Attach_3_BartlettAOP_XB442_PlanClarification.docx

DOCX document 53 KB Posted

Attached to
AG-1484-S-17-0004 XB442 AOP
Solicitation number
AG-1484-S-17-0004
Issued by

About this file

Attach 3 BartlettAOP_XB442_PlanClarification

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AOP Culvert Replacement Bartlett Experimental Forest/ Saco Ranger District White Mountain National Forest Bartlett, New Hampshire

Plan Clarifications A. Design Set:

Sheet 2, Notes Sheet (1 of 2): General Notes:

· Delete Note 4 and replace with: “The contractor shall be responsible for obtaining all environmental permits. An erosion control plan shall be included in the permit submittal. The Forest Service shall review and sign the permit application(s) prior to submittal. The contractor shall ensure that all permit conditions are met during construction.”

· Delete the first sentence of Note 5.

Sheet 6, Profile and Typical Sections: OM-3L Typical and OM-3R Typical:

· Add installation detail below.

image1.png

File details come from the government source that posted it. Updated .