Statement of Work (FCco CRL GH SOW - 20161110)

View the file

Other files for this federal contract opportunity

Other files attached to Replace Glazing on Greenhouses, newest first.
File Type Posted
Wage_Determination_CO160034_1-13-2017_CO34.pdf PDF
AG-32SD-S-17-0004_0003.pdf PDF
FC_CO_GH_Site_Visit_Attendees_20170110.pdf PDF
AG-32SD-S-17-0004_000002_Clauses.pdf PDF
AG-32SD-S-17-0004_000002.pdf PDF
GHA&B_CD_Elev_20120906v5.pdf PDF
GHA&B_C&D_Floor_Plan_20120926v.pdf PDF
AG-32SD-S-17-0004_000001.pdf PDF
RFI_FORM.pdf PDF
FCcoCRL_GH_Ridge_Vents_13125_20161109.pdf PDF
GH_B1_R_and_P_20161109.pdf PDF
ars371.pdf PDF
Contractor_Certification_Regarding_EMR.pdf PDF
Calculation_of_Self_Performed_Work.pdf PDF
GH_AB_aisle_R_and_P20161109.pdf PDF
GH_D_S_End_R_and_P_20161109.pdf PDF
FCcoCRL_GHglazing_acrylic_13123_20161110.pdf PDF
Wage_Determination_CO160034_12-9-2016_CO34.pdf PDF
AG-32SD-S-17-0004.pdf PDF
GH_A_and_B_aisle_close_R_and_P_20161109.pdf PDF
ars372.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT STATEMENT OF WORK

1. CONTRACT PROJECT:

A. Project Title: Replace Glazing on Greenhouses A, B, C, D, & Aisles on East Sloping Roofs and Repair Ridge Vent Operators B. Project Location: Crops Research Laboratory, Fort Collins, CO

2. PROJECT CONTACT PERSONS:

A. CONTRACTING OFFICER (CO):

Jeffery RidenourTel. No.: (309) 363-5914
USDA, ARS, WBSCFax:
1815 N University St.Email: jeffery.ridenour@ars.usda.gov

Peoria, IL 61604

B. ENGINEERING PROJECT MANAGER (EPM):

Greg GrahamTel. No.: (970) 492-7035
USDA, ARS, WBSCFax No.: (970) 492-7049
2150 Centre Avenue,Email: Greg.Graham@ars.usda.gov

Building D, Suite 310, Fort Collins, CO 80526

C. RESEARCH PROGRAM REPRESENTATIVES (RPR):

Dr. Lee PanellaTel. No.: (970) 492-7140
Supervisory Research GeneticistEmail: Lee.Panella@ars.usda.gov

Crops Research Laboratory 1701 Centre Ave.

Fort Collins, CO 80526

D. ADMINISTRATIVE OFFICERS (AO):

Donna MartinTel. No.: (970) 492-7701
Administrative OfficerEmail: Donna.Martin@ars.usda.gov

Center for Agricultural Resources Research (CARR) 2150 Centre Ave., Building D, Fort Collins, CO 80526

E. LOCATION COORDINATORS (LC):

William Prange Tel. No.: (970) 492-7706 Safety and Occupational Health Specialist Email: William.Prange@ars.usda.gov Center for Agricultural Resources Research (CARR) 2150 Centre Ave., Building D, Fort Collins, CO 80526

F. SAFETY AND OCCUPATIONAL HEALTH MANAGER (SOHM):

Phil SmithTel. No.: (979) 260 - 9449
USDA, ARS, WBSCEmail: Phil.Smith@ars.usda.gov

1001 Holleman Drive East College Station, TX 77840

3. SCOPE OF WORK:

A. Base Bid is to Replace Glazing on Greenhouses A, B, C, D, & Aisles on East Sloping Roofs.

B. Option 1 is to Repair Greenhouse Ridge Vent Rack and Pinion Operators if Option 1 is accepted.

4. RELEVANT DOCUMENTS

A.Attached Documents: The Consultant shall use all documents marked by an “X” in preparing the required contract documents.
[X]Specification Section 13123, Replace Glazing on Grenhouses A, B, C, D,and Aisles, “FCcoCRL GHglazing acrylic 13123 20161110.pdf”
[X]Specification Section 13125, Repair Ridge Vents in Greenhouses A, B, C,D, and Aisles, “FCcoCRL GH Ridge Vents 13125 20161109.pdf
[X]Floor Plan and Elevation Drawings in files “GHA&B C&D FloorPlan20120926v.pdf”;“GHA&B CD Elev20120906v5 .pdf”
[X]Four Photos of existing Rack and Pinion Operators in files
“GH A and B aisle close R and P 20161109.jpg” ;
“GH AB aisle R and P 20161109.JPG”;
“GH B1 R and P 20161109.JPG”;
“GH D S End R and P 20161109.JPG”

5. PROJECT REQUIREMENTS:

A. The CONTRACTOR shall Replace Glazing on Greenhouses A, B, C, D, & Aisles on East Sloping Roofs as the Base Bid. The Contractor shall Replace Glazing as specified in Specification Section 13123, Replace Glazing on Greenhouses A, B, C, D, and Aisles.

B. The CONTRACTOR shall Repair Ridge Vent Operators if Option 1 is accepted. Contractor shall Repair Ridge Vents as specified in Specification Section 13125, Repair Ridge Vents in Greenhouses A, B, C, D, and Aisles.

6. GENERAL REQUIREMENTS:

A. Coordination and Assistance

1. Coordination and Assistance between the Contractor, Contractor's personnel and Sub-Contractors, Contracting Officer, Contracting Officer's Representative, Location Monitor, and Research Personnel on the following items will keep all appropriate personnel involved to expedite this project for everyone’s benefit.

B. Notice to Proceed

1. Notice to proceed from the Contracting Officer is needed before the Contractor shall incur any costs and before any work is done on site.

C. Correspondence

1. Correspondence between the Contractor, Contracting Officer, and Contracting Officer’s Representative shall be dated, logged, and copies kept at the originator’s office.

D. Progress schedule

1. Progress schedule shall be completed and submitted to the Contracting Officer before the Pre-Construction Conference.

E. Pre-Construction Conference.

1. Schedule: The Pre-construction Conference with the Contracting Officer’s Representative.

2. Attendees shall include the Contracting Officer, Contracting Officer's Representative, the Contractor, Contractor's superintendent, Location Monitor, and others.

3. Agenda shall include the following:

a. Introductions of Attendees, with designation for 24 hour calls, by the Contracting Officer’s Representative and the Contractor.

b. Facilities normal working hours are 8 to 5.

c. Allowable Contractor’s use of Premises, Office, Work, and Storage areas with safety, housekeeping, and security procedures.

d. Allowable Contractor’s equipment and material deliveries.

e. Contractor’s Progress Schedule and coordination items for any utility outages or hazardous materials.

f. Due to the size of this Project, the Materials, Products, Installation Procedures, Testing Procedures, etc. shall meet commercial standards and shall be reviewed if requested by the Contractor or the Contracting Officer’s Representative requests a specific item, otherwise review will be at the Final Inspection.

g. Contractor’s Inspection Procedure, including field testing and approvals with a remedial process for any deficiencies.

h. Government’s Quality Assurance Program of random inspections and notifying the Contractor of any noted deficiencies. This does not relieve the Contractor from requirements of the Contract.

i. Procedures for the Contractor to submit Applications for Payment.

4. Safety.

a. Contractor's Safety Competent Person designation will be made at the Pre-Construction Conference.

b. Past safety record will be used as an evaluating factor in future contracts.

c. Request a copy of past 4 years OSHA 300A Summary of Work Related Injuries and Illnesses.

d. Investigate past OSHA safety inspections using the establishment search (http://www.osha.gov/pls/imis/establishment.html ).

e. Request a copy of any OSHA training course documentation for contractor and his/her employees.

f. Request copy of relevant safety plans.

g. Contractor will be required to hold at least weekly safety meetings.

h. Contractor and his employees will be required to follow all requirements of 29 CFR 1926 OSHA Standards for the Construction Industry.

i. All relevant PPE as dictated by the hazards present must be worn by the contractor and all employees working on the job site.

j. Location Monitor will walk the site twice a day with an eye to safety.

k. Possible Hazards of this Contract are:

1. Ladder Use.

2. Excavations.

3. Loading and Hauling.

4. Asbestos Containing Material Handling and Disposal.

F. Operations and Storage Areas

1. Water, gas, electricity are available on the site.

2. Toilet: Contractor shall supply his or her toilet facilities, wash facilities, drinking water, and all necessary disposable materials, comply with regulations and health codes for the type, number, location, operation, and maintenance of fixtures. The COR can waive this requirement.

G. Cleaning Up

1. Debris and rubbish shall be removed from the site daily. Upon the end of the work day, the entire area of the contract work shall be cleaned of all excess materials, dirt, rubbish, and debris.

2. Transportation of debris shall be in a manner as to prevent spillage on street or adjacent areas.

H. Utilities

1. Utilities are to the site and can be used reasonably.

I. Specifications and Drawings.

1. No scaling. Do not scale drawings for dimensions.

J. Schedules and Coordination.

1. Coordination: Coordinate construction activities with the Contracting Officer's Representative to be in compliance with the Scheduling Requirements. Coordination meetings shall be held once a week usually, but the COR can change the time period depending on the amount of activity by the Contractor. The agenda shall include accomplishments, problems, and solutions since the previous meeting. The Contractor shall prepare and distribute minutes of progress meetings. No later than 3 days after each meeting, the Contractor shall provide a copy of the minutes to the CO and COR.

2. Monitoring the Progress Schedule: The Contractor or the COR shall inform the CO if the Contractor is behind on the schedule, why and what is planned to get back on schedule, so the CO can take appropriate action if needed.

K. Quality Assurance.

1. Required Submittals will be noted in the Statement of Work or in the Specification section that is applicable. Contracting Officer can request additional submittals on contract items when needed. A submittal form in Word format, will be provided upon request after contract award.

2. Construction Inspector’s Daily Reports are recommended with the Contractor’s standard form. The Contractor shall complete and submit the daily reports to the COR weekly, on the first working day of the following week. The COR can waive the requirement for daily reports, at their discretion.

L. Protection of Existing Equipment, Utilities, and Improvements.

1. Contractor is responsible for protection and restoration if damage occurs. See Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (FAR 52.2369) (APR 1984) in Section H Special Contract Requirements.