SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

855142

USDA FOREST SERVICE

GIFFORDPINCHOT NATIONAL FOREST

501 E 5TH STREET 404

VANCOUVER WA 98661

05K3

Gifford Pinchot National Forest

501 E. 5th Street #404 Vancouver, WA 98661

STEVONNE FULLER 360-891-5085

1x 06/15/2017

AG-05K3-S-17-0036

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

CVRD NFR 4700 MP 7.5 Aquatic Organism Passage (AOP)

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 30 calendar days and complete it within ________________ ________________ calendar days after receiving

07/14/2017

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

Cowlitz Valley Ranger District AG-05K3-S-17-0036

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

USDA FOREST SERVICE

GIFFORDPINCHOT NATIONAL FOREST

501 E 5TH STREET 404

VANCOUVER WA 98661

05K3

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

Cowlitz Valley Ranger District AG-05K3-S-17-0036

Invoice Processing Platform (IPP)

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 43

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-05K3-S-17-0036

CVRD FR 47 MP 7.5 AOP - KV052213

Delivery Location Code: 05L7

USDA FOREST SERVICE

RANDLE RANGER DISTRICT

10024 US HWY 12

RANDLE WA 98377-9201 US

FOB: Destination

001 CVRD FR 47 MP 7.5 AOP - KV052213

002 CVRD FR 47 MP 7.5 AOP - KV052214

003 CVRD FR 47 MP 7.5 AOP - KV052215

004 CVRD FR 47 MP 7.5 AOP - S2W61514

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

PART I – THE SCHEDULE

SECTION A—PROJECT GENERAL INFORMATION

A.1 FOR INFORMATION CALL:

Sarah Rockey 360-497-1113 Technical Contact Telephone No.

A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK

DESCRIBED IN THESE DOCUMENTS

CVRD NFR 4700 MP 7.5 Aquatic Organism Passage (AOP) Gifford Pinchot National Forest Cowlitz Valley Ranger District Lewis County, Washington

PART I - SCHEDULE OF ITEMS

SECTION B – SUPPLIES, SERVICES AND PRICES

SCHEDULE OF ITEMS:

NOTES:

1. AQ = Actual Quantities, DQ = Design (Contract) Quantities, LSQ = Lump Sum Quantities

2. Road construction equipment operating in known areas of noxious weed infestations shall be cleaned prior to leaving the area. Cleaning of this equipment is incidental to pay item 15101.

3. All volume unit pay items are measured in-place. All reference to quantities of excavated materials, backfill and embankment materials refer to original (prior to excavation) volumes.

4. The contractor may use excess excavation as embankment and/or structural backfill if the material meets the requirements of special contract requirements 204 and 208 respectively.

5. The Government may elect to order any actual quantity specified above or to exclude items from award entirely.

The quantity ordered will be dependent upon unit prices received, funding available at the time of award, and what is needed on the ground.

Item No. Description

Method of Measurement Pay Unit

Estimated Quantity Remarks Unit Price Total Price

15101 Mobilization LSQ Lump Sum 1 Mobilize Equipment, Labor and Materials to Project Site.

15201 Construction survey and staking, method I, tolerance A. LSQ Lump Sum 1 See culvert survey and staking requirements.

15713 Soil Erosoin & Pollution Control LSQ Lump Sum 1 Includes Stream Channel Diversion, dewatering and erosion control.

20105 Clearing and grubbing, disposal of tops and limbs disposal (f), logs disposal (f), stumps disposal (f)

LSQ Lump Sum 1 All Required, see FSSS 203.05 for disposal methods.

20301 Removal of existing 72" (In.) x 48' (Ft.) CMP, disposal method (a)

AQ Each 1 Payment for excavation is included under 20801.

20401 Roadway Excavation, compaction method B, finishing method A

DQ CY 430

Tolerance class C

20411 Embankment construction, compaction method B, finishing method A

DQ CY 235

Tolerance class C

20801 Structure Excavation DQ CY 330 Material meeting specification requirements may be used for structural backfill.

20802 Foundation fill DQ CY 15 Place foundation fill (commercial source), material conforming to FP-03 704.01.

20808 Structural Backfill DQ CY 280 Place backfill material 3" minus (screened on site material), additional material needed shall be obtained from designated borrow source (see plans). Material conforming to FP-03 704.04.

25101 Placed Riprap (min. 18") DQ CY 40 Place 40 CY of (borrow pit) Riprap. Material is government furnished.

30801 Roadway Aggregate, Compacton Method 2 (Compaction A)

DQ CY 25

Place 25 CY of (borrow pit) crushed aggregate.

Material is government furnished.

50203 Grout AQ CY 0.5 Nom-shrink grout conforming to FP-03 725.22(c) and FSSS 725.22(c).

55204 Structural concrete class A(AE) for Slotted concrete footings

AQ CY 35

Conform to FP-03 552 and FSSS 522.

55403 Reinforcing steel LSQ Lump Sum 1 Conform to FP 554 and FSSS 554.

60304 19' span, 6'-4" rise, structural plate arch, 0.110" (Galvanized Steel)

AQ Ft. 50 None.

62530 Seeding and Mulching, Dry Method LSQ Lump Sum 1 Seed and mulch all disturbed areas with certified weed-free mulch and government furnished weed-free native grass seed.

63501 Temporary traffic control LSQ Lump Sum 1 Provide temporary traffic control signs for the project in accordance with the traffic control plan.

64804(a) Placed streambed simulation rock, bed class 8, method A DQ CY 100 Commercial source

64804(b) Placed streambed simulation rock, channel rock size 2, method A

DQ CY 98

Commercial source.

Total

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 DESCRIPTION OF WORK

The project consists of the following major items of work:

1. Roadway excavation and removal of existing 72” x 48’ corrugated metal pipe.

2. Installation of temporary bypass channel.

3. Installation of a 19’ span x 6’-4” rise bottomless arch culvert with concrete footings and stream simulation rock.

4. Roadway embankment construction.

C.2 PROJECT LOCATION

The project is located approximately 28 miles east of Randle, WA on the Gifford Pinchot National Forest, Cowlitz Valley Ranger District. Site is at stream crossing on North Fork Willame Creek. Project road identification and legal description as follows:

• Forest Road 4700000 Milepost 7.5; T13N, R8E, Sec. 12

Information about the district and location of site can be obtained at the Cowlitz Valley Ranger District Office located at milepost 116.1 on U.S. Highway 12, the office is approximately 1 mile east of the town of Randle, WA.

C.3 PRICE RANGE

The Government’s estimate is between $100,000 and $250,000.

C.4 PROSECUTION OF WORK

(a) General:

The contractor shall conduct activities so that interference with the public is kept to a minimum.

(b) Timing Restrictions:

In water work window for the AOP site on NFR 4700 MP 7.5 is:

• 07/15/2017 to 09/30/2017 - pending state approval.

Work window for Spotted Owl and Marbled Murrelet is:

• 07/16/2017 to 09/05/2017 – cannot start work until 2 hours after sunrise and need to quit work 2 hours before sunset.

• 09/06/2017 to 02/28/2018 – no work restrictions.

(c) Transport & Delivery – Use of Roads by Contractor:

The Contractor is authorized to use roads that are part of the construction project and those Forest Service Roads designated below for performance of work under this contract:

- 4700000, 4740015 (Borrow Source) and 5200000

Coordinate planned transport and delivery dates with the Contracting Officer and Contracting Officers Representative. The Contractor shall notify the Contracting Officer a minimum of 3 working days before transporting any material.

Traffic Control Plan – Contractor is responsible for submitting a traffic control plan. See C.5 (e) for review requirements. Contractor shall perform no work that interferes or conflicts with traffic or existing access to the roadway surface until the required traffic control management plan is submitted and approved. Contractor shall not to proceed with work on the project until all required signs and safety devises are in place and approved. During transport on USFS roads, contractor shall provide sufficient traffic control in compliance with MUTCD standards and standard specification sections 156 & 635 in order to control and protect public traffic.

Contractor shall be responsible for traffic control during the equipment & material transport on Forest Service land.

Road Use Permit - Forest Service road use permits for this project may be obtained by contacting the Contracting Officer. See C.5 (e) for review requirements.

Overload Limit & Overwidth Permits (As required)- All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained by contacting the Gifford Pinchot National Forest Bridge Program Manager located at Forest Headquarters. See C.5 (e) for review requirements.

Please allow for 3 weeks processing time, overload and overwidth vehicle shall not travel on Forest Service roads until the permit has been issued. Permit may be applied for in advance of the post-award conference.

(d) Road Closure:

- Contractor shall close a section of USFS Road(s) 4700000 for a maximum of two weeks.

- Limit road closure time, for USFS Road 4700000, as acceptable to reduce interference with public traffic.

- Contractor shall sign the road closure and place temporary barricades in accordance with the

MUTCD, FP-03 section 156, and section 635. This will include the use of “Road Closed” and “Road Closed Ahead” signs, as well as the use of Type III Barricades. Do not proceed with work on the project until all required signs and safety devises are in place and approved.

Contractor shall at all times be responsible for ensuring that necessary temporary traffic control devices remain in place for the duration of the project work. All temporary signs and barricades shall be removed from the project by the contractor after work is complete and approved by the CO. Removal of signs and barricades shall not occur before CO approval.

C.5 APPLICABLE SPECIFICATIONS AND MATERIAL CERTIFICATIONS LISTED

(a) Applicable Specifications:

References to Standard Specifications in the contract refer to the FOREST SERVICE

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON

FEDERAL HIGHWAY PROJECTS, FP-03.

Sections 100 through 149, and other Standard Specifications, listed on the Specification List, are included in this solicitation by reference only. Specifications not on the list but referenced by other Standard Specifications, shall also be applicable to this document.

The project Supplemental Specifications are also given on the Specification List but are physically attached in Section J. All requirements contained on the Specification List are hereby made a part of this solicitation and any resultant contract.

Product Substitution:

Any modification of other items, designs, materials, products or equipment (including Government- Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

(b) General Guidelines for Submittals:

Submittals are required by the following specifications:

603 - Culverts, Commercial Certification for metal pipe.

552 – Structural Concrete Mix Design and Testing.

554 – Reinforcing Steel.

324 - Minor Aggregate, Commercial Source Aggregate Gradations.

Work requiring submittals shall not begin until submittals have been approved.

Submittals shall include:

Date and Revision Dates.

Project Name and Contract Number.

Names of Contractor, Subcontractor, Supplier, and Manufacturers.

Field Dimensions and Relation to Adjacent Structures.

Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.

Samples:

Physical examples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.

Manufacturer's requirements:

Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts.

Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.

Approval or Rejection Time Allowance:

Submittals will be reviewed and either approved or rejected within the time designated in the table in section C.5.(e). Review time begins from date of receipt by Contracting Officer or COR.

(d) Shop Drawing Submittals:

- None Required

(e) Material Certifications, Testing Reports & Other Submittals:

The following plans, details, specifications, designs, certificates, test reports, samples and test data shall be submitted on this project (see table below for number of copies required). See AGAR section 452.236-76 for timely submittal and approval by Contracting Officer.

Brief Title Basic Reference

Number Of Copies To Section

Allowable Time for Government Approval After Receipt, by the CO, of Submittal (Working Days)

Hazardous Spill Plan FP-03, 107 and

1 7

Erosion Control Plan includes Dewatering Plan

FP-03, 157 1 7

Traffic Management Plan MUTCD 1 7 Weather-Caused Suspensions of Work Plan

H.2 (e) 1 7

Fire Plan J.1 (3) 1 7 Project Work Schedule FAR 52.236-

1 7

Road Use permit 36CFR261.12 & 261.54(c)

1 7

Road Oversize/Overweight permit(s)

36CFR261.12

& 261.54(c)

1 21

Structural Concrete Mix Design FP-03 552.03 1 7 Structural Concrete Quality Control Certificates, including batch tickets and test results

FP-03 552.09 1 7

Structural Concrete Commpressive Strength Test 28 day

FP-03 552.09 1 7

Commercial Certification for metal pipe

FP-03, 603,

106.03(b)

1 7

Reinforcing Steel Production Certification

FP-03 554.10 1 7

Commercial Source Aggregate Gradations.

FSSS, 324,

and FP-03 106.03(b)

1 7

Weed Free Certification (Mulch & Commercial Rock Source)

H.2 1 7

C.6 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (AGAR 452.211-73)

(FEB 1988)

The attachments to the Statement of Work/Specifications, listed in Section J, are hereby made part of this solicitation and any resultant contract.

C.7 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

ON FEDERAL HIGHWAY PROJECTS (AGAR 452.236-78)(NOV 1996)

The STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03, U.S. CUSTOMARY UNITS, is included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.

C.8 CONSTRUCTION PLANS

Copies of the plans pertinent to this project have been attached in section J.

C.9 BIO PREFERRED PRODUCTS

A. The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

B. The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer (CO).

C. The following are examples of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Hydraulic fluids Absorbents Diesel fuel additives 2-cycle engine oil Multipurpose Lubricants Penetrating lubricants Greases

D. Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor shall provide data for their biobased products such as biobased content.

E. In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.

F. The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

a. As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c) (3)), the Offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

G. The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased ProductsUnder Service and Construction Contracts.

SECTION D – PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E – INSPECTION AND ACCEPTANCE

E.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/Far/current/pdf/FAR.pdf

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

E.2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

E.3 INSPECTION AND TESTING PERFORMED BY GOVERNMENT

The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the Forest Service specifications or by the Special Project Specifications.

E.4 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Drawings, indicated in the specifications, or designated on the ground.

"Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

Cowlitz Valley Ranger District AG-05K3-S-17-0036 https://www.acquisition.gov/Far

SECTION F - DELIVERIES AND PERFORMANCE

F.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/Far/current/pdf/FAR.pdf

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the date the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Estimated start work date: 07/16/2017

F.3 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (AGAR 452.236-75) (NOV

1996)

Within 0 working days after receipt of the notice to proceed, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is Monday through Friday, 6:00 a.m. to 7:00 p.m.

Submit the Project Work Schedule on or before the date of the post-award conference.

F.4 BIO PREFERRED PRODUCT PERFORMANCE REQUIREMENTS SUMMARY

Required Service - Ensure the mandatory purchasing & use of biobased products.

Performance Indicator – Quantitative Factor Performance Standard - Contractor compliance with FSIRA, EO 13423, and FAR Surveillance Methodology – 100% Inspection

AQL – 100%

Deduction – 5%

Cowlitz Valley Ranger District AG-05K3-S-17-0036

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 CLAUSES INCORPORATED BY REFERENCE (FAR 52.252-2)(FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/Far/current/pdf/FAR.pdf

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.245-1 Government Property (JAN 2017)

G.2 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract:

• Seed

• Structural Backfill

• Roadway Aggregate

• Riprap

G.3 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within _5_ days after the date of contract award. The conference location will be determined at the time of award.

G.4 DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of the pre-work meeting.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

Cowlitz Valley Ranger District AG-05K3-S-17-0036

G.5 CONTRACT RELEASE

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein.

Reservations:______________"

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 EMERGENCY CONTROL

(USDA 452.236-77) (JUL 1985)

(a) Maintenance of Existing Facilities:

The Contractor shall conduct operations to minimize disruptions to the Government employees and public using the existing facilities.

No planned disruption of utilities is anticipated.

H.2 LANDSCAPE PRESERVATION

EROSION CONTROL MEASURES

Measures may include, but not be limited to:

Install check dams and sediment fences as necessary to minimize the entry of silt-laden water into streams or other water bodies.

Seed and mulch all disturbed areas. Seed to be provided by FS. Certified weed free straw mulch to be provided by contractor, 2 inches thick.

Submit the Erosion Control Plan on or before the date of the post-award conference.

LANDSCAPE PRESERVATION

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the clearing limits shall be repaired as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(c) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live steams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

(d) Prevention of Oil Spills - If the Contractor maintains storage facilities for oil or oil products on Project Area, appropriate preventive measures shall be taken to ensure that any spill of such oil or oil products do not enter any stream or other waters of the United States or any of the individual States.

(e) The Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan.

Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a professional engineer registered in Washington State, and shall include the following:

1. Identify a project contact (name, phone number, address) that will be responsible for implementing the SPCC Plan measures.

2. List and describe any hazardous material that would be used at the project site, including:

• procedures for inventory, storage, handling, and monitoring

• notification procedures

• specific clean-up and disposal instructions for different products on site

• proposed methods for disposal of spilled material

• types and amounts of spill containment materials that will be available on-site at all times during project implementation

• employee training for spill containment

CLEANING OF EQUIPMENT

Cleaning of Off-Road Equipment used by the Contractor for contract work shall be conducted outside the boundary of any National Forest Service land prior to moving each piece of equipment onto the project. The Contractor shall notify the Forest Service prior to moving each piece of equipment onto the project. Upon request from the Forest Service, arrangement will be made for Forest Service to inspect each piece of equipment prior to it being placed into service. The Contractor shall use cleaning methods necessary to ensure equipment is free of all attached mud, dirt, and plant parts. If noxious weeds are present at a project site, cleaning may also be required before moving between locations within the same project. These measures will assist to prevent the introduction/spread of the seeds of noxious weeds onto National Forest land. "Off-road Equipment" includes all machinery other than log trucks, chip vans, pickup trucks or vehicles used to transport personnel on a daily basis. Any equipment that will be working instream, and has been utilized for instream work in the past year, must be thoroughly pressure washed with hot water prior to entering National Forest Service land to kill/remove aquatic invasive species. If possible, pressure wash all equipment that will be working instream at 140°F (60°C) or higher for minimum of five minutes or at 120°F or higher for a minimum of 30 minutes.

PLAN FOR WEATHER-CAUSED SUSPENSIONS OF WORK

The Contractor shall prepare a plan for weather-caused suspensions of work to ensure preservation of resources affected on the work site or sites. The plans shall be consistent with the requirements in the LANDSCAPE PRESERVATION clause contained in this contract. The plan shall be submitted in writing to the Contracting Officer for review within 5 working days of the notice to proceed. See C.5 (e) for review requirements. The plan shall distinguish between short-term shut-downs caused by intermittent weather activity and longer-term shut-downs associated with the advent of winter. If rejected by the Contracting Officer, the Contractor shall revise the plan and re-submit it for consideration within 3 working days of verbal or written notification by the Contracting Officer. The Contractor shall take action consistent with the plan before suspending activity on the site(s). Acceptance of the plan by the Contracting Officer in no way waives any of the requirements of the LANDSCAPE PRESERVATION clause.

The Plan for Weather-Caused Suspension of Work shall be submitted on or before the date of the post-award conference.

H.3 USE OF PREMISES

(a) Forest Service Regulations for Use of Campground prohibits occupancy of developed recreation sites for other than primarily recreation purposes.

(b) A storage site will be permitted within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.

(c) Permanent and temporary electrical power is not available on site for construction use.

(d) Sanitary facilities are not required and are to be provided by the Contractor.

(e) Potable and non-potable water is to be provided by the Contractor.

Non-potable water for construction is not available on NFS lands for this contract.

H.4 FISH AND WILDLIFE REQUIREMENTS FOR FOREST ROAD 4700 – MP 7.5 AOP

ARCH CULVERT

1. The intake(s) on the dewatering pump(s) must have a fish screen(s) and be operated in accordance with WDFW fish screen criteria. WDFW-approved fish screens have both of the following specifications (see MOU Appendices pg. 4)

a. The intake on any pump used for diverting water from a fish-bearing waterbody shall be screened with material that has openings no larger than 5/64 inch for square openings, measured side to side, or 3/32 inch diameter for round openings, and the screen must have at least one square inch of functional screen area for every gallon per minute (gpm) of water drawn through

it. For example, a 100 gpm-rated pump would require at least a 100 square inch screen. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place whenever water is withdrawn from the waterbody through the pump intake.

b. Fish within construction sites that will be dewatered or isolated from the main waterbody shall be captured and safely moved from the job site. Fish capture and transportation equipment shall be available on the job site during all inwater activities.

c. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place at all times that water is being withdrawn from the stream through the pump intake.

2. The project Fisheries Biologist will coordinate and implement all fish relocation efforts prior to any instream work.

3. If at any time and as a result of project activities a fish kill occurs, fish are observed in distress, or water quality problems develop that may present a threat to fish life, the contractor will immediately notify a Forest Service representative (i.e. COR, project leader) who shall then immediately notify the project Fisheries Biologist.

Dewatering and Rewatering

1. A written dewatering plan shall be prepared prior to the start of the instream work that describes the method of bypass, location and construction of coffer dams (which must be built with non-erosive materials), the number and size of pumps to be used, and backup plans in place in case of mechanical failure or unanticipated storm events.

2. The dewatering system will be designed and installed to minimize erosion and sediment delivery to the stream, to withstand all stream flows anticipated during the construction period, and to not dewater downstream stream reaches below the by-pass culvert.

3. Water will be routed downstream of the work site using a by-pass culvert. The bypass discharge point shall be designed to minimize erosion and scour of the stream channel, banks, and vegetation.

4. Diversion sandbags can be filled with material mined from the floodplain as long as such material is replaced at end of project. Small amounts of instream material can be moved to help seal and secure diversion structures.

5. Wastewater from project activities within the dewatered area shall be routed to an area outside the bankfull channel to allow removal of fine sediment and other contaminants prior to infiltrating back into the stream.

6. Upon project completion, slowly re-water the construction site to prevent loss of surface water downstream as the construction site streambed absorbs water and to prevent a sudden release of suspended sediment. Monitor downstream during re-watering to prevent stranding of aquatic organisms below the construction site.

7. Any materials used to construct the dewatering system will be removed prior to the completion of the project.

Heavy Equipment

1. The use of heavy equipment within the bankfull channel of the stream will be minimized where possible. Where such work is necessary, appropriate measures shall be taken to minimize damage to the stream banks and streambed. To the extent feasible, heavy equipment will work from the top of the bank, unless work instream would result in less damage to the aquatic ecosystem.

2. To prevent the introduction and spread of aquatic and terrestrial invasive plants and animals, accumulations of soil and debris shall be removed from the drive mechanisms (wheels, tires, tracks, etc.)

and undercarriages of all heavy equipment prior to its working within the bankfull channel of the stream. Any equipment that will be working instream, and has been utilized for instream work in the past year, must be thoroughly pressure washed with hot water prior to entering National Forest Service land to kill/remove aquatic invasive species. If possible, pressure wash all equipment that will be working instream at 140°F (60°C) or higher for minimum of five minutes or at 120°F or higher for a minimum of 30 minutes.

3. To prevent contamination, equipment used around any streams and wetlands shall be free of external petroleum-based products. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities. All machinery fueling and maintenance involving petroleum products shall occur at a sufficient distance from stream channels, waterbodies, or wetlands to prevent delivery of potential contaminants. Spill containment equipment and material shall be on site.

Pollution and Erosion Control

1. Alteration or disturbance of the stream bed, banks, and bank vegetation of the stream shall be minimized and limited to that necessary to construct the project.

2. Implement the following pollution and erosion control measures:

a. Project Contact: Identify a project contact (name, phone number, address) that will be responsible for implementing pollution and erosion control measures.

b. List and describe any hazardous material that would be used at the project site, including procedures for inventory, storage, handling, and monitoring; notification procedures; specific clean-up and disposal instructions for different products available on the site; proposed methods for disposal of spilled material; and employee training for spill containment.

c. Temporarily store any waste liquids generated at the staging areas under cover on an impervious surface, such as tarpaulins, until such time they can be properly transported to and treated at an approved facility for treatment of hazardous materials.

d. Procedures based on best management practices to confine, remove, and dispose of construction waste, including every type of debris, discharge water, concrete, cement, grout, washout facility, welding slag, petroleum product, or other hazardous materials generated, used, or stored on-site.

e. Procedures to contain and control a spill of any hazardous material generated, used or stored on-site, including notification of proper authorities. Ensure that materials for emergency erosion and hazardous materials control are onsite (e.g., silt fence, straw bales, oil-absorbing floating boom whenever surface water is present).

f. Best management practices to confine vegetation and soil disturbance to the minimum area, and minimum length of time, as necessary to complete the action, and otherwise prevent or minimize erosion associated with the action area.

g. Place sediment barriers prior to construction around sites where significant levels of erosion may enter the stream directly or through road ditches. Temporary erosion controls will be in place before any significant alteration of the project site and will be removed once the site has been stabilized following construction activities.

h. No uncured concrete or form materials will be allowed to enter the active stream channel.

i. Steps to cease work under high flows, except for efforts to avoid or minimize resource damage.

Invasive Species Control All materials and equipment used in or near any waterbodies shall be free of aquatic invasive species and noxious weeds. Materials and equipment used at a project site at which aquatic invasive species are already established shall be decontaminated so that no viable aquatic invasive species are transported from the job site.

Stockpile materials Minimize clearing and grubbing activities when preparing staging, project, and or stockpile areas. Any large wood, topsoil, and native channel material displaced by construction will be stockpiled for use during site restoration.

Temporary access roads For this project, only existing roadways will be used. Construction of new permanent roads is not permitted.

Timely completion Minimize time in which heavy equipment is in stream channels, riparian areas, and wetlands. Complete earthwork (including drilling, excavation, dredging, filling and compacting) as quickly as possible.

During excavation, stockpile native streambed materials above the bankfull elevation, where it cannot reenter the stream, for later use.

Site Restoration Initiate rehabilitation – Upon project completion, rehabilitate all disturbed areas in a manner that results in similar or better than pre-work conditions through removal of project related waste, spreading of stockpiled materials (soil, large wood, trees, etc.), seeding, and mulching. *Note: The USFS will provide the native grass seed mix for all seeding activities.

Decompact soils – Decompact soil by scarifying the soil surface of travel paths, stream crossings, staging, and stockpile areas, as directed by USFS representative.

Other A copy of the Memorandum of Understanding between the Washington Department of Fish and Wildlife and the U.S. Forest Service-Region 6 (January 2012) shall be available on site at all times.

Wildlife Timing Restrictions Project activities that produce noise above ambient levels (100 db) will not occur from April 1 to July 15 in or adjacent to units 4, 8, 9, 19 and 20, to limit disturbance to possible nesting marbled murrelets.

Also, activities that produce noise about the ambient levels will only occur between the hours beginning two hours after sunrise and two hours before sunset from July 16 to September 05 Applies to all action alternatives.

H.5 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor

H.6 DEFINITIONS AND ABBREVIATIONS

Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:

Building Limits - A line 5 feet outside foundations of the structure.

Calendar Day - Every day shown on the calendar, Sundays and holidays included.

Change Order - A written order issued by the Contracting Officer, to the Contractor documenting modifications within the scope of the contract.

Contract Amendment - A bilateral written supplemental agreement between the Government and the Contractor.

Contract Time - The number of calendar days allowed by the contract for the completion of the work.

Contracting Officer's Representative (COR) - The duly authorized representative of the Contracting Officer, responsible for on-site administration of the contract within the limits of specific written delegation of authority.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

Forest Supervisor - The person, or designated representative, responsible for administration of a National Forest.

Inspector - The Government authorized representative designated in writing by the COR responsible for detailed inspections of contract performance, within delegation of authority.

Materials - Any substances specified for use in the construction of the project and its appurtenances.

Notice of Non-Compliance - Written notice issued detailing specific area(s) of Non-Compliance with contract requirements.

Original Contract Quantities - Those quantities shown in the Schedule of Items.

Right-of-way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.

Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.

Specifications - A general term applied to all written directions and requirements pertaining to performance of the work.

Utility Services - Services such as electricity, gas, steam, water and sewerage.

Working Day - Every day shown on the calendar, except Saturdays, Sundays, and Federal or local holidays.

Work Order - A written instruction directing the Contractor to fulfill contract requirements.

Reference to a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.

––-–––– ACRONYMS –––––––

AA Aluminum Association AASHTO American Association of State Highway and Transportation Officials ACI American Concrete Institute ADA Americans With Disabilities Act AGC Associated General Contractors AI Asphalt Institute AISC American Institute of Steel Construction AISI American Iron and Steel Institute AITC American Institute of Timber Construction ALSC American Lumber Standards Committee ANSI American National Standards Institute APA American Plywood Association API American Petroleum Institute ARTBA American Road and Transportation Builders Association ASHRAE American Society of Heating, Refrigerating & Air Conditioning Engineers ASME American Society of Mechanical Engineers ASTM American Society for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .