Amendment_3.pdf

PDF 133 KB Posted

Attached to
SNOQUALMIE BUNKHOUSE REMODEL Federal contract opportunity
Solicitation number
AG-05M6-S-14-0019
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

View the file

Other files for this federal contract opportunity

Other files attached to SNOQUALMIE BUNKHOUSE REMODEL, newest first.
File Type Posted
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Copy_to_Submit_Solicitation_AG-05M6-S-14-0019.pdf PDF
Solicitation_AG-05M6-S-14-0019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 3 08/27/2014

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

USDA Forest Service Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Suite 3A Everett, WA 98201

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-05M6-S-14-0019

9B. DATED (SEE ITEM 11)

07/21/2014

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. THE EXTENDED TIME IS 12 SEPTEMBER 2014 2:00PM

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this Amendment is to extend the closing of the Solicitation to September 12th , 2014 at 2:00 PM and to add to the Solicitation the information on page two of this Amendment.

QUOTERS MUST QUOTE ON ALL LINE ITEMS. NO PARTIAL QUOTES WILL BE ACCEPTED.

All else remains the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

JORGE A SOMOZA CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

08/27/2014

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 3

Delete note #6 in page 5/5 of the drawings and replace with the following statements:

The project is not subject to any building department jurisdiction. However as part of the

Contractor’s quality assurance program, the Contractor is responsible for obtaining a building permit from the appropriate local agency to ensure that the work is completed to current building codes.

All of the electrical work included in this contract shall be inspected by an independent State‐ certified electrical inspector prior to placing the facility into service. The Contractor may complete this inspection through the State Labor and Industries or by obtaining an electrical permit from the appropriate local agency. A minimum notice of 3 business days shall be given to the Contracting Officer or their designated representative prior to the date of the inspection. Documentation of the inspection shall be provided to the Contracting Officer.

All electrical wirings shall be run within the walls; no exposed wiring or surface raceways are allowed.

Add the following to note #5 Kitchen of page 2/5 of the drawings:

The existing ceiling is a suspended ceiling. The Contractor shall frame a ceiling for a new sheetrock ceiling, using the existing ceiling height. The wood framing is incidental to Pay Item

092116‐1.

Add the following statements to section C.10 Statement of work:

Lead Based Paint:

A “Lead Based Paint Risk Assessment” was conducted at the building in 2009. The stairway wall plaster indicated a positive test for lead paint; all other areas indicated negative results.

The Lead Based Paint analysis reports are available to contractors upon request.

All renovation work shall follow EPA’s Renovation, Repair and Painting Rule.

Contractor and/or Subcontractors performing work shall be Lead‐Safe Certified Firms employing Certified Renovators.

That firm shall be certified under the EPA or WA State Department of Commerce.

Required documentation, submit with bid: Copies of current Lead‐Safe Certified Firm certificate along with Certified Renovator certificate(s).

Asbestos Containing Materials:

The Government will be performing sampling and testing any suspect asbestos containing material (ACM). The results of the tests will be disclosed to the Contractor. If ACM found in the building there will be a modification for removal or encapsulating the ACM.