AG-3604-S-14-0011_Amend_000001_Package.pdf

PDF 175 KB Posted

Attached to
Houghton Lab & Shop Renovation
Solicitation number
AG-3604-S-14-0011
Issued by

About this file

Amendment 000001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-3604-S-14-0011

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NEWTOWN SQUARE PA 19073-4100

11 CAMPUS BLVD SUITE 200

NORTHERN RESEARCH STATION

USDA FOREST SERVICE

07/18/2014000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/03/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

USDA Forest Service, Northern Research Station, Houghton, MI - Lab & Shop

Remodel/Renovation - AMEND 000001

This Amendment 000001 DOES NOT change the proposal due date of August 4, 2014 at 11:00 AM

Eastern Time.

Please acknowledge receipt of this amendment by completing Blocks 8, and Blocks 15A, 15B, and 15C and returning it as part of your proposal package.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MARIA T. EVANS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

mtevans Typewritten Text mtevans@fs.fed.us

AG-3604-S-14-0011

UNIT: NRS – Houghton, MI

PROJ NAME: Lab & Ship Remodel Amendment 000001

P a g e | 2 of 8

The following changes are hereby made by this Amendment 000001:

The Contracting Officer’s e-mail address is mtevans@fs.fed.us

The attachment Specifications Section 01400 – Quality Requirements is hereby added to the solicitation.

The following questions were received and are hereby answered by this amendment:

Q 1: Is there painting required in this project for other than the remodeling work?

A1: Follow the Finish Schedule on drawing sheet A601.

Q2: Drawing sheet C102. Call out note: PROPOSED LIMITS OF RE-GRADING AND “POLY-

PAVEMENT”.

A2: Remove “and Poly-Pavement” from the note. Note should read: PROPOSED LIMITS OF

RE-GRADING.

Q3: Any concerns regarding asbestos or lead based paint?

A3: Asbestos and lead based paint are not anticipated to be encountered. Any encounters with either substance will be dealt with at that time.

Q4: Add-Alt 3: Is a separate work schedule required?

A4: Yes. Add-Alt 3 should reflect the complete renovation of the shop building prior to beginning the laboratory renovation along with an accompanying project schedule.

Q5: Is there landscaping on this project?

A5: There are specification sections covering landscaping, seeding and soil preparation.

mailto:mtevans@fs.fed.us

PROJ NAME: Lab & Ship Remodel Amendment 000001

P a g e | 3 of 8

Section M, Paragraph M.1 –

Change From:

M.1 FAR 52.212-2 -- Evaluation -- Commercial Items (Jan 1999)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Technical Capability

2. Experience and Qualifications of Contractor and Key Personnel [and Subcontractors, if applicable]

3. Past Performance

4. Price/Cost

Factors 1 – 3, when combined, are more important when compared to price.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of Provision)

PROJ NAME: Lab & Ship Remodel Amendment 000001

P a g e | 4 of 8

To:

M.1 FAR 52.212-2 -- Evaluation -- Commercial Items (Jan 1999)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Experience and Qualifications of Contractor and Key Personnel [and Subcontractors, if applicable]

2. Past Performance

3. Technical Capability

4. Price/Cost

Factors 1 – 3, when combined, are more important when compared to price.

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of Provision)

SPECTEXT® 2000, Copyright 2000 Revised 01/2000

The Construction Sciences Research Foundation

Quality Requirements

01400 - 1

SECTION 01400

QUALITY REQUIREMENTS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Quality control and control of installation.

B. References.

C. Testing and inspection services.

D. Manufacturers' field services.

E. Examination.

F. Preparation.

1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION

A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.

B. Comply with manufacturers' instructions, including each step in sequence.

C. When manufacturers' instructions conflict with Contract Documents, request clarification from Government before proceeding.

D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

E. Perform Work by persons qualified to produce required and specified quality.

F. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.

G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.

1.3 REFERENCES

A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.

B. Conform to reference standard by date of issue current on date of Contract Documents except where specific date is established by code.

mtevans Typewritten Text

AG-3604-S-14-0011

MOD 000001

01400 - 2

C. Obtain copies of standards where required by product specification sections.

D. When specified reference standards conflict with Contract Documents, request clarification from Government before proceeding.

E. Neither contractual relationships, duties, nor responsibilities of parties in Contract nor those of Government shall be altered from Contract Documents by mention or inference otherwise in reference documents.

1.4 TESTING AND INSPECTION SERVICES

A. Employ and pay for services of an independent testing agency or laboratory acceptable to

Government to perform specified testing.

1. Prior to start of Work, submit testing laboratory, name, address, and telephone number.

2. Submit copy of report of laboratory facilities inspection made by Materials

Reference Laboratory of National Bureau of Standards during most recent inspection, with memorandum of remedies of deficiencies reported by inspection.

B. The independent firm will perform tests, inspections and other services specified in individual specification sections.

C. Reports will be submitted by independent firm to Government and Contractor indicating observations and results of tests and indicating compliance or non-compliance with

Contract Documents.

D. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, storage, safe access, and assistance by incidental labor as requested.

1. Notify Government and independent firm 48 hours prior to expected time for operations requiring services.

2. Make arrangements with independent firm and pay for additional samples and tests required for Contractor's use.

E. Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents.

F. Re-testing or re-inspection required because of non-conformance to specified requirements shall be performed by same independent firm on instructions by

Government. Payment for re-testing or re-inspection will be charged to Contractor by deducting testing charges from Contract Sum/Price.

G. Testing Agency Responsibilities:

1. Test samples of mixes submitted by Contractor.

2. Provide qualified personnel at site. Cooperate with Government and Contractor in performance of services.

3. Perform specified sampling and testing of products in accordance with specified standards.

4. Ascertain compliance of materials and mixes with requirements of Contract

Documents.

5. Promptly notify Government and Contractor of observed irregularities or non-conformance of Work or products.

mtevans

01400 - 3

6. Perform additional tests required by Government.

H. Testing Agency Reports: After each test, promptly submit copies of report to

Government and to Contractor. When requested by Government, provide interpretation of test results. Include the following:

1. Date issued.

2. Project title and number.

3. Name of inspector.

4. Date and time of sampling or inspection.

5. Identification of product and specifications section.

6. Location in Project.

7. Type of inspection or test.

8. Date of test.

9. Results of tests.

10. Conformance with Contract Documents.

I. Limits On Testing Authority:

1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of Contract Documents.

2. Agency or laboratory may not approve or accept any portion of the Work.

3. Agency or laboratory may not assume duties of Contractor.

4. Agency or laboratory has no authority to stop the Work.

1.5 MANUFACTURERS' FIELD SERVICES

A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment and to initiate instructions when necessary.

B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.

C. Refer to Section 01330 - SUBMITTAL PROCEDURES, MANUFACTURERS' FIELD

REPORTS article.

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work.

Beginning new Work means acceptance of existing conditions.

mtevans Typewritten Text mtevans

01400 - 4

B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.

C. Examine and verify specific conditions described in individual specification sections.

D. Verify utility services are available, of correct characteristics, and in correct locations.

3.2 PREPARATION

A. Clean substrate surfaces prior to applying next material or substance.

B. Seal cracks or openings of substrate prior to applying next material or substance.

C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.

END OF SECTION

mtevans

File details come from the government source that posted it. Updated .