Mechanical_Drawings.pdf

PDF 7 MB Posted

Attached to
Building Automation System Control Upgrades Federal contract opportunity
Solicitation number
AG-32SC-S-17-0044
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Mechanical Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Building Automation System Control Upgrades, newest first.
File Type Posted
Sol_AG-32SC-S-17-0044_Amd_000001.pdf PDF
Revised_SOW.pdf PDF
Q&A.pdf PDF
Past_Performance.pdf PDF
Brand_Name_-_Siemens_Cntrls_CCRU_BAS_Upgrades_Redacted.pdf PDF
AG-32SC-S-17-0044.pdf PDF
RCx_FINAL_REPORT_A.v.pdf PDF
RCx_FINAL_REPORT_B.iv.pdf PDF
RCx_FINAL_REPORT_A.ii.pdf PDF
RCx_FINAL_REPORT_B.i.pdf PDF
General_Conditions.pdf PDF
RCx_FINAL_REPORT_B.xiv_and_B.xv.pdf PDF
Wage_Determination.pdf PDF
RCx_FINAL_REPORT_A.xix.pdf PDF
Statement_of_Work.pdf PDF
ARS372.pdf PDF
RCx_FINAL_REPORT_A.iv.pdf PDF
ARS371.pdf PDF
RCx_FINAL_REPORT_A.iii.pdf PDF
RCx_FINAL_REPORT_B.xiii.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trisha.Vigil Callout A.i

Trisha.Vigil Callout A.vii

Trisha.Vigil Callout B.xi

Trisha.Vigil

B.xii

B.iii

Trisha.Vigil Callout B.iv

Trisha.Vigil Callout B.xiv and B.xv

Trisha.Vigil

B.ii

B.vi

Line

A.xxiv

A.viii Return fan shall be slowed down to match airflow of supply fan

Trisha.Vigil Callout A.x

Trisha.Vigil Callout B.ix Implement a program that controls the exhaust fans (EF-1 and EF-2) in which there is one lead fan, one lag fan, and one standby fan. The new static pressure setpoint for EF-1 and EF-2 will be - 2.85" H2O. When the one lead fan cannot keep up with the load demand, the lag fan will start and the bypass dampers will operate in parallel with the lead fan bypass dampers. With both the lead and lag fans operating, once the load drops to the point where the bypass dampers are 100% open, the lag fan will be shut down again. As before, the standby fan shall be put in place of either the lead or lag fan in the event of a fan failure. During unoccupied times only the lead fan will operate.

A.xi

Trisha.Vigil Callout A.xii

Trisha.Vigil Line

Trisha.Vigil Callout A.xii

Trisha.Vigil Line

Trisha.Vigil Callout B.vii

Trisha.Vigil Callout A.vi

Trisha.Vigil Line

Trisha.Vigil Line

Trisha.Vigil Callout A.xiv

Trisha.Vigil Callout B.viii

Trisha.Vigil Callout B.xvi

A.xxvi. Program a 1 deg F deadband.

Trisha.Vigil

B.x Setpoint to be reduced to 55 deg F (typ x33)

A.xxv (typ. x4)

M-001
M-110
M-111
M-112
M-113
M-120
M-121
M-210
M-310
M-410
M-411
M-412
M-500
M-501
M-502
M-503
M-610
M-611
M-612
M-613
M-710
M-810
M-811
M-812