Solicitation_AG-05M6-S-14-0019.pdf

PDF 1 MB Posted

Attached to
SNOQUALMIE BUNKHOUSE REMODEL Federal contract opportunity
Solicitation number
AG-05M6-S-14-0019
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to SNOQUALMIE BUNKHOUSE REMODEL, newest first.
File Type Posted
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Copy_to_Submit_Solicitation_AG-05M6-S-14-0019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 202

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-05M6-S-14-0019 07/21/2014

UNDER BDSA REG. 2 �

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.

Everett, WA 98201

See Section F.2

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

JORGE A SOMOZA 425 783-6053 a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

August 15, 2014 2:00PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f) Snoqualmie Bunkhouse Bldg. #1030

Remodel

Snoqualmie Ranger District

Do Not Enter Prices Here

See Schedule of Items

Mail Quote to Contracting Officer

2930 Wetmore Avenue, Suite 3A

Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at

(425) 783-0129

Technical Point of Contact is Thomas Warter at 425-783-6082 or cell phone

(425) 210-5751

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT � NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS 1 OF 2

SNOQUALMIE BUNKHOUSE BLDG #1030 REMODEL

SNOQUALMIE RANGER DISTRICT

ESTIMATED PAY

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

024119 Selective Demolition 1 L.S. $______________

064600 Wood Trim 500.00 L.FT. $_____________ $______________

072100 Building Insulation 20.00 Rolls. $_____________ $______________ (Fiberglass, 15’Wx39’L, R19)

082550 Solid Wood Doors and Frames 4.00 EA. $_____________ $______________

088300 Mirrors 3.00 EA. $____________ $______________

092116-1 Gypsum Wallboard 2,200.00 SQ.FT. $____________ $______________ (Kitchen Ceiling, bedrooms, Bathrooms , hallway and closets.

092116-2 Wall Plaster Repairs 100.00 SQ.FT. $____________ $______________ (Living Room Walls)

093100 Floor Tiles 10.00 SQ.FT. $____________ $_____________

096543 Linoleum Flooring 180.00 SQ.FT. $____________ $_____________ (Kitchen and Bathrooms)

096800 Carpet 550.00 SQ.FT. $____________ $______________ (Second Floor and Stair)

099000-1 Painting and Coatings 1 L.S. $_____________

099000-2 Walls Re-Furbish 1 L.S. $_____________ (Includes dinning walls, Second floor wall and all windows)

102800-1 First Floor Bathroom Remodel 1 L.S. $______________ (Includes two showers, compartment Towel ring , wall board, sink, glass doors, exhaust fan, faucets, toilet and cabinet)

102800-2 Second Floor New Bathroom 1 L.S. $_____________ (Includes Wall, sink, door, toilet, Exhaust fan, faucets and cabinet)

114510-1 Microwave 1.00 EA. $____________ $______________

114510-2 Undercabinet Range Hood 1.00 EA. $____________ $______________

ESTIMATED PAY

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

123560 Kitchen Remodel 1 L.S. $______________ (Includes counter top, sink Faucets, cabinets, pantry and under cabinets)

221000 Re-Plumbing 1 L.S. $________________ (Entire Building)

260000 Upgrade Electrical Systems 1 L.S. $________________ (includes light switch, outlets, smoke alarm, wiring), See Specification

265100-1 50-Watt White LED 9.00 Each $____________ $_______________ Recessed Down light/Recess Housing.

(Kitchen and bathroom)

265100-2 Light Flush Mount, Classic 18.00 Each $____________ $_______________ Bronze Lighting, Round Ceiling LED Light (Bedrooms, Living Room and Hallway)

265100-3 Closet Lights 3.00 Each $____________ $_______________

265100-4 Smoke Alarm 6.00 Each. $____________ $_______________

265600 Exterior Light 6.00 Each. $____________ $_______________

265700 ENVI Electric Heater 1.00 Each. $____________ $_______________

OPTION ITEMS: (THE FOLLOWING ITEMS MAY NOT BE AWARDED)

080152-1 Replace Window Synthetic 8.00 Each. $____________ $______________ Sash Cord.

096800 Wood Floor Re-Furbish 700.00 SQ.FT. $____________ $______________ (First Floor)

114510-3 Electric Range/Oven 1.00 Each $____________ $______________

114510-4 Refrigerator/Freezer 2.00 Each $____________ $______________

122116-1 Vertical Louver Blind 3.00 Each $____________ $______________ 3’-8” x 4’-6”

122116-2 Vertical Louver Blind 10.00 Each $____________ $______________ 2’-10” x 4’-6”

TOTAL $

NOTE : ONLY OFFERS TO THE NEAREST CENT WILL BE ACCEPTED.

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

The purpose of this contract is to remodel a residential building into a bunkhouse. Work includes installation of sheetrock on walls and ceiling, linoleum flooring, carpet covering, tile, molding, lighting, kitchen cabinets, countertop, painting, refurbishing walls, installation of all new lavatory fixtures, upgrade of the electrical and plumbing systems, removal and disposal of existing vinyl flooring, kitchen cabinets, portion of walls and ceiling plaster. Repairs living room walls plaster. (SEE ATTACHED FLOOR PLAN).

Arrangements to view the buildings may be made by telephoning John Griffith at

(360) 888-8780 Monday –Friday or for technical information contact Thomas Warter at

(425) 783-6082, cell phone (425) 201-5751.

Contractor shall give Contracting Officer five days’ notice prior to beginning work at the project site. Desired start date for the project is October 1st 2014.

C.2 PROJECT LOCATION

The project site is located at the Snoqualmie Ranger Station Compound. From city of Seattle travel east on I-90 for 32 miles.

SNOQUALMIE RANGER DISTRICT

North Bend Office 902 S.E. North Bend Way North Bend, Wa. 98045

C.3 PRICE RANGE

The Government's estimate is: between $25,000 and $100,000.

C.4 CONTRACT PRODUCTS AND MATERIALS

The Buy American applies to this contract with no exceptions. See I.3 FAR 52.225-9 Buy American-- Construction Materials.

Brand names shown in this contract are not required brands but supplied products and materials are to be similar in material, quality, and appearance of those brands shown.

C.5 PRE-BID CONFERENCE

A pre-bid meeting is schedules ON AUGUST 7, 2014 at 10:00AM at the project site.

C.6 CONSTRUCTION RELATES

Reasonable quantities of water and electricity relating to contract operations are available for contractor use at no charge during contract.

The restroom located in Snoqualmie Ranger Station is available for Contractor to use.

C.7 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.8 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.9 SUBMITTALS

Contractor must get Contracting Officer approval prior to installation of any improvements.

The Contractor shall provide submittals on proposed products and must obtain Contracting Officer’s approval, prior to use and installation.

C.10 STATEMENT OF WORK

Work includes:

Remove existing kitchen counter and any other fixed cabinetry.

Remove existing carpeting, light fixtures, and floor coverings in the first and second floors of building.

Remove existing interior bathroom fixtures, flooring and window treatments.

Remove, dispose and installation of kitchen, bathroom cabinets, counter top and fixtures.

Remove existing kitchen lights and ceiling Install new sheetrock for kitchen ceiling, plumbing for sewer for second floor half bath.

Reconstruction of interior bathroom: plumbing, fixtures, flooring and cabinet.

Construction of new ½ bath on second floor, incorporate new sewer system through kitchen ceiling and wall to connect to the basement sewer.

Install carpeting in main floor, stairway and upper floor of building.

Install flooring similar to the following: Commercial Armstrong Linoleum Floor for kitchen and bathrooms. Contractors shall provide samples for Government to select materials.

Stripping, clean and refurbish wooden paneling, door frames and window frames, All materials used shall be new, unless noted otherwise.

All debris, excess materials shall be properly disposed of off national forest land in a facility approved for the type(s) of material disposed of.

Wood Molding covers the all custom wood molding for all rooms. Molding shall match existing molding and paint.

Walls refurbishing includes costs of refurbishing walls, interior doors and windows.

“Refurbishing” is defined as cleaning, sanding or strip and re-staining to match the existing walls, interior doors and windows.

Carefully retain existing windows trim if damage contractor shall repair or replace In-kind.

All existing walls plaster and ceiling tiles shall be demolished and installed with new sheet rocks. Do not disturb wood panels.

Upgrade electrical system to compatibles with new accessories and codes.

Coordinate acceptance of flooring, tiles, fixtures, faucets, shower compartments, cabinets, countertop, doors and equipment’s selections with the CO.

KITCHEN:

Kitchen cabinet sizes: Use Available Standard size or custom make to fit kitchen layout.

Cabinet Material:

1. WOOD-VENEER-FACED ARCHITECTURAL cabinet doors similar to, but not limited to:

a. Classics Denver

b. Finish type: Hickory

c. ¾” solid wood frames

d. Adjustable concealed hinges

e. 3/8” furniture board sides, tops and bottom

f. Brushed –Satin Nickel Round Cabinet Knob

g. Stainless Steel Dir-Cast Drawer Lock

Cabinet above refrigerator is 18” height x 30” width.

Kitchen Counter Top: Similar to Laminated Plastic

a. Color: As selected by CO from manufacturer's full range.

Kitchen Sink/Double Compartment:

a. Double compartment, self-rimming.

b. Size: Approximately 22" x 33" with 9” deep bowls.

c. Finish: Stainless Steel

d. Gauge: 18 Gauge.

e. Centered 3-1/2" drain outlets in each bowl, underside undercoated.

f. Faucet holes: 3 - 1-3/8" faucet holes at 4" oc.

APPLIANCES:

Electric Range: with four-burner cooktop and oven with broiler, UL listed.

1. Width: 30 inches.

2. Type: Freestanding Clean Design.

3. Oven Cleaning: Self.

4. Color: As selected by Contracting Officer (CO) from manufacturer's full range.

5. Options: Stainless Steel.

Microwave Oven: UL listed.

1. Type: Countertop

2. Capacity: 2.2 cu. ft.

3. Wattage: 1,200.

4. Color: As selected by CO from manufacturer's full range.

5. Options: Stainless Steel.

Refrigerator/Freezer: Freestanding, two-door refrigerator with freezer, UL listed.

1. Type: Top-mounted freezer.

2. Defrosting: Frost free.

3. Interior Cabinet Liners: ABS thermoplastic-copolymer.

4. Compartment Volume: 17.6 cubic feet

5. Color: As selected by CO from manufacturer's full range.

6. Options: Stainless Steel.

Range Hood:

1. Type: Undercabinet

2. Ductless

3. Charcoal Filter

BATHROOM REMODEL:

Remove and dispose the existing tub, install two new threshold shower bases with wall panels. Awarded Contractor shall furnish doors and shower fixtures.

Vanity.

a. Similar to but is not limited to: Vitreous China Complete Pedestal Sink Toilet Paper Holder (recessed).

a. Type 457.

Rack Towel.

a. Stainless Steel Wall-Mount Towel Ring.

Mirror Shower Door Features:

a. Tempered safety glass

b. Silver Shine frame finish

c. Rain privacy glass

Wall Set Features: Two Shower compartments

a. Bath Wall Set: dimensions (36”x34”x75”) tall

b. White Polystyrene Wall

c. Durable high-gloss finish

d. Mounts directly to studs.

e. Caulk-less installation.

Toilet:

a. Similar to but not limited to an American Standard Compact Cadet 3 FloWise 1-piece toilet in white.

Exhaust Fan: Centrifugal Ceiling Exhaust Fan.

Construct new cabinets with sliding door.

NEW BATHROOM:

See construction layout details

a. Existing wood walls to be removed and install with new sheetrock for entire bathroom walls.

b. Bathroom walls shall be insulated for noise reduction.

c. Sewer connection from second floor ½ baths shall be included in pay item 102800

(Second Floor New Bathroom); Contractor shall provide the sewer layout connection through kitchen ceiling and wall to the basement. Minimize disturb of existing building structure if possible.

Toilet Paper Holder (recessed).

a. Type 457.

Mirror Vanity:

a. Similar to but is not limited to Espresso Under mount Single Sink Bathroom Vanity with granite Top

Electric Heater: Envi high-Efficiency Electric panel heater with thermostat Rack Towel:

a. Stainless Steel Wall-Mount Towel Ring Toilet:

a. Similar to but not limited to an American Standard Compact Cadet 3 FloWise 1-piece toilet in white.

PLUMBING:

The entire interior plumbing system shall be upgraded to current code, *see Exception below. Supply piping shall be PEX with PEX connectors; see CSI specifications, submittals required. Drain, waste and vent piping shall be to current code. See plumbing items as detailed in the Schedule of Items, Section C., above, CSI Specifications Section 15140, Domestic Water Piping and 15401, Plumbing, and the drawings for additional details.

Do not disturb existing On Demand hot water tank, updated water line shall connected to existing water tank.

The Contractor shall provide new plumbing and modify the existing plumbing to provide a complete operating system, replace all cast iron and galvanized fittings to the main stack with plastic plumbing fittings).

The main stack is understood to be fine in its current condition and is not expected to be part of this project, except for connecting to it.

All items related to plumbing work shall be paid by item installed otherwise incidental to pay item 221000 (Re-Plumbing).

ELECTRICAL:

The electrical system shall be upgraded to comply with current code. Note:

All wiring shall be replaced.

Electrical panel shall be upgrade to accommodate electrical systems.

All electrical outlets must be upgraded to code.

All exposed wiring, including wiring in the basement, shall be in conduit.

All outlets and switches throughout the building’s interior shall be replaced and grounded.

State inspection and permits are not required but all electrical work must be completed by an electrician licensed in the State of Washington.

Review the Schedule of Items, Section C, CSI specifications, and drawings for all references and descriptions for replacement of lighting fixtures.

All items related to electrical work shall be paid by item installed otherwise incidental to pay item 260000 (Electrical Upgrade)

Additionally and specifically, electrical inspections were completed in 2011 and inspectors recommended the following items be corrected during remodel. The Contractor shall incorporate the following recommendations to the electrical system upgrade work:

Add 3-way switch system at stairs to basement Install ¾” Flex Connector on wire below Panel in basement Bond gas pipe to water lines Install ½”EMT Connectors on 4-outlets that have Romex entering the EMT in basement Secure flex at furnace GFI in Kitchen outlet Small attic –open live old MC Cable needs to be J-box and blank off for safety.

C.11 BIOBASED PRODUCTS

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases

Dust suppressant 2-cycle engine oil Absorbents

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at a location beneficial for all parties.

G.2 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(JULY 2013)

52.204-13 System for Award Management Maintenance (JULY 2013)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) 52.211-18 Variation in Estimated Quantity (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-6 Construction Wage Rates Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)

52.222-13 Compliance with Construction Wage Rates Requirements and Related Regulations (MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014)

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000

(MAY 2014)

52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010)

52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)

52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-14 Irrevocable Letter of Credit (MAY 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014)

52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(JULY 2013)

52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)

52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (MAY 2014) 52.245-1 Government Property (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)

452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE ITEM

(MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days after contract award.

Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

I.3 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause—

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (Dollars)*

Item 1:

Foreign construction material _______ _______ _______

Domestic construction material _______ _______ _______

Item 2: _______ _______ _______

Foreign construction material _______ _______ _______

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I.4 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) (Applicable to Contracts >$30,000 but < $150,000)

(a) The Contractor shall submit one of the following payment protections

Payment Bond

Irrevocable Letter of Credit (ILC)

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I.5 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)

If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to: USDA Forest Service.

I.6 ORDER OF PRECEDENCE—CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following orde

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

I.7 AGAR 452.209–71 ASSURANCE REGARDING FELONY CONVICTION OR TAX

DELINQUENT STATUS FOR CORPORATE APPLICANTS ALTERNATIVE 1

(FEB 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

I.8 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

Title Pages

1. Specification List 2

2. Supplemental Specifications 144

3. Project Drawings 5

Page No Description 1 of 5 Vicinity Map 1 2 of 5 First Floor Existing Plan/First Floor Proposed Plan 1 3 of 5 Second Floor Existing Plan/Second Floor Proposed Plan 1 4 of 5 Proposed Kitchen Floor Plan 1 5 of 5 General Construction Notes 1

4. DOL Wage Decision No. WA20130018 5

5. Fire Protection and Suppression (R6-FS-6300-52) 6

6. Past and Current Contract Information 1

SNOQUALMIE BUNKHOUSE REMODEL

SPECIAL PROJECT SPECIFICATIONS

01 33 00 Submittal Procedures

01 35 50 LEED Requirements

01 62 10 Color Schedule

01 77 00 Closeout Procedures

02 41 19 Selective Demolition

06 10 00 Rough Carpentry

06 16 00 Sheathing

06 20 23 Interior Finish Carpentry

06 41 13 Wood-Veneer-Faced Architectural Cabinets

06 46 00 Wood Trim

07 21 00 Building Insulation

07 90 00 Joint Protection

08 01 52 Historic Treatment of Windows

08 25 50 Solid Wood Doors

08 70 00 Hardware

08 83 00 Mirrors

09 21 16 Gypsum Board

09 31 00 Tiles

09 65 43 Linoleum Flooring

09 68 00 Carpeting

09 68 10 Floor prepare for Carpet installation

09 90 00 Painting and Coating

10 28 00 Toilet, Bath, and Laundry Accessories

11 45 10 Residential Appliances

12 21 16 Vertical Louver Blinds

12 25 00 Window Treatment Operating Hardware

12 26 23 Plastic Laminate Countertops

12 35 60 Kitchen Casework

15 15 00 Sanity Waste

22 10 00 Plumbing Piping

22 11 16 Domestic Water Piping

22 41 00 Residential Plumbing Fixture

26 00 00 Electrical

26 51 00 Interior Lighting

26 56 00 Exterior Lighting

26 57 00 Electrical Wall Heater

01 33 00 - 1

SECTION 01 33 00

SUBMITTAL PROCEDURES

1. PART 1 - GENERAL

1.01 DESCRIPTION

A. The work of this section consists of submittal requirements before and during construction.

B. This section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1.02 RELATED REQUIREMENTS

A. Closeout Procedures - Section 01 77 00.

1.03 SUBMITTAL AND APPROVAL PROCEDURES

A. All submittals shall be transmitted using United States Forest Service form DSC- 1(CS), dated 11/95. (A copy of the form is included at the end of this section.) No action will be taken on a submittal item unless accompanied by the transmittal form.

B. As specified in the individual sections, forward submittals to Contracting Officer at least 15 days before need for approval. Unless a different number is specified, submit one reproducible original and one copies of each shop drawing, one copies of manufacturer's catalog sheets (cut sheets).

C. Shop Drawings: Include the following information with each copy of shop drawings:

1. Firm or entity that prepared each submittal clearly at the top of each submittal.

Name and address of the prime Contractor

2. Project name.

3. Date.

4. Date of revisions (when applicable).

5. Contractor's certification that shop drawing has been checked for compliance with contract documents.

6. Number and title of appropriate Specification Section and drawing number and detail reference as appropriate.

7. Details of fabrication, assembly and erection including connections and engagement to contiguous work.

8. Materials used and manufacturer’s information.

9. All required dimensions.

10. The term "by others" shall not be used. All work to be performed by others shall be identified by Contractor or subcontractor name, discipline, or trade.

D. Samples: Samples shall be large enough to illustrate clearly the functional characteristics.

E. Manufacturers' Catalog Sheets: Submit only pertinent pages; mark each copy of standard printed data to identify specific products proposed for use.

F. Manufacturer's Installation Instructions: When contract documents require compliance with manufacturer's printed instructions, provide one complete set of instructions for

01 33 00 - 2

Contracting Officer and keep another complete set of instructions at the project site until substantial completion.

G. Contracting Officer reserves the right to require submittals in addition to those called for in individual sections.

H. Approved Equals:

1. For each item proposed as an "approved equal," submit supporting data, including:

a. Drawings and samples as appropriate.

b. Comparison of the characteristics of the proposed item with that specified.

c. Changes required in other elements of the work because of the substitution.

d. Name, address, and telephone number of vendor.

e. Manufacturer's literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists.

2. A request for approval constitutes a representation that Contractor:

a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

b. Will provide the same warranties for the proposed item as for the item specified.

c. Has determined that the proposed item is compatible with interfacing items.

d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

e. Waivers all claims for additional expenses that may be incurred as a result of the substitution.

I. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material.

J. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.

K. Submittal Identification:

1. All sets of shop drawings, manufacturer's catalog sheets, samples, and other documents submitted to the Contracting Officer must have the identification information uniquely identifying the submittal, manufacturer, date, specification section stamped on the submittal.

2. Identification information of the submittal and specification section shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.

L. Submittal Numbering:

1. Number each submittal consecutively.

2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.

M. Contracting Officer's Review:

01 33 00 - 3

1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated.

2. Any work done or orders for materials or services placed before approval shall be at the Contractor's own risk.

3. After reviewing submittals, the Contracting Officer will return one copy of form DSC-1(CS) and one copy of applicable (marked up) submittal sheets to the Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.

The returned submittal will be marked in one of three ways as defined below:

a. APPROVED: Acceptable with no corrections.

b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The Contractor shall address all review comments when proceeding with the work.

c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The Contracting Officer will identify the reasons for disapproval. The Contractor shall revise and resubmit with changes clearly identified. The Contractor shall allow an additional 15 days for CO approval of resubmittals

PART 2 PRODUCTS NOT USED

PART 3 EXECUTION NOT USED

END OF SECTION

SECTION 01 35 50

LEED REQUIREMENTS

PART 1 GENERAL

1.01 PROJECT GOALS

A. This project has been designed to achieve the LEED-NC Certified rating, as defined in the LEED(tm) Green Building Rating System for New Construction and Major Renovations, Version 2.1, Nov. 2002.

B. Obviously, many of LEED credits can be achieve only through intelligent design of the project and are beyond the control of the Contractor, However, certain credits relate to the products and procedures used for construction. Therefore, the full cooperation of the Contractor and subcontractors is essential to achieving final certification.

C. Contractor shall familiarize him/herself with the relevant requirements and provide the necessary information and instruction to all subcontractors and installers.

D. Since Contractor and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .