ATTACHMENT 2 DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-3434-S-14-0030_meeting_attendees_(2).pdf | ||
| Pre_solicitation_meeting_notes_and_questions.pdf | ||
| AMENDMENT001-signed.pdf | ||
| Attachment_4.doc | DOC document | |
| Attachment_3.pdf | ||
| AG-3434-S-14-0030.pdf | ||
| Attachment_1.pdf | ||
| Attachment_5.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/01/12
E0.0
06/01/12
INDEX
INDEX OF ELECTRICAL SHEETS
E0.0 INDEX (THIS SHEET)
E2.1 ELECTRICAL DEMOLITION
E3.0 PUMP HOUSE
E3.1 PUMP HOUSE PANEL
E4.1 TOILET FACILITY
E6.0 ELECTRICAL DETAILS
E6.1 ELECTRICAL DETAILS
PROJECT GENERAL NOTES
1. ALL TRENCH BACKFILL COMPACTION SHALL BE IN ACCORDANCE WITH THE SPECIFICA-
TIONS LISTED IN THE CIVIL ENGINEERING SPECIFICATIONS.
2. CONTRACTOR IS STRONGLY ENCOURAGED TO USE TRENCHING THAT IS REQUIRED FOR
THE WATER LINES IN ACCORDANCE WITH THE CIVIL ENGINEERING SPECIFICATIONS AND THE
TRENCH DETAIL SHEET E6.0.
3. SURFACE RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR TO MATCH ADJA-
CENT EXISTING CONDITIONS.
4. THE CONTRACTOR SHALL OBTAIN AND IS RESPONSIBLE FOR PAYING FOR ALL STATE AND
LOCAL PERMITS FOR THIS PROJECT.
5. THE CONTRACTOR SHALL FIELD VERIFY ALL UNDERGROUND UTILITIES. ALL COSTS ASSO-
CIATED WITH UTILITY LOCATING ARE AT THE CONTRACTOR‘S EXPENSE. IF QUESTIONS ARISE
REGARDING EXISTING UTILITIES, CONTACT C.O.R.
6. ALL DEMOLISHED EQUIPMENT SHALL BE RECYCLED AS INDICATED ON THE CIVIL ENGI-
NEERING DRAWINGS.
7. ALL WORK ON THE PRIMARY SYSTEM SHALL BE DONE BY LICENSED LINEMEN TO THE CON-
STRUCTION AND SAFETY STANDARDS OF ALLEGHENY POWER SYSTEMS (THE LOCAL
UTILITY).
PROJECT WARNING
THE CAMPGROUND SITE CONTAINS UNDERGROUND 7200 VOLT PRIMARY CABLING AND
UNDERGROUND 120/240 VOLT SECONDARY CABLING. IT IS BELIEVED BOTH ARE DIRECT
BURY BUT THE BURIAL METHOD AND DEPTH IS NOT INDICATED ON THE DRAWINGS.
THE DRAWINGS SUGGEST THAT THE PRIMARY AND SECONDARY CABLING COULD BE
INSTALLED IN THE SAME TRENCH OR IN ADJACENT TRENCHES. THE CABLING MAY NOT BE
MARKED SUCH THAT THE PRIMARY CABLING IS CLEARLY MARKED.
THE CONTRACTOR IS WARNED THAT EXTREME CAUTION IS REQUIRED TO SAFELY WORK
NEAR THE PRIMARY CABLING.
THE ENGINEER HAS MARKED THE DRAWINGS WITH WHAT IS BELIEVED TO BE PRIMARY ONLY
CABLING AND PRIMARY AND SECONDARY CABLING IN CLOSE PROXIMITY. THIS IS BASED ON
SOME FIELD OBSERVATION AND THE DRAWINGS - BUT THE ENGINEER CANNOT WARRANT
THAT THE CABLING IS AS INDICATED.
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text
E2.1
06/01/12
ELECTRICAL
DEMOLITION
PHOTO E2.1-1 ELECTRICAL DEMOLITION: PUMP HOUSE
BID ITEM-4
REFER TO THE CIVIL ENGINEERING DRAWINGS AND SPECIFICA-
TIONS FOR THE REQUIREMENTS OF ITEM 4 AND
THE PRICING REQUIREMENTS THEREOF.
IN GENERAL, ITEM 4 CONSISTS OF A NEW PUMP
HOUSE AND ASSOCIATED EQUIPMENT.
THEREFORE, WORK INCLUDED ON THIS SHEET IS INCLUDED IN
ITEM-4.
DEMOLISH THE ELECTRICAL SYSTEMS IN THE EXISTING PUMP HOUSE.
THIS DEMOLITION IS IN SUPPORT OF THE GENERAL REPLACEMENT OF THE PUMP HOUSE.
PHOTOS ARE INCLUDED FOR GENERAL REFERENCE AND DO SHOW ALL OF THE ELECTRICAL SYSTEMS TO BE DEMOLISHED.
SEE CIVIL ENGINEERING DRAWINGS FOR ADDITIONAL INFORMATION.
PHOTO E2.1-2 ELECTRICAL DEMOLITION: RECEPTACLES
AND CONTROLS
PHOTO E2.1-3 ELECTRICAL DEMOLITION: STARTER AND CONTROLS
PHOTO E2.1-4 ELECTRICAL DEMOLITION: CONDUIT ,
WIREWAYS, ETC.
PHOTO E2.1-4 ELECTRICAL DEMOLITION: PANELS,
RECEPTACLES, TELEMETRY , ETC.
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula Typewritten Text msmakula
E3.0
06/01/12
PUMP
HOUSE
PUMP HOUSE ELECTRICAL PLAN
SCALE: 1/2" = 1'–0" AT 11 X 17 SIZE
0 6" 1 52
NEMA 5-20R RECEPTACLE
SUBSCRIPT INDICATES:
42" AFF - MOUNTING HT . OF 42" ABOVE
FLOOR TO CTR OF DUPLEX
WP - NEMA WEATHER PROOF
GFI - GROUND FAULT INTERRUPTING
42"
AFF
WP
GFI
WP
GFI
HD
2, 3, 4, P, K, D
HOME RUN TO CIRCUIT
XX. #ZZ WIRE; SINGLE
POLE.
SNAP SWITCH
SUBSCRIPT INDICATES:
2 - TWO POLE
3 - THREE WAY
P - PILOT LIGHT
CONNECTION POINT IN A CIRCUIT FOR
ONE OR MORE CONDUCTORS. THIS
POINT IS USED FOR CLARITY ON THE
DRAWING FOR CIRCUIT CONNECTIONS
WHICH MAY OR MAY NOT REQUIRE A
PHYSICAL CONNECTION AT THE POINT
SHOWN.
S
SURFACE MOUNTED INTERIOR
EMERGENCY LIGHT FIXTURE
XX#ZZ
1. COORDINATE ALL DEVICE SELECTION WITH PROJECT ENGINEER, WITH OTHER
TRADES AND WITH EQUIPMENT SUPPLIERS TO VERIFY AND CONFIRM COMPATIBILITY
WITH EQUIPMENT TO BE SUPPORTED.
2. SEE CATALOG SHEETS IN 16900.
3. FOR CIRCUITS INCLUDING GFI PROTECTED RECEPTACLES, EACH INDIVIDUAL
RECEPTACLE SHALL BE NEMA GFI RATED RECEPTACLE, NOT FEED THROUGH
PROTECTED.
LEGEND
SIMPLEX RECEPTACLE
NOTE 2
WATER METER
5-20 R SIMPLEX
P
GFI
42" AFF
C
C
B
GFI
42" AFF
EF-1
PUMP PANEL
A-3
#12
A-5
#10
NOTE 3
FLOATS TO TANK
PANEL ‘A’
3/0 URD
FROM NEW PAD
MOUNTED
TRANSFORMER
NOTE 4
NOTE 5
A-1 #12
A A
4-20 mA
A
A-15 #12
SHEET SPECIFIC NOTES
1. FABRICATE A WOOD FRAME SURFACE MOUNTED ON THE CEILING USING STAINLESS
STEEL GROUTED BOLTS AND PLASTIC FLANGES TO HOLD FAN EF-1. THE DUCT WORK IS
PLASTIC PVC PIPE. THE DUCT WORK AND THE FRAME ARE TO BE CORROSION RESIS-
TANT . FAN EF-1 IS TO BE INSTALLED IN A MANNER TO BE EASILY REPLACED WHEN
CORROSION DESTROYS THE FAN.
2. THE SWITCH WITH THE PILOT IS TO BE TURNED ON AND LEFT ON BEFORE ENTERING
THE CHLORINATOR ROOM. THE INTENT IS TO EXHAUST THE ROOM BEFORE ENTRY .
3. PUMP SUPPLY: FURNISH AND INSTALL 3 — #10 COPPER THWN CONDUCTORS (2
HOTS, 1 GROUND) IN SCHEDULE 80 PVC CONDUIT BETWEEN THE PUMP CONTROL
PANEL AND THE WELL HEAD. AT THE WELL HEAD CONNECT TO THE WELL SUPPLY
CABLE (TYPICALLY YELLOW) IN THE WELL HEAD USING WATER PROOF SPLICES.
INSTALL IN SAME TRENCH AS WATER LINE USING THE JOINT USE TRENCHING DETAIL.
WELL FLOAT: FURNISH AND INSTALL 3 — #10 COPPER THWN CONDUCTORS (2 FOR
FLOAT, 1 SPARE) IN SCHEDULE 80 PVC CONDUIT BETWEEN THE PUMP CONTROL PANEL
AND THE WELL HEAD. AT THE WELL HEAD CONNECT TO THE FLOAT CABLE (TYPICALLY
YELLOW) IN THE WELL HEAD USING WATER PROOF SPLICES. INSTALL IN SAME TRENCH
AS WATER LINE USING THE JOINT USE TRENCHING DETAIL.
TANK FLOATS: INSTALL EXISITNG 9 — #10 COPPER THWN CONDUCTORS (8 FOR
FLOATS, 1 SPARE) TO THE NEW PUMP CONTROL
PANEL. FURNISH AND INSTALL A PLASTIC NEMA 4X
PUMP CONTROL PANEL.
4. SUPPLY PANEL ‘A’ FROM THE NEW PAD MOUNTED TRANSFORMER USING 3/0 COPPER
TRIPLEX URD OR 4/0 AL TRIPLEX URD IN SCHEDULE 40 PVC CONDUIT .
5. BOND PANEL ‘A’ GROUND BAR TO THE SUPPLY NEUTRAL CONDUCTOR, TO THE PANEL
ENCLOSURE, AND TO TWO 5/8 INCH BY 8 FOOT LONG COPPER CLAD STEEL GROUND
RODS DRIVEN 6 FEET APART OUTSIDE OF THE BUILDING.
NOTE 1
CP-1
A-13 #12
A-11 #12
B
A-9 #12
A A
FROM WELL
TO TANK
NOTE 3
#10
#10
#10
ITEM-4
REFER TO THE CIVIL ENGINEERING DRAWINGS AND SPECIFICA-
TIONS FOR THE REQUIREMENTS OF ITEM 4 AND THE
PRICING REQUIREMENTS THEREOF.
IN GENERAL, ITEM 4 CONSISTS OF A NEW PUMP HOUSE AND
ASSOCIATED EQUIPMENT.
THEREFORE, WORK INCLUDED ON THIS SHEET (EXCEPT FOR
PANEL SUPPLY) IS INCLUDED IN ITEM 4.
NOTE THAT POWER FROM THE NEW TRANSFORMER TO THE NEW
PANEL OR THE EXISTING PANEL (WHICH APPEARS TO BE A SQUARE
D LOAD CENTER) IS INCLUDED IN THIS ITEM.
SEE PHOTO 1 THIS SHEET FOR EXISTING PUMP HOUSE PANEL.PHOTO E3.0-1 EXISTING PUMP HOUSE PANEL msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula
E3.1
06/01/12
PUMP
HOUSE PANEL
NOTE:
A 200 AMP PANEL WAS CHOSEN FOR ITS RELATIVE LOW COST INCREASE AS COMPARED
TO A 100 AMP PANEL AND TO PROVIDE A FUTURE POTENTIAL SOURCE OF BREAKER
PROTECTED POWER FOR NEARLY ALL OF THE CAMPGROUND AREA BETWEEN THE
UPPER LOOP AND THE SEWAGE TREATMENT SITE.
A 100 AMP TWO POLE BREAKER WILL FIT IN A 200 AMP PANEL. IN SOME CASES IT MAY
TAKE UP 3 POLE SPACES ALL THE WAY ACROSS THE PANEL AND THUS A LARGER SIZE
PANEL, 32 SLOTS, WOULD BE USEFUL.
ITEM-4
REFER TO THE CIVIL ENGINEERING DRAWINGS AND SPECIFICA-
TIONS FOR THE REQUIREMENTS OF ITEM-4 AND
THE PRICING REQUIREMENTS THEREOF.
IN GENERAL, ITEM-4 CONSISTS OF A NEW PUMP
HOUSE AND ASSOCIATED EQUIPMENT, MODIFICATIONS TO THE
WELL.
THEREFORE, WORK INCLUDED ON THIS SHEET IS INCLUDED IN
ITEM 4.
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text msmakula
06/01/12
TOILET
FACILITY
E4.1
TOILET FACILITY
NOT TO SCALE
INFORMATION IS PROVIDED BY THE MANU-
FACTURER.
FUSSELL ENGINEERING HAS NOT REVIEWED
OR OTHERWISE APPROVED OF THE MANU-
FACTURER’S DESIGN. FUSSELL ENGINEER-
ING’S SCOPE OF WORK IS LIMITED TO THE
DESIGN OF THE ELECTRICAL SERVICE TO
THIS BUILDING AND THE MOUNTING OF THE
SEPTIC TANK ALARM PANEL.
SHEET GENERAL NOTES
A. CAREFULLY REVIEW THE CIVIL ENGINEERING DRAWINGS FOR
DETAILS OF THE WORK AS THEY ARE AUTHORITATIVE.
B. CAREFULLY REVIEW THE BUILDING DRAWINGS AND THEIR
RELATIVE LOCATION ON THE SITE PLAN. THIS DRAWING INDI-
CATES AN ASSUMED ORIENTATION BASED ON INFORMATION
AVAILABLE DURING DESIGN. ADJUSTMENTS MAY BE REQUIRED
TO THE LOCATION OF THE ALARM PANEL BASED ON ACTUAL ORI-
ENTATION OF THE INSTALLED BUILDING.
C. ALL BUILDING ELECTRICAL INCLUDING THE PANEL IS FACTORY
INSTALLED. THE BUILDING PANEL SHALL BE ORDERED WITH A
MAIN BREAKER AND AT LEAST 5 SPARE 20 AMP SINGLE POLE
BREAKERS.
D. THE C.O.R SHALL SPECIFY AND THE CONTRACTOR SHALL VER-
IFY THAT THE FACTORY PROVIDES A 6 INCH BY 12 INCH LEAVE
OUT BELOW THE FACTORY INSTALLED ELECTRICAL PANEL
(LOAD CENTER). THIS LEAVE OUT SHALL NOT BE FILLED BUT
LEFT WITH EXPOSED DIRT AND GRAVEL.
SHEET SPECIFIC NOTES
1. THE 200 AMP GE LOAD CENTER IS LOCATED INSIDE THE
CHASE DOOR ABOVE A FACTORY PROVIDED (SEE NOTE D) LEAVE-
OUT IN THE FLOOR ON THE LATCH SIDE OF THE DOOR.
2. FURNISH AND INSTALL THE SERVICE 1/0 AL DIRECT BURY
FROM THE EXISTING IN-THE-GROUND JUNCTION BOX (SEE
SHEET E2.0) UNDERGROUND, 30 INCHES UNDER THE BUILDING
FOUNDATION AND THENCE UP THROUGH THE CONCRETE FLOOR
(SEE NOTE 1) TO THE PANEL MAIN BREAKER.
THE SERVICE CABLE SHALL BE INSTALLED IN A SCHEDULE 80 PVC
SLEEVE FROM OUTSIDE OF THE FOOT PRINT OF THE BUILDING
UP THROUGH THE BUILDING FLOOR TO THE PANEL.
3. FURNISH AND INSTALL A 120 VAC 20 AMP BRANCH CIRCUIT
FROM THE BUILDING PANEL SPARE 20 AMP BREAKER TO THE
ALARM PANEL.
INSTALL 3 — #12 COPPER THWN CONDUCTORS (HOT, NEUTRAL,
GROUND) IN EMT CONDUIT FROM THE BUILDING MAIN PANEL
SURFACE MOUNTED INSIDE THE CHASE, THROUGH THE OUTSIDE
WALL TO THE ALARM PANEL.
MOUNT THE ALARM PANEL AT 60 INCHES ABOVE GRADE. VERI-
FY THE ALARM PANEL LOCATION WITH THE C.O.R.
4.INSTALL EXISTING ALARM PANEL AND FLOAT CONDUCTORS.
UP HILL SIDE OF THE BUILDING OR MORE OR LESS
THE SOUTH OFTHE BUILDINGNG
NOTE 1
NOTE 2
100 AMP SERVICE
FROM THE EXISTING
IN-THE-GROUND
JUNCTION BOX
EXISTING BUILDING
ELECTRICAL PANEL
NOTE 3
NOTE 4
SEPTIC TANK
ALARM PANELSNOTE 3
TO EXISTING
JUNCTION BOX
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text
NOTE 5
msmakula Typewritten Text
5. FURNISH AND INSTALL A BRANCH CIRCUIT TO THE
BOOSTER PUMP AND PRESSURE TANK. REFER TO SHEET
A-2.
msmakula msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text msmakula
E6.0
06/01/12
ELECTRICAL
DETAILS
NOTE 2
WARNING TAPE
SCHEDULE 40 PVC
CONDUIT SLEEVE AND
DIRECT BURY
COMPACTED
BACKFILL
BEDDING SAND
UNDISTURBED EARTH
4 in.
4 in.
TRENCHING AND BEDDING DETAIL
NOT TO SCALE
UNDISTURBED EARTH
4 in.
NOTES:
1. SINGLE CONDUIT SLEEVE OR DIRECT BURY SHOWN. DIRECT BURY
CABLES SHALL BE USED EXCEPT WHERE CONDUITS ARE SPECIFICALLY
REQUIRED.
2. BURIAL DEPTH 24 INCHES MINIMUM.
3. IF MORE THAN ONE DIRECT BURY CABLE OF THE SAME FACILITY IS
INSTALLED IN A TRENCH, THE DIRECT BURY CABLES SHALL BE SEPARATED
BY 9 INCHES MINIMUM.
4. INSTALL CONDUIT SLEEVE(S) 24 INCHES (UNLESS OTHERWISE NOTED)
BELOW FOOTING FOUNDATION OR PAVEMENT BASE FILL.
5. CONDUIT(S) OR DIRECT BURY CABLE(S) SHALL NOT BE LOCATED ANY
CLOSER THAN 3 INCHES FROM TRENCH SIDE WALL.
NOTE 2
UNDISTURBED EARTH
WARNING TAPE
COMPACTED
BACKFILL
BEDDING SAND 4 in.
4 in.
TRENCHING AND BEDDING DETAIL (JOINT USE)
NOT TO SCALE
UNDISTURBED EARTH
4 in.
12 in. min
OTHER FACILITIES SUCH
AS GAS, WATER, SEWER
ALLOWED BY CODE.
NOTES:
1. SINGLE CONDUIT SLEEVE OR DIRECT BURY SHOWN. DIRECT BURY
CABLES SHALL BE USED EXCEPT WHERE CONDUITS ARE SPECIFICALLY
REQUIRED.
2. BURIAL DEPTH 24 INCHES MINIMUM.
3. IF MORE THAN ONE DIRECT BURY CABLE OF THE SAME FACILITY IS
INSTALLED IN A TRENCH, THE DIRECT BURY CABLES SHALL BE SEPARATED
BY 9 INCHES MINIMUM.
4. INSTALL CONDUIT SLEEVE(S) 24 INCHES (UNLESS OTHERWISE NOTED)
BELOW FOOTING FOUNDATION OR PAVEMENT BASE FILL.
5. CONDUIT(S) OR DIRECT BURY CABLE(S) SHALL NOT BE LOCATED ANY
CLOSER THAN 3 INCHES FROM TRENCH SIDE WALL.
SCHEDULE 40 PVC
CONDUIT SLEEVE AND
DIRECT BURY
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text msmakula Typewritten Text msmakula
E6.1
06/01/12
ELECTRICAL
DETAILS
SCHEDULE 80 PVC CONDUIT
WELLHEAD
GROUND WIRE AND METAL
WELL-HEAD TO BE BONDED
TOGETHER. IF WELLHEAD IS
PLASTIC, USE GROUND ROD.
TO PUMP CONTROLLER
WELL INSTALLATION PARTIAL DETAIL
NOT TO SCALE
NOTE:
1. REFER TO CIVIL ENGINEERING DRAWINGS FOR EXACT WELL
HEAD CONFIGURATION.
2. IT IS ACCEPTABLE TO USE WATERPROOF SPLICES WITH
STRAIN RELIEF UNDER WELL HEAD CAP TO MAKE THE
TRANSISTION FROM SUPPLY CONDUCTORS TO THE WELL
SUBMERSIBLE CABLE.
WATER TIGHT SPLICES INSIDE
FOR COMPLETE DETAIL REGARDING INSTALLATION OF THE WELL SEE THE
CIVIL ENGINEERING DRAWINGS
NOTE THAT PUMP MOTOR SHALL HAVE
INTEGRAL STARTING CAPACITOR.
WELL HEAD DETAIL
NOT TO SCALE
REFER TO THE CIVIL ENGINEERING DRAWINGS AND SPECIFICA-
TIONS FOR THE REQUIREMENTS OF OPTIONAL ITEM O-4 AND
THE PRICING REQUIREMENTS THEREOF .
IN GENERAL, ITEM-4 CONSISTS OF A NEW PUMP
HOUSE AND ASSOCIATED EQUIPMENT , MODIFICATIONS TO THE
WELL.
THEREFORE, WORK INCLUDED ON THIS SHEET IS INCLUDED IN
ITEM4.
msmakula Cross-Out msmakula Inserted Text
BID ITEM
msmakula Typewritten Text 5/15/2014 msmakula Typewritten Text msmakula
| TitleSheet 11X17L |
| G2 SITE PLAN |
| C-1 LOOP A PLAN |
| C-2 LOOP B SITE PLAN |
| M-1 PUMPHOUSE |
| A1_LoopA_toilet_elevations (1) |
| A2-LoopA_FLOOR PLAN (1) |
| D-1 TRENCH DETAIL |
| D-2 WELL DETAIL |
| BB_Electrical |
| E00.pdf |
| E10 |
| E11 |
| E12 |
| E20 |
| E21 |
| E30 |
| E31 |
| E32 |
| E40 |
| E41 |
| E50 |
| E60 |
| E61 |
| E62 |