USDA IDIQ Painting Services Page 10 of 74

AG-3142-S-15-0014

SECTION C – DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1. GENERAL

1.2 DES CRIPTION/SPECIFICATION/WORK STATEMENT

The Contractor shall, during the period of performance, furn ish all necessary labor, parts, tools, materials, equipment, supervision, and appurtenances to perform the work described hereinafter as

EXTERIOR-INTERIOR PAINTING, INDEFINITE DELIVERY/INDEFINITE

QUANTITY (IDIQ) TERM CONTRACT in the U.S. Department of Agricu lture Headquarters Complex. The work consists of, but not limited to, scraping, sanding, blasting, patching, and preparing surfaces as required. The work also includes the application of various protective coatings and finishes to surfaces and exposed items and is generally referred to but not limited to repair and alteration work o rders and in-house maintenance and repair work.

The work shall be performed when authorized by the Contracting Officer (CO), Contract Officer’s Representative (COR), and Administrative Contracting Officer (ACO) for the requirements named in the Notice to Proceed Letter. Only the CO and ACO are authorized to administer the Task Orders and Delivery Orders which are perfo rmed in accordance with Sect ion C under this awarded contract, unless otherwise indicated. Any and all work described below shall be performed in accordance with the contract documents, specifications and manufacture’s specifications unless otherwise noted by the Contracting Officer (CO) or the Contracting Officer’s Representative (COR).

The buildings under this requirement shall include those buildings under the control of the Office of Operations, Facility Management Division, Washington Area Service Center located in the National Capital Region. These building are identified as the South Build ing and Jamie L.

Whitten Build ing located in Washington D.C. and the George Washington Carver Center (GW CC) located in Beltsville, Maryland.

1.2.1 Contractor’s work shall meet the quality standards listed in manufacturer’s instructions. The work will be identified in writing on a task order statement of work.

1.2.2 Contractor and his subcontractors shall be able to read, write, speak, and understand English.

1.2.3 Contractor and his subcontractors shall obtain all permits, notificat ions, and licenses required to fulfill the requirements described in this statement of work.

1.2.4 Salvaged Materials: Contractor shall not incorporate salvaged or used material.

Note: All costs arising from requirements of this Statement of Work are considered to be included in the contract’s pricing bid schedule, including any overtime premiums and associated fringe benefits required by any applicable DoL Wage Determination/Davis-Bacon Act.

1.3 SCOPE OF WORK

1.3.1 For locations of refin ishing or painting existing work, painting of new work, special preparation of surfaces (patching, resurfacing,; special clean ing, stripping of paint, etc.), number of coats and fin ish color schemes, see schedules itemized on individual work orders, as issued by the Contracting Office or the Contracting Officer’s Representative (COR). All cost arising from the requirements of the scope of work are considered to be included in the contractor’s bid pricing.

USDA IDIQ Painting Services Page 11 of 74

1.3.2 The Contractor and their subcontractors shall obtain all permits, notificat ions, and licenses necessary to fulfill the requirements described in the scope of work.

1.3.3 Clean, prepare and paint all prev iously painted and natural finished surfaces specified in the delivery order.

1.3.4 Paint surfaces of equipment such as radiators, unit heaters, etc., as specified in delivery order.

1.3.5 Remove bands on covered piping during painting. Install new banding, to match existing, after painting is complete.

1.3.6 Do not paint identification tags on mechanical-electrical equipment.

1.3.7 Clean, prepare and paint all prev iously painted interior surfaces specified in the contract documents.

1.3.8 Paint surfaces of all new items installed on the interior of the building, which are specified in the contract documents to match existing adjoin ing work unless otherwise noted.

1.3.9 Paint doors, transoms and doorframes, including trim in all rooms and spaces as listed on the schedule.

1.3.10 Remove putty from steel and wood windows and install new putty per manufacture’s and specified requirements

1.3.11 Where one coat only is specified for previously painted interior surfaces, apply the paint in accordance with the requirements indicated by the contract documents and manufacture’s specifications.

1.3.12 Re-letter all painted-on lettering within the painted surfaces, per the specified requirements

1.3.13 Paint all surfaces specified in the final fin ish color as listed on the individual work order schedules.

1.3.14 Remove or relocate and replace such items as wire guards, screens, grilles, gratings, furniture, bookcases, file cases, shelves, etc., as necessary for painting specified surfaces. The movement of furniture, as defined in this paragraph, does not permit any additional compensation to the contractor. The movement of heavy files, safes, and types of equipment that require any kind of moving equipment is considered as special and beyond the requirements of this contract. Any items damaged by the contractor during the period of performance will be rep laced at no additional cost to the Government.

1.4 DEFINITIONS

1.4.1 The term “paint”, as used herein, includes paints, all coatings, enamels, fillers, stains, varnishes and sealers used as primer (first), body (second) and finish (third) coats.

1.4.2 The term “walls” or “wall surfaces” as used herein include: all flat surfaces, and, surface applied conduit, electrical panels, telephone cabinets, telephone cables.

The term “Trim will herein include doors, doorframes, jambs, window trim and frames, framing for bulletin boards and other surface mounted items, HVAC units, shelving, radiators, piping, and other non-flat surfaces where a paint roller cannot be used.

1.4.3 The term “coat” or “coat of paint” as used herein on flat wall and ceiling surfaces, whether it is prime, body or fin ish coat, will be considered as “a coat”.

USDA IDIQ Painting Services Page 12 of 74

1.4.4 The term “strip” as used herein means removal of all coatings to the bare substrate by chemical means or by mechanical means.

1.4.5 The term “color numbers” as used herein and designated by a five digit numbering system include the color and finish (flat, semi-g loss, gloss) of the paint as indicated in Federal Standard 595.

1.4.6 The term appurtenances, as used herein, include but are not limited to: equipment, protective clothing, tools and or instruments used in the performance of the contract requirements.

1.5 QUALITY ASS URANCE

1.5.1 Contractor shall provide a submittal of materials/products that they will use to fulfill the requirements in this contract to the COR for review prior to commencing work under this contract.

Contractor shall maintain/provide, upon request from the CO/COR, current Material Safety Data Sheet (MSDS) for all products used to fulfill the requirements outlined in this contract.

1.5.2 Labels on paint containers shall show the following information:

Manufacturer’s name Type of Paint Manufacturer’s stock number Color Date of manufacture Label analysis Federal specification number

All of which shall be legible on delivery to the job site.

1.5.3 Furnish a “Supplier’s Record of Test Results” for each batch of paint, in accordance with Federal

Standards 141. Limit testing to those properties for which there are requirements in the material specifications

1.5.4 Sampling of materials: The Contracting Officer may require the Contractor to obtain, by random selection, one paint sample of each kind of paint from the sealed containers, in the presence of the Contracting Officer. Mix o r stir paints thoroughly prior to sampling, to insure uniform representative samples. These samples will be held for testing purposes, should the need arise for testing. The cost of testing paint samples, which do not meet the specification requirements, will be charged against the Contractor.

1.5.5 Fungus control: Organic coatings shall show no fungus growth when tested as specified in

Federal Standards 141D - General methods for testing of paint, varnish, lacquer and related materials

1.5.6 The fungicidal agents shall not adversely affect the floor, texture or durability of the paint or size to which it is added. It shall be employed in the amount required to meet the fungus resistance test specified in Federal Specificat ions. The fungicidal agent shall be added to the paint and size by the manufacturer, where it is specified to be added.

1.5.7 Spackling compound shall meet ASTM requirements for finishing and topping compounds.

1.5.8 Mineral spirits shall conform to Federal Specificat ions.

1.5.9 Caulking compound shall conform to Federal Specification.

1.5.10 Putty for metal sash glazing shall conform to Federal Specification.

USDA IDIQ Painting Services Page 13 of 74

1.5.11 Putty for wood sash glazing shall conform to Federal Specification.

1.5.12 Sealer, surface for knots shall conform to Federal Specification.

1.5.13 Sealing Compound shall conform to Federal Specification.

1.6 SUBMITTALS

1.6.1 Furnish manufacturer’s certifications, with independent test reports (for current similar batches of paint) for written approval by the Contracting Officer. Certify that listed materials comply with specifications. When applicable, cert ify that a specific material is listed on the appropriate qualified products listing which is maintained and issued by the Federal Supply Serv ice. List each type of paint and other materials proposed for use with the specification number or the name with which it complies.

1.6.2 Submittal of the manufacturer’s certification may be waived by the COR, only when the quantity of a particular paint required is ten gallons or less.

1.7 PRODUCT DELIVERY, S TORAGE

1.7.1 Deliver sealed containers with labels that are leg ible and intact.

1.7.2 Deliver the containers to the project site in advance of use, so the inspector may approve the materials.

1.7.3 Store all goods, equipment and approved materials in ventilated spaces or areas as arranged with the COR and as approved by the Contracting Officer. Keep storage areas neat and clean. Furn ish and temporarily install a fully charged fire extinguisher near the door within designated the storage area.

1.7.4 Repair and refinish any and all damage to surfaces and equipment in the assigned storage area caused by and due to the Contractor’s operation, at no additional cost to the Government.

1.8 MATERIAL WHICH CONTAINS ASBES TOS/LEAD

1.8.1 General: USDA HQ facilit ies in may contain cement plaster which contains asbestos, or paint which may contain lead. In the event this type of cement plaster or paint is chipped, frayed or crumbling, the Contractor shall immediately notify the COR and await d irect ion from the Contracting Officer.

1.8.1.1 Compliance With Regulations: All work, including contact with and handling of hazardous materials, the disturbance or dismantling of structures containing hazardous materials and/or disposal of hazardous materials shall comply with all applicab le state and federal regulations.

Work involv ing the disturbance, dismantling of asbestos or asbestos containing materials, and lead base materials or the disposal and removal shall also comply with all applicable state and Federal safety and health regulations. Where there is a conflict between applicable regulations, the most stringent shall apply.

1.8.2 Sample testing for asbestos or lead will be performed by US DA personnel on areas to be painted or coated prior to job start date. The results will be made availab le to the Contractor, upon request through the CO or COR.

1.8.3 The Contractor shall notify the COR upon encountering any materials in the immediate job area which are believed to be hazardous to workers or personnel, but were not previously iden tified.

USDA IDIQ Painting Services Page 14 of 74

1.8.4 Contractor shall comply with the directives in this SOW, as well as local laws, regulations, ordinances and standards, which pertain to the safety of workers and building occupants when working with materials containing asbestos or lead.

1.9 JOB SITE/ WORK AREA

1.9.1 Contractor shall confine operations at the job site to the areas identified on the Work Order.

Contractor shall protect all interior fu rn ishes to include carpet , furn itu re and window t reatment.

Contractor shall not store excess materials in pub lic spaces or emergency egress routes.

1.9.2 Contractor shall not smoke within government facilit ies and may only s moke in designated areas outside the buildings.

1.9.3 Working in Restricted/Controlled Areas: The Authorized caller will provide escorts, or assist in obtaining passes for Contractor personnel performing painting operations in Restricted/Controlled Areas.

1.9.4 Contractor shall be responsible for contacting the COR to coordinate which items they shall be responsible for moving. The Contractor shall maintain a written log of notification and acknowledgments by the COR, (date, time, name of person contacted etc.) to be reviewed by the Authorized Caller when necessary. The customer, (occupants where the work/painting is be done) will be responsible for relocating contents/furniture as required, so as not to interfere with Contractor’s work. In most cases, occupants will be working in or near the job site during the entire painting period. Contractor shall cooperate fully with occupants during painting operations to minimize conflicts.

1.9.5 Environmental conditions: Comply with Manufacturer’s written recommendations and Federal standards as to the environmental conditions under which paint coatings and systems should be applied.

1.9.6 Do not apply paint or other fin ish in spaces or areas where dust exists in the atmosphere to the extent that it becomes evident on the surface of freshly applied fin ishes within a reasonable period.

1.9.7 Atmosphere and ambient conditions: Apply paint, other than water-thinned coatings, to materials, which are completely free from surface moisture. Maintain the temperature of the surface to be painted, and of the atmosphere in contact therewith, per the specified requirements for interior paint and coatings.

1.9.8 Clean-Up: Upon completion of painting work, remove all rubbish, discard materials, surplus materials and paint spots from floors, glass and other surfaces which are due to contact work.

Leave the area clean and orderly. If the USDA must use the services of an outside contractor to accomplish any cleanup, all charges will be deducted from the original work order.

1.10 PROTECTION

1.10.1 Do not clean paint buckets, paint rollers, paint ro ller pans, paint brushes, etc. at sink or other drainage facilities and do not allow any debris to run into drainage lines of the build ing.

1.10.2 Protect any and all murals, art work, and designated fixtures with drop cloths or other suitable methods from paint spatters, dirt or other damage during progress of the work.

1.10.3 Protect adjoining work, not being painted, by masking, drop cloths and other suitable coverings as best determined by site conditions.

1.10.4 Store or locate paint containers to eliminate exposure to freezing conditions.

USDA IDIQ Painting Services Page 15 of 74

1.10.5 Remove used rags, waste, empty containers, etc. from the site at the end of each day’s work.

1.10.6 Provide at least one 2-B fire extinguisher for each 200 square feet of area occupied for paint mixing and storage.

1.10.7 Provide for use of face masks or respirators, supplied with air, for persons working in areas where ventilation is insufficient.

1.10.8 Do not prepare surfaces nor apply paint to surfaces in kitchens or cafeterias while food is being prepared or served.

1.10.9 Ventilate areas where toxic coatings are being applied, during application and for a period of 24 hours after application is completed.

1.10.10 Provide barriers or seal around openings between spaces being painted and occupied areas, to prevent paint fumes, vapors and dust from passing into the occupied area.

1.10.11 Apply such additional safety and protection items or devices when necessary as recommended in

Manufacturer’s specifications and Federal standards.

1.10.12 Take necessary corrective action immediately, upon reported notice of fumes by occupants.

1.10.13 Spill Reporting: The Contractor shall immediately report all spills, releases, or potential releases of hazardous or suspected hazardous material or wastes regardless of quantity to the CO and COR . A written follow-up report shall be submitted to the Contracting Officer. The Contractor shall be responsible for the removal, and the disposal of the spill material. If the quantity of the spill is beyond the capability of the Contractor to manage/remove, it may be held responsible for hazardous material response provided by USDA, or other agencies, if the response is the result of the Contractor’s neglect or non- compliance with this contract.

1.11 STANDARDIZATION OF METHODS OF MEAS UREMENTS

1.11.1 Uniform methods for interpretation and measurement of work quantities will be used for inspection and acceptance of all work. The Contractor is bound thereby to apply the appropriate standardized methods of measurement, as stated below, in p reparation of his bid and in the performance of the contract.

1.11.2 Work shall be performed on the basis of a unit price per square foot of surface. Instead of unit prices for each category (i.e., one coat system, two coat system, different paint, materials or systems, etc.) of painting to be specified in the contract, a base unit price has been established, together with factors for subcategories of painting. These price factors shall reflect the cost of the painting relative to the base unit price. Unit price for painting shall include, but is not limited to:

surface preparation, such as the removal of peeling or loose paint; sanding, cleaning, and dusting;

and filling of nail holes, chips, dents, and hairline cracks. Surface preparation beyond this shall be deemed to be “repairs”. Surface areas to be painted, stained, varnished, repaired, etc., shall be calculated as indicated below.

All measurements should be taken in feet and inches. In all appropriate cases, separate premium unit prices shall be required for painting of surfaces above 12 feet 0 inches in height from floor level. If the surface is higher, the Contractor will be paid both the applicable unit price per square foot and the premium unit price per square foot for that painting done above 12 feet 0 inches, both calculated in the manner described. When prices per item, i.e ., per door, per window, per linear foot of partition, etc., are required, those prices shall take into account work that is 12 feet 0 inches or more above the fin ished floor.

USDA IDIQ Painting Services Page 16 of 74

1.11.3 Ceilings. The area of ceiling surfaces to be painted shall be the overall measured length multiplied by the actual measured width of the ceiling, and shall be rounded to the nearest square foot. Side areas of beams and/or recesses in the ceiling 6 inches or more in depth, are to be painted with the ceiling and shall be computed and added to obtain the total square footage for which payment is to be made. No additional square footage will be calcu lated for the painting of side areas of beams and/or recesses in a ceiling, which are less than 6 inches in depth. No deduction is to be made fo r the cross-sectional areas of columns that intersect the ceiling.

Exposed ductwork, p iping, conduit, etc., 6 inches or less in diameter or depth and continuous to be ceiling shall be considered as part of the ceiling, and the price fo r painting the ceiling shall include the painting of this work at no addit ional square footage or cost. Unit prices for this work shall be required in the bid documents.

1.11.4 Walls or partit ions. The area of walls or partition surfaces to be painted shall be the overall actual measured length multiplied by the actual measured height of the wall, and shall be rounded to the nearest s quare foot. The side areas of columns and/or recesses that are 6 inches or more in depth and are integral with the wall shall be included in the total square footage of wall surface to be painted.

a. No additional square footage will be calcu lated for painting of side areas of columns and/or recesses which are less than 6 inches in depth. Exposed ductwork, pip ing, conduit, etc., 6 inches or less in diameter or depth and contiguous to the wall shall be considered as part of the wall, and the price for painting the wall shall include the painting of the work at no additional square footage or cost. In addition to calculating the entire surface area, the area which is higher than 12 feet 0 inches shall be similarly measured and calculated, and the contractor will be paid both the applicable unit price per square foot for the entire area and the premium un it price per square foot for the calculated area which is higher than 12 feet 0 inches. Unit prices for this work shall be required in the bid documents.

1.11.5 Wall and Ceiling exclusions: All trim will be subtracted from wall calcu lations. Unit prices shall be required for each of the following wall areas and shall be calcu lated as follows then subtracted from the gross area of the wall surfaces

a. Base or cove molding. Actual measured length multiplied by the actual measured width, rounded to the nearest s quare foot.

b. Windows. Actual overall measured width of window including trim, multiplied by actual overall measured height of window unit, including trim, rounded to the nearest square foot.

c. Doors. Actual measured width of door, including trim, multiplied by the actual measured height of door, including trim and transom, rounded to the nearest square foot. A door frame and transom assembly shall not be subtracted unless it exceeds 24 square feet

1.11.6 Free-standing columns. The area of free-standing column surfaces to be painted shall be the actual measured perimeter multiplied by the actual measured height, rounded to the nearest square foot. Exposed piping, conduit, etc., 6 inches or less in diameter or depth contiguous to the column shall be considered as part of the column, and the price for painting the column surface shall include the painting of this work at no additional square footage or cost. Base and cove molding shall be treated the same as in the case of walls.

1.11.7 Door. (See 1.9.5 c above) Should the door or transom area contain glass (or other areas not to be painted) of two square feet or more, the area of the glass (or other areas not to be painted) shall be subtracted and be rounded to the nearest square foot.

USDA IDIQ Painting Services Page 17 of 74

Windows (See 1.9.5 b above)

1.11.8 Miscellaneous trim, base, cove molding, and stair risers. The surface area of molding, miscellaneous trims and stair risers to be painted shall be the actual measured width multiplied by the actual measured length and shall be rounded to the nearest s quare foot.

1.11.9 Shelves, cabinets, etc. The areas of shelves, cabinets, etc., to be painted shall be computed by measuring the actual lengths and widths of all surfaces to be painted and obtaining the total area of each shelving or cabinet unit, rounded to the nearest square foot.

1.11.10 Ornamental metal work. Areas of ornamental metal work, such as railings, grilles, rad iators, etc., to be painted shall be the actual measured length of the metal work multiplied by the actual measured height or width, and shall be rounded to the nearest square foot. No deduction is to be made for opening, offsets, etc. contained in the ornamental metal work.

1.11.11 Ductwork, conduit, and piping in o ffice areas and other finished space. The surface areas of ductwork, conduit, and piping which are not included as part of the painting of walls, ceilings, and columns as provided above, or which are to be painted with a color or finish di fferent from the walls, ceilings, or columns, shall be computed and founded to the nearest square foot and paid for under the appropriate unit price for this work. Painting of mechanical rooms is excluded from the scope of the contract, except for floors.

1.11.12 Floors. The area of floor surface to be painted shall be the overall actual measured length multiplied by the actual overall width of the floor and shall be rounded to the nearest s quare foot. No deduction is to be taken for the cross-sectional areas of columns which intersect the floor surface.

1.11.13 Repairs. The area of repairs on all types of surfaces shall be the measured average width multiplied by the measured average length of the repaired area (measured in 6 inch increments) and shall be rounded to the nearest s quare foot. Note that surface preparation is included in the unit prices for painting, as provided above.

2. MATERIALS

2.1 PRODUCTS

2.1.1 See paragraph 5, entitled “APPLICABLE PUBLICATIONS” for listing of materials which are referred to be FS, ASTM and CI designations.

2.1.2 Use of environmentally-friendly and bio-base products at USDA facilit ies is desired, whenever feasible. Env ironmentally -friendly paint features include:

Products that do not contain the following materials: methylene chloride; 1,1,1-trichloroethane, benzene, toluene, ethyl benzene, naphthalene, 1,2-dich lorobenzene, di (2-ethylexy l) phthalate, butyl benzyl phthalate, di-n-octyl phthalate, diethyl phthalate, acrolein or acrylonitrile.

The Contractor shall not use paints containing mercurial mildewcide or insecticide.

Paints shall contain no or low-odor or level of irritation. Items with noxious or irritating odors must be approved by the Contracting Officer prio r to use.

Paints with an excess of 0.06 percent by weight of lead shall not be used. Preferably, paint should not contain any lead. The use of leaded-paint cans or components is not authorized.

Paints containing zinc or strontium-chromate p igments shall not be used.

USDA IDIQ Painting Services Page 18 of 74

Paint shall not exceed VOC concentration (measured in grams per liter g/l), using the Environmental Protection Agency’s test, to determine concentration, any higher than the following:

Interior non-flat paint: 150 g/l; flat 50 g/l.

Exterior non-flat paint: 200 g/l; flat 100 g/l.

Solvent-based paint: 380 g/l.

High-performance water-based acrylic coatings: 250 g/l.

2.2 COLOR SCHEMES

2.2.1 See color schedule sheets for room numbers, description of spaces, and tabulation of areas or sections to be prepared and painted. Contractor is to verify all room tabulations shown on schedules and/or drawings provided.

2.2.2 Paint exposed metal accessories, in connection with mechanical and electrical work in interior fin ished areas, the color of the background wall o r ceiling, except where safety colors are required.

2.2.3 Paint mechanical and electrical systems to match their present identifying colors, unless otherwise noted in the contract specifications.

2.2.4 Repaint lettering and numbering to duplicate the work that it replaces, unless otherwise indicated on the work order. Th is includes, but is not limited to all numbers and titles on glass within or adjacent to spaces to be repainted.

2.2.5 The Government reserves the right to specify the variety of type and/or colors in the area to be painted.

a. The paint color and fin ishes at the US Department of Agriculture are purchased from DURON PAINTS. All paint color must match existing colors.

3 EXECUTION

3.1 CLEANING, PREPARATION AND PRETREATMENT

3.1.1 Prior to surface preparation and painting, remove, mask, or otherwise protect all hardware, accessories, machined surfaces, plates, lighting fixtures, cover p lates for telephone, signal and special purpose outlets, electrical receptacles, switches and similar items in place and not previously painted.

3.1.2 Do not prepare nor paint any room or area surface until all patching, resurfacing and replacement of substrata, as specified in the contract documents or noted on the schedule, is completed.

3.1.3 Dust, wash and/or treat with appropriate solvent all surfaces specified for paint ing; make them clean and free of dust, oil, grease, loose particles and other contaminants. Schedule all pretreatment so that dust and other contaminants will not fall on wet paint surfaces.

3.1.4 Dusting shall consist of wip ing the entire surface with soft, clean cloths.

3.1.5 Washing shall consist of washing off the entire surface with a set cloth which is dipped frequently in a mixtu re of water and detergent.

3.1.6 Remove all calcimine coatings or other cold water paint by washing as described above.

USDA IDIQ Painting Services Page 19 of 74

3.1.7 Remove all loose, cracked putty and caulking materials from window sash and from the perimeter of window and doorframes. Clean the exposed rabbets and recesses free of all friab le and loose material. Apply finish coat(s) of paint when painting adjoin ing surfaces.

3.1.8 Prepare surfaces noted or specified: “clean” and “spot patch” as follows:

NOTE: The Contractor will not be permitted to use sandblasting equipment nor blow-torches on any surface. An electric heating tool may be used with prior approval from the Contracting Officer or the Contracting Officer’s Representative. Prepare doors, window sash, frames, trim, mechanical and electrical equipment within a space and adjacent to a surface indicated to be “cleaned” and “spot patched” that are not otherwise specifically mentioned on the schedules, in the same manner as the adjacent surface, using the technique specified for the appropriate material. Complete the preparation work in each room, space or isolated surface before proceeding with the application of paint.

3.1.9 Prepare concrete, stucco and masonry including the concrete floors that are to receive new paint as follows:

3.1.9.1 Cleaning: Remove loose powdery or flaking material and dirt by wire brushing, scraping or washing. Remove efflorescence and laitance. Leave surfaces dry and clean.

3.1.9.2 Glazed or very smooth surfaces: Roughen glazed or very s mooth surfaces by acid etching, light sanding or rubbing with coarse grit abrasive stones. Leave surface dry and clean.

3.1.9.3 Regardless of treatment, fill all minor cracks, air holes and honeycomb, to hairline, by kn ifing with an appropriate masonry compound. For cracks over ¼ inches, see plaster repairs section.

3.1.10 Prepare new wood surfaces for painting by sanding surfaces smooth, filling holes and cracks with glazing putty, or plastic wood compound applying a thin coat of shellac, to surfaces of exposed knots.

3.1.10.1 Prepare new wood surfaces for natural finishes or stained finishes by sanding surfaces smooth and applying stain of approved shade and color . In addit ion, apply paste wood filler, to open wood grain and fin ish by sanding.

3.1.11 Prepare previously painted surfaces as follows:

3.1.11.1 Cleaning: Sand smooth, except floors, and wash clean with detergent. Clean interior wood floors with commercial type non-flammable wax remover. Remove ground-in d irt and heel marks.

3.1.11.2 Spot patching: Scrape, sand smooth and feather out to existing ground surfaces, all surfaces with minor irregularities or spotty loose finish. Fill recesses, cracks, joints, crevices and holes in the wood with glazing putty or plastic wood compound, and sand flush with adjacent surface. For natural finish surfaces, use past wood filler, to match the shade of the finish. After patching, sand the entire surface smooth and wash clean .

3.1.11.3 Prior to applicat ion of paint to a bleeding type stained surface, apply a coat of knot sealer, Clean knots, pitch streaks showing through the existing finish and coat the area with sealer,

3.1.12 Clean new metal surfaces that have not been shop-coated with solvent cleaner to remove oil and grease. Wire brush clean to remove rust, mill scale or other foreign substances. Prepare new shop-coated metal the same as “spot-patching” below.

3.1.12.1 Prepare previously painted structural steel surfaces in accordance with Volume 2 Systems and Specifications

USDA IDIQ Painting Services Page 20 of 74

3.1.13 Prepare all other previously painted metal in accordance with the following requirements:

3.1.13.1 Cleaning: Wash surface clean

3.1.13.2 Spot patching: Wire brush abraded, rusted or corroded spots down to bare metal and touch up with a quality rust inhibitor primer and acrylic latex paint, fo r ferrous metal; zinc-chromate paint, for aluminum; and zinc dust paint, for non-ferrous and galvanized metal.

3.1.14 Prepare previously painted surfaces as follows:

3.1.14.1 Cleaning: Dry clean the entire surface by wip ing with a soft cloth and using a vacuum cleaner. Spot wash all glossy, greasy or grimy surfaces with a clean damp cloth. Do not put water on wallboard. Sand s mooth, clean and fill with white putty fine, hairline cracks less than 1/16 inch wide.

3.1.14.2 Spot patching: Remove all loose, blistered or otherwise defective paint. Smooth and feather edges by sanding. Patch 1/16 inch or wider cracks in p laster surfaces Dust and moisten area with water. Fill opening to within ¼ inch of surface with joint compound and allow to partially set before leveling up with finishing compound. Fill cracks in gypsum wallboard with joint compound, followed by tape and finishing joint compound feathered out on the adjacent surface.

Smooth rough surface by sanding and crush clean.

3.1.15 Clean and prepare surfaces of asbestos cement board and hardboard as specified above for

“Gypsum Wallboard and plaster”, the repair of cracks or defective substrate is not allowed. When specifically ordered under “SCOPE OF WORK” paragraph, or scheduled on the drawing, all defective board must be removed and new material installed, and must be performed in compliance with OSHA regulations and Federals standards for the removal of asbestos and hazardous materials.

3.1.16 Clean and prepare cloth covering over insulation or plaster as follows:

3.1.16.1 Where existing surface is sound, wash with a mild alkali and rinse thoroughly with clean water.

Use adhesive backed cotton or canvas tape to repair minor covering defects.

3.1.17 In addition to the above requirements, sand glossy surfaces to remove gloss prior to repainting

3.1.18 Prepare for resealing and re-puttying as follows:

3.1.18.1 Prime exposed bare surfaces of frames and adjoining construction with a primer as recommended by the manufacturer of the sealant. Insert a bond breaker material of appropriate size into all open joint spaces more than one-half inch deep, after the primer coat is dry. Apply sealant uniformly to the prepared joint at the perimeter of frames to completely seal the joint, except for the provision of weep holes at the bottom of the frames. Do not use oil based caulking compound on stone or masonry surfaces.

3.1.18.2 Clean exposed surfaces free of all residues. Exercise due care not to damage or remove glazing joints or glazing clips. Prime exposed surfaces, when dry, apply putty neatly and uniformly to the wood sash. Install new glazing compound, neatly and uniformly to the metal sash.

3.1.19 Complete all surface preparation, including patching and replacement, required in the substrata prior to painting. Report, in writ ing, to the Contracting Officer, any surfaces which are found unsuitable for the clean ing, preparation or painting, as specified. Do not proceed with work at such locations until directed.

3.2 PAINT APPLICATION

USDA IDIQ Painting Services Page 21 of 74

3.2.1 All paints for this project may be applied by the brush or roller methods.

3.2.2 Apply paints in the number of coats to surfaces specified as required in the “SCOPE OF W ORK”

3.2.3 Except on clean finishes such as varnishes, shellacs, waxes, lacquers, etc. and for covering of deep or dark accent colors, apply each coat of paint at such rates as to completely hide the substrate or the preceding coat when viewed from a reasonable distance. In no case shall the paint thickness of a system be less than that noted in Tables I and III.

3.2.4 Re-letter all damaged, and faded letting in the same to match existing unless otherwise directed.

3.2.5 Paint shall be applied by skilled painters, following the manufacturer’s printed instructions, using brush or roller, as appropriate. Painting using the spray method will not be permitted except where specifically ordered by the Contracting Officer. To prevent format ion of skins and loss of volatile solvent, cover paint containers when delays in application are encountered. Thoroughly mix paint immediately before use and at frequent intervals during application. Apply paint in proper consistency. The meeting line between colors shall be straight and sharply defined, with no blending, running or gaps. Apply all coats of paint uniformly and be free from sags, roller marks, wrinkles, runs, smears, dirt or spattered paint. Remove paint drops and over-sprays before dry.

Apply each coat so as to produce a film of unifo rm thickness completely hid ing the previous coat.

Give special attention during application of paint coatings to insure that edges, corners , welds and rivets receive a thickness equivalent to that of adjacent painted surfaces. Use job mixed aluminum paint within 4 hours. Discard aluminum paint not used within the specified time.

3.2.6 Paint properties, storage, mixing and thinning:

3.2.6.1 At the time of applicat ion, paint shall show no signs of deterioration. St ir paint thoroughly; strain and keep at a uniform consistency during application. Do not mix paints of different manufacturers or different types together. When approved by the Contracting Officer as necessary to suit conditions of surface, temperature and method of application, the packaged paint may be thinned immediately prior to application, in accordance with the provisions of the applicable Federal Specification and manufacturer’s directions, but not in excess of 1 pint of suitable thinner per gallon of paint. The use of thinning for any reason shall not relieve the Contractor from obtaining thickness equivalent to that of adjacent painted surfaces or providing film thickness specified.

3.2.7 Time scheduling of painting:

3.2.7.1 Apply a coat of the specified material as soon as the surfaces have been cleaned, pre-treated or prepared for painting, prior to any deterioration of the prepared surface. Allow sufficient time to elapse between successive coatings to permit proper drying. Apply second coat of paint per manufacture and Federal specificat ions. During application the surface should not deform or feel sticky under moderate pressure of the thumb, and when the application of another coat of paint does not cause lifting nor loss of adhesion of the undercoat.

3.2.8 Color of undercoat:

3.2.8.1 The color of each coat shall vary sufficiently from the color of the preceding coat to enable the visual determination of complete coverage, unless otherwise noted by the contract documents

3.2.9 Requirements for specific paints:

3.2.9.1 Apply the first coat of interior emulsion paint on new work, at such a rate that will not affect sealing of the surface.

USDA IDIQ Painting Services Page 22 of 74

3.2.9.2 Use lamb’s wool wax applicator to apply moisture curing polyurethane coating. Do not use a roller. Ventilate space as specified in clause, “PRODUCT DELIVERY AND STORA GE” and clause ‘PROTECTION”.

3.2.9.3 On new and stripped concrete floors, apply concrete curing compound per manufactures specifications to the dry concrete and allow dry ing for at least two hours. Apply two coats without thinning.

3.2.10 Windows and doors:

3.2.10.1 Prepare and paint as specified, surfaces of window sash (except glass), doors, window frames, door frames and associated trim specified for painting

3.2.10.2 To prevent excessive buildup of paint and subsequent jamming of windows and doors, apply the specified number of coats in thin layers, regardless of thickness specified, to those matching surfaces where window sash and doors meet with the jambs.

3.2.10.3 Paint top and bottom edges of window sash, doors and trim. Painting of doors included both flush and recessed top and bottom edges.

3.2.10.4 Paint exposed edges of window stools, viewable parts of meeting rails of double hung windows when in the partial open position, sash beads, stops, blind stops, putty and glazing compound, etc.

3.2.10.5 Do not paint surfaces of weather-stripping and gaskets at the perimeter of window sash and doors.

3.2.10.6 Do not paint surfaces of plated and other architectural metal finished hardware.

3.2.10.7 Do not completely close freshly painted operating windows and doors until painted contact surfaces are completely dry.

3.2.10.8 Prime surfaces where part of the substrate has been repaired, or otherwise exposed, for the final coat in the required system.

3.2.10.9 Apply all paint in a s mooth and consistent manner, completely covering all repairs patches.

Extend the last coat of paint to the closest adjacent break in the wall or surface.

3.2.10.10 Additional cost of paint shall not be authorized except through the Contracting Officer, and only after an inspection has verified the need for an additional paint.

3.2.11 SPRAY APPLICATION GUIDE LINES

3.2.11.1 The use of an air atomizing spray gun is only applicable with the consent of the Contracting

Officer, and the paint application thereof shall follow manufacture/Federal standards and specifications.

3.3 FIELD QUALITY CONTROL

3.3.1 Using the specified number o f coats, complete a min imum area of 20 square feet of painting of each color scheme to show color, fin ish texture and workmanship, for approval by the Contracting Officer Representative (COR), p rior to proceeding with general painting. The approved areas will serve as a standard for similar work throughout the project and remain as part of the paint finish system.

3.3.2 When paint work is completed, notify the Contracting Officer’s Representative, who will inspect the completed paint work v isually and by instrument for compliance with specifications for color, surface texture, number of coats and thickness. Defects and omissions found will be listed in

USDA IDIQ Painting Services Page 23 of 74 writing. A copy of the list will be provided for the Contractor’s use in correcting defects and omissions or for the Government’s use in making final ad justment of the contract price.

3.3.2.1 Keep the Contracting Officer fully informed as to the proposed painting schedule, to permit adequate time for inspection of materials and thickness as specified in the schedule.

3.3.3 The Contracting Officer will use such instruments as they may need during their inspection, to verify compliance of the work with specificat ion requirements, including, but not limited to the following:

3.3.3.1 Consistency testing equipment: Dipp ing type cup

3.3.3.2 Moisture meter:

3.3.3.3 Opacity testing equipment: Reflectance measure board

3.4 CORRECTIVE WORK

3.4.1 Contractor will repair and correct, any and all defects and omissions listed in a timely manner.

Match methods and materials on each specific wall area or wall section. A “patch-in” appearance will not be acceptable.

3.4.2 After inspections or after removal and laboratory testing of samples, touch up the surfaces marred by the procedure.

3.5 COMPLETION

3.5.1 On completion and approval of painting work in any given area, remove protective coatings, tape, etc. Rep lace all items, removed during the preparation and performance of work, to their proper locations. Have electrical power restored to temporarily disconnection equipment.

4 PLASTER REPAIRS

4.1 SCOPE OF WORK

4.1.1 This section covers repairs of existing plaster surfaces which have been damaged, where plaster has fallen off or is otherwise visibly defect ive, only for those surfaces required to be painted or to receive vinyl wall covering. This work performed will be on a unit basis as listed on the bid sheet.

4.1.2 Repairs shall be made to all cracks ¼” or less in width, cracked areas less than one (1) square foot, holes less than two (2) inches in diameter in p laster and wallboard. Such repairs shall be included as part of the cost of applying the initial coat of paint (or wall covering) required.

4.2 STANDARD SPECIFICATIONS

4.2.1 The following Standards and publications shall govern, except as modified herein :

American National Standards Institute American Society for Testing and Materials GSA’s Federal Specification and Standards

4.3 GENERAL

4.3.1 Plaster repairs shall be done by a certified plasterer.

4.3.2 Verify existing conditions of the building.

USDA IDIQ Painting Services Page 24 of 74

4.3.3 Protect surfaces of affected areas and furnishings therein by moving, covering, o r other suitable means.

4.4 STANDARDIZATION OF METHODS OF MEAS UREMENTS

4.4.1 The area of repairs on all types of surfaces shall be the measured average width multiplied by the measured average length of the repaired area (measured in 6 inch increments) and shall be rounded to the nearest square foot. Note that surface preparation is included in the unit prices for paint ing.

4.4.2 The Contractor must provide the quantity and quality of work for which the Government has contracted and the Federal and manufacture’s specifications mandate. The Contracting Officer shall be notified of any omissions or discrepancies on the part of the Contractor that hinder the quality of work or cause delay of completion. The Contractor shall be responsible for quality control and inspection of the work performed. Inspection of the work by the Government does not relieve the Contractor of the responsibilities.

4.5 MATERIALS

4.5.1 All materials must be compatible with the existing materials in the buildings.

4.5.2 All materials must be furnished and used in accordance with the written instructions of the manufacturer.

4.5.3 Materials shall meet the requirements of referenced, Federal Specifications, American Society for Testing and Material Standards and Military Specifications.

4.5.4 Gypsum Plaster:

4.5.5 Keene’s Cement

4.5.6 Special Finishing Hydrated Lime

4.5.6.1 Lime putty: Shall be made from special finishing hydrated lime. Approved measures shall be taken to protect the putty from sun and to prevent excessive evaporation when stored.

4.5.6.2 Fiber: Non-staining synthetic, or vegetable, or mineral product clean and free from foreign material and free from asbestos.

4.5.6.3 Sand: required by manufacture’s specifications

4.5.6.4 Water: Free from injurious amounts of oils, acids, alkalis, and organic matter injurious to the plaster.

4.5.6.5 Metal Lath: cut from copper-bearing sheet steel, flat, expanded metal. A ll surfaces of lath shall be coated with rust inhibitive paint.

4.5.6.6 Metal Accessories: Grounds and casing corner beads shall be on zinc-coated sheet steel, 26 gage or heavier, with expanded or perforated flanges or clips so shaped and fabricated as to permit complete embedment in the plaster.

4.5.6.7 Lacing Wire: Steel, not less than .035 inch diameter.

4.6 EXECUTION

USDA IDIQ Painting Services Page 25 of 74

4.6.1 PREPARATION FOR PLAS TERING

4.6.1.1 Carefully remove all soft, broken, or loose plaster or lathing and to solid adjacent plastering, clean, beveled inward. Sweep masonry and lath clean and dampen immediately prio r to re-p lastering.

Join new work and make flush with contiguous work.

4.6.1.2 Any asbestos encountered in plaster removal shall be treated in accordance with OSHA and

Federal specifications and reported to the Contracting Officer or the Contracting Officer Representative.

4.6.1.3 Repair any damaged plastered cornices to exact profiles with adjoin ing work, keying the new work in p lace.

4.6.1.4 Bonding Compound on Concrete Surfaces: Application shall be in strict accordance with the manufacturer’s recommendation. .

4.6.2 LATHING

4.6.2.1 Apply metal lath in accordance with the Federal standards and specifications for the installation of like materials.

4.6.2.2 Use metal lath as a base for all plaster work on tile, wainscot backup, wood or metal framing or furring and wherever masonry or concrete surface is not suitable to receive plaster.

4.6.3 PLASTERING

4.6.3.1 Mixtures, mixing, and application of plaster shall conform to the requirements of the American

National Standards Institute’s standard specification for gypsum plastering and Gypsum Association’s Recommended Specifications of Gypsum Plastering.

4.6.3.2 Plaster shall be applied to all surfaces where plaster is missing, removed, cut-out, etc., in the number and type of coats specified. Join new work neatly to and make flush with adjoin ing plaster work.

4.6.3.3 Gypsum Plaster on Gypsum Lath, Gypsum Partit ion, Tile and Masonry

4.6.3.3.1 Apply in two coats, scratch coat and finish coat. The base coat shall be a scratch coat doubled-back. The surface of scratch coat shall be left level but rough to form a bond for the fin ish coat.

4.6.3.3.2 Scratch coat shall be mixed in accordance with the manufacture’s specification ASTM’s standards. Scratch coat of wood fibered gypsum plaster shall be used .

4.6.3.4 Gypsum Plaster on Metal Lath:

4.6.3.4.1.1 Apply the scratch coat, brown coat, and finish coat in accordance with the manufacture’s specifications and ASTM’s standards

4.6.4 FINIS H COAT

4.6.4.1 Gypsum gauging plaster finish shall be applied in accordance with the manufacture’s specification

ASTM’s standards.

4.6.4.1.1 Once plaster is complete the surface shall be clean, free from blisters, discoloration, cracks or other defects.

USDA IDIQ Painting Services Page 26 of 74

4.6.4.1.2 When plaster repairs have been completed, wash down the new plaster with a zinc sulphate solution and allow to dry.

4.6.5 CURING:

4.6.5.1 During the applicat ion of each coat of plaster, keep the exterior closed until the plaster has set, then adjust for proper ventilation to regulate the drying and curing of the plaster.

4.6.5.2 Protect plaster against drying too rapidly.

4.6.6 CLEAN UP:

4.6.6.1 Remove all rubbish and debris caused by plastering work.

4.6.6.2 Clean all affected surfaces or room and…