WageDetermination.pdf

PDF 12 KB Posted

Attached to
Forest Road 60 AOP Culvert Replacement on the Green Mountain NF
Solicitation number
AG-24H8-S-12-0058
Issued by

About this file

Davis Bacon Wage Determination that applies to workers on this contract.

View the file

Other files

File Type Posted
Amendment1.rtf RTF text file
SolicitationPackage.rtf RTF text file
SubmissionPackage.rtf RTF text file
FR60.01.3_Supplemental Specs.docx DOCX document
FR60-Project Details.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: VT120041 04/13/2012 VT41

Superseded General Decision Number: VT20100069

State: Vermont

Construction Type: Highway

County: Rutland County in Vermont.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels; building structures in rest areas; railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction;

and other major bridges)

Modification Number Publication Date 0 01/06/2012 1 04/13/2012

* SUVT2011-026 09/14/2011

Rates Fringes

CARPENTER, Includes Form Work....$ 17.11 1.79

CEMENT MASON/CONCRETE FINISHER...$ 25.34 0.00

ELECTRICIAN, Includes Installation of Traffic Signals..........................$ 21.87 2.95

GUARDRAIL INSTALLER..............$ 12.93 0.00

IRONWORKER, REINFORCING..........$ 16.03 2.39

IRONWORKER, STRUCTURAL...........$ 21.15 15.54

LABORER: Common or General Includes Asphalt Raker and Concrete Work....................$ 13.16 2.70

LABORER: Flagger................$ 9.57 2.99

LABORER: Landscape..............$ 12.31 1.03

LABORER: Screedman..............$ 16.30 4.23

LABORER: Sign Erector/Installer................$ 14.31 4.70

OPERATOR: Asphalt Roller........$ 18.02 4.08

OPERATOR: Backhoe...............$ 18.99 1.64

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.03 0.00

OPERATOR: Broom.................$ 16.88 3.72

7/23/2012http://www.wdol.gov/wdol/scafiles/davisbacon/VT41.dvb?v=1

OPERATOR: Bulldozer.............$ 19.18 2.56

OPERATOR: Cold Planer/Milling Machine...........$ 15.56 0.00

OPERATOR: Crane.................$ 20.00 2.13

OPERATOR: Excavator.............$ 17.01 1.36

OPERATOR: Grader/Blade..........$ 18.44 3.50

OPERATOR: Loader................$ 24.52 9.86

OPERATOR: Mechanic..............$ 20.45 0.00

OPERATOR: Paver.................$ 16.02 3.94

OPERATOR: Pounder...............$ 18.11 0.00

OPERATOR: Roller excluding Asphalt..........................$ 15.12 4.08

OPERATOR: Screed................$ 17.09 4.44

OPERATOR: Sweeper...............$ 24.44 12.24

PAINTER (Parking Lot and Highway Striping Only)...........$ 17.08 3.40

TRUCK DRIVER, Includes all axles including Dump Trucks......$ 14.60 3.21

TRUCK DRIVER: Distributor Truck............................$ 17.89 0.00

TRUCK DRIVER: Semi/Trailer Truck............................$ 14.72 4.39

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rate.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .