Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Demolition 15 Buildings BARC, newest first.
File Type Posted
Amend_3_Q A_II_-_S-16-46_Demo_15_Bldgs_BARC.pdf PDF
Sol_AG-32SC-S-16-0046_Amd_000003.pdf PDF
Sol_AG-32SC-S-16-0046_Amd_000002.pdf PDF
Sign_In_sheet_-_Wed_-_Demo_15_Bldgs.pdf PDF
Sign_In_sheet_-_Thur_-_Demo_15_Bldgs_BARC.pdf PDF
Sol_AG-32SC-S-16-0046_Amd_000001.pdf PDF
of0306.pdf PDF
Past_Performance_Project_Sheet_-_Demo_15_Bldgs__BARC.docx DOCX document
Wage_Decision_15-4281_Rev_3_-_Demo_15_Bldgs_BARC.pdf PDF
Person_Model_PII_Sheet_-_Revised_April_2015.pdf PDF
AD-1197fill.pdf PDF
Specification_01_34_00_Submittals.doc DOC document
Specification__31_20_11_Earthwork.doc DOC document
Specification_02_09_00_Disturbance_of_Lead.doc DOC document
Specification_01_74_19_Demolition_Waste_management.doc DOC document
Specification_02_08_10_Asbestos.doc DOC document
Specification_02_84_16_Lamps_Containing_PCB_and_Mercury.doc DOC document
Specification_02_41_00_Demolition.doc DOC document
Specification_01_01_00_General_Conditions.doc DOC document
Building_470AA_to_470JJ_Reference_Drawings_-_Combined.pdf PDF
Building_470A_Reference_Drawing_1963_Study_for_Drainage.pdf PDF
Building_470A_Reference_Drawing_1963_Drainage.pdf PDF
Building_470A_Reference_Drawing_1962_Blower_Coolers_installation.pdf PDF
Building_470A_Reference_Drawing_1979_Boiler_Installation.pdf PDF
Building_470A_Reference_Drawing_1967_Greenhouse_Construction.PDF PDF
Building_470A_Reference_Drawing_1967_Greenhouse_for_Alfalfa_Invest.pdf PDF
Building_470A_Reference_Drawing_1978_Greenhouse_Modifications.pdf PDF
Building_255A_Reference_Drawing_Greenhouse_Tables.PDF PDF
Building_255A_Reference_Drawing_Alterations.pdf PDF
Building_255A_Reference_Drawing_1962_Lighting_ _Plumbing.pdf PDF
Building_255A_Reference_Drawing_1962_Preliminary_for_Estimate_only.pdf PDF
Building_288A_Reference_Drawings_Combined.pdf PDF
Building_255A_Reference_Drawing_1962_Grading_Plan.pdf PDF
Building_255A_Reference_Drawing_1998_Drainage_Modifications.pdf PDF
Building_255A_Reference_Drawing_Site_Plan.pdf PDF
Building_255A_Reference_Drawing_1962_Experimental_Poultry_Breeder.pdf PDF
Building_177B_Reference_Drawing_Site_Plan.pdf PDF
Building_177B_Reference_Drawing_1966_Experimental_Poultry_Breeding_House.pdf PDF
Sol_AG-32SC-S-16-0046_Demo_15_Bldgs_BARC.pdf PDF
Building_009_Reference_Drawing_1941_Original_Construction.pdf PDF
Building_177B_Reference_Drawing_1984_Replace_HVAC_System.pdf PDF
Building_177B_Reference_Drawing_1963_Construction_of_Concrete_Slab.pdf PDF
Building_177B_Reference_Drawing_1967_Electron_Microscope_Lab-Meeting_Room.pdf PDF
Building_177B_Reference_Drawing_1987_HVAC_Replacement_-_West_End.pdf PDF
Building_009_Reference_Drawing_Site_Plan.pdf PDF
BARC_Site_Vist_MAP_07-25-16.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture

Research, Education, and Economics Agricultural Research Service

Eastern Business Service Center, Acquisition Branch 1815 North University Street

Peoria, IL 61604-3902 USDA is an Equal Opportunity Provider and Employer

AG-32SC-S-16-0046 Demo 15 Bldgs, BARC, Beltsville, MD Amendment 002 – Questions & Answers

1. The CMU Planters at Bldgs. #470AA thru #470JJ to stay in place or to be considered as trash to be removed with the Bldgs.?

A: The CMU Planters shall be considered part of Bldgs. #470AA thru #470JJ and shall be removed along with the major Bldg. #009 structures as well.

2. The trash and scrap metal material including the metal table around at Bldgs. #009 to stay in place or to be considered as trash to be removed with the major Bldgs. #009 structure?

A: The trash and scrap metal material including the metal table around at Bldgs. #009 and shall be removed along with the major Bldg. structures as well.

3. Are the existing concrete sidewalks coming from the Building #009 and connecting to the concrete curb at the street are to stay in place or to be demolished with the Bldg.?

A: The existing concrete sidewalks coming from the Building #009 and connecting to the concrete curb at the street shall be removed along with the major Bldg. #009 structures as well.

4. At Bldg. #009 existing active steam vault on the West end on the Bldg. which shares the East wall of the steam vault with Bldg. #009 concrete foundation wall is to stay in place or to be removed with Bldg. #009 major structure?

A: Bldg. #009 existing active steam vault on the West end on the Bldg. which shares the East wall of the steam vault with Bldg. #009 concrete foundation wall is to stay in place and fully intact. All Bldg. #009 major structures including the foundation walls, footings and all associated components of the building shall be removed except the portion that is connected to the active steam vault and would cause a direct adverse condition to the steam vault integrity.

5. Regarding the project proposal for the 15 buildings demo, the Hazardous Material quantities in the solicitation do not match the actual amounts on site. How do you wish for me to provide the proposal and what amounts should I use? The amounts listed in the solicitation or the actual amounts?

A: Base proposals on the quantities indicated in the contract documents.

(Continued)

AG-32SC-S-0046 Demo 15 Bldgs BARC, Amend 2 Q&A Page 2 of 2

6. "Page 27, Factor 2 - Relevant Experience, Subfactor 1 - Comparable work, states that the government will perform an assessment of completed or ongoing projects, but does not state how many projects should be submitted with the proposal, or what project information should be provided. The Past Performance Project Sheet states, "Minimum of three needs to be submitted with contractor's proposal." Please clarify how many projects are to be submitted for Relevant Experience, if there is a specific format/form/list of project information that is required, and if these project should be the same projects provided under Past Performance."

A: A minimum of three projects are to be submitted, in any format chosen by the contractor, but text paragraphs are the most common format, and the projects submitted can be the same or different projects as those submitted regarding past performance.

END of Questions & Answers