Package__2 _MBS_NF_(Zone_1)_Seed_Project.pdf
PDF 5 MB Posted
- Attached to
- Road Construction Indefinite-Delivery Indefinite-Quantity (IDIQ) Federal contract opportunity
- Solicitation number
- AG-05M6-S-16-0008
About this file
Package 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_06.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_03.pdf | ||
| Amendment_02.pdf | ||
| Amendment_01_-_Add_Seed_Projects.pdf | ||
| Package__3_-_Colville_NF_(Zone_2)_Seed_Project.pdf | ||
| Package__4 _Oka-Wen_NF_(Zone_3)_Seed_Project.pdf | ||
| Package__1_Experience_Questionnaire.pdf | ||
| Packages__2_thru__4_(Special_Note).pdf | ||
| Solicitation_No_AG-05M6-S-16-0008pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-05M6-S-16-0008
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
4-27-2016
PAGE OF PAGES
1 95
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT/ / TASK ORDER NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY CODE 05M6 8. ADDRESS OFFER TO
BLOCK 7
USDA Forest Service Mt. Baker-Snoqualmie National Forest Attn: Brian A. Johnson, Contracting Officer 2930 Wetmore Ave., Suite 3A Everett, WA 98201-4067
9. FOR INFORMATION
CALL:
A. NAME
Brian A. Johnson
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(425) 783-6056
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
SULPHUR CREEK CAMPGROUND DRAINAGE
Package #2: Mt. Baker-Snoqualmie NF (Zone 1)
Darrington Ranger District Washington State
(Snohomish County)
Price Range: The Government's estimate is: Less than $25,000.
11. The Contractor shall begin performance within 5 calendar days and complete it within * calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See Section F.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
YES
13. . ADDITIONAL SOLICITATION REQUIREMENTS:
12B. CALENDAR DAYS
A. Sealed offers in original and three copies to perform the work required are due at the place specified in Item 8 by 3:30 p.m. (hour) local time May 27, 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee [ X ] is, [ ] is not required. If project is priced over $150,000, offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Computer Generated
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 1 of 95
799934
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
21. ITEMS ACCEPTED:
AWARD (To be completed by Government)
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
IPP
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
Invoice Processing Platform IPP
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return c o p i e s to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract.
The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED
TO SIGN (Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
AMOUNTS
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 2 of 95
DUNS No.: _______________________
E-mail: __________________________
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SULPHUR CREEK CAMPGROUND DRAINAGE
Package #2: Mt. Baker-Snoqualmie National Forest (Zone 1)
Darrington Ranger District Washington State
(Snohomish County)
B.1 SCHEDULE OF ITEMS
ITEM
NO. DESCRIPTION PAY
UNIT
EST.
QTY UNIT PRICE TOTAL
PRICE
15101 Mobilization LS 1 $__________ $___________
20304 Remove Trees and Rootwads LS 1 $__________ $___________
20701* Subsurface Drainage Geotextile Fabric
– Type 1E SY 40 $__________ $___________
25101* Placed Riprap, Class 2 CY 1 $__________ $___________
32451* Aggregate Surfacing, 5/8” minus WSDOT, Compaction Method A TON 52 $__________ $___________
60201 Install 18” HDPE culvert (Government Furnished) FT 30 $__________ $___________
60204 6” Perforated Drain Pipe FT 160 $__________ $___________
60291* Permeable Drain Rock, 2” CY 15 $__________ $___________
60292* Permeable Drain Rock, 4-6” CY 2 $__________ $___________
Total Price: $___________
*Indicates contract quantity (See FP-03 Section 109.02)
LS = Lump Sum; SY = Square Yard; CY = Cubic Yard; TON = Ton; FT = Linear Foot
B.2 PAYEMENT FOR BOND PREMIUMS
Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 15101 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 3 of 95
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
This project includes but is not limited to removal of trees, stumps, and associated slash; trench excavation; drain pipe installing; drain rock; culvert installation; and crushed aggregate surfacing.
C.2 PROJECT LOCATION
This project is located in Snohomish County, WA (T32N – R12E – Sec. 24). From Highway 530 at Darrington, WA, head North for 7.5 miles to Suiattle River Road (Forest Service Road 26). Follow the Suiattle River Road for 22.8 miles to the project site.
C.3 DISCLOSURE OF THE MAGNITUDE OF CONSTRUCTION PROJECTS
The Government's estimate is: less than $25,000
C.4 WORK RESTRICTIONS ARE AS FOLLOWS
For Wildlife Concerns:
The project area is within Marbled Murrelet habitat. All activities that generate noise levels above 92 decibels shall occur between 2 hours after sunrise and 2 hours before sunset from April 1st to September 23rd annually to minimize potential adverse effects to breeding Marbled Murrelets within forest stands that have suitable nesting branch structure.
C.5 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES
ON FEDERAL HIGHWAY PROJECTS (FP-03)
These specifications are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract. They are available online at http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm
C.6 APPLICABLE SPECIFICATIONS
Standard and Supplemental Specifications applicable to this contract for the FP-03 are shown in the specification listings contained in the attachments. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The Supplemental Specifications for the FP-03 specifications shown on the specification lists are physically attached.
C.7 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 4 of 95 http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm
C.8 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.9 FEDERAL HIGHWAY ADMINISTRATION STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES (FP-03)
The Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03) are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract. Delete any reference to Department of Transportation Acquisition Regulations (TAR) wherever shown.
C.10 MATERIAL CERTIFICATIONS, INVOICES, TESTING REPORTS & OTHER
SUBMITTALS
Submit the following certificates, test reports, samples and test data for this project (1 set each). See FP- 03 sections 104, and 106 for timely submittal and approval by the Contracting Officer.
Materials associated with the following Pay Items will require certifications and/or testing reports submitted to the Contracting Officer Representative prior to implementation on the project:
ITEM DESCRIPTION TIME FOR GOVERNMENT
APPROVAL
20701 Geotextile Fabric – Type 1E 7 days 32451 Aggregate Surfacing, 5/8” WSDOT mix (commercial source) 7 days 60204 6” Perforated Drain Pipe 7 days 60291 Permeable Drain Rock, 2” 7 days 60292 Permeable Drain Rock, 4-6” 7 days
C.11 WDFW-USFS INTERIM MOU PROVISIONS (JAN 2012)
A copy of this MOU must be on site at all times when work is conducted under the provisions of Appendix A. A full copy of the WDFW-USFS MOU will be provided at the Prework meeting.
The following provisions are applicable to this contract:
GENERAL PROVISIONS APPLICABLE TO ALL APPENDIX A PROJECTS
Fish-bearing Waters
1. Streams which meet the Washington State Forest Practices Act physical criteria for fish presence (WAC 222-16-031 Interim Water Typing System) are assumed to be fish- bearing unless documented survey information is available that provides evidence of a lack of fish presence.
2. The Forest Service will consult with WDFW to agree on the status of streams that
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 5 of 95 meet the physical criteria for fish presence but where biological information is incomplete, inconclusive, or not well documented.
Timing
1. Freshwater hydraulic projects conducted under Appendix A in fish-bearing streams or in tributary streams within ¼ mile of fish-bearing streams will be implemented only during the work periods outlined in Appendix D unless the Forest Service fisheries biologist and the WDFW Area Habitat Biologist agree that implementing the activity outside of the normal work period would be unlikely to cause negative impacts to fish and fish habitat. The location of the project within a watershed, site-specific conditions, circumstances, nature of the proposed work, and fish species and life stages actually present at the project site may make alternative instream work periods acceptable for many projects. Any agreements to modify the work periods in Appendix D for specific projects or specific sites shall be documented by
WDFW.
2. Those portions of hydraulic project work that occur outside or above the bankfull channel and have little or no potential to negatively affect fish or fish habitat are not subject to the work periods specified in Appendix D. Examples of such work include replacing bridge decking, constructing a bridge superstructure after footings are in place, and building up the fill over a culvert that is in place. These projects are still bound by the other provisions in Appendix A.
3. Hydraulic projects conducted in intermittent non-fish-bearing streams that are dry during the proposed work are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
4. Hydraulic projects conducted in wetted non-fish-bearing streams that are greater than ¼ mile from fish-bearing waters are not subject to the work periods specified in Appendix D unless the USFS fish biologist determines the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.
Fish Protection
1. The intake on any pump used for diverting water from a fish-bearing waterbody shall be screened with material that has openings no larger than 5/64 inch for square openings, measured side to side, or 3/32 inch diameter for round openings, and the screen must have at least one square inch of functional screen area for every gallon per minute (gpm) of water drawn through it. For example, a 100 gpm-rated pump would require at least a 100 square inch screen. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place whenever water is withdrawn from the waterbody through the pump intake.
2. Fish within construction sites that will be dewatered or isolated from the main waterbody
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 6 of 95 shall be captured and safely moved from the job site. Fish capture and transportation equipment shall be available on the job site during all inwater activities.
3. If at any time, as a result of project activities, a fish kill occurs, fish are observed in distress, or water quality problems develop that may present a threat to fish life, the Forest Service shall immediately notify the Washington Military Department’s Emergency Management Division at 1-800-258-5990.
Erosion Control
1. Alteration or disturbance of the bed, banks, and bank vegetation of waterbodies shall be minimized and limited to that necessary to construct the project.
2. Erosion prevention and control methods shall be used as necessary during and immediately after project implementation to minimize loss or displacement of soils and to prevent delivery of sediment into waterbody. These may include, but are not limited to, operational techniques, straw bales, silt fencing, erosion control blankets, temporary sediment ponds, and/or immediate mulching of exposed areas. Disturbed ground with the potential to deliver sediment into waterbodies shall be revegetated or protected from surface erosion by seeding, mulching, or other methods prior to the fall rainy season.
3. After project completion, disturbed streambanks and lakeshores shall be revegetated with site-appropriate vegetation to maintain soil stability and provide shade and future sources of large wood. Revegetation can be accomplished by planting or natural reproduction, depending on site conditions.
Dewatering
1. Where the project-specific provisions require worksite isolation from flowing waters and/or dewatering, a written dewatering plan shall be prepared prior to the start of the instream work that describes the method of bypass, location and construction of any coffer dams or diversion dams, the number and size of pumps to be used, and backup plans in place in case of mechanical failure or unanticipated storm events. The dewatering plan does not require review or approval by WDFW.
2. The dewatering system will be designed and installed to minimize erosion and sediment delivery to watercourses and to withstand all streamflows anticipated during the construction period.
3. Water bypassed around the site will be returned to the stream channel downstream of the work site. The bypass discharge point shall be designed to minimize erosion and scour of the stream
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 7 of 95 channel, banks, and vegetation.
4. Wastewater from project activities within the dewatered area shall be routed to an area outside the bankfull channel to allow removal of fine sediment and other contaminants prior to infiltrating back into waterbodies.
5. Water shall be reintroduced back into the channel in a manner that minimizes the mobilization of fines and sediment into downstream waters.
6. Any materials used to construct the dewatering system will be removed prior to the completion of the project.
Heavy Equipment
1. The use of heavy equipment within the bankfull channel in streams and below the ordinary high water line in lakes is discouraged. If such work is necessary, operation of heavy equipment in these areas shall be minimized and appropriate measures shall be taken to minimize damage to streambanks and streambed.
2. Accumulations of soil or debris shall be removed from drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of all heavy equipment prior to its working within the bankfull channel in streams or below the ordinary high water line in lakes.
3. To prevent contamination, equipment used around waterbodies shall be free of external petroleum-based products. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities. All machinery fueling and maintenance involving petroleum products shall occur at a sufficient distance from stream channels, waterbodies, or wetlands to prevent delivery of potential contaminants. Spill containment equipment and material shall be on site.
Concrete and Treated Wood
1. Fresh concrete, concrete by-products, or other chemical contaminants shall not be allowed to enter waterbodies. Structures containing concrete shall be sufficiently cured to prevent leaching prior to contact with the waterbody.
2. Wood treated with creosote or with pentachlorophenol in heavy oil solvent may not be used for wood components that will be over or in contact with water in hydraulic projects. Wood treated with any pentachlorophenol formulation may not be used for in- water contact (i.e., within the 100 year floodplain). All treated wood used for hydraulic projects shall meet or exceed the criteria and guidance established in the most current edition of 'Best Management
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 8 of 95
Practices For the Use of Treated Wood in Aquatic and Other Sensitive Environments' developed by the Western Wood Preservers Institute, Wood Preservation Canada, Southern Pressure Treaters' Association, and Timber Piling Council, and any current amendments or addenda to it. Current amendments and addenda include but may not be limited to 'Amendment #1: CCA - Chromated Copper Arsenate', dated October 25, 2006; and 'Addendum #1: ACC - Acid Chromated Copper', dated February 28, 2007.
Invasive Species Control
1. All materials and equipment used in the construction of hydraulic projects shall be free of aquatic invasive species and noxious weeds. Materials and equipment used at a project site at which aquatic invasive species are already established shall be decontaminated so that no viable aquatic invasive species are transported from the job site.
Other
1. A copy of this MOU shall be available on site at all times when work is conducted under the provisions of Appendix A.
SPECIFIC PROJECT PROVISIONS
Permanent Culvert Installation and Replacement NOTE: Permanent culvert installation and replacement projects include installation of new culverts that are installed for more than one year and replacement of existing culverts with similar or larger structures.
In addition to the General Provisions Applicable to All Projects, the following project specific provisions apply when conducting permanent culvert installation or replacement projects.
1. In non fish-bearing waters, provisions highlighted with a * are not required.
2. *Culverts in fish-bearing streams shall be designed, installed, and maintained to provide passage for all fish species and all life stages that are likely to be encountered at the site.
3. *Culverts in fish-bearing streams shall be designed and installed based on the stream simulation approach. Stream simulation designs are intended to mimic the natural stream characteristics and processes.
4. *Site investigations and selections of appropriate stream simulation culvert designs will be guided by the current version of Forest Service design manual “Stream Simulation: An Ecological Approach to Providing Passage for Aquatic Organisms as Road-Stream Crossings” or the current version of Washington State “Design of Road Culverts for Fish Passage”.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 9 of 95
5. *Forest Service shall notify WDFW when it begins the design process for a fish passage culvert.
Collaboration is encouraged on these projects and can be initiated by either agency.
6. *A Forest Service staff with expertise in stream processes and fish habitat shall be on-site during initial culvert placement and placement of streambed materials inside the pipe for all culverts in fish-bearing streams.
7. *Installation of baffled culverts in fish-bearing streams is not included under Appendix A.
8. *Installation of culverts in fish-bearing streams utilizing the “Hydraulic Method” or “No- Slope” method are not included under Appendix A.
9. Culverts shall be designed, installed and maintained to accommodate the 100-year peak flow with consideration of the sediment load and wood likely to be encountered.
10. Culverts shall be designed, installed and maintained to avoid negative channel changes such as inlet scouring or erosion of the streambed or banks downstream of the project.
11. The crossing structure shall consist of a single culvert.
12. Construction sites shall be dewatered or isolated from flowing waters to prevent delivery of sediment to watercourses.
13. Every effort shall be made to avoid stream crossings with heavy equipment. A single round-trip equipment crossing of the stream channel shall be allowed, if necessary. Equipment operation within the stream channel inside of the approximate culvert footprint is permissible so long as the stream has been dewatered.
C.12 FOREST SERVICE NATIONAL CORE BEST MANAGEMENT PRACTICES (BMP’S)
NONPOINT SOURCE PLLUTION CONTROL FOR WATER QUALITY
MANAGEMENT ON NATIONAL FOREST LANDS (2010)
The BMP’s are a part of this Contract for all the related items listed herein. The Contractor shall have a copy of the BMP’s available and on-site at all times.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 10 of 95
SECTION D--PACKAGING AND MARKING
D.1 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE
The government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The government issued contract number shall be be referenced by the contractor on all official communications to the government, e.g. letters, certified payrolls, e-mails, submittals, etc., starting upon notice of award.
Note: The solicitation number will have an “S” for the solicitation indicator in the number.
Contracts will have a similar number format but will have a “C” in place of the “S.” Individual Project Task Orders will have a “D.”
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 11 of 95
SECTION E--INSPECTION AND ACCEPTANCE
(Refer to Base IDIQ Contract)
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 12 of 95
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the notice to proceed.
The time stated for completion shall include final cleanup of the premises.
Note: The Government is currently estimating work to start around: June 13, 2016.
F.2 NOTICE TO PROCEED
A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer’s Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.
F.3 REQUIRED SUBMITTALS
The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.
Submittal Title Referenced By Specification No. Submittal Date
Schedule of Work Base Contract Include with Bid Proposal
Job Specific Safety Plan Base Contract Prior to Work Starting
Copy of Required Insurance Coverage Base Contract Prior to Work Starting
Notification of Subcontracting Base Contract Prior to Subcontractor Starting Work
Fire Plan Base Contract Prior to Work Starting
Camping Permit Base Contract Prior to Camping
Release of Claims Form Base Contract Prior to Final Payment
Bio-based or Bio-preferred Products FAR 52.223-2 With Proposal and in accordance with Clause
Hazardous Spill Plan FSSS 107.20 Prior to Work Starting
Quality Control Plan FP-03 153.02 Prior to Work Starting
Other Submittals FP-03 & FSSS As required in specifications
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 13 of 95
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at: To be determined after task order award.
Note: Post Award Conference
The Contractor shall meet with the Government to discuss contract terms and work performance requirements, Work Progress Schedule, and Fire Prevention and Suppression Plans.
Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the conference.
G.2 GOVERNMENT FURNISHED PROPERTY (GFP)
• The Forest Service will supply one (1) 18” culvert with an estimated value of $435.00.
G.3 NOTIFICATION OF SUBCONTRACTING
The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The Contractor and subcontractor shall fill out the SF 1413, Statement and Acknowledgement and submit to the Contracting Officer. Other written notification shall include as a minimum:
A. The name, address and telephone number of the subcontractor.
B. The date upon which the subcontract was entered into and its duration.
C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
D. Documentation of the subcontractor's representative authority.
Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.
G.4 INVOICE PROCESSING PLATFORM (IPP)
All invoices are to be submitted via the electronic Invoice Processing Platform (IPP). Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted. The Contractor must also attach a detailed invoice in IPP.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 14 of 95
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.
B. Weather conditions: Normal west slopes of the Cascade Mountains.
C. Transportation facilities: Road 26 (Suiattle River Road) is a good double lane paved road to MP
10.0 and then turns to a good single lane gravel road with turnouts to the project site.
D. Elevation: 2000 ft.
H.2 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
C. Government inspections and tests are for the sole benefit of the Government and do not--
1. Relieve the Contractor of responsibility for providing adequate quality control measures;
2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3. Constitute or imply acceptance; or
4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 15 of 95
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H.3 SAFETY PLAN
Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for his/her employees at no cost to them. It shall include how often the PPE is inspected to insure that it is not defective or damaged.
It shall include steps the Contractor takes to insure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 16 of 95
H.4 SAFETY ITEMS
(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.
(b) The following checked activities have been identified by the Government as potential safety hazards:
[ ] Confined Entry Space.
[X] Temporary excavation/deep trenching/slope stability.
[ ] Tree Felling.
[ ] Fall hazard from work heights exceeding six feet.
[ ] Blasting.
[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[X] Heavy equipment operation.
[ ] Tree climbing and/or tower climbing.
[ ] Fire hazards.
[ ] Hazard materials handling.
[ ] Electrical hazard.
[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.
[ ] Mechanical hazards such as pulleys, springs, etc.
[X] Power tool operation including eye protection.
[ ] Overhead hazards.
H.5 FSAR 4G52.222-704 PERSONAL PROTECTIVE EQUIPMENT (FEB 2007)
1. The Contractor will train in the safe operation and use of equipment to all workers using such equipment.
2. Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body.
3. Defective or damaged personal protective equipment shall not be used.
4. The Contractor shall provide, at no cost to the employee, to each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. These chaps must be approved by Underwriters Laboratory or meet Forest Service specification 6170-47. The chaps shall cover the full length of the thigh to the top of the boot on each leg.
5. The Contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support. Employees operating chain saws shall wear foot protection that is constructed with cut-resistant material which will protect the employee against contact with a running chain saw.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 17 of 95
6. The Contractor shall provide, at no cost to the employee, and assure that each employee who works in an area where there is potential for head injury from falling objects or flying objects wears a hard hat that meets the minimum requirements of American National Standards Institute (ANSI) standard Z89.1- 1997.
7. The Contractor shall provide, at no cost to the employee, eye protection where there is potential for eye injury due to flying objects. This eye protection must meet the minimum requirements of ANSI standard Z87.1-2003.
8. The Contractor shall provide, at no cost to the employee, hearing protection where there is a potential for hearing loss due to high intensity noise e.g., chain saw operation.
H.6 USE OF PREMISES
A. The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
B. Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on Forest Service land or lands administered by the Forest Service, the Contractor shall obtain written permission from the appropriate Ranger District. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor. If permission is granted, a work order will specify all conditions and requirements.
Sanitation facilities shall be provided for all employees of the Contractor and members of the campsite.
C. It is further stipulated that in addition to clean-up of any campsites, the Contractor shall remove his equipment from National Forest Service land before final acceptance and payment of the contract.
D. The Contractor shall provide and maintain sanitary facilities. There shall be a minimum of one toilet for each ten employees. Solid waste shall be dispose of in accordance with applicable Federal, State and local regulations.
H.7 CONTRACTOR’S USE OF EXISTING ROADS
The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.
The roads authorized for use will be subject to the following general conditions:
(1) State laws governing traffic rules and equipment requirements on State and County Highways.
(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 18 of 95
The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.
H.8 FIRE PRECAUTIONARY MEASURES
All Fire Precautionary Measures listed in the base contract are applicable to this task order. This includes:
Fire Protection and Suppression (Eastside) Form R6-FS-6300-52 (see attachment).
H.9 LOAD LIMITS
All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, over width permits. Forest Service overload permits for this project may be obtained from the Supervisor’s Office. Overload Permits must be obtained for all vehicles exceeding posted bridge weight limits. Contractors should anticipate up to 21 days to secure needed overload permits.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 19 of 95
SECTION I--CONTRACT CLAUSES
I.1 CONTRACT CLAUSES
All clauses in the base contract, except the ones for material and labor hour contracts, are applicable to this task order.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 20 of 95
SECTION J -- LIST OF ATTACHMENTS
J.1 LIST OF ATTACHMENTS
Attachment No. / Description Pages
1. Project Drawings 4
2. Forest Service Supplemental Specifications 22
3. Fire Protection & Suppression (R6-FS-6300-52) 7
4. DOL Wage Determination (Davis-Bacon Act) 38
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 21 of 95
Attachment 1 - Project Drawings (4 Pages)
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 22 of 95
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 23 of 95
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 24 of 95
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 25 of 95
Supplemental Specifications for Sulphur Creek Campground Drainage
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 Deletions
Attachment 2 - Supplemental Specifications (22 Pages)
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 26 of 95
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts
155 Delete
324 - Minor Aggregate, Commercial Source
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 27 of 95
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 28 of 95
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 29 of 95 http://www.nist.gov/ lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 30 of 95
Figure 101-1—Illustration of road structure terms.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 31 of 95
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 32 of 95
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 33 of 95
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 34 of 95
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 35 of 95
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
Package #2: Mt. Baker-Snoqualmie NF (Zone 1) Seed Project Sulphur Creek Campground Drainage Page 36 of 95
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .