement dwg.pdf PDF
AG-435H-S-13-0022.pdf PDF
Relevant Experience Input Form.docx DOCX document
Janitorial Floor Maintenance Plan.pdf PDF
Task Frequency and Inspection.pdf PDF
SF1449 form.pdf PDF
SCA WageDet 05-2133 Rev12.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-435H-S-13-0022

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

August 9, 2013

PAGE OF PAGES

1 31

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

530812

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

USDA Forest Service

Chattahoochee-Oconee National Forest

1755 Cleveland Highway

Gainesville, GA 30501

USDA Forest Service

Chattahoochee-Oconee National Forest

1755 Cleveland Highway

Gainesville, GA 30501

Attn: Contracting, Include solicitation number on envelope

9. FOR INFORMATION

CALL:

A. NAME

Marcia O’Connor

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

770-297-3055 or e-mail moconnor@fs.fed.us

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Tumbling Creek Culvert Replacement

Site Showing August 22, 2013. See page 30 for further information

Offeror Name: ______________________________

DUNS Number: _____________________________

Registration required prior to award of a contract at www.SAM.gov

Offeror’s Proposal shall include:

This form (pages 1 and 2) complete blocks 14 - 20, Schedule of Items, pages 3 and 4

Representations, pages 20-23, and

Technical Proposal (attachment).

11. The Contractor shall begin performance within 10 calendar days and complete it within 120 calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _______________.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __0__ copies to perform the work required are due at the place specified in Item 8 by 4:00 PM (hour) local time Sept 6, 2013(date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e) mailto:moconnor@fs.fed.us http://www.sam.gov/

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE E-Mail:

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within _____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED

TO SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

Solicitation AG-435H-S-13-0022

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

Tumbling Creek Road (FSR-22) Culvert Replacement

OPTION 1 - Aluminum Headwalls & Wingwalls

ITEM DESCRIPTION Measure PAY UNIT QTY UNIT PRICE TOTAL

60301A

Site #1 Aluminum Structural Plate 13'-0" X 4'-1" X 27'-0" (including ALUMINUM headwalls & wingwalls and all appurtenances) LSQ Lump Sum 1 $_________ $_____________

60301B

Site #2 Aluminum Structural Plate 14'-0" X 4'-8" X 27'-0" (including ALUMINUM headwalls & wingwalls and all appurtenances) LSQ Lump Sum 1 $_________ $_____________

SubTotal $_____________ plus Base Items – from next page $_____________

TOTAL – OPTION 1 (Aluminum) $_____________

OPTION 2 - Concrete Headwalls & Wingwalls

ITEM DESCRIPTION Measure PAY UNIT QTY UNIT PRICE TOTAL

60301A

Site #1 Aluminum Structural Plate 13'-0" X 4'-1" X 27'-0" (including CONCRETE headwalls & wingwalls and all appurtenances) LSQ Lump Sum 1 $_________ $_____________

60301B

Site #2 Aluminum Structural Plate 14'-0" X 4'-8" X 27'-0" (including CONCRETE headwalls & wingwalls and all appurtenances) LSQ Lump Sum 1 $_________ $_____________

Subtotal $_____________ plus Base Items – from next page $_____________

TOTAL – OPTION 2 (Concrete) $_____________

Solicitation AG-435H-S-13-0022

Tumbling Creek Road (FSR-22) Culvert Replacement

BASE ITEMS

ITEM DESCRIPTION Measure PAY UNIT QTY UNIT PRICE TOTAL

15204 Drainage structure survey and staking CQ Each 2 $_________ $_____________

15714 Erosion Control & Pollution Prevention Plan LSQ Lump Sum 1 $_________ $_____________

20101 Clearing and grubbing LSQ Lump Sum 1 $_________ $_____________

20301 Removal of Existing Culverts Stuctures CQ Each 2 $_________ $_____________

20903 Culvert backfill,(Common Borrow from area sites), Compaction Method B CQ Cubic Yard 530 $_________ $_____________

20857 Cofferdams and water diversion structures LSQ Lump Sum 1 $_________ $_____________

21201 Linear grading CQ STA 4 $_________ $_____________

25102 Placed riprap, class 2 (with Type 2C geotextile) CQ Ton 188 $_________ $_____________

30115A Aggregate surface course, Type GDOT #57 Stone, compaction method B CQ Ton 200 $_________ $_____________

30115B Aggregate surface course, Type GDOT GAB Stone, compaction method B CQ Ton 28 $_________ $_____________

59050 Precast concrete member, Footings CQ Each 4 $_________ $_____________

61303 Simulated stone masonry surface treatment & test wall(s) LSQ Lump Sum 1 $_________ $_____________

63306 Object markers, Type 3 CQ Each 8 $_________ $_____________

63501 Temporary traffic control LSQ Lump Sum 1 $_________ $_____________

Total Base items $_____________

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

Table of Contents SECTION B - Supplies or Services and Prices/Costs Schedule of Items

SECTION C - Description/specifications/Statement of Work

452.211-72 Statement of Work/Specifications. (FEB 1988)

452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

SECTION E - Inspection and Acceptance

SECTION F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

SECTION I - Contract Clauses

52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005)

52.225-9 Buy American Act - Construction Materials. (SEP 2010)

52.228-1 Bid Guarantee. (SEP 1996)

52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)

52.236-1 Performance of Work by the Contractor. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.244-6 Subcontracts for Commercial Items. (JUL 2013)

52.246-21 Warranty of Construction. (MAR 1994)

452.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate

Applicants – Alternate 1 (FEB 2012)

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) 18

SECTION J - List of Documents, Exhibits, and Other Attachments

SECTION K - Representations, Certifications, and Other Statements of Offerors

52.204-8 Annual Representations and Certifications. (JUL 2013)

AGAR 452.209-70 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction

SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents

52.215-1 Instructions to Offerors - Competitive Acquisition. (JAN 2004)

52.216-1 Type of Contract. (APR 1984)

52.225-10 Notice of Buy American Act Requirement - Construction Materials. (FEB 2009)

52.233-2 Service of Protest. (SEP 2006)

452.204-70 Inquiries. (FEB 1988)

452.237-71 Pre-Bid/Pre-Proposal Conference. (FEB 1988)

SECTION M - Evaluation Factors for Award

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

SECTION C - Description/specifications/Statement of Work

A. DESCRIPTION OF WORK:

The intent of this project is to provide passage for aquatic organisms (fish, frogs, salamanders, etc). The project consists of removing the existing 24” culverts at two different sites (three culvert per site including rock headwalls and wingwalls) and replacing them with: Site #1 aluminum structural plate 13'-0" X 4'-1" X

27'-0" and Site #2 aluminum structural plate 14'-0" X 4'-8" X 27'-0". For both sites project includes headwalls, wingwalls, all appurtenances and concrete footings, also the constructions of rock headwalls and wingwalls to match rock work of existing culverts in the area. The project includes reconstructing approximately 4 stations (400 feet) of roadway. The work consists of clearing and grubbing, excavation, roadway reconditioning, and temporary traffic control measures.

B. LOCATION

The project sites are along FSR 22(Tumbling Creek Road) in Fannin County Georgia. (Google search:

Forest Service Road 22-2 Epworth GA) Site #1 is located on FSR-22 over No Name Creek approximately

4 miles north from intersection with Old Ga Highway 2 (Watson Gap). Site #2 is located over Walnut

Creek approximately 5.2 miles north from Old Ga Highway 2.

Note that Forest Service Road 22 will NOT accommodate a tractor with flat-bed trailer. The Cohutta

Wilderness boundary lies 40 feet west of the road centerline. No construction, equipment, materials, trash, debris, etc will be allowed in the wilderness area.

C. PRICE RANGE

The Government price range is between $150,000 and $300,000.

D. ENVIRONMENTAL

The Contractor is to dispose of all waste material off of National Forest System Lands in an appropriate manner, and location.

The Contractor shall not remove merchantable timber from the project. All timber that had been marked for clearing is to be disposed as specific site shown on drawings.

The Contractor shall not perform any equipment maintenance within 100 feet of the stream.

The resulting streambed within the confines of the culverts should reflect the stream characteristics both up- and downstream, to the extent possible. This area will be highly disturbed when the existing culverts is removed, but equipment should be used to match the new ‘stream’ within the culverts to the average channel shape of the current stream (looking upstream and downstream), including width and depth of water, and channel slope.

In order to ‘connect’ the new stream within the culverts to the existing stream, the existing stream banks should be altered or disturbed as little as possible. This will maintain bank stability and allow the new crossing to function for aquatic organism passage.

In addition to adjacent stream banks, the existing stream channel or bed (both up- and downstream) should be disturbed as little as possible. This will also allow the site to recover quickly from construction and maintain the maximum possible fish habitat and passage.

E. SPECIFICATIONS

The projects specifications are included by reference are Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03, U.S. Department of Transportation Federal Highway

Administration. They may be obtained on the internet at http://flh.fhwa.dot.gov/resources/pse/specs/ http://flh.fhwa.dot.gov/resources/pse/specs/

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

452.211-72 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D - Packaging and Marking

No clauses in this section

SECTION E - Inspection and Acceptance

52.246-12 Inspection of Construction. (APR 1996)

SECTION F - Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after the effective date of the Notice to

Proceed. The time stated for completion shall include final cleanup of the premises.

SECTION G - Contract Administration Data

SECTION H - Special Contract Requirements

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

SECTION I - Contract Clauses

52.202-1 Definitions. (JAN 2012)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)

52.203-7 Anti-Kickback Procedures. (OCT 2010)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN

1997)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)

52.204-7 System for Award Management (JUL 2013) Note (b)(1) – By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.215-2 Audit and Records - Negotiation. (OCT 2010)

52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)

52.219-8 Utilization of Small Business Concerns. (JUL 2013)

52.219-14 Limitations on Subcontracting. (NOV 2011)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (JUL 2005)

52.222-5 Davis-Bacon Act--Secondary Site of the Work. (JUL 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-6 Davis-Bacon Act. (JUL 2005)

52.222-7 Withholding of Funds. (FEB 1988)

52.222-8 Payrolls and Basic Records. (JUN 2010)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (JUL 2005)

52.222-12 Contract Termination - Debarment. (FEB 1988)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (FEB 1988)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)

52.222-35 Equal Opportunity for Veterans. (SEP 2010)

52.222-36 Affirmative Action for Workers With Disabilities. (OCT 2010)

52.222-37 Employment Reports on Veterans. (SEP 2010)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-14 RESERVED.

52.225-9 Buy American Act - Construction Materials. (SEP 2010)

(a) Definitions. As used in this clause -

"Commercially available off-the-shelf (COTS) item"--

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR

2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46

U.S.C. App. 1702), such as agricultural products and petroleum products.

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

"Component" means an article, material, or supply incorporated directly into a construction material.

"Construction material" means an article, material, or supply brought to the construction site by the

Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

"Cost of components" means -

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph

(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

"Domestic construction material" means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United

States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

"Foreign construction material" means a construction material other than a domestic construction material.

"United States" means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

[Contracting Officer to list applicable excepted materials or indicate "none"]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that -

(i) The cost of domestic construction material would be unreasonable. The cost

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement of a particular domestic construction material subject to the requirements of the

Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the

United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including -

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph

(d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the

Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy

American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item 1: _______ _______ _______

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

Item 2: _______ _______ _______

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-1 Bid Guarantee. (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds -

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds

(including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement difference.

52.228-2 Additional Bond Security. (OCT 1997)

52.228-11 Pledges of Assets. (JAN 2012)

52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)

52.228-14 Irrevocable Letter of Credit. (DEC 1999)

52.228-15 Performance and Payment Bonds - Construction. (OCT 2010)

(a) Definitions. As used in this clause -

"Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.

(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:

(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.

(ii) The Government may secure the additional protection by directing the

Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.

(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department

Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury

Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.

(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement the contract.

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)

52.232-17 Interest. (OCT 2010)

52.232-23 Assignment of Claims. (JAN 1986)

52.232-27 Prompt Payment For Construction Contracts. (JUL 2013)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (JUL 2013)

52.233-1 Disputes. (JUL 2002)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor. (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the

Government.

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;

(4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.

(b) The Government assumes no responsibility for any conclusions or interpretations made by the

Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.

52.236-5 Material and Workmanship. (APR 1984)

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

52.236-6 Superintendence by the Contractor. (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the

Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

52.236-7 Permits and Responsibilities. (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The

Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.

(APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.242-13 Bankruptcy. (JUL 1995)

52.243-4 Changes. (JUN 2007)

52.244-6 Subcontracts for Commercial Items. (JUL 2013)

(a) Definitions. As used in this clause--

"Commercial item" has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.

"Subcontract" includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or non-developmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010)

(Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)), if the subcontract exceeds $5,000,000 and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.219-8, Utilization of Small Business Concerns (JUL 2013) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212(a)).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010)

(29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor

Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C.

7104(g)).

(ix) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels

(FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

52.246-21 Warranty of Construction. (MAR 1994)

(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.

(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.

(c) The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect.

In addition, the Contractor shall remedy at the Contractor's expense any damage to Government-owned or controlled real or personal property, when that damage is the result of -

(1) The Contractor's failure to conform to contract requirements; or

(2) Any defect of equipment, material, workmanship, or design furnished.

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.

(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.

(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense.

(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall -

(1) Obtain all warranties that would be given in normal commercial practice;

(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and

(3) Enforce all warranties for the benefit of the Government, if directed by the

Contracting Officer.

(h) In the event the Contractor's warranty under paragraph (b) of this clause has expired, the

Government may bring suit at its expense to enforce a subcontractor's, manufacturer's, or supplier's warranty.

(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.

(j) This warranty shall not limit the Government's rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

452.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate

Applicants – Alternate 1 (FEB 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L.

No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)

The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of perfor-mance and payment bonds required by the contract. Reimbursement for bond premiums under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not cover any amount therefor not included in the contract price.

452.236-73 Archaeological or Historic Sites. (FEB 1988)

452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

SECTION J - List of Documents, Exhibits, and Other Attachments

Wage Determination No. GA130001 rev. 01/04/2013 3 pages

Supplemental Specifications 53 pages

Drawings 16 pages

Technical Proposal Format 2 pages

Standard Form 24 – Bid Bond 2 pages

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

SECTION K - Representations, Certifications, and Other Statements of Offerors

52.204-8 Annual Representations and Certifications. (JUL 2013)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is

237310.

(2) The small business size standard is $33.5 million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the

Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence

Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-

Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I).

This provision applies to solicitations when the contract will be performed in the

United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by

DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United

States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting

Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased

Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xvi) 52.225-2, Buy American Act Certificate. This provision applies to

Solicitation AG-435H-S-13-0022 Tumbling Creek Road (FSR-22) Culvert Replacement solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American Act--Free Trade Agreements--Israeli Trade Act

Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $77,494, the provision with its Alternate II applies.

(D) If the acquisition value is $77,494 or more but is less than

$100,000, the provision with its Alternate III applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in

Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-Representation and Certifications.

This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution

Representation. This provision applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and…