J2_Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- AG-24H8-S-11-0066
About this file
J2 Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J4_TechnicalProposalForms.rtf | RTF text file | |
| J1_SupplementalSpecs.docx | DOCX document | |
| J3_WageDetermination.pdf | ||
| AG24H8S110066.doc | DOC document | |
| SubmissionPackage.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN
NOT TO SCALE
Forest Supervisor
District Ranger
Forest Engineer
Date
Date
Date
LOCATION MAP
NOT TO SCALE
SITE
R
ES
ER
V O
IR
B R O O K
FR 73
FR 73
WEST BRANCH
DEERFIELD RIVER
WOODFORD
V T R T E
Y A W P O N D B R O O K
V T R T E
US DEPARTMENT OF AGRICULTURE
FOREST SERVICE - REGION 9
PROPOSED FOREST DEVELOPMENT PROJECT
FOREST SERVICE ROAD 73 OVER
RESERVOIR BROOK, CULVERT NO. 73.02.4
MANCHESTER RANGER DISTRICT
WOODFORD TOWNSHIP, BENNINGTON COUNTY, VERMONT
SHEET INDEX:
1. TITLE SHEET
2. NOTES & EROSION CONTROL DETAILS
3. SITE PLAN
4. PROFILE & TYPICAL SECTIONS
5. STRIP FOOTING 1 DETAILS
6. STRIP FOOTING 2 DETAILS
7. STRIP FOOTING LAYOUT & DETAILS
8. SUPERSTRUCTURE DETAILS
9. WINGWALL ELEVATIONS
VTRANS STANDARD G-1 (GUARDRAIL)
VTRANS STANDARD G-1d (END TERMINAL)
VTRANS STANDARD SB-R6-82 (BRIDGE RAIL)
CAMP CASINO RD
TTC
CJH
MAC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
NOTES & EROSION CONTROL DETAILS
N/A
N.T.S.
SILT FENCE TYPICAL SECTION
N.T.S.
EROSION CONTROL MAT
R E S E R V O
IR
B R O O K
CJH
CJH
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
SITE PLAN
1" = 10'
LEGEND
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
PROFILE & TYPICAL SECTIONS
AS SHOWN
N.T.S.
EARTHWORK - TYPICAL SECTION
1" = 5'
CULVERT - LONGITUDINAL SECTION
N.T.S.
CULVERT SECTION
ROADWAY - TYPICAL SECTION
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
STRIP FOOTING 1 DETAILS
AS SHOWN
2" = 1'
STRIP FOOTING 1 PLAN
2" = 1'
STRIP FOOTING 1 STEM REINFORCEMENT PLAN 3
4" = 1'
TYPICAL STRIP FOOTING REINFORCEMENT
4" = 1'
TYPICAL STRIP FOOTING
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
STRIP FOOTING 2 DETAILS
AS SHOWN
2" = 1'
STRIP FOOTING 2 PLAN
2" = 1'
STRIP FOOTING 2 STEM REINFORCEMENT PLAN
4" = 1'
TYPICAL STRIP FOOTING REINFORCEMENT
4" = 1'
TYPICAL STRIP FOOTING
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
TIE SHEET
1 1/2" = 1'
112" = 1'
TIE SHEET
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
SUPERSTRUCTURE DETAILS
AS SHOWN
1" = 5'
SUPERSTRUCTURE PLAN
N.T.S.
DOWNSTREAM ELEVATION
UPSTREAM END ELEVATION
TTC
7/20/2011
7/20/2011
7/20/2011
FOREST SERVICE ROAD 73
OVER RESERVOIR BROOK
WINGWALL ELEVATIONS
3/8" = 1'
8" = 1'
WINGWALL NO. 3
PLAN
ELEVATION
8" = 1'
WINGWALL NO. 1
PLAN
ELEVATION
8" = 1'
WINGWALL NO. 2
PLAN
ELEVATION
8" = 1'
WINGWALL NO. 4
PLAN
ELEVATION
| 57263.17_CV.dwg |
| 24x36 |
| 57263.17_NT.dwg |
| 2-Notes |
| 57263.17_SP.dwg |
| Site Plan |
| 57263.17_DT.dwg |
| Profile & Typical Sections |
| Strip Footing 1 |
| Strip Footing 2 |
| Tie Sheet |
| Superstructure Details |
| Wingwall Details |
File details come from the government source that posted it. Updated .