AG-32SD-P-17-0155_RFQ_ATTACHMENT_3_-5.docx

DOCX document 46 KB Posted

Attached to
LOCAL DEMOLITION AT USDA ARS, MILES CITY, MT
Solicitation number
AG-32SD-P-17-0155
Issued by

About this file

ATTACHMENT 3 - 5 REQUIRED FORMS #3 - COST BREAKDOWN #4 - CALCULATION OF SELF-PERFORMED WORK #5 - PAST PERFORMANCE QUESTIONNAIRE

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-32SD-P-17-0155

LOCAL DEMOLITION: REMOVAL OF CONCRETE BIN BASES

USDA ARS, FORT KEOGH LIVESTOCK & RANGE RESEARCH LABORATORY (FKL&RRL), MILES CITY, MT

ATTACHMENT 5 – PAST PERFORMANCE QUESTIONNAIRE

SUBMITTED IN RESPONSE TO RFQ # AG-32SD-P-17-0155

Self Performance for General Construction Contracts = 15% Self Performance for Specialty Trade Contracts = 25%

Use this form to identify and calculate cost of the work to be self-performed. (Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

A.1 - Clearly describe the trades and the work to be self-performed by your company:

A.2 - Clearly describe the trades and the work which will be subcontracted for this project:

Show Calculation of Self-Performed work

B.1 Total Offer Price:$__________________
-

B.2 Subtract G&A, home office overhead, prime $(__________________) Contractor’s markups for profit, bond, state use tax, etc.

B.3“Total amount of work to be performed under $___________________ the Contract”

B.4 “Work to be self-performed”: = $ ________________________________________

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B. 5. Self-performed Work = Line B.4 / B.3 X 100% = __________________________%

AG-32SD-P-17-0155

LOCAL DEMOLITION: REMOVAL OF CONCRETE BIN BASES

USDA ARS, FORT KEOGH LIVESTOCK & RANGE RESEARCH LABORATORY (FKL&RRL), MILES CITY, MT

ATTACHMENT 4 – CALCULATION OF SELF-PERFORMED WORK

Please submit three (3) past performance references along with your quote for general construction.

Provide the following information requested in this format for each of the projects/contracts being described. Projects may be on going and cannot have been completed no later than Three (3) years prior to the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.

A. Quoter/Contractor (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as _________________Prime or ________________________________Subcontractor

2. Contract Number _____________________________

3. Original Contract $ Value ______________________ Current/Final Contract $ Value __________________

4. If amounts in 3 above are different, provide a brief description of the reason:

5. Completion Date:

1. Original Date______________________________

2. Current Schedule___________________________

3. Estimate/Final Completion Date_______________
4. Primary cause for Contract___________________

6. Modifications________________________________

D. Provide detailed description of the work performed under the contract and describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

In addition, address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and indicate if those same subcontractors will be used on this project.

3. Address any technical areas about this project you consider uniquely relevant to this solicitation.

image1.emf

Microsoft_Excel_97-2003_Worksheet1.xls Sheet1

ATTACHMENT 3: COST BREAKDOWN - Submit with a completed SECTION B

Project No.: AG-32SD-P-17-0155 Date:

Project Title: DEMOLITION - REMOVAL OF CONCRETE BIN BASES

Project Location: USDA, ARS, FKL&RRL, MILES CITY, MT

QUOTER/CONTRACTOR: Company Name and Address:

Item Description Labor Cost Material Cost Total Cost

Division 1 - General Requirements

Division 2 - Existing Conditions

Division 3 - Concrete

Division 4 - Masonry

Division 5 - Metals

Division 6 - Wood and Plastic

Division 7 - Thermal and Moisture Protection

Division 8 - Doors and Windows

Division 9 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

Division 14 - Conveying Equipment

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heat, Ventilating, and Air Conditioning

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety and Security

Division 31 - Earthwork

Division 32 - Exterior Improvements

Division 33 - Utilities

Division 34 - Transportation

Subtotal

Overhead (xx %)

Profit (xx %)

Bond (xx %)

Total Base Offer Cost

Sheet2

Sheet3

File details come from the government source that posted it. Updated .