Attachment 1 - Construction Specifications

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

AG-2B46-S-17-0035

Construction and Material Specifications

Jimmy Carter - Plant Materials Center Exclusion Fence

Date: March 23, 2017

Table of Contents

List of Construction Specifications…………………………………………………………………………..page 2

List of Material Specifications………………………………………………………………………………….page 2,3

Construction Specification 008 Mobilization and Demobilization……………………………page 4,5

1. Scope……………………………………………………………………………………………………………page 4

2. Equipment and Material…………………………………………………………………………….…page 4

3. Payment……………………………………………………………………………………………………….page 4

4. Items of work and construction details………………………………………………………..page 4,5

Construction Specification 092 Field Fence…………………………………………………………….page 6

1. Scope……………………………………………………………………………………………………………page 6

2. Material……………………………………………………………………………………………………….page 6

3. Setting posts………………………………………………………………………………………………..page 6

4. Corner assembly…………………………………………………………………………………………..page 6

5. End panels…………………………………………………………………………………………………...page 6

6. Pull post assembly…………………………………………………………………………………….…page 7

7. Attaching fencing to posts……………………………………………………………………………page 7

8. Stays……………………………………………………………………………………………………………page 7

9. Crossings at depressions and watercourses…………………………………………………page 7,8

10. Measurement and payment………………………………………………………………………..page 8

11. Items of work and construction details…………………………………………………….….page 8,9

Material Specification 582 Galvanizing…………………………………………………………………..page 10

1. Scope…………………………………………………………………………………………………………..page 10

2. Quality…………………………………………………………………………………………………………page 10

Material Specification 585 Wood Preservatives and Treatment…………………………….page 10

1. Scope………………………………………………………………………………………………………….page 10

2. Treatment Processes…………………………………………………………………………………..page 10

3. Preservatives………………………………………………………………………………………………page 10

4. Quality of Treated Material…………………………………………………………………………page 10

5. Marking………………………………………………………………………………………………………page 10

6. Fasteners and Connectors…………………………………………………………………………..page 10

Material Specification 591 Field Fencing Material……………………………………………page 11

1. Scope……………………………………………………………………………………………………page 11

2. Wire gauge……………………………………………………………………………………………page 11

3. Fencing………………………………………………………………………………………………….page 11

4. Stays, fasteners, and tension wire…………………………………………………………page 11

5. Wood fence posts and braces……………………………………………………………….page 11

6. Steel fence posts and braces…………………………………………………………………page 11

7. Concrete fence posts…………………………………………………………………………….page 11

8. Panel gates……………………………………………………………………………………………page 11

9. Wire gates………………………………………………………………………………………….….page 11

10. Staples……………………………………………………………………………………………….…page 11

11. Galvanizing…………………………………………………………………………………………...page 11

List of Construction Specifications

• 005 Pollution Control

• 008 Mobilization and Demobilization

• 092 Field Fence

List of Material Specifications

• 582 Galvanizing

• 585 Wood Preservatives and Treatment

• 591 Field Fencing Material

Construction Specification 008 - Mobilization and Demobilization

1. Scope The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract.

Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.

2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable; and other items specified in section 4 of this specification.

Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.

This work includes mobilization and demobilization required by the contract at the time of award. If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.

3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.

Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.

4. Items of work and construction details A. Bid Item #1, Mobilization and Demobilization.

1) This item shall consist of the mobilization and demobilization required by the contractor to perform the work under this contract.

Payment as described will constitute full compensation for completion of the work.

2) Contractor shall provide:

a) Construction Site Plan: Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the work area. Indicate if the use of a supplemental or other staging area is desired. Show locations, construction entrances, trash dumpsters, and worker parking areas.

b) Bulletin Board: Immediately upon beginning of work, provide a weatherproof covered (glass, acrylic glass, or plastic) bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster (if applicable), and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer. Erect signs within 15 days after receipt of the notice to proceed. Correct the data required by the safety sign daily, with light colored metallic or non-metallic numerals.

c) Haul Roads: All farm paths traversed during construction shall be remediated to pre-construction conditions prior to demobilizing.

d) Any open post holes shall be covered at the end of each workday.

e) Employee Parking: Contractor employees will park privately owned vehicles in an area designated on the construction drawings unless otherwise approved by the Contract Officer.

This area will be within reasonable walking distance of the construction site. Contractor employee parking must not interfere with existing and established parking requirements of the government installation.

f) Restoration of Storage and Temporary Office Areas: Upon completion of the project remove the bulletin board, signs, barricades, haul roads, and any other temporary products from the site. Restore to the original or better condition, areas used by the Contractor for the storage of equipment or material, or other use. Gravel used to traverse grassed areas must be removed and the area restored to its original condition, including top soil and seeding as necessary.

3) Payment shall constitute full compensation for all work associated with Bid Line Item #1.

Measurement and payment will be on a lump sum (LS) basis.

Construction Specification 092 – Field Fence

The work shall consist of furnishing and installing field fence, including gates and fittings.

2. Material

Material for field fence shall conform to the requirements of Material Specification 591. All wooden posts shall be of the same species, when available.

Unless otherwise specified, surfacing, cutting, and boring of preservative treated wooden posts and braces shall be completed before treatment. If field cutting or field repair of treated material is approved, all cuts and abrasions shall be carefully trimmed and coated with copper naphthenate preservative containing a minimum of 2.0 percent copper metal. The treatment preservative shall be applied according to the product label. Any excess preservative not absorbed by the wood member shall be cleaned from the surface prior to the use of the member. Bored holes for connectors or bolts may be treated by pumping coal-tar roofing cement meeting ASTM D5643 into the holes using a caulk gun or similar device. After assembly, any unfilled holes shall be plugged with tightly fitting wooden plugs that have been treated with preservative as specified.

3. Setting posts

Concrete or wood posts shall be set in holes and backfilled with earth except where otherwise specified.

Wood posts may be driven when approved by the engineer. Steel posts shall be driven unless otherwise specified.

Holes for installing fence posts shall be at least 6 inches larger than the diameter or side dimension of the posts.

Earth backfill around posts shall be thoroughly tamped in layers not thicker than 4 inches and shall completely fill the posthole up to the ground surface. Concrete backfill around posts shall be rodded into place in layers not thicker than 12 inches and shall completely fill the posthole to the surface of the ground. Backfill, either earth or concrete, shall be crowned-up around posts at the ground surface.

No stress shall be applied to posts set in concrete for a period of not less than 24 hours following the development of a firm set of the concrete.

4. Corner assembly

Unless otherwise specified in section 11, corner assemblies shall be installed at all points where the fence alignment changes 15 degrees or more.

5. End panels

End panels shall be built at gates and fence ends.

6. Pull post assembly

Pull post assembly (bracing within a section of straight fence) shall be installed at the following locations:

a. In straight fence sections, at intervals not to exceed 660 feet.

b. At any point where the vertical angle described by two adjacent reaches of wire is upward and exceeds 10 degrees (except as provided in section 11 of this specification).

c. At the beginning and end of each curved fence section.

7. Attaching fencing to posts

The fencing shall be stretched and attached to posts as follows:

a. The fencing wire or netting shall be placed on the side of the post opposite the area being protected except for installation along curved sections.

b. The fencing wire or netting shall be placed on the outside for installation along curved sections.

c. The fencing wire or netting shall be fastened to each end post, corner post, and pull post by wrapping each horizontal strand around the post and tying it back on itself with not less than three tightly wound wraps.

d. The fencing wire or netting shall be fastened to wooden line posts by means of steel staples.

Woven-wire fencing shall be attached at alternate horizontal strands. Each strand of barbed wire shall be attached to each post. Steel staples shall be driven diagonally with the grain of wood and at a slight downward angle and shall not be driven so tightly as to bind the wire against the post.

e. The fencing wire or netting shall be fastened to steel or concrete line posts with either two turns of 14 gauge galvanized steel or iron wire or in accordance with recommendations provided by the post's manufacturer.

f. Wire shall be spliced by means of a Western Union splice or by suitable splice sleeves applied with a tool designed for that purpose. The Western Union splice shall have no less than eight wraps of each end about the other. All wraps shall be tightly wound and closely spaced. Splices made with splice sleeves shall have a tensile strength no less than 80 percent of the strength of the wire being spliced.

8. Stays

Stays shall be attached to the fencing at the spacing outlined in section 11 or as shown on the drawings to ensure maintenance of the proper spacing of the fence wire strands.

9. Crossings at depressions and watercourses

Where fencing is installed parallel to the ground surface, the line posts subject to upward pull shall be anchored.

a. If the fence wire or netting is installed parallel to the ground surface, the line posts subject to uplift shall be anchored by means of extra embedment or by special anchors as detailed on the drawings.

b. If the fence wire is installed with the top wire straight and parallel to the ground surface on either side of the depression, extra length posts shall be used to allow normal post embedment.

Unless otherwise specified, excess space between the bottom of the fence and the ground shall be closed with extra strands of barbed wire or with netting.

10. Measurement and payment

Method 1—The length of each type and kind of fence is measured to the nearest foot along the profile of the fence, including gate openings. Payment for each type and kind of fence is made at the contract unit price for that type and kind of fence. Such payment constitutes full compensation for completion of the work, including fabricating and installing gates.

Method 2—The length of each type and kind of fence is measured to the nearest foot along the profile of the fence, excluding gate openings. Payment is made at the contract unit price for the specified height of fence. The number of each size and type of gate installed is determined. Payment is made at the contract unit price for that type and size of gate. Such payment constitutes full compensation for all labor, material, equipment, and all other items necessary and incidental to the completion of the work.

All methods—The following provisions apply to all methods of measurement and payment.

Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 11 of this specification.

11. Items of work and construction details

Items of work to be performed in conformance with this construction specification and construction details are:

The materials shall conform to the requirements of this construction specification along with material specifications 582 - Galvanizing, 585 - Wood Preservatives and Treatment, and 591 -Field Fence. The measurement and payment shall be Method 2 in section 10 of this construction specification.

Measurement and payment for field fence shall be rounded to the nearest liner foot, (LF.).

Measurement and payment for gates installed as part of the field fence will use the unit of each.

A. Bid item #2, Field Fence

1) This item shall consist of any materials, labor, equipment, transportation, tools, and supervision to accomplish the construction of field fence for deer exclusion as described within this specification and attached drawings.

2) The contractor shall furnish manufacturers specifications of all materials provided for adherence to material specifications 582- Galvanizing, 585 - Wood Preservatives and Treatments, and 591- Field Fence. Payment shall not be made unless material specifications are provided.

3) Approximately 3750 linear feet (LF) of fence shall be installed enclosing and protecting a rectangular area approximately 20 acres in size using woven wire 96 inches tall with 2 strands of barbed wire spaced at 8 inch intervals above the woven wire. Two gate openings shall be provided within the fence meeting the location and description of this specification and drawings.

B. Bid item #3, Gates for Field Fence

1) This item shall consist of any materials, labor, equipment, transportation, tools, and supervision to accomplish the construction of Gates for Field Fence for deer exclusion as described within this specification and attached drawings.

2) The contractor shall furnish manufacturers specifications of all materials provided for adherence to material specifications 582- Galvanizing, and 591- Field Fence. Payment shall not be made unless material specifications are provided.

3) Two gate openings provided for under Section 11, Items of Work and construction details subpart A. Bid item #2, Field Fence, shall have four gate panels constructed and installed according to this specification and drawing.

Material Specification 582- Galvanizing

This specification covers the quality of zinc coatings applied to iron and steel productions.

2. Quality Zinc coatings shall conform to the requirements of ASTM A 123 for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products or as otherwise specified in the items of work and construction details of the Construction Specification.

ASTM A 123 covers both fabricated and non-fabricated products; e.g., assembled steel products, structural steel fabrications, large tubes already bent or welded before galvanizing, and wire work fabricated from non-coated steel wire. It also covers steel forgings and iron castings incorporated into pieces fabricated before galvanizing or which are too large to be centrifuged (or otherwise handled to remove excess galvanizing bath metal).

Items to be centrifuged or otherwise handled to remove excess zinc shall meet the requirements of ASTM A 153, except bolts, screws, and other fasteners 0.5 inch or less in diameter may be coated with electro-deposited zinc or cadmium coating conforming to the requirements of ASTM B 766, coating thickness Class 5, Type III, or ASTM B 633, Service Condition SC-3, unless otherwise specified.

Material Specification 585 – Wood Preservatives and Treatment

1. Scope This specification covers the quality of wood preservatives, treatment processes, quality of treated material, and marking related to preservative treatment. Included are requirements for fasteners, connectors, and any other metal that will be in contact with preservative treated wood.

2. Treatment processes Treatment processes may use any combination of atmospheric air, initial air pressure, or vacuum and pressure that will achieve the desired results without damaging the wood.

3. Preservatives The wood shall be treated with the specified type of preservative.

4. Quality of treated material Treated lumber, timber, piles, poles, or posts shall be free from heat checks, water bursts, excessive checking, chafing damage, or from any other damage or defects that would impair their usefulness or durability for the purpose intended. The use of s-irons is not permitted.

Holes bored for tests shall be filled with tight fitting, treated wood plugs.

5. Marking Each treated wood item delivered to the job site shall be identified with a label, brand, or stamp that lists: the product name or logo; treatment company name and location; names of the preservative components; treatment end use category; minimum retention; and the applicable AWPA treatment standard or the number of the evaluation report from an evaluation service recognized by the International Code Council at http:// www.iccsafe.org.

6. Fasteners and Connectors All fasteners, connectors, and any other metal contacting preservative treated wood shall be hot-dip galvanized or stainless steel. Unless otherwise specified, all fasteners, connectors, and any other metal contacting ammonical copper zinc arsenate (AVZA), alkali copper quaternary (ACQ), micronized copper quaternary (MCQ) copper azole (CA) or micronized copper azole (MCA) treated wood shall be stainless steel. Galvanizing for fasteners shall conform to ASTM A153. Galvanizing for connectors made from steel sheet shall conform to ASTM A653, Class G185. Galvanizing for all other metal in contact with preservative treated wood shall conform to ASTM A123. Stainless steel shall be AISI Type 304 or 316.

Material Specification 591 – Field Fence

1. Scope: This specification provides the minimum quality requirements for the material used in the construction of field fences.

2. Wire gauge: When the size of steel wire is designated by gauge number, the diameter shall be as defined for U.S. Steel Wire Gauge.

3. Fencing: Fencing material shall conform to the requirements of ASTM A 121 for barbed wire, ASTM A 116 for woven wire, ASTM A 390 for poultry fence or netting, and ASTM A 854 for high-tensile wire.

Barbed wire and woven wire shall be class 3 zinc coated as specified in ASTM A 641 unless otherwise specified. High-tensile wire shall have type I zinc coating unless otherwise specified.

4. Stays, fasteners, and tension wire: Stays and fasteners shall conform to the requirements of the appropriate ASTM for the fencing material specified unless otherwise specified. Tension wires shall have a tensile strength not less than 58,000 pounds per square inch. Stays, fasteners and tension wire shall have class 3 zinc coating as specified in ASTM A 641 unless otherwise specified.

5. Wood fence posts and braces: Unless otherwise specified, wood posts shall be naturally rot resistant, preservative-treated, or other wood of equal life and strength. At least half the diameter or diagonal dimension of naturally rot resistant posts shall be in heartwood. Provide new wood posts that are sound, free from decay with all limbs trimmed substantially flush with the body. All posts shall be substantially straight throughout their full length. Make tops convex rounded or inclined. Provide posts free of ring shake, season cracks more than a quarter-inch wide, splits in the end, and unsound knots.

Pine shall be pressure treated in conformance with Material Specification 585, Wood Preservatives and Treatment. Wood braces shall be of wood material equal to or better than construction grade Douglas fir. Wood braces shall be pressure treated in conformance with Material Specification 585.

6. Steel fence posts and braces: Steel fence posts shall conform to the requirements of ASTM A702.

Posts with punched tabs for fastening the wires shall not be installed. Bracing pipes shall conform to the requirements of ASTM A53 except that the A53 requirements for hydrostatic test shall not apply.

7. Concrete fence posts: Concrete fence posts shall be manufactured to the specified requirements of size, shape, and strength.

8. Panel gates: Panel gates shall be the specified types, sizes, and quality and shall include the necessary fittings required for installation. Gates shall be of rigid construction free from sag or twist. The fittings shall consist of not less than two hinges and one latch or galvanized chain for fastening. Latches shall be of such design that a padlock may be used for locking. All fittings shall not be of lesser quality than the gate manufactures standard.

9. Wire gates: Wire gates shall be the type shown on the drawings, constructed in accordance with specifications, at the locations, and to the dimensions shown on the drawings. The material shall conform to the kinds, grades, and sizes specified for new fence, and shall include the necessary fittings and stays.

10. Staples: Staples required to secure the fence wire to wood posts shall be 9-gauge galvanized wire with a minimum length of 1.5 inches for soft woods and a minimum length of 1 inch for close-grain hardwoods.

11. Galvanizing: All iron and steel fencing material, except as otherwise specified, shall be zinc coated by the hot dip process meeting the requirements of Material Specification 582. Clips, bolts, and other small hardware may be protected by electro-deposited zinc or cadmium coating. n the gate manufacturer's standard.