SPECIFICATIONS (PART 1 OF 2)

View the file

Other files for this federal contract opportunity

Other files attached to Recovery: USDA South Bldg. Modernization Phase 4A, newest first.
File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment -02 05500-081209 Dwg.pdf PDF
Project overview presented at pre-bid conference MEP.pdf PDF
Pre-Bid Conference Linc Pass.pdf PDF
Pre-Bid Conference Site Visit Sign-In Sheet.pdf PDF
PreBid Conference.doc DOC document
Amendment -02 05500-081209 Spec 2.pdf PDF
Amendment -02 05500-081209 Spec.pdf PDF
Pre-Bid Conference Site Visit Questions.doc DOC document
Amendment -02 05500-081209.pdf PDF
Project Overview Architect.pdf PDF
Amendment-01 Part 6of6.pdf PDF
Amendment-01 Part 4of6.pdf PDF
Amendment-01 Part 3of6.pdf PDF
Amendment-01 Part 1of6.pdf PDF
Amendment-01 Part 2of6.pdf PDF
Amendment-01 Part 5of6.pdf PDF
15682m-air cooled water chillers Spec.pdf PDF
2009-0713-Vol2-BidSet.pdf PDF
AG-3142-S-09-0077 pt1.pdf PDF
2009-0713-Vol1-BidSet.pdf PDF
2009-0713-Vol4-BidSet.pdf PDF
2009-0713-Vol3-BidSet.pdf PDF
AG-3142-S-09-0077 pt2.pdf PDF
AG-3142-S-09-0077 pt3.pdf PDF
Vol 2 Bid Set Specifications 07-13-09.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODERNIZATION

OF THE SOUTH BUILDING

UNITED STATES DEPARTMENT OF AGRICULTURE

USDA NUMBER SBM-PH-4A

CONTRACT NO. 53-3142-4-6049

S H A L O M B A R A N E S A S S O C I A T E S , P.C. / S Y S K A H E N N E S S Y G R O U P J O I N T V E N T U R E

Phase 4A Bid Set

July 13, 2009

SPECIFICATION

VOLUME 1

Modernization of the South Building US Department of Agriculture Contract No. 53-3142-4-6049

*July 13, 2009 Bid Set TOC-1 Table of Contents

Project Manual Volume I Table of Contents

BID REQUIREMENTS, CONTRACT FORMS, CONDITIONS OF THE CONTRACT

(Not Included)

DIVISION 1 - GENERAL REQUIREMENTS

01010* Summary of the Work 01011 Drawing Schedule 01030 Options 01031 Unit Prices 01040 Project Coordination 01045 Cutting and Patching 01090 Definitions and Standards 01120 Construction IAQ Management 01300 Submittals 01311 Critical Path Method Scheduling 01352* LEED Requirements 01410 Testing and Inspection Services 01500 Temporary Facilities 01541 Security Regulations 01546 Safety and Health 01572 Construction Waste Management 01632 Products 01700 Project Closeout 01810 Commissioning

DIVISION 2 - SITEWORK

02085 Asbestos Abatement Procedures 02089 Removal of PCB Containing Lighting Ballast and Mercury Containing Fluorescent Light Tubes 02090 Lead Containing Paint Abatement Procedures 02095 PCB Contaminated Concrete Abatement 02222 Selective Demolition

DIVISION 3 - CONCRETE

03150 Plastic Foam Fill 03310 Cast-In-Place Concrete 03350 Concrete Finishes 03530 Concrete Toppings 03540 Concrete Underlayment

Bid Set TOC-2 Table of Contents

DIVISION 4 - MASONRY

04060 Mortar and Grout 04210 Unit Masonry 04400 Stonework 04900 Masonry Restoration

DIVISION 5 - METALS

05120 Structural Steel 05310 Steel Deck 05410 Load-Bearing Metal Studs 05500 Metal Fabrications 05700 Ornamental Metal 05910 Metal Cleaning and Refinishing

DIVISION 6 - WOOD AND PLASTIC

06100 Rough Carpentry 06200* Finish Carpentry 06910 Woodwork Restoration

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

07180 Traffic Coatings 07210 Building Insulation 07270 Firestopping 07410 Metal Panels 07590 Roof Repairs 07720 Roof Accessories 07810 Applied Fireproofing 07811 Intumescent Mastic Fireproofing 07900 Joint Sealers

DIVISION 8 - DOORS AND WINDOWS

08000* Door Schedule 08110 Steel Doors and Frames 08210 Wood Doors 08310 Access Doors and Panels 08342 Sound Control Doors 08580 Interior Thermal Windows 08710* Finish Hardware 08800 Glass and Glazing

Bid Set TOC-3 Table of Contents

DIVISION 9 - FINISHES

09000* Materials List 09205 Furring and Lathing 09210 Gypsum Plaster 09250 Gypsum Board 09280 Plaster Repairs 09310 Tile 09490 Terrazzo Restoration 09510* Acoustical Ceilings 09619 Interior Stone Cleaning and Restoration 09650 Resilient Tile Flooring 09680* Carpet 09720* Wallcovering 09900 Painting and Finishing 09910 Decorative Painting

DIVISION 10 - SPECIALTIES

10100 Visual Display Boards 10180 Toilet Compartments 10200 Louvers and Vents 10440 Interior Signage 10445* Interior Signage Schedule 10520 Fire Protection Specialties 10605 Wire Mesh Partitions 10800 Toilet Accessories

DIVISION 11 - EQUIPMENT

11130 Projection Screens

DIVISION 12 - FURNISHINGS

12492 Shades 12510 Horizontal Louver Blinds

DIVISION 13 - SPECIAL CONSTRUCTION

Not used

DIVISION 14 - CONVEYING SYSTEMS

14211 Rehabilitation of Existing Traction Elevators

END OF TABLE OF CONTENTS

Bid Set 01010 - 1 Summary of the Work

SECTION 01010

SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and conditions of the construction contract, including but not limited to Sections A through J of the Solicitation and Special Conditions listed below, apply to work of this section.

1. Section 01010 SUMMARY OF THE WORK.

2. Section 01011 DRAWING SCHEDULE.

3. Section 01030 OPTIONS.

4. Section 01031 UNIT PRICES.

5. Section 01040 PROJECT COORDINATION.

6. Section 01045 CUTTING AND PATCHING.

7. Section 01090 DEFINITIONS AND STANDARDS.

8. Section 01115 VOLATILE ORGANIC COMPOUND (VOC) LIMITS FOR

ADHESIVES AND SEALANTS.

9. Section 01120 CONSTRUCTION IAQ MANAGEMENT.

10. Section 01300 SUBMITTALS.

11. Section 01311 CRITICAL PATH METHOD SCHEDULING.

12. Section 01352 LEED REQUIREMENTS.

13. Section 01410 TESTING AND INSPECTION SERVICES.

14. Section 01500 TEMPORARY FACILITIES.

15. Section 01541 SECURITY REGULATIONS.

16. Section 01546 SAFETY AND HEALTH.

17. Section 01572 CONSTRUCTION WASTE MANAGEMENT

18. Section 01632 PRODUCTS.

19. Section 01700 PROJECT CLOSEOUT.

20. Section 01810 COMMISSIONING.

1.2 PROJECT/WORK IDENTIFICATION

A. Project Name and Location:

USDA/OPPED/POD South Building Modernization 14th Street & Independence Avenue, SW Washington, DC

Bid Set 01010 - 2 Summary of the Work

B. Architect: The term "Architect" refers to the professional services contractor listed below.

The Architect's status relative to this construction will be fully delineated in writing by the Government prior to the pre-award or pre-construction conference.

Shalom Baranes Associates/Syska Hennessy Group 3299 K Street, NW, Ste. 400 Washington, DC 20007

C. Contracting Officer for this project is:

TBD

USDA/OPPEP/POD

300 7th Street SW Room 377 Washington, DC 20024-9850

1.3 SCHEDULING

A. Sequencing and Phasing:

1. Construction of this Contract is Phase Four Work. Work of other phases is not part of this Contract.

2. Work described in Contract Documents applies to Work of entire contract, unless otherwise noted.

1.4 SCOPE OF WORK

A. The following is an abbreviated summary of the Scope of Work, as indicated on Contract Documents:

1. Phase 4A Work consists generally of the modernization of the above grade levels of

Wing 5 of the USDA South Building.

2. The building includes six floors above grade, an attic mechanical level and elevator penthouses.

3. The existing structural frame is concrete-encased steel and floor slabs are poured-in-place concrete joists with terra cotta infill.

B. LEED-CI Certification Process:

1. Certified Level: Phase 4A is designed to achieve no less than a certified level under the USGBC=s LEED-CI Version 2.0 (Commercial Interiors) Green Building Rating System.

2. LEED-CI Version 2.0 Requirements: See Section 01352 LEED REQUIREMENTS.

C. Architectural Requirements:

1. Upgrade and modernize existing office areas.

Bid Set 01010 - 3 Summary of the Work

2. Provide new mechanical, electrical, fire protection, and plumbing systems with associated life safety and architectural modifications.

3. Provide hazardous materials abatement.

4. Renovate first floor lobby and corridors.

5. Provide conduit and pull string for electronic security devices.

6. Provide new finishes and partitions for office areas. (Option 1)

7. Cutting and patching of existing materials.

8. Upgrade selected elevator controls and equipment. (Option 2)

9. Provide new roof structures as indicated.

D. Structural Requirements:

1. New structural framing and supports for new architectural, mechanical, electrical and plumbing Work.

E. Mechanical and Plumbing Requirements:

1. Replace existing HVAC system with combination all-air variable-air-volume and perimeter fin-tube radiation heating and cooling system.

2. Remove existing perimeter induction units and replace with new fin-tube radiators.

3. Upgrade existing chilled water and hot water piping.

4. Provide new fire suppression sprinklering.

5. Replace existing storm drain leaders.

6. Provide new pumps and controls for fire supply services.

7. Replace existing plumbing fixtures to meet LEED requirements.

F. Electrical Requirements:

1. Replace existing light fixtures and controls.

2. Replace existing primary and secondary electrical distribution system including upgrading of existing transformers.

3. Provide new electrical and telecommunications closets and replace existing telecommunications cabling system.

4. Provide new emergency lights, fire alarms, exit lights, and emergency power distribution.

G. Summary by References: Work of Contract can be summarized by reference to the conditions of the contract, specification sections as listed in the "Index of Specification Sections" bound herewith, drawings as listed in "Schedule of Drawings" bound herewith, addenda and modifications to the contract documents issued subsequent to the initial printing of this project manual, and including but not necessarily limited to printed matter referenced by any of these.

Bid Set 01010 - 4 Summary of the Work

1.5 WORK UNDER OTHER CONTRACTS

A. Separate Contract Work: The Contractor shall cooperate with other contractors performing related work, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts.

B. Preceding Work: Separate contract work has been awarded by the Government for performance of certain construction operations that are expected to be substantially complete before the Work of this Contract begins. Follow-on activities under this Contract shall be satisfactorily conducted to protect and, if indicated, to complete the related preceding separate Contract work.

1. Separate contracts have been awarded for Phase One, Phase Two, and Phase Three.

C. Concurrent and Future Work: Separate contract work has been awarded by the Government for performance of certain construction operations that will be conducted simultaneously with the Work of this contract, and performed at the site after Substantial Completion of the Work of this Contract. Interface work under this Contract shall be satisfactorily conducted in compliance with the schedule requirements of the related concurrent separate contract work.

1. Separate contracts have been awarded for building security.

1.6 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

A. The project includes the following Government furnished property to be installed by the Contractor (previously salvaged in Phases 1, 2, and 3):

1. Interior stone base and plinth units

2. Paneled wood doors, door surrounds, transoms, and historic glass.

3. First Floor Corridor lighting fixtures Type F.

B. The project includes the following Government furnished property to be installed by the Contractor:

1. Toilet accessories as indicated on drawings.

1.7 GOVERNMENT OCCUPANCY

A. Full Government Occupancy: The Government will occupy the site and the existing building during the entire period of construction. Cooperate fully with the Government representative during construction operations to minimize conflicts and to facilitate Government usage.

Perform the work so as not to interfere with the Government operations.

B. Partial Government Occupancy: The Government reserves the right to place and install equipment as necessary in completed areas of the building and to occupy such completed areas prior to substantial completion, provided that such occupancy does not substantially interfere with completion of the work. Such placing of equipment and partial occupancy shall not constitute acceptance of the work or any part of the work.

Bid Set 01010 - 5 Summary of the Work

1.8 WORK HOURS

A. On-Site Work Hours:

1. Working Hours: Typically perform Work inside the existing building during normal business working hours of 6:00 am to 6:00 pm Monday thru Friday.

2. Non-working Hours: 6:00 pm to 6:00 am Monday thru Sunday, and Federal holidays.

3. Weekend Hours: 6:00 pm Friday to 6:00 am the following Monday.

4. Early Morning Work Time Hours: 4:00 am to 6:00 am Monday thru Friday.

5. Submit written request to Contracting Officer, at least two weeks in advance, prior to performing work in the existing building during non-working, weekend, and early morning work time hours. Obtain written approval of proposed schedule from Government before proceeding.

6. Utility shutdowns:

a. Work which requires the shutdown of any utility serving the existing building shall be performed outside normal working hours.

b. Schedule each shutdown at least 48 hours in advance with the Contracting Officer.

7. Coordinate and schedule work to prevent interruption of on-going Government activities.

8. Fully restore normal building operations by the start of standard building working hours each day.

1.9 SEPARATE PRICE ITEMS

A. See Section 01030 OPTIONS.

B. Unit Prices: Unit prices are required for certain portions of the Work as described in Section

01031 UNIT PRICES.

1. Architectural work.

2. Hazardous material abatement, removal and disposal.

3. Mechanical and electrical work.

4. Provide unit prices based on necessary labor, materials and overhead required to complete that portion of Work.

1.10 MISCELLANEOUS AND GENERAL PROVISIONS

A. Existing Structures: Unless otherwise indicated, shall remain in place.

B. Items so shown or scheduled will remain the property of the Government. Store where directed.

C. New Work: Unless otherwise noted on drawings or specified, new work in extension of existing conditions shall correspond in all respects with that to which it connects, or to similar existing conditions, in materials, workmanship, and finish.

Bid Set 01010 - 6 Summary of the Work

D. Alterations to Existing Work: See Section 01045 CUTTING AND PATCHING.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 SCHEDULES

A. Drawing Schedule: See Section 01011 DRAWING SCHEDULE.

B. Door Schedule: Door Schedule is bound separately.

END OF SECTION

Modernization of the South Building Contract No. 53-3142-4-6049 US Department of Agriculture

July 13, 2006 Bid Set 01011-1 Drawing Schedule

SECTION 01011

DRAWING SCHEDULE

VOLUME ONE:

ARCHITECTURAL / VERTICAL TRANSPORTATION / STRUCTURAL

C-4A-001 COVER

C-4A-010 SHEET LIST

ARCHITECTURAL

C-4A-020 SYMBOLS/ABBREVIATIONS

C-4A-030 CODE CERTIFICATION

1:400 REFERENCE PLANS ( 001-199 )

1-4A-001 SITE PLAN

1-4A-101 SUB- BASEMENT REFERENCE PLAN

1-4A-105 BASEMENT REFERENCE PLAN

1-4A-110 FIRST FLOOR REFERENCE PLAN

1-4A-120 SECOND FLOOR REFERENCE PLAN

1-4A-130 THIRD FLOOR REFERENCE PLAN

1-4A-140 FOURTH FLOOR REFERENCE PLAN

1-4A-150 FIFTH FLOOR REFERENCE PLAN

1-4A-160 SIXTH FLOOR REFERENCE PLAN

1-4A-170 ATTIC LEVEL REFERENCE PLAN

1-4A-180 ROOF LEVEL REFERENCE PLAN

1:100 DEMOLITION FLOOR PLANS ( 101-199 )

2-4A-101 SUB-BASEMENT LEVEL DEMO PLAN WING 5

2-4A-105 BASEMENT LEVEL DEMO PLAN WING 5

2-4A-111 FIRST FLOOR DEMO PLAN WING 5

2-4A-121 SECOND FLOOR DEMO PLAN WING 5

2-4A-131 THIRD FLOOR DEMO PLAN WING 5

2-4A-141 FOURTH FLOOR DEMO PLAN WING 5

2-4A-151 FIFTH FLOOR DEMO PLAN WING 5

2-4A-161 SIXTH FLOOR DEMO PLAN WING 5

2-4A-171 ATTIC LEVEL DEMO PLAN WING 5

2-4A-181 ROOF LEVEL DEMO PLAN WING 5

1:100 FLOOR PLANS ( 101-199 )

3-4A-101 SUB-BASEMENT FLOOR PLAN WING 5 NEW WORK

3-4A-105 BASEMENT FLOOR PLAN WING 5 NEW WORK

3-4A-111 FIRST FLOOR PLAN WING 5 NEW WORK

3-4A-121 SECOND FLOOR PLAN WING 5 NEW WORK

Bid Set 01011-2 Drawing Schedule

3-4A-121-1 SECOND FLOOR PLAN WING 5 (OPTION #1)

3-4A-131 THIRD FLOOR PLAN WING 5 NEW WORK

3-4A-141 FOURTH FLOOR PLAN WING 5 NEW WORK

3-4A-151 FIFTH FLOOR PLAN WING 5 NEW WORK

3-4A-151-2 FIFTH FLOOR PLAN WING 5 (OPTION #2)

3-4A-161 SIXTH FLOOR PLAN WING 5 NEW WORK

3-4A-161-2 SIXTH FLOOR PLAN WING 5 (OPTION #2)

3-4A-171 ATTIC FLOOR PLAN WING 5 NEW WORK

3-4A-181 ROOF PLAN WING 5 NEW WORK

1:50 PLANS - WING 5 (201-299)

3-4A-201 SUPPORT SPACE PLANS - WING 5

3-4A-202 SUPPORT SPACE PLANS - WING 5

3-4A-211 TOILET ROOM DEMO PLANS - WING 5

3-4A-221 TOILET ROOM PLANS - WING 5

3-4A-253 TRASH CHUTE AT COURT 4 PLAN AND DETAILS

1:100 REFLECTED CEILING PLANS ( 301 - 399 )

3-4A-301 BASEMENT REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-311 FIRST FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-321 SECOND FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-321-1 SECOND FLOOR REFLECTED CEILING PLAN WING 5 (OPTION #1)

3-4A-331 THIRD FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-341 FOURTH FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-351 FIFTH FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-351-2 FIFTH FLOOR REFLECTED CEILING PLAN WING 5 (OPTION #2)

3-4A-361 SIXTH FLOOR REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-361-2 SIXTH FLOOR REFLECTED CEILING PLAN WING 5 (OPTION #2)

3-4A-371 ATTIC REFLECTED CEILING PLAN WING 5 (NEW WORK)

3-4A-401 REFLECTED CEILING PLANS (TOILETS) WING 5

ARCHITECTURAL ELEVATIONS/BUILDING SECTIONS (101-199)

4-4A-101 BUILDING SECTION & DETAILS

4-4A-104 ATTIC SECTIONS

4-4A-106 MECHANICAL DORMER DETAILS

4-4A-108 MISC ROOF DETAILS

4-4A-109 MECHANICAL ATTIC DETAILS

4-4A-201 WING 5 EAST ELEVATION

4-4A-202 WING 5 WEST ELEVATION

SCHEDULES (301 - 399)

5-4A-301 WING 5 FINISH SCHEDULE

5-4A-310 DOOR TYPES - WING 5

5-4A-325 FRAME TYPES AND DETAILS

Bid Set 01011-3 Drawing Schedule

5-4A-330 DOOR DETAILS WING 5

5-4A-331 MISC PORTAL DETAILS

5-4A-332 MISC DOOR DETAILS WING 5

5-4A-333 DOOR DETAILS WING 5

5-4A-370 PARTITION TYPES - WING 5

5-4A-371 PARTITION & MISC. DETAILS - WING 5

INTERIOR ELEVATIONS (401-499)

5-4A-404 BASEMENT LOBBY ELEVATIONS WING 5 HEADHOUSE

5-4A-405 FIRST FLOOR CORRIDOR ELEVATIONS WING 5 (DEMO WORK)

5-4A-406 FIRST FLOOR CORRIDOR ELEVATIONS WING 5 (NEW WORK)

5-4A-407 SECOND FLOOR CORRIDOR ELEVATIONS WING 5 (NEW WORK)

5-4A-408 TYPICAL FLOORS (2-6) LOBBY ELEVATIONS WING 5 HEADHOUSE

5-4A-410 TYPICAL OFFICE DETAILS

5-4A-411 TYPICAL PLAN & OFFICE ELEVATIONS

5-4A-421 TOILET ROOM ELEVATIONS- WING 5 HEADHOUSE

5-4A-422 TOILET ROOM ELEVATIONS- WING 5 HEADHOUSE

5-4A-423 TOILET ROOM ELEVATIONS- WING 5 TAILHOUSE

5-4A-424 TOILET ROOM ELEVATIONS- WING 5 TAILHOUSE

5-4A-425 TOILET ROOM DETAILS- WING 5

5-4A-426 TOILET ROOM PLANS & ELEVATION & DETAILS- TYPICAL

5-4A-427 TOILET ROOM PLANS & ELEVATION @ 6TH FLR

MISCELLANEOUS DETAILS ( 500-599 )

5-4A-500 MISC. DETAILS - WING 5

5-4A-501 MISC. DETAILS - WING 5

5-4A-502 SHAFT DETAILS - WING 5

5-4A-511 MISC. DETAILS - WING 5

5-4A-514 MILLWORK DETAILS - WING 5

5-4A-550 WING 5 SIGNAGE

5-4A-550-SB SUB-BASEMENT PLAN - SIGNAGE INSTALLATION

5-4A-550-B BASEMENT PLAN - SIGNAGE INSTALLATION

5-4A-551 FIRST FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-552 SECOND FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-552-1 2nd FLR PLAN - TENANT SIGNAGE INSTALLATION (OPTION #1)

5-4A-553 THIRD FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-554 FOURTH FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-555 FIFTH FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-555-2 5th FLR PLAN - TENANT SIGNAGE INSTALLATION (OPTION #2)

5-4A-556 SIXTH FLOOR PLAN - SIGNAGE INSTALLATION

5-4A-556-2 6th FLR PLAN - TENANT SIGNAGE INSTALLATION (OPTION #2)

5-4A-557 ATTIC FLOOR PLAN - SIGNAGE INSTALLATION

Bid Set 01011-4 Drawing Schedule

STAIR DETAILS

5-4A-601 STAIR(2) 500H WING 5

5-4A-602 STAIR(3) 500T WING 5

5-4A-620 MISC. STAIR DETAILS

5-4A-621 MISC. STAIR DETAILS

PHOTOS

5-4A-660 FIRST FLOOR CORRIDOR PHOTOS

5-4A-661 TYP UPPER FLOOR ELEVATOR LOBBY PHOTOS

5-4A-662 TYP OFFICE PHOTOS

5-4A-663 ATTIC FLOOR PHOTOS

5-4A-664 ROOF-6TH FLOOR SETBACK PHOTOS

5-4A-665 PENTHOUSE PHOTOS

5-4A-666 TYPICAL ELEVATOR CAB PHOTOS

5-4A-667 TYPICAL STAIR PHOTOS

5-4A-668 TYP TOILET ROOM PHOTOS

VERTICAL TRANSPORTATION - ELEVATORS 51, 52, 53: OPTION #3

5-4A-701 ELEVATORS 51,52,53 MACHINE ROOM PLAN (OPTION #3)

5-4A-702 ELEVATOR LOBBY ELEVATIONS (OPTION #3)

5-4A-703 ELEVATOR SECTION & HOISTWAY PLAN (OPTION #3)

6-4A-104 ELEVATOR CAB - ELEVATIONS & DETAILS (OPTION #3)

STRUCTURAL

1:10 & 1:50 & 1:100 STRUCTURAL

7-4A-010 STRUCTURAL GENERAL NOTES

7-4A-011 STRUCTURAL GENERAL NOTES AND ABBREVIATIONS

7-4A-012 TYPICAL DETAILS AND SECTIONS

7-4A-013 TYPICAL DETAILS AND SECTIONS AT EXIST OPNG INFILLS

7-4A-100 FLOOR OPENING PARTIAL PLANS – 1ST FLOOR

7-4A-100-1 FLOOR OPENING PARTIAL PLANS –1ST FLOOR (OPTION 1)

7-4A-101 FLOOR OPENING PARTIAL PLANS – 2ND TO 5TH FLOORS

7-4A-101-1 FLOOR OPENING PARTIAL PLANS – 2ND TO 5TH FLOORS (OPTION 1)

7-4A-102 FLOOR OPENING PARTIAL PLANS – 6TH FLOOR

7-4A-102-1 FLOOR OPENING PARTIAL PLANS – 6TH FLOOR (OPTION 1)

7-4A-103 FLOOR OPENING PARTIAL PLANS – ATTIC LEVEL

7-4A-104 PARTIAL ROOF FRAMING PLANS

7-4A-200 DETAILS AND SECTIONS

7-4A-201 DETAILS AND SECTIONS

7-4A-202 DETAILS AND SECTIONS

7-4A-203 DETAILS AND SECTIONS

Bid Set 01011-5 Drawing Schedule

VOLUME TWO:

MECHANICAL / PLUMBING / FIRE PROTECTION

MC-4A-001 COVER SHEET

MC-4A-010 SHEET LIST

MECHANICAL

9M-4A-001 SYMBOLS, ABBREVIATIONS & GENERAL NOTES

9M-4A-201 HVAC SUB-BASEMENT FLOOR PLAN - WING 5 (DEMO)

9M-4A-203 HVAC FIRST FLOOR PLAN - WING 5 (DEMO)

9M-4A-204 HVAC SECOND FLOOR PLAN - WING 5 (DEMO)

9M-4A-205 HVAC THIRD FLOOR PLAN - WING 5 (DEMO)

9M-4A-206 HVAC FOURTH FLOOR PLAN - WING 5 (DEMO)

9M-4A-207 HVAC FIFTH FLOOR PLAN - WING 5 (DEMO)

9M-4A-208 HVAC SIXTH FLOOR PLAN - WING 5 (DEMO)

9M-4A-209 HVAC & PIPING ATTIC FLR PLAN - WING 5 (DEMO)

9M-4A-211 PIPING SUB-BASEMENT FLR PLAN - WING 5 (DEMO)

9M-4A-301 HVAC SUB-BASEMENT FLR PLAN - WING 5 (NEW WORK)

9M-4A-302 HVAC BASEMENT FLR PLAN - WING 5 (NEW WORK)

9M-4A-303 HVAC & PIPING 1ST FLR PLAN - WING 5 (NEW WORK)

9M-4A-304 HVAC & PIPING 2ND FLR PLAN - WING 5 (NEW WORK)

9M-4A-304-1 HVAC & PIPING 2ND FLR PLAN - WING 5 (OPTION 1)

9M-4A-305 HVAC & PIPING 3RD FLR PLAN - WING 5 (NEW WORK)

9M-4A-306 HVAC & PIPING 4TH FLR PLAN - WING 5 (NEW WORK)

9M-4A-307 HVAC 5TH FLOOR PLAN - WING 5 (NEW WORK)

9M-4A-307-1 HVAC 5TH FLOOR PLAN - WING 5 (OPTION 2)

9M-4A-308 HVAC & PIPING 6TH FLR PLAN - WING 5 (NEW WORK)

9M-4A-308-1 HVAC & PIPING 6TH FLR PLAN - WING 5 (OPTION 2)

9M-4A-309 HVAC & PIPING ATTIC FLR PLAN - WING 5 (NEW WORK)

9M-4A-310 HVAC & PIPING ROOF PLAN - WING 5 (NEW WORK & OPTION 3)

9M-4A-311 PIPING SUB-BASEMENT FLR PLAN - WING 5 (NEW WORK)

9M-4A-317 PIPING FIFTH FLOOR PLAN - WING 5 (NEW WORK)

9M-4A-320 SUBSTATION #2 VAULT (DEMO & NEW WORK)

9M-4A-321 ELEV. 51, 52 & 53 - WING 5 - DEMO & NEW (OPTION 3)

9M-4A-401 CHILLED AND HOT WATER SYSTEM - FLOW DIAGRAM

9M-4A-402 HEATING WATER SYSTEM - FLOW DIAGRAM

9M-4A-403 HEATING FIN-TUBE RADIATOR SYSTEM - FLOW DIAGRAM

9M-4A-404 AIR HANDLING UNIT SYSTEMS - FLOW DIAGRAM

9M-4A-405 ENVIRON. AIR COND. UNIT SYSTEMS - FLOW DIAGRAM (INCLUDES

OPTION 3 WORK)

9M-4A-501 CONTROL DIAGRAMS

9M-4A-502 CONTROL DIAGRAMS

9M-4A-503 CONTROL DIAGRAMS

Bid Set 01011-6 Drawing Schedule

9M-4A-601 MECHANICAL DETAILS

9M-4A-602 MECHANICAL DETAILS

9M-4A-603 MECHANICAL DETAILS

9M-4A-701 ATTIC PARTIAL PLAN & SECTIONS - WING 5

9M-4A-702 ATTIC PARTIAL PLAN & SECTIONS - WING 5

9M-4A-703 ATTIC PARTIAL PLAN & SECTIONS - WING 5

9M-4A-704 ATTIC PARTIAL PLAN & SECTIONS - WING 5

9M-4A-705 ATTIC PARTIAL PLAN - HEADHOUSE

9M-4A-706 FIFTH FLOOR PARTIAL PLAN & SECTIONS - WING 5

9M-4A-707 BUILDING SECTION - WING 5

9M-4A-801 MECHANICAL EQUIPMENT SCHEDULES

9M-4A-802 MECHANICAL EQUIPMENT SCHEDULES

9M-4A-901 HVAC EXISTING CONDITION PHOTOGRAPHS

PLUMBING

9P-4A-001 SYMBOLS, ABBREVIATIONS & NOTES

9P-4A-201 SUB-BASEMENT PLAN - WING 5 (DEMO)

9P-4A-202 BASEMENT PLAN - WING 5 (DEMO)

9P-4A-203 FIRST FLOOR PLAN - WING 5 (DEMO)

9P-4A-204 SECOND FLOOR PLAN - WING 5 (DEMO)

9P-4A-205 THIRD FLOOR PLAN - WING 5 (DEMO)

9P-4A-206 FOURTH FLOOR PLAN - WING 5 (DEMO)

9P-4A-207 FIFTH FLOOR PLAN - WING 5 (DEMO)

9P-4A-208 SIXTH FLOOR PLAN - WING 5 (DEMO)

9P-4A-209 ATTIC FLOOR PLAN - WING 5 (DEMO)

9P-4A-301 SUB-BASEMENT PLAN - WING 5 (NEW WORK)

9P-4A-302 BASEMENT PLAN - WING 5 (NEW WORK)

9P-4A-303 FIRST FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-304 SECOND FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-305 THIRD FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-306 FOURTH FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-307 FIFTH FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-308 SIXTH FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-309 ATTIC FLOOR PLAN - WING 5 (NEW WORK)

9P-4A-401 WATER RISER DIAGRAM

9P-4A-402 SANITARY RISER DIAGRAM

9P-4A-403 STORM RISER DIAGRAM

9P-4A-701 FIRST FL. PART PLANS - WING 5 (NEW WORK)

9P-4A-702 2ND, 3RD & 4TH FL. PART PLANS - WING 5 (NEW WORK)

9P-4A-703 Fifth FL. PART PLANS - WING 5 (NEW WORK)

Bid Set 01011-7 Drawing Schedule

9P-4A-704 SIXTH FLOOR PART PLANS - WING 5 (NEW WORK)

FIRE PROTECTION

9F-4A-001 SYMBOLS, ABBREVIATIONS & NOTES

9F-4A-201 SUB-BASEMENT PLAN - WING 5 (DEMO)

9F-4A-202 BASEMENT PLAN - WING 5 (DEMO)

9F-4A-203 FIRST FLOOR PLAN - WING 5 (DEMO)

9F-4A-204 SECOND FLOOR PLAN - WING 5 (DEMO)

9F-4A-205 THIRD FLOOR PLAN - WING 5 (DEMO)

9F-4A-206 FOURTH FLOOR PLAN - WING 5 (DEMO)

9F-4A-207 FIFTH FLOOR PLAN - WING 5 (DEMO)

9F-4A-208 SIXTH FLOOR PLAN - WING 5 (DEMO)

9F-4A-209 ATTIC FLOOR PLAN - WING 5 (DEMO)

9F-4A-301 SUB-BASEMENT PLAN - WING 5 (NEW WORK)

9F-4A-302 BASEMENT PLAN - WING 5 (NEW WORK)

9F-4A-303 FIRST FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-304 SECOND FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-304-1 SECOND FLOOR PLAN - TENANT - WING 5 (OPTION 1)

9F-4A-305 THIRD FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-306 FOURTH FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-307 FIFTH FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-307-1 FIFTH FLOOR PLAN - TENANT - WING 5 (OPTION 2)

9F-4A-308 SIXTH FLOOR PLAN - WING 5 (NEW WORK)

9F-4A-308-1 SIXTH FLOOR PLAN - TENANT - WING 5 (OPTION 2)

9F-4A-309 ATTIC PLAN - WING 5 (NEW WORK)

9F-4A-310 PART PLANS ATTIC (OPTION 3)

9F-4A-401 FIRE PROTECTION RISER DIAGRAM

9F-4A-601 FIRE PROTECTION DETAILS & SECTIONS

VOLUME THREE:

ELECTRICAL / TELECOM / SECURITY

EC-4A-001 COVER SHEET

EC-4A-011 SHEET LIST

ELECTRICAL

9E-4A-001 ELECTRICAL SYMBOLS, ABBREVIATIONS, AND NOTES

9E-4A-201 SUB-BASEMENT FLOOR PLAN - WING 5 (DEMO)

9E-4A-202 BASEMENT FLOOR PLAN - WING 5 (DEMO)

9E-4A-203 FIRST FLOOR PLAN - WING 5 (DEMO)

9E-4A-204 SECOND FLOOR PLAN - WING 5 (DEMO)

Bid Set 01011-8 Drawing Schedule

9E-4A-205 THIRD FLOOR PLAN - WING 5 (DEMO)

9E-4A-206 FOURTH FLOOR PLAN - WING 5 (DEMO)

9E-4A-207 FIFTH FLOOR PLAN - WING 5 (DEMO)

9E-4A-208 SIXTH FLOOR PLAN - WING 5 (DEMO)

9E-4A-209 ATTIC FLOOR PLAN - WING 5 (DEMO)

9E-4A-301 SUB-BASEMENT FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-302 BASEMENT FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-303 FIRST FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-304 SECOND FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-304-1 SECOND FLOOR TENANT PLAN - POWER & F/A WING 5 (OPTION 1)

9E-4A-305 THIRD FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-306 FOURTH FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-307 FIFTH FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-307-1 FIFTH FLOOR PLAN - POWER & F/A WING 5 (OPTION 2)

9E-4A-308 SIXTH FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-308-1 SIXTH FLOOR PLAN - POWER & F/A WING 5 (OPTION 2)

9E-4A-309 ATTIC FLOOR PLAN - POWER & F/A WING 5 (NEW WORK)

9E-4A-310 ELEVATORS 51, 52, 53 - ATTIC - WING 5 (OPTION 3)

9L-4A-301 SUB-BASEMENT FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-302 BASEMENT FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-303 FIRST FLOOR PLAN - LIGHTING WING 5 (NEW WORK)

9L-4A-304 SECOND FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-304-1 SECOND FLOOR TENANT PLAN - LIGHTING - WING 5 (OPTION 1)

9L-4A-305 THIRD FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-306 FOURTH FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-307 FIFTH FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-307-1 FIFTH FLOOR PLAN - LIGHTING - WING 5 (OPTION 2)

9L-4A-308 SIXTH FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9L-4A-308-1 SIXTH FLOOR PLAN - LIGHTING - WING 5 (OPTION 2)

9L-4A-309 ATTIC FLOOR PLAN - LIGHTING - WING 5 (NEW WORK)

9E-4A-401 SUBSTATION #2 VAULT - DEMOLITION AND DETAILS

9E-4A-402 SUBSTATION #2 VAULT - NEW WORK AND DETAILS

9E-4A-403 SUBSTATION #6 VAULT - NEW WORK AND DETAILS

9E-4A-404 208V & 480V SWITCHGEARS #2 DETAILS

9E-4A-405 ELECTRICAL CLOSETS PART PLANS WING 5 (NEW WORK)

9E-4A-406 HEADHOUSE & TAILHOUSE FEEDER ROUTING

9E-4A-501 WING 5 PART POWER RISER DIAGRAM (DEMO)

9E-4A-502 WING 5 PART POWER RISER DIAGRAM (NEW WORK)

9E-4A-503 SUBS #1 & #2 ONE LINES & ELEVATIONS (NEW WORK)

9E-4A-504 EXISTING 15KV ONE LINE (DEMO)

9E-4A-505 MODIFIED 15KV ONE LINE (NEW WORK)

9E-4A-506 TYPICAL NETWORK RELAYING AND INSTALLATION DETAILS

9E-4A-507 WING 5 PART FIRE ALARM RISER DIAGRAM (NEW WORK)

9E-4A-601 ELECTRICAL DETAILS (NEW)

Bid Set 01011-9 Drawing Schedule

9E-4A-602 ELECTRICAL DETAILS (NEW)

9E-4A-701 LIGHTING FIXTURE AND LOW VOLT. RELAY SCHEDS (NEW WORK)

9E-4A-702 PANEL SCHEDULES (BASEMENT)

9E-4A-703 PANEL SCHEDULES - CLOSET "5B" (FIRST FLOOR)

9E-4A-704 PANEL SCHEDULES - CLOSET "5C" (FIRST FLOOR)

9E-4A-705 PANEL SCHEDULES (SECOND FLOOR)

9E-4A-706 PANEL SCHEDULES - CLOSET "5B" (THIRD FLOOR)

9E-4A-707 PANEL SCHEDULES - CLOSET "5C" (THIRD FLOOR)

9E-4A-708 PANEL SCHEDULES (FOURTH FLOOR)

9E-4A-709 PANEL SCHEDULES (FIFTH FLOOR)

9E-4A-710 PANEL SCHEDULES - CLOSET "5B" (SIXTH FLOOR)

9E-4A-711 PANEL SCHEDULES - CLOSET "5C" (SIXTH FLOOR)

9E-4A-712 PANEL SCHEDULES (ATTIC FLOOR)

9E-4A-801 ELEVATORS 51, 52, 53 - ATTIC WING 5 (OPTION 3)

9E-4A-802 WING 5 PART POWER RISER DIAG. (DEMO) (OPTION 3)

9E-4A-803 WING 5 PART POWER RISER DIAG. (NEW WORK) (OPTION 3)

TELECOMUNICATIONS

9T-4A-001 LEGEND, ABBREVIATIONS & GENERAL NOTES

9T-4A-209 ATTIC FLOOR PLAN - WING 5 (DEMO)

9T-4A-303 FIRST FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-304 SECOND FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-304-1 SECOND FLOOR TENANT PLAN - WING 5 (OPTION 1)

9T-4A-305 THIRD FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-306 FOURTH FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-307 FIFTH FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-307-1 FIFTH FLOOR PLAN - WING 5 (OPTION 2)

9T-4A-308 SIXTH FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-308-1 SIXTH FLOOR PLAN - WING 5 (OPTION 2)

9T-4A-309 ATTIC FLOOR PLAN - WING 5 (NEW WORK)

9T-4A-401 VOICE AND DATA DISTRIBUTION DIAGRAM

9T-4A-402 DATA AND AUDIO VIDEO TOPOLOGY DIAGRAM

9T-4A-403 VOICE TOPOLOGY DIAGRAM

9T-4A-404 FIBER OPTIC RISER DIAGRAM

9T-4A-405 VOICE RISER DIAGRAM

9T-4A-501 PRIMARY TELECOM CLOSETS - LAYOUT & RACK ELEVATION

9T-4A-502 TELECOM CLOSETS - LAYOUT & RACK ELEVATION

9T-4A-601 TELECOMMUNICATION DETAILS

9T-4A-602 TELECOMMUNICATION DETAILS

Bid Set 01011-10 Drawing Schedule

VOLUME FOUR:

HAZARDOUS MATERIALS

H-4A-001 COVER

H-4A-010 SHEET LIST

2-4A-501 FIRST FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-502 FIRST FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-503 SECOND FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-504 SECOND FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-505 THIRD FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-506 THIRD FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-507 FOURTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-508 FOURTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-509 FIFTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-510 FIFTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-511 SIXTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-512 SIXTH FLOOR PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-513 ATTIC PLAN WING 5 ASBESTOS ABATEMENT PLAN

2-4A-514 ASBESTOS ABATEMENT PLAN MISC. PLANS AND DETAILS

2-4A-600 SUB-BASEMENT FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-601 FIRST FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-602 SECOND FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-603 THIRD FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-604 FOURTH FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-605 FIFTH FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-606 SIXTH FLOOR PLAN WING 5 PCB & Hg ABATEMENT PLAN 2-4A-607 ATTIC PLAN WING 5 PCB & Hg ABATEMENT PLAN

END OF SECTION 01011

July 13, 2009 Bid Set 01030-1 Options

SECTION 01030

OPTIONS

PART 1 - GENERAL

1.1 SUMMARY

A. Definition:

1. Option: An amount proposed by Bidders and stated on the Bid Form that will be added to the Contract amount if the Government accepts a corresponding change in the scope of work, described in Contract Documents.

B. Coordination: Coordinate related work and modify or adjust adjacent work as required to ensure that work affected by each accepted option is complete and fully integrated into the project.

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.3 SCHEDULE OF OPTIONS

A. Option 1: Tenant Build-Out on the Second Floor as indicated on the Contract Drawings.

B. Option 2: Tenant Build-Out on the Fifth and Sixth Floors as indicated on the Contract Drawings.

C. Option 3: Renovation of Elevators 51, 52 and 53 - These elevators, existing overhead gearless traction 2500 lb units, will be modified and renovated in accordance with Section 14211 REHABILITATION OF EXISTING TRACTION ELEVATORS and accompanying drawings.

Bid Set 01031 - 1 Unit Prices

SECTION 01031

UNIT PRICES

PART I - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Description of Work: Unit price definitions and allowances to determine value of Work that may be added to and/or deleted from the work indicated on the contract documents by a unilateral modification to the contract by the Government.

B. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.

1.3 SUBMITTALS

A. Proposal:

1. Submit unit prices as listed in ASection B@.

2. Provide unit prices based on necessary labor, materials and overhead required to complete that portion of Work.

B. In cases of dispute as to classification of material or system, opinion of Government is final.

Bid Set 01031 - 2 Unit Prices

1.4 SCHEDULE OF UNIT PRICES

A. Architectural

WORK ITEM

UNIT

ESTIMATED

QUANTITY

(for evaluation only)

1. Doors/Hardware

a. Door Type EWC, Frame Type WD, Hardware Set #22 - typical corridor entry with four sidelights

Ea 4

b. Door Type EWC, Frame Type WE, Hardware Set #22 - typical office entry with two sidelights

Ea 6

c. Door Type EWC, Frame Type WG, Hardware Set #22 - typical office entry

Ea 6

d. Door Type NWE, Frame Type MA, Hardware Set #15 - typical inner office door

Ea 10

e. Door Type NWD, Frame Type MA, Hardware Set #15 - typical inner office door, glazed

Ea 20

2. Partitions

a. Partition Type P2 - typical office partition

1 m 100 m

b. Partition Type P1 - typical corridor partition

1 m 75 m

3. Floor coverings

a. Carpet

1) CPT #1, 500 mm sq. carpet tile

2) CPT #2, broadloom

Ea 1 sm

300 sm

b. Vinyl tile flooring

Bid Set 01031 - 3 Unit Prices

QUANTITY

1) Areas more than 50 sm

2) Areas less than 50 sm

25 sm 75 sm

c. Resilient base (100 mm high, coved profile at resilient floor, straight profile at carpet)

1 m 350 m

4. Wall finishes

a. Painted drywall

b. Vinyl wallcovering

c. Fabric wallcovering

800 sm

250 sm

250 sm

5. Window sills (exterior)

6. Window repair

a. Wood window frame and sash, including chains and counterweights

b. Window re-glazing with clear glass.

Sm sm

TBD

7. Plaster Repair

a. Plaster repair at ceiling sm

8. Existing slab infill and leveling

a. Reinforced concrete on metal deck and structural steel as required.

b. Roof gyp. plank deck replacement

c. Slab leveling per detail s on 5-4a-371 and 5-

4a-502.

9. Existing Flooring repair/replacement

a. Terrazzo at toilet rooms to match existing.

Bid Set 01031 - 4 Unit Prices

QUANTITY

b. Marble floor trim and base at toilet rooms and corridors

c. Ceramic Quarry Tile at public corridors

10. Slate Roof repair / replacement replacement of slate roof and roofing system due to new construction sm TBD

11. Fireproofing

a. spray-on fireproofing, when permitted, at existing steel exposed by required demo and/or lead paint removal.

b. Intumescent paint fireproofing at new/existing exposed structural steel

B. Hazardous Material Abatement: (Items to be removed within an established hazardous materials work area and properly disposed of in accordance with project documents.) The unit costs provided by the Contractor are to represent all cost associated with the item. Cost is to include the Contractor=s labor, equipment, materials, taxes, insurance, overhead, mobilization, and profit.

1. Asbestos containing insulation removal and disposal for:

a. Pipes up to 100 mm

b. Pipes up to 100-200 mm

c. Pipes up to 200-360 mm

d. Pipes larger than 360 mm

e. Pipe fittings up to 100 mm

f. Pipe fittings over 100 mm l m l m l m l m

400 m 100 m 50 m 10 m

g. Spot abatement of pipe

1 sm 100 sm

2. Asbestos containing floor tile removal and disposal.

1 sm 100 sm

3. Removal and disposal of PCB contaminated ballast.

Ea 150

Bid Set 01031 - 5 Unit Prices

4. Removal and disposal of lead based paint on surfaces to remain:

a. Doors and Door Assemblies

b. Transoms

10 sm 20 sm

5. Removal of materials covered with lead containing paint and disposed as construction waste.

1 m3 50 m3

6. Removal and disposal of mercury containing light tubes.

a. 600 mm

b. 1200 mm

c. 2400 mm

7. Selective Demolition of plaster-on-clay tile exhaust flue construction.

1 sm 10 sm

C. Hazardous Material Abatement: (Items to be removed and disposed of in accordance with project documents from areas outside of hazardous materials work areas established to remove base bid items.) The unit costs provided by the Contractor are to represent all cost associated with the item. Cost is to include the Contractor=s labor, equipment, materials, taxes, insurance, overhead, mobilization, and profit.

1. Mobilization, construction and demobilization of mini-enclosures outside of the primary asbestos work area.

Ea 15

2. Asbestos containing insulation removal and disposal by glove bag for:

a. Pipes up to 100 mm including fittings.

b. Pipes up to 100-200 mm including fittings.

c. Pipes up to 200-360 mm including fittings.

d. Pipes above 360 mm including fittings.

e. Ducts

1 m

10 m 20 m

3. Removal and disposal of PCB contaminated ballast.

Ea 50

4. Removal and disposal of lead based paint on surfaces to remain:

a. Doors and Door Assemblies

b. Transoms

5 sm

Bid Set 01031 - 6 Unit Prices

c. Plaster walls

d. Plaster ceilings

e. Pipe

1 sm

20 sm 20 sm 20 sm

5. Removal of materials contaminated with lead containing paint and disposed as construction waste.

1 m3 10 m3

6. Removal and disposal of mercury containing light tubes.

a. 600 mm

b. 1200 mm

c. 2400 mm

D. HVAC

1. VAV box B 165 L/S w/ controls Ea 12

2. Galvanized sheet metal ductwork 1 kg 300 kg

3. Flexible duct, low pressure, 200 mm dia. 1 m 84 m

4. Volume dampers Ea. 20

5. Flexible duct, medium pressure, 125 mm dia. 1 m 6 m

6. Perforated face ceiling diffusers for supply air, Type >B= as scheduled on Dwg. 9M-1-801 Ea 12

7. Perforated face ceiling grille for return air, Type >C= as scheduled on Dwg. 9M-1-801

Ea 12

E. FIRE PROTECTION

1. Schedule 40 black steel; threaded pipe 25 mm 1m 20 m

2. Sprinkler heads; semi-recessed, quick response, chrome plated

F. ELECTRICAL

1. Receptacles

a. IG duplex Ea 12

b. Standard duplex Ea 36

2. System furniture connectors Ea 12

3. Double gang backbox with 50 mm conduit B 3 m long Ea 12

4. Single backbox with 50 mm conduit B 3 m long

Ea 12

Bid Set 01031 - 7 Unit Prices

5. Switches, single pole Ea 6

6. Switches; three-way Ea 6

7. Dimmer Switches

a. 600 W Ea 2

b. 1000 W Ea 2

8. Finish plates

a. Single Ea 48

b. Double Ea 12

9. Low voltage switches Ea 12

10. Occupancy sensors

a. Wall mounted Ea 12

b. Ceiling mounted Ea 4

11. Light fixtures

a. Type A Ea 24

b. Type B Ea 12

c. Type C Ea 12

d. Type >X= Ea 12

12. Fire alarm speaker Ea 12

13. Fire alarm strobe Ea 4

G. TELECOMMUNICATIONS

1. UTP Plenum Rated Station Cable 1 m 2400 m

2. Wall Telephone Outlet (1x4-UTP) Ea 1

3. Flush Wall Mounted Outlet (4x4-UTP) Ea 12

4. Surface Mounted Outlet (4x4-UTP) Ea 12

5. Category 5, 568A Connectors Ea 48

July 13, 2009 Bid Set 01040 - 1 Project Coordination

SECTION 01040

PROJECT COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 DESCRIPTION OF WORK

A. This section specifies general administrative procedures and performance required, including but not necessarily limited to, the following:

1. Coordination and meetings.

2. Administrative/supervisory personnel.

3. Records or reports.

4. Limitations for use of site and site protection.

5. Special reports.

6. Tradespeople and workmanship standards.

7. Inspections, tests and reports.

8. General installation provisions.

9. Cleaning and protection.

10. Energy Conservation.

11. Environmental Protection.

12. Overtime work, suspension of work.

13. Salvage.

14. Utility service interruption.

15. Cutting/patching and matching existing work.

16. Protection of site.

17. Precondition survey of the site.

B. Protection of Historic Properties: The project site has been determined to be eligible for listing on the National Register of Historic Places and requires special attention to the quality of materials and repair/replacement work. All work shall comply with the regulations of the Advisory Council on Historic Preservation 36 CFR Part 800 "Protection of Historic Properties." All work shall be in accordance with the "Secretary of the Interior's Standards for Rehabilitation," U.S. Department of the Interior, National Park Service, 1990."

1.3 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

July 13, 2009 Bid Set 01040 - 2 Project Coordination

1.4 COORDINATION AND MEETINGS

A. General: Prepare and distribute to each entity performing work at project site, a written memorandum of instructions on required coordination activities, including required notices, reports and attendance at meetings. Prepare similar memorandum for separate contractors where interfacing of work is required.

B. Coordination Drawings:

1. General: Prepare Coordination Drawings where careful coordination is needed for installation of products and materials fabricated by separate entities, and prepare Coordination Drawings where limited space availability necessitates maximum utilization of the space for efficient installation of different components.

a. Obtain graphic files from Government, to serve as backgrounds for Coordination

Drawings.

b. Show the relationship of components shown on separate Shop Drawings.

c. Indicate required installation procedures.

d. Provide horizontal and vertical dimensions necessary to locate each component and avoid conflicts within the space.

e. Refer to clause "Shop Drawings, Coordination Drawings, and Schedules," of

"General Provisions," for additional requirements.

f. Contracting Officer will review and process Coordination Drawings in same manner as Shop Drawings. Comply with requirements of Section 01300

SUBMITTALS.

g. Refer to DIVISIONS 15 and 16 for specific Coordination Drawing (Composite Drawing) requirements for mechanical and electrical installations.

2. Sleeves and Inserts: Before sleeves or inserts are set or mechanical or electrical equipment or foundations or other work is installed, Contractor shall prepare and submit for approval by Government composite coordination drawings for equipment rooms, spaces and other areas in which work of two or more trades or subcontractors is to be installed and in which the probability of interference exists, as determined by either Contractor or Government. Drawings shall show work of all trades covered, shall be drawn to a scale not smaller than 1:25, and shall show clearly in both plan and elevation that work can be installed without interference.

3. Work installed without prior approval: Any work installed prior to approval of coordination drawings shall be at Contractor's risk. Subsequent relocations required to avoid interferences shall be made without additional expense to Government. In case interference develops, Government will decide which work shall be relocated, regardless of which was installed first.

July 13, 2009 Bid Set 01040 - 3 Project Coordination

C. Coordination of Trades: Coordinate work of different trades so that interference between mechanical, electrical, architectural, and structural work, including existing services, will be avoided and within limits indicated the maximum practical space for operation, repair, removal, and testing of equipment is provided. Keep pipes, ducts, conduit, and the like as close as possible to ceiling slab, walls, and columns to take up a minimum amount of space.

Locate pipes, ducts, and equipment so that they do not interfere with the intended use of eyebolts and other lifting devices.

D. Preconstruction Meeting: See Section 01546 SAFETY AND HEALTH for requirements of preconstruction safety meeting.

E. Weekly Coordination Meeting: In addition to specific preinstallation meetings and coordination meetings for each major element of work, and regular project meetings for other purposes (as indicated elsewhere in contract documents), hold weekly general project coordination meetings at regularly scheduled times which are convenient for everyone involved. Request representation (at each meeting) by every entity currently involved in coordination or planning for work of the entire project. Conduct meetings in a manner which will resolve coordination problems. Record results of meetings and distribute copies to everyone in attendance and to others affected by decisions or actions resulting from each meeting.

1. In addition to general construction coordination, discuss and document coordination efforts regarding environmentally sensitive procedures. Refer to the following specifications for procedures and requirements:

a. Section 01115 VOLATILE ORGANIC COMPOUND (VOC) LIMITS FOR

ADHESIVES AND SEALANTS (LEED BUILDING).

b. Section 01120 CONSTRUCTION IAQ MANAGEMENT.

c. Section 01352 LEED REQUIREMENTS.

d. Section 01572 CONSTRUCTION WASTE MANAGEMENT.

1.5 ADMINISTRATIVE/SUPERVISORY PERSONNEL

A. General: In addition to a General Superintendent and other administrative and supervisory personnel required for performance of the work, provide specific coordinating personnel as specified herein.

July 13, 2009 Bid Set 01040 - 4 Project Coordination

B. Environmental Control Officer: Designate an "Environmental Control Officer" whose duties shall include the responsibility for enforcing environmental protection provisions of these specifications, (to include but not be limited to the Sections listed in 1.2.E.1 above), in addition to safety and health; requirements of the Occupational Safety and Health Act; and other applicable Federal, state and local standards. As outlined in applicable sections of this specification, submit for approval by Government the proposed LEED plan, traffic flow plan, security plan, program for temporary structures, housecleaning plan, erosion control plan, demolition program, and safety and health plan. After approval by Government, implementation and enforcement of these programs shall become responsibility of Environmental Control Officer. Any changes in the programs must be requested by Contractor through Environmental Control Officer for written concurrence by Government.

C. Energy Conservation Officer: Designate an "Energy Conservation Officer" whose duties shall consist of developing and implementing a program for minimizing energy use on the site. He shall develop an energy conservation plan, which is subject to approval of Government. Contractor may designate the same person, or different persons, as "Environmental Control Officer," and "Energy Conservation Officer."

D. Mechanical/Electrical Coordinator: Provide a full-time mechanical/electrical (M/E) coordinator, who is experienced in administrative and supervisory coordination of mechanical and electrical work, both within the various types of M/E work required for project and with relation to other types of work. For the purposes of this provisions, "interface" is defined to include scheduling and sequencing of M/E work, sharing of access to work spaces, integration of work placed into limited spaces available for M/E installations, each trade's protection of work by other trades, cutting and patching, tolerances, preparation of M/E coordination drawings, inspections, tests, and utilization of M/E temporary facilities.

1. Licensed Engineer: Provide a M/E Coordinator who is registered (licensed) as a professional engineer in at least one recognized licensing jurisdiction.

E. Construction Waste Management Coordinator: Provide construction waste management coordinator to oversee implementation of the LEED CWM Plan on site.

F. Indoor Air Quality Management Coordinator: Provide indoor air quality management coordinator to oversee implementation of the LEED IAQ Management Plan on site.

G. Commissioning Team Personnel: Refer to Section 01810 COMMISSIONING.

H. Submittal of Staff Names, Duties: Within 15 days of contract date, submit a listing of Contractor's principal staff assignments and consultants, naming persons and listing their addresses and telephone numbers.

July 13, 2009 Bid Set 01040 - 5 Project Coordination

1.6 LIMITATIONS FOR USE OF SITE

A. General: In addition to site utilization limitations and requirements shown on drawings, and indicated by other contract documents, administer allocation of available space equitably among entities needing access and space, so as to produce best overall efficiency in performance of total work of project. Schedule deliveries so as to minimize space and time requirements for storage of materials and equipment on site.

1. Confine operations to construction work area, unless otherwise authorized by

Government.

2. Each construction work area will have personnel egress through existing stairways.

B. Use of Equipment by Government: See clause of same title in the General Provisions.

C. Parking Facilities: Except as noted or specified, there will be no parking available at site during normal working hours. Contractor and his employees shall make their own arrangements for vehicle parking.

D. Materials on the Site: Unless otherwise noted or specified, materials and equipment that are removed and not reused under this contract become the property of the Contractor, and salvage value shall be reflected in the bid.

E. Storage or Sale of Equipment on Site: Storage or sale of excess salvageable material on the site is not permitted. Said materials shall be remove from site to another location to be stored or sold.

1.7 SPECIAL REPORTS

A. General: Except as otherwise indicated, submit special reports to the Government within one day of occurrence requiring special report, with copy to others affected by occurrence.

B. Reporting Accidents: Refer to Section 01546 SAFETY AND HEALTH.

C. Reporting Unusual Events: When an event of unusual and significant nature occurs at site (examples: visit by news media; extraordinary weather phenomenon), prepare and submit a special report listing chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. When such events are known or predictable in advance, advise the Government in advance at earliest possible date.

July 13, 2009 Bid Set 01040 - 6 Project Coordination

1.8 TRADESPERSONS AND WORKMANSHIP STANDARDS

A. General: Instigate and maintain procedures to ensure that persons performing work at site are skilled and knowledgeable in methods and craftsmanship needed to produce required quality-levels for workmanship in completed work.