Amendment1.pdf

PDF 5 MB Posted

Attached to
Paving Coal Road & Saint Mary's Road
Solicitation number
AG-3395-S-15-0024
Issued by

About this file

Amendment 1 Must acknowledge receipt and submit with proposal

View the file

Other files

File Type Posted
OGB_Clarification.docx DOCX document
Experience_questionnaire_Revised.doc DOC document
AG3395S150024.pdf PDF
AllAttachments.pdf PDF
SubmittalCopy.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 1

2. AMENDMENT NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

1 07/22/2015

6. ISSUED BY:

Cherokee National Forest 2800 North Ocoee Street Cleveland, TN 37312

7. ADMINISTERED BY (If other than 6.):

8. NAME AND ADDRESS OF CONTRACTOR

[ X ]

9A. AMENDMENT OF SOLICITATION NUMBER

AG-3395-S-15-0024

Old Coal Road & Saint Mary’s Road Paving 9B. DATED (see item 11)

06/23/2015

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ x ] is NOT extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning ___1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE IS ISSUED PURSUANT TO:

THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority )

E. IMPORTANT: Contractor [ ] is, [ ] is not required to sign this document and return copy(s) to the issuing office.

RE: Section B, Schedule of Items:

1. Delete original Schedule of Items. Replace with Revised Schedule of Items, attached.

RE: Attachment # 2

1. Delete Attachment # 2 Specifications / Plans. Replace with revised Specifications / Plans, attached.

Additional Attachments:

1. CO note on Pre-Bid Meeting

2. Sign-In Sheets, Pre-Bid Meeting Attendees

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print)

NINA B. BARROW, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY: Nina B. Barrow 07/22/2015

(signature of authorized person) (signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

PART I – THE SCHEDULE

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

Item 1 (Section I): Placement of new asphalt pavement on designated sections of Old Coal Road and Saint Mary’s Road. Work consists of furnishing, installing and maintaining traffic control devices, aggregate base placement and subgrade preparation, ditch armoring, placement of 2” (compacted thickness) of Base Course-VDOT BM-25.0; and 1-1/2” (compacted thickness) of Intermediate Course- VDOT IM-19.0 on approximately 3 miles of the road. The average road width of Section I is approximately 13 feet. Shoulders shall be constructed of VA #21B aggregate as shown in the attached typical section. Shoulder material shall be compacted using rollers or an approved tamper or compactor.

Item Number

Description Method of

Measurement Quantity Unit Cost Total

301.01 Aggregate Shoulders, #21B, Compaction Method B Ton / AQ 318.00 $ $

301.01A Aggregate Base Course, #21B (4"), Roller Compaction Ton / AQ 3,720.00 $ $

301.01B Aggregate Surfacing, VA #26 Ton / AQ 36.00 $ $

301.01C Ditch Armor, OBG Stone Ton / AQ 2,993.00 $ $

303.08

Surface Preparation, Surface Blading and Roller Compaction of Existing Aggregate Surface MI / AQ 3.00 $ $

403.01A Hot Asphalt Concrete Pavement, VDOT IM 19.0 (1.5") Ton / AQ 1,866.00 $ $

403.01B Hot Asphalt Concrete Pavement, VDOT BM 25.0 (2.0") Ton 2,488.00 $ $

635.01 Temporary Traffic Control LS / LSQ 1.00 $ $

TOTAL, ITEM 1 $

Item 2 (Section II): Placement of new asphalt pavement on designated sections of Old Coal Road and Saint Mary’s Road. Work consists of furnishing, installing and maintaining traffic control devices, aggregate base placement and subgrade preparation, ditch armoring, placement of 2” (compacted thickness) of Base Course-VDOT BM-25.0; and 1-1/2” (compacted thickness) of Intermediate Course- VDOT IM-19.0 on approximately 1 mile of the road. The average road with of Section II is approximately 16 feet. Shoulders shall be constructed of VA #21B aggregate as shown in the attached typical section. Shoulder material shall be compacted using rollers or an approved tamper or compactor.

Item Number

Description Method of

Measurement Quantity Unit Cost Total

301.01 Aggregate Shoulders, #21B, Compaction Method B Ton / AQ 106.00 $ $

301.01A Aggregate Base Course, #21B (4"), Roller Compaction Ton / AQ 1,573.00 $ $

301.01B Aggregate Surfacing, VA #26 Ton / AQ 18.00 $ $

301.01C Ditch Armor, OBG Stone Ton / AQ 997.00 $ $

303.08

Surface Preparation, Surface Blading and Roller Compaction of Existing Aggregate Surface MI / AQ 1.00 $ $

403.01A Hot Asphalt Concrete Pavement, VDOT IM 19.0 (1.5") Ton / AQ 790.00 $ $

403.01B Hot Asphalt Concrete Pavement, VDOT BM 25.0 (2.0") Ton 1,053.00 $ $

635.01 Temporary Traffic Control LS / LSQ 1.00 $ $

TOTAL, ITEM 2 $

GRAND TOTAL ITEM 1 & ITEM 2: $________________________________

AQ = Actual Quantity LSQ = Lump Sum Quantity LS = Lump Sum MI = Mile

Note to Contractors:

• Hardcopy proposals must be delivered to the address shown on the front of the SF-1442 in block 7 by the receipt date and time as stated in Block 13A.Faxed proposals or changes to proposals will not be accepted. Emailed proposals or changes to proposals will not be accepted.

• Recommended format for bid bonds is the SF-24. Original bid bond must be submitted with the bid. Failure to submit an original bid bond may result in your bid being found non-responsive.

• Davis-Bacon wage rates applicable to this project are attached. Successful contractor is required to pay these rates at a minimum for the category of worker that will be used on this job.

Contractor is required to submit weekly payrolls to project COR, and to keep payrolls filed for three years subject to DOL review.

• Registration in SAM is not required for submission of a proposal; however registration must be completed within 5 days of notification of award. (See FAR 52.204-7(d)). Access SAM at www.sam.gov/; registration is free.

A complete proposal package includes the following (See Section L):

• Completed SF-1442 (Complete Blocks 14 - 20c)

• Completed Schedule of Items (Section B)

• Completed Representations and Certifications (Section K, Representations)

• Original bid bond (recommended format is SF-24 form, Section J)

• Completed Experience Questionnaire (Section J) http://www.sam.gov/

USDA FOREST SERVICE

GEORGE WASHINGTON & JEFFERSON NATIONAL FORESTS

GLENWOOD-PEDLAR RANGER DISTRICT

PLANS FOR

HOT ASPHALT PAVING

ON

FOREST HIGHWAY 41 & 42 – SAINT MARY’S & OLD COAL ROAD

CONTENTS:

AREA MAP…………………………………………………………

DESCRIPTION & CONSTRUCTION NOTES…….……………3

SCHEDULE OF WORK……………………………………………….5

TYPICAL SECTION……………………………………………………..6

ADDITIONAL MAPS……………………………………………….7-8

ENGINEERING STAFF OFFICER / DATE

DISTRICT RANGER/DATE

FOREST SUPERVISOR / DATE

AREA MAP

DESCRIPTION OF WORK

Work consists of furnishing, installing and maintaining traffic control devices, aggregate base placement and subgrade preparation, ditch armoring, placement of 2” (compacted thickness) of

Base Course-VDOT BM-25.0; and 1-1/2” (compacted thickness) of Intermediate Course-VDOT

IM-19.0 on approximately 4 miles of the road. The average road width of Section I is approximately 13 feet. The average road with of Section II is approximately 16 feet. Shoulders shall be constructed of VA #21B aggregate as shown in the attached typical section. Shoulder material shall be compacted using rollers or an approved tamper or compactor.

CONSTRUCTION NOTES

GENERAL

All work shall be done in accordance with plans and Standard Forest Specifications for

Construction of Roads and Bridges on Federal Highway Projects, FP-03 and all applicable Forest

Service Supplemental Specifications (FSSS). The 3.0 mile length referred to in the plans begins on Saint Mary’s Road and continues for approximately 0.5 miles, and continues onto Old Coal

Road for approximately 2.5 miles. The 1.0 mile section of Old Coal Road begins on State Route

664 (Sherando/Lyndhurst side).

MAINTENANCE OF TRAFFIC

At least 14 days prior to the start of construction, the Contractor shall submit to the Engineer a

Schedule of Operations, detailing any proposed closures of the road. This Schedule of

Operations must be approved by the Engineer and the District Representative, to ensure that proper public notification has been achieved for adjacent landowners and other users.

Prior to the start of the construction operations, the Contractor shall erect signs, barricades, and other traffic control devices. Traffic control devices shall be operated only when they are needed and only those devices that apply to conditions actually in existence shall be operable.

The Contractor without additional compensation shall replace any devices that are lost, stolen, destroyed, or deemed unacceptable by the CO, while their use is required on the project.

Following completion of a particular construction operation, all warning signs, except those necessary for the safety of the public, shall be removed or entirely covered so that the sign panel will not be visible.

HOT ASPHALT CONCRETE PAVEMENT

The existing aggregate course must be graded in a manner that will ensure a hard, uniform, well compacted surface. The additional crushed aggregate base (VA #21B) shall be placed in one or more layers directly on the existing aggregate course; spread, and compacted to a minimum total thickness of six inches (6″), including the existing courses. The asphalt base course should be placed directly on the prepared subgrade in one or more lifts, spread, and compacted to the pavement thickness as indicated. The final pavement surface shall be constructed to drain.

The pavement and its application shall be in accordance with FP-03 Section 403 and all applicable FSSS. The asphalt mix shall meet requirements of VDOT specifications for IM-19.0 and BM-25.0. The asphalt shall be furnished from an approved VDOT plant.

Testing for asphalt shall be as designated in the FP-03 and FSSS Sections 403. Testing for aggregate shall be in accordance with Section 301 of the above and shall include gradation, moisture content and density for every 1000 Tons placed. Testing may occur at the quarry or in the field. In-place compaction testing shall also be performed in accordance with Section 301 of the FP-03 and FSSS.

Schedule of Work

Section I

0.00 Begin Subgrade Preparation, Aggregate Base Placement, Paving, Ditch Armoring and Shoulder Placement at the end of the pavement on Saint Mary’s Road. The new pavement section shall be constructed to provide a smooth transition from the existing pavement.

0.5 End paving on Saint Mary’s Road at the object marker just past the intersection of Old Coal Road. Place aggregate and taper for 50’ to transition from the asphalt edge to a graveled road surface as shown in the attached typical section.

0.5 Continue all work onto FH 42, Old Coal Road. Pave the Y-intersection.

3.0 End paving on Section I at least 50’ before entrance of private driveways at approximately MP 3.0 (2.5 miles from the beginning of Old Coal Road). Place aggregate and taper for 50’ to transition from the asphalt edge to a graveled road surface as shown in the attached typical section. Final grading of stone shall allow smooth transition between the graveled and paved roadway.

Section II

0.00 Begin Subgrade Preparation, Paving, Ditch Armoring and Shoulder Placement at the intersection of SR 664 and FH 42, Old Coal Road. Pave the Y-intersection.

The new pavement section shall be constructed to provide a smooth transition from the existing pavement on SR 664.

1.00 Pave the turnout on the left. Place aggregate and taper for 50’ to transition from the asphalt edge to the graveled road surface as shown in the attached typical section.

BRP

162A

K

0 1 20.5 Miles shaminadillard Line shaminadillard Line shaminadillard Typewritten Text Begin Section I at Edge of Pavement shaminadillard Typewritten Text End Section I at Milepost 3.0. The length of this section will vary as funding allows.

BRP

42P

42H

91B

B 1290

91D

42C

91C

91E91J 91A

0 1 20.5 Miles shaminadillard Line shaminadillard Line shaminadillard Typewritten Text End Section II, at M.P. 1 shaminadillard Typewritten Text Begin Section II at Intersection of SR 664 and Old Coal Road

FH 41 and 42 - Old Coal/Saint Mary's Road Paving

Schedule of Items

PAY ITEM DESCRIPTION

METHOD OF

MEASUREMENT

QUANTITY UNIT COST TOTAL

301.01 Aggregate Shoulders, #21B, Compaction Method B Ton/AQ 318.00

301.01A Aggregate Base Course, #21B (4"), Roller Compaction Ton/AQ 3,720.00

301.01B Aggregate Surfacing, VA #26 Ton/AQ 36.00

301.01C Ditch Armor, OGB Stone Ton/AQ 2,993.00

303.08 Surface Preparation of Existing Aggregate Surface MI/AQ 3.00

403.01A Hot Asphalt Concrete Pavement, VDOT IM 19.0 (1.5") Ton/AQ 1866.00

403.01B Hot Asphalt Concrete Pavement, VDOT BM 25.0 (2.0") Ton 2488.00

635.01 Temporary Traffic Control LS/LSQ 1.00

TOTAL

PAY ITEM DESCRIPTION

METHOD OF

MEASUREMENT

QUANTITY UNIT COST TOTAL

301.01 Aggregate Shoulders, #21B, Compaction Method B Ton/AQ 106.00

301.01A Aggregate Base Course, #21B (4"), Roller Compaction Ton/AQ 1,573.00

301.01B Aggregate Surfacing, VA #26 Ton/AQ 18.00

301.01C Ditch Armor, OGB Stone Ton/AQ 997.00

303.08 Surface Preparation of Existing Aggregate Surface MI/AQ 1.00

403.01A Hot Asphalt Concrete Pavement, VDOT IM 19.0 (1.5") Ton/AQ 790.00

403.01B Hot Asphalt Concrete Pavement, VDOT BM 25.0 (2.0") Ton 1053.00

635.01 Temporary Traffic Control LS/LSQ 1.00

TOTAL

OPTION ITEM-SECTION II (MILEPOST 12.65 TO 13.65)

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

155 Delete

301 - Untreated Aggregate Courses

301 Title Change

301.01 Work

301.02 Material

301.03 General

301.04 Mixing and Spreading

301.05 Compacting

301.06 Surface Tolerance

301.08(b) Plasticity Index

Table 301-1 Field Density Requirements

Table 301-1—Acceptance Sampling and Testing Requirements

301.09 Measurement

403 - Hot Asphalt Concrete Pavement

403.06 Surface Preparation

403.16 Pavement Smoothness

Table 403-1—Acceptance Sampling and Testing Requirements

633 - Permanent Traffic Control

633.02 Material

633.03 General

633.05 Panels

635 - Temporary Traffic Control

635.03 General

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

703.10(e) Flakiness Index

703.10(i) Adherent Coating

Table 703-2 Correction

Table 703-2 Correction

Table 703-7 Target Value Ranges

718 - Traffic Signing and Marking Material

718.02 Reserved

718.02 Protective Overlay Film and Edge Film

718.05 Aluminum Panels

718.08 (a) Signpost - Wood posts

718.08 (b)(2)(c)Signpost - Square tubular steel posts

718.14 (g)Waterborne Traffic Paint - Daylight reflectance

718.15 (g)Epoxy Marking - Drying Time

718.15 (a)Epoxy Markings Pigments

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition

Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or

“design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

301 - Untreated Aggregate Courses

301.00_nat_us_03_03_2005

301 Title Change.

Change the title to: Section 301 Aggregate Courses

301.01_nat_us_03_03_2005

301.01 Work.

Add the following:

Work includes producing aggregate by pit-run, grid rolling, screening, or crushing methods, or placing Government-furnished aggregate. Work may include additive mineral filler, or binder.

301.02_nat_us_05_16_2005

301.02 Material.

Add the following:

Bentonite 725.30

Calcium Chloride Flake 725.02

Lignon Sulfonate 725.20

Magnesium Chloride Brine or Calcium Chloride Liquid 725.02

301.03_nat_us_09_14_2005

301.03 General.

Add the following:

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size. No gradation other than maximum size will be required for pit-run or grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size. After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to

Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.

301.04_nat_us_03_03_2005

301.04 Mixing and Spreading.

Delete the first sentence of the first paragraph and add the following:

Ensure that aggregate and any required additives, water, mineral filler, and binder are mixed by the specified method except, if crushed aggregate products are being produced and mineral filler, binder, or additives are required, uniformly blend following crushing. Control additive proportions to 0.5 percent dry weight.

(a) Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

(b) Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant. During mixing, add water to provide the necessary moisture content for compacting.

(c) Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content until the mixture is uniform throughout. Mix aggregate, water, and all other materials until a uniform distribution is obtained.

Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

Route and distribute hauling and leveling equipment over the width and length of each layer.

301.05_nat_us_05_17_2005

301.05 Compacting

Delete and replace with the following:

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box

7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box

7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

301.06_nat_us_03_03_2005

301.06 Surface Tolerance.

Add the following:

Thickness and Width requirements:

The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of

4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.

The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.

301.08_nat_us_03_30_2005

301.08(b) Plasticity Index.

Add the following to the first sentence:

“and under 703.05(c)(1)”.

301.08_nat_us_02_07_2007

Table 301-1 Field Density Requirements.

Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:

Material or Product

Type of

Acceptance

(Subsection)

Characteristi c

Category Test Methods

Specification s

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Base and

Subbase

Measured and tested conformance (Subsection

106.04)

Moisture Density ---

Method C --- AASHTO T 99 1 per type and source of material

Source of material

Yes Before using in work

Method C-1 --- R-1 Marshall “ “ “ “

Method D --- AASHTO T 180 “ “ “ “

Method D-1 --- R-1 Marshall “ “ “ “

Compaction ---

Method C, C-1, D, D-1

--- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

Surfacing Measured and tested conformance (Subsection

106.04)

Moisture Density

Method C-1 --- R-1 Marshall “ “ “ Before using in work

Method D --- AASHTO T 180 “ “ “ “

Method D-1 --- R-1 Marshall “ “ “ “

Compaction

Method C, C-1, D, D-1

--- AASHTO T 310 or other approved procedures

1 per 500 t In-place --- Before placing the next layer

301.08_nat_us_03_03_2005

Table 301-1: Add the following:

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or

Product

Type of

Acceptance

(Subsection)

Characteristi c

Category Test Methods

Specification s

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Subbase & Base

Courses L, M, N, O, P, Q, R

Measured and tested conformance

(Subsection 106.04)

Plastic Limit - AASHTO T 90 1 per each 1,000

T

From the windrow or roadbed after processing

Yes 4 Hours

Table 301-1—Acceptance Sampling and Testing Requirements.

Material or

Product

Type of

Acceptance

(Subsection)

Characteristi c

Category Test Methods

Specification s

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Aggregate Width Measured and tested conformance

(Subsection 106.04)

Width - - 4 per each 0.5 mi

Roadbed after processing

- 4 Hours

Aggregate Thickness Measured and tested conformance

(Subsection 106.04)

Thickness - - 4 per each 0.5 mi

Roadbed after processing

- 4 Hours

Additive Measured and tested conformance

(Subsection 106.04)

Amount of Additive - 1 per each 1,000

T

From the windrow or roadbed after processing

No 4 Hours

301.09_nat_us_07_07_2005

301.09 Measurement.

Replace the second paragraph with the following:

Measure aggregate by cubic yard compacted in place when payment is by contract quantities.

301.10_nat_us_03_03_2005

301.10 Payment

Delete the following:

adjusted according to Subsection 106.05

403 - Hot Asphalt Concrete Pavement

403.06_nat_us_05_17_2005

403.06 Surface Preparation.

Add the following:

Prelevel dips, depressions, sags, excessive or nonexistent crown, or other surface irregularities with hot asphalt concrete according to Section 404. Spread and compact the hot asphalt concrete in layers parallel to the grade line not exceeding 2 inches in compacted depth.

403.16_nat_us_03_02_2005

403.16 Pavement Smoothness.

Delete the heading and replace with the following:

Pavement Smoothness and Surface Tolerance

Add the following:

The maximum variation from the compacted width is 3 inches and the average width of 4 or measurements for any ½ mile of road segment is the specified width.

The maximum variation from the compacted specified thickness is ¼ inch and the average thickness of 4 measurements for any ½ mile of road segment is the specified thickness

403.17_nat_us_03_02_2005

Table 403-1—Acceptance Sampling and Testing Requirements.

Material or

Product

Type of

Acceptance

(Subsection)

Characteristi c

Category Test Methods

Specification s

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Pavement Width Measured and tested conformance

(Subsection 106.04)

Width - - 4 per each 0.5 mile

Pavement after compaction

- 4 Hours

Pavement Thickness Measured and tested conformance

(Subsection 106.04)

Thickness - - 4 per each 0.5 mile

Pavement after compaction

- 4 Hours

403.17_nat_us_03_02_2005

403.17 Acceptance.

Modify Table 403-1 Sampling, Testing, and Acceptance Requirements as follows:

In the sampling frequency column for the characteristics: gradation, asphalt content, and compaction, add the following:

but no fewer than a minimum of 1 per shift

633 - Permanent Traffic Control

633.02_nat_us_03_03_2005

633.02 Material.

Add the following subsections

Protective Overlay Film 718.02

Edge Film 718.02

633.03_nat_us_03_03_2005

633.03 General.

Delete the subsection and add the following:

Furnish traffic control devices and guide signs according to the MUTCD, approved USDA-FS and state supplements, the current edition of USDA-FS EM-7100-15 Sign and Poster Guidelines for the Forest Service, and Standard Highway Signs published by FHWA. Submit the sign list for approval before ordering.

633.05_nat_us_03_03_2005

633.05 Panels.

Add the following:

Apply protective overlay film and top edge film as required and according to with manufacturer’s recommendations.

Delete the sentence: “Use antitheft fasteners where possible” in the fifth paragraph and replace it with the following: “For each sign panel use at least one antitheft fastener.”

635 - Temporary Traffic Control

635.03_nat_us_05_13_2004

635.03 General.

Install temporary traffic control signs to temporary posts or approved temporary sign mounts.

703 - Aggregate

703.05_nat_us_08_14_2009

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-16

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T a b le

-2 rg et

V a lu e

R a n g es f o r

S u b b a se a n d B a se

G ra d a ti o n

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

E

B a se

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o n fr o m t h e ta rg et v al u es

D

B a

.0

.0

C

B a

.0

.0

B

S u b b a

.0

.0

A

S u b b a se

.0

.0

S ie v e

S iz e

½ i ch i

½ i

/4 i

/2 i

/8 i

N

Delete Table 703-3 and replace with the following:

b le

-3 rg et

V a lu e

R a n g es f o r

S u rf a ce G ra d a ti

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

U

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o n fr o m t h e ta rg et v al u es

I f th e p la st ic it y i n d ex

P I) i s g re at er t h an th e T

V r an g e fo r th e

N o s ie v e si ze i s

-1

.0

.0

S

.0

.0

H

.0

.0

G

.0

.0

F

-1

-8

-6

-5

-3

-2

.0 -1

.0

S ie v e

S iz e

/2 i

/4 i

/2 i

/8 i

Add Table 703-16:

Table 703-16

Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

703.06_nat_us_03_02_2005

703.10(e) Flakiness Index.

Delete and replace with the following:

Flakiness Index, FLH T 508 30% max.

703.10(i) Adherent Coating.

Adherent coating on the aggregate, FLH T 512 0.5% max.

703.07_nat_us_03_02_2005

Table 703-2 Correction

Include the following substitution

In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”

Table 703-2 Correction

Include the following substitution

In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”

703.10_nat_us_03_02_2005

Delete Table 703-7 and substitute the following:

Table 703-7 Target Value Ranges

Table 703-7

Target Value Ranges for

Single and Multiple Course Surface Treatment Aggregate Gradation

Sieve

Percent by Mass Passing Designated Sieve

(AASHTO T 27 & T 11)

Size

Grading Designation

A B C D E F

1½ inch 100 (1)

1 inch 90-100(3) 100

(1)

¾ inch 0-35(5) 90-100(3) 100 (1)

½ inch 0-8(3) 0-35(5) 90-100(3) 100 (1)

⅜ inch — 0-12(3) 0-35(5) 85-100(3) 100

(1) 100

(1)

No. 4 — — 0-12(3) 0-35(5) 85-100(3) 85-100 (1)

No. 8 — — — 0-8(3) 0-23(4) —

No. 200 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-1(1) 0-10 (1)

(1) Statistical procedures do not apply.

( ) The value in the parentheses is the allowable deviation (±) from the target values.

718 - Traffic Signing and Marking Material

718.02_nat_us_03_02_2005

718.02 Reserved.

Replace this section with the following:

718.02 Protective Overlay Film and Edge Film.

Protective overlay film will be a high performance flouropolymer film such as 3M Scotchlite

Premium Protective Overlay Film Series 1160 or approved equal.

Edge film will be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3 inches wide vinyl film.

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

718.08_nat_us_12_04_2009

718.08 (a)Signpost - Wood posts

Change the following:

“0.4 pounds per cubic foot.” to “0.6 pounds per cubic foot”.

718.08_nat_us_03_27_2007

718.08 (b)(2)(c)Signpost - Square tubular steel posts

Delete the existing subsection and substitute the following:

(c) Galvanizing after punching ASTM A 653M, (inside and outside of post) coating Z275 designation

718.14_nat_us_03_02_2005

718.14 (g)Waterborne Traffic Paint - Daylight reflectance

(g) Daylight reflectance. (Without glass beads)

(1) White, ASTM E 1347 84% relative to magnesium oxide standard

(2) Yellow, ASTM E 1347 55% relative to magnesium oxide standard

718.15_nat_us_03_27_2007

718.15 (g)Epoxy Marking - Drying Time

(g) Drying time. 15 mil film thickness with beads.

(1) Laboratory at 72

F, ASTM D 711 30 minutes maximum to no-pick-up condition

(2) Field at 77

F, viewed from 50 feet 10 minutes maximum to no-pick-up condition

718.15_nat_us_03_27_2007

718.15 (a)Epoxy Markings Pigments

(2) Yellow.

(a) Chrome yellow (PbCrO4), 23% min.

ASTM D 126, type III.

(b) Epoxy resin 70 to 77%

SF30
Section B
PART I – THE SCHEDULE
SECTION B - Supplies or Services and Prices/Costs Schedule of Items
Item
Method of Measurement
Total
Unit Cost
Quantity
Description
$
$
318.00
Ton / AQ
301.01
$
$
3,720.00
Ton / AQ
301.01A
$
$
36.00
Ton / AQ
Aggregate Surfacing, VA #26
301.01B
$
$
2,993.00
Ton / AQ
301.01C
Surface Preparation, Surface Blading and Roller Compaction of Existing Aggregate Surface
$
$
3.00
MI / AQ
303.08
$
$
1,866.00
Ton / AQ
403.01A
$
$
2,488.00
Ton
403.01B
$
$
1.00
LS / LSQ
635.01
$
TOTAL, ITEM 1
Item
Method of Measurement
Total
Unit Cost
Quantity
Description
$
$
106.00
Ton / AQ
301.01
$
$
1,573.00
Ton / AQ
301.01A
$
$
18.00
Ton / AQ
Aggregate Surfacing, VA #26
301.01B
$
$
997.00
Ton / AQ
301.01C
Surface Preparation, Surface Blading and Roller Compaction of Existing Aggregate Surface
$
$
1.00
MI / AQ
303.08
$
$
790.00
Ton / AQ
403.01A
$
$
1,053.00
Ton
403.01B
$
$
1.00
LS / LSQ
635.01
$
TOTAL, ITEM 2
Old Coal and Saint Mary's Road Plans and Notes_Final
PreBid

File details come from the government source that posted it. Updated .