Attachment_4_Contract_Decom_worklist.xls

XLS spreadsheet 309 KB Posted

Attached to
CFLR Roads Decommission
Solicitation number
AG-05GG-S-15-0001
Issued by

About this file

Attachment 4

View the file

Other files

File Type Posted
CFLR_Roads_Decommission_RFP_Updated_SF_1442.pdf PDF
Attachment_7_fire_clauses_r6-fs-6300-52.doc DOC document
CFLR_Roads_Decommission_RFP.pdf PDF
Attachment_8_fire_clauses_r6-fs-6300-53.rtf RTF text file
Attachment_6_General_Decision_WA150001_1.23.2015.txt TXT text file
Attachment_5_1611_improve_worklist.xls XLS spreadsheet
Attachment_1_CFLR_Decom_Specification_List.xlsx XLSX spreadsheet
Attachment_2_Specifications.docx DOCX document
Attachment_9_experience_questionaire.doc DOC document
Attachment_3_CFLR_Roads_DWG.pdf PDF
pre-sol_map_16Oct2014.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1500135

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
15001351.16 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
61+40 - 12+67BOP Seed and mulch62501 625072.81Acres
61+40 - 45+04Roadway Obliteration, Method 221106B1636Feet
49+68 (0.941)Remove 18" x 48' Length CMP20301A1Each3' - 5' @ CL
45+04 - 43+56Roadway Obliteration, Method 121106A147Feet
44+35 (0.840)Remove 18" x 52' Length CMP20301A1Each3' - 5' @ CL
43+56 - 38+65Roadway Obliteration, Method 221106B491Feet
38+65 - 37+06Roadway Obliteration, Method 121106A158Feet
37+75 (0.715)Remove 24" x 48' Length CMP
Dewater20301A
157551
1Each
Each3' - 5' @ CL
37+06 - 22+33Roadway Obliteration, Method 221106B1473Feet
34+21 (0.648)Remove 18" x 38' Length CMP20301A1Each3' - 5' @ CL
24+60 (0.466)Remove 18" x 40' Length CMP20301A1Each3' - 5' @ CL
22+33 - 20+01Roadway Obliteration, Method 121106A232Feet
20+85 (0.395)Remove 36" x 90' Length CMP
Dewater20301D
157551
1Each
Each600 CY
20+01 - 12+67Roadway Obliteration, Method 221106B734Feet
8+97Jct. 1500139

Retain road to EOP

5+82Jct. 1500136
0+00EOP

1500139

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
15001390.68 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
36+00 - 0+00BOP Seed and mulch62501 625071.23Acres
36+00 - 0+00Roadway Obliteration, Method 221106B3600Feet
31+52 (0.597)Remove 18" x 36' Length CMP20301A1Each3' CL
30+09 (0.57)Remove 18" x 32' Length CMP20301B1Each4' CL
28+67 (0.543)Remove 18" x 34' Length CMP20301B1Each4' CL
27+88 (0.524)Remove 18" x 34' Length CMP20301B1Each5' CL
18+35Dispersed Campground
(Decom Method 3 100' x 50' Area)21106C250Feet
6+44 (0.122)Remove 18" x 30' Length CMP20301A1Each2' CL
4+75 (0.09)Remove 18" x 36' Length CMP20301A1Each3' CL
3+17 (0.06)Remove 18" x 28' Length CMP20301A1Each1' CL
0+58Construct Closure Berm650041Each
0+00Jct. 1500135 EOP

1502119-605

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
15021190.93 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
49+32 - 15+84BOP Seed and mulch62501 625071.15Acres
49+32 - 46+99Roadway Obliteration, Method 221106B232Feet
46+99 - 42+77Roadway Obliteration, Method 321106C422Feet
44+29 (0.839)Jct. with Spur 605
42+77 - 38+54Roadway Obliteration, Method 221106B423Feet
38+54 - 29+04Roadway Obliteration, Method 321106C950Feet
20+28Retain Road to EOP
33+4824" CMP (Retain)
49+32Jct. with 1502

EOP

Legal DescriptionRoad NumberLength
15026050.15
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
7+92BOP
7+92 - 0+00Roadway Obliteration, Method 321106C792Feet
7+92 - 0+00BOP Seed and mulch62501 625070.27Acres
0+00Jct FSR 1502119 - EOP

1600219

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16002190.71 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
37+49 - 0+00BOP at Landing Seed and mulch62501 625071.29Acres
37+49 - 1+25Scarcification303070.69 (3624')Mile
37+49 - 1+25Construct Water Bar @200' intervals2115118Each
18+84 (0.35)Jct. 1603655
15+84 (0.30)Remove 18" x 40' Length CMP20301B1Each4' Inlet

10' Outlet 11+05 (0.21) Remove 18" x 40' Length CMP 20301A 1 Each 3' Inlet 5' Outlet 5+80 (0.11) Remove 18" x 50' Length CMP 20301B 1 Each 7' Inlet 10' Outlet

1+25 - 0+00Decom Method 121106A1
125Feet
0+00Remove CMP
Recondition Ditchline along 1600 rd jct20301A
303040.01 (50')Each
Mile3' Inlet

3' Outlet

1600283

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16002830.23 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
12+20 - 0+00BOP Seed and mulch62501 625070.42Acres
12+20 - 9+40Roadway Obliteration, Method 321106C280Feet
11+60Construct Water Bar211511Each
11+00Construct Water Bar211511Each
10+25Construct Water Bar211511Each
9+50Construct Water Bar211511Each
9+40 - 6+95Roadway Obliteration, Method 121106A245Feet
6+95Construct Water Bar211511Each
6+95 - 5+35Roadway Obliteration, Method 321106C160Feet
6+20Spur Right
6+00Re-Construct Draw204201Each2' Inlet

4' Outlet

5+35 - 1+40Roadway Obliteration, Method 221106B395Feet
2+00Remove 18" x 40' Length CMP20301B1Each5' Inlet

10' Outlet

1+40 - 0+10Roadway Obliteration, Method 321106C130Feet
0+00Construct Closure Ber650041Each

1600283 Spur

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
1600283 Spur0.1 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
5+00 - 0+00BOP Seed and mulch62501 625070.17Acres
5+00 - 3+25Roadway Obliteration, Method 221106B175Feet
3+25 - 0+00Roadway Obliteration, Method 321106C325Feet
1+40Construct Water Bar211511Each
0+00EOP

Jct. 1600283

1601234

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16012341.26
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
66+53BOP - jct w/1601233
66+53Construct Closure Berm650041Each
66+53 - 0+00Scarify - 6" depth303071.26Mile
66+53 - 0+00Waterbar @ 500' interals2115114Each
66+53 - 0+00Seed and Mulch62501 625072.30acre
0+00Construct Closure Berm650041Each
0+00EOP - Jct. 1601233

1603255

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16032550.6 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
0+00BOP
31+68 - 0+00Scafication 6" depth303070.6Mile
31+68 - 0+00Seed and Mulch62501 625071.45acre
31+68Construct Water Bar211511Each
27+46Construct Water Bar211511Each
26+40Construct Water Bar211511Each
23+76Construct Water Bar211511Each
22+70Construct Water Bar211511Each
22+18Construct Water Bar211511Each
51+12Jct. 1603266
15+84Re-Construct Draw204201Each
13+52Re-Construct Draw204201Each
10+56Re-Construct Draw204201Each
5+28Re-Construct Draw204201Each
0+00Jct. 1603245

Construct Closure Berm EOP 65004 1 Each

1603262

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16032620.74 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
39+25 - 0+00BOP Seed and Mulch62501 625071.80acre
39+25 - 36+00Roadway Obliteration, Method 321106C325Feet
38+00Construct Water Bar211511Each
36+90Construct Water Bar211511Each
36+00Construct Water Bar211511Each
36+00 - 29+30Roadway Obliteration, Method 221106B670Feet
29+30 - 26+75Roadway Obliteration, Method 321106C255Feet
26+75 - 12+10Roadway Obeliteration, Method 221106B1465Feet
25+90Re-Construct Draw204201Each
21+20Re-Construct Draw204201Each
14+65Jct. Spur 2
12+10 - 8+77Roadway Obliteration, Method 321106C333Feet
11+30Construct Water Bar211511Each
9+85Construct Water Bar211511Each
8+77Jct. Spur 1 Construct Water Bar211511Each
8+77-5+81Roadway Obliteration, Method 221106B296Feet
5+81-3+42Roadway Obliteration, Method 321106C239Feet
3+42-0+00Roadway Obliteration, Method 121106A342Feet
5+18Construct Water Bar211511Each
3+42Construct Water Bar211511Each
0+00Jct. 1603250

EOP

1603262 Spurs

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
1603262 Spur 10.06 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
3+20- 0+00BOP Seed and mulch62501 625070.11acre
3+20 - 0+00Roadway Obliteration, Method 221106B320Feet
0+00Jct. 1603262

EOP

Legal DescriptionRoad NumberLength
1603262 Spur 20.15 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
7+75 - 0+00BOP Seed and mulch62501 625070.27acre
7+75 - 0+00Roadway Obliteration, Method 221106B775Feet
0+00Jct. 1603262

1603610

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036100.44 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
408023+30 - 3+20BOP
Roadway Obliteration, Method 221106B2010Feet
23+30 - 0+00Seed and Mulch62501 625070.80acre
3850.0021+00Re-Construct Draw204201Each
3520.0016+10Re-Construct Draw204201Each
3200.0014+70Re-Construct Draw204201Each
3170.0080++Re-Construct Draw204201Each
3070.007+75Spur Lt
2375.003+20 - 1+35Roadway Obliteration, Method 321106C185Feet
2140.001+35 - 0+25No Work
2020.000+25Re-Construct Closure Berm after complete work650041Each
1885.000+00EOP - Jct with 1603254
Legal DescriptionRoad NumberLength
1603610 Spur 10.12 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
0+00 - 4+85BOP - jct with 1603610
Roadway Obliteration, Method 221106B485Feet
0+00 - 6+00Seed and Mulch62501 625070.21acre
2+80Re-Construct Draw204201Each
4+85 - 6+00Roadway Obliteration, Method 121106A115Feet
6+00EOP - jct with 1603254

1603635

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036350.62
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
32+80 - 0+10BOP Seed and mulch62501 625071.13Acres
32+80 - 24+80Roadway Obliteration, Method 321106C800Feet
26+90Jct. 1603639
24+80 - 14+80Roadway Obliteration, Method 221106B1000Feet
20+75Jct. 1603637
14+80 - 9+10Roadway Obliteration, Method 321106C570Feet
14+75Construct Water Bar211511Each
11+50Construct Water Bar211511Each
9+10 - 0+40Roadway Obliteration, Method 221106B870Feet
6+75Re-Construct Draw204201Each
4+50Construct Water Bar211511Each
2+30Construct Berm on Spur-right side650041Each
0+10Construct Closure Berm650041Each
0+00EOP

1603637

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036370.45 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
23+85 - 0+00BOP Seed and mulch62501 625070.82Acres
23+85 - 4+30Roadway Obliteration, Method 2
Use slash pile at the edge of the landing at BOP as cover over decommissioned road21106B1955Feet
4+30 - 3+10Roadway Obliteration, Method 321106C120Feet
3+10 - 0+00Roadway Obliteration, Method 221106B310Feet
2+70Re-Construct Draw204201Each
0+00EOP - Jct with 1603635

1603639

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036390.32
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
17+00 - 0+00BOP Seed and mulch62501 625070.58Acres
17+00 - 0+00Roadway Obliteration, Method 221106B1700Feet
9+80Re-Construct Draw204201Each
0+00Jct. 1603635

1603645

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036450.47 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
24+50 - 0+00BOP Seed and mulch62501 625070.84Acres
24+50 - 23+50Roadway Obliteration, Method 121106A100Feet
23+50 - 11+50Roadway Obliteration, Method 221106B1200Feet
13+70Construct Water Bar211511Each
12+32Remove 24" x 35' Length CMP20301A1Each1'
11+50 - 9+20Roadway Obliteration, Method 321106C230Feet
9+20 - 2+70Roadway Obliteration, Method 221106B650Feet
6+40Re-construct Draw204201Each
3+00Re-construct Draw204201Each
2+70 - 1+50Roadway Obliteration, Method 121106A120Feet
1+50 - 0+10Roadway Obliteration, Method 221106B140Feet
0+90Roadway Obliteration, Method 3 for 30' on spur to 250 Rd21106C30Feet
0+00Construct Closure Berm
EOP650041Each

1603655

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16036550.39
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
20+30 - 0+00BOP - Jct 1600219 Seed and mulch62501 625070.71Acres
19+90Reshape ditch and cut bank along 1603219303040.01 (50')Mile
19+90 - 2+75Roadway Obliteration, Method 221106B1715Feet
19+85Construct Closure Berm650041Each
18+50Construct Waterbar211511Each
9+70Construct Waterbar211511Each
2+75 - 1+50Roadway Obliteration, Method 321106C125Feet
2+70Construct Water Bar211511Each
1+80Spur- Roadway Obliteration, Method 3 for 100 ft21106C100Feet
1+50 - 0+00Roadway Obliteration, Method 121106A150Feet
0+00EOP - Jct with 1603250

1611236

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLengthPage 1 of 2
16112362.3 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
123+00BOP
123+00 - 11+65Seed & Mulch62501 625075Acres
123+00 - 100+20Roadway Obliteration, Method 221106B2280Feet
121+80Re-Construct Draw204201Eachinlet=1' outet=3'
121+80Dewater site157551Each
110+90Remove 18" x 40' CMP20301A1Eachinlet=1' outet=3'
100+20 - 11+90Roadway Obliteration, Method 121106A8830Feet
98+00Remove 18" x 30' CMP w/20' Downspout - remove downspout ~50' downslope incidental to pipe removal20301A1Eachinlet=1' outet=4'
93+80Remove 18" x 30' CMP w/10' Downspout20301A1Eachinlet=1' outet=4'
90+70Remove 18" x 30' CMP w/10' Downspout20301A1Eachinlet=1' outet=4'
86+70Remove 18" x 30' CMP w/20' Downspout20301A1Eachinlet=1' outet=4'
82+20Remove 18" x ~60' CMP (can't find outlet)20301B1Eachinlet=6' outet=~20'
82+20Re-Construct Draw204201Eachinlet=6' outet=~20'
77+80Remove 18" x 30' CMP w/20' Downspout20301A1Eachinlet=1' outet=5'
74+10Remove 18" x 30' CMP w/5' Downspout20301A1Eachinlet=1' outet=3'
70+15Remove 18" x 50' CMP w/20' Downspout20301B1Eachinlet=5' outet=7'
70+15Re-Construct Draw204201Eachinlet=5' outet=7'
66+50Remove 18" x 40' CMP w/ Downspout20301A1Eachinlet=1' outet=5'
63+50Remove 18" x 40' CMP w/ Downspout Remove detached Downspout ~ 30' downslope - incidental to pipe removal20301A1Eachinlet=1' outet=5'
57+65Remove 18" x ~60' CMP (can't find outlet)20301B1Eachinlet=4' outet=~20'
WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLengthPage 2 of 2
1611236 (Decommission)2.3 Miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
51+00Remove 18" x 30' CMP20301A1Eachinlet=1' outet=5'
46+50Remove 18" x 40' CMP w/ Downspout Remove detached Downspout ~ 10' downslope - incidental to pipe removal20301A1Eachinlet=1' outet=5'
46+50Dewater site157551Each
41+10Remove 18" x ~60' CMP (can't find outlet)20301B1Eachinlet=8' outet=~20'
41+10Re-Construct Draw204201Eachinlet=8' outet=~20'
41+10Dewater site157551Each
35+50Remove 18" x 40' CMP w/ Downspout20301A1Eachinlet=1' outet=5'
30+80Remove 18" x 30' CMP20301A1Eachinlet=1' outet=5'
30+80Re-Construct Draw204201Eachinlet=2' outet=~7'
28+20Remove 18" x 40' CMP w/ Downspout20301A1Eachinlet=1' outet=4'
24+00Remove 18" x 60' CMP20301B1Eachinlet=3' outet=15'
19+50Remove 18" x 40' CMP w/ Downspout Remove detached Downspout ~ 20' downslope20301A1Eachinlet=1' outet=4'
15+82Remove 18" x 30' CMP w/ Downspout20301A1Eachinlet=1' outet=4'
11+90End Method 1
11+65Remove 24" x 60' CMP20301B1Eachinlet=7' outet=10'
11+65Re-Construct Draw204201Eachinlet=7' outet=10'
11+65Dewater site157551Each
11+50Construct Closure Berm650041Each
11+00 - 2+20Re-construct Ditch30304880Feet
0+00Jct with FSR 1611 - EOP

1613266

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLengthPage 1 of 2
16132661.7 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
89+76 - 0+00BOP, Rock Pit Seed & Mulch62501 625073Acres
89+76 - 31+68Roadway Obliteration, Method 221106B5808Feet
89+76Remove 18" x 35' Length CMP20301B1Each4' Inlet

10' Outlet 84+48 Remove 18" x 30' Length CMP 20301A 1 Each 3' Inlet 6' Outlet 79+20 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet 76+56 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet 73+92 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet 63+36 Remove 24" x 45' Length CMP 20301B 1 Each 1' Inlet 7' Outlet 60+72 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 6' Outlet 58+08 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 2' Outlet 55+44 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 4' Outlet 52+80 Remove 18" x 30' Length CMP 20301A 1 Each 1' Up 4' Down 50+16 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 4' Outlet 44+88 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet 42+24 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet 36+96 Remove 18" x 30' Length CMP 20301A 1 Each 1' Inlet 3' Outlet

31+68 - 26+40Roadway Obliteration, Method 121106A528Feet
26+40Jct. 1613233
Construct Closure Berm on South side of 16132661Each
26+40 - 15+84Roadway Obliteration, Method 321106C1056Feet
15+84 - 3+70Roadway Obliteration, Method 221106B1215Feet
15+84Jct. Spur 2
WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLengthPage 2 of 2
1613266 (Decommission)1.7 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
10+56Remove 24" x 45' Length CMP20301A1Each1" Inlet

5' Outlet

10+03Jct Spur 1
3+70 - 0+00Roadway Obliteration, Method 121106A370Feet
0+00Jct. 1613

1613266 Spurs

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
1613266 Spur 10.05 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
2+50 - 0+00BOP
Roadway Obliteration, Method 121106A250Feet
2+50 - 0+00Seed & Mulch62501 625070.08Acres
0+00Jct. 1613266 - EOP
Legal DescriptionRoad NumberLength
1613266 Spur 20.87 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
45+80 - 0+00BOP, Jct 1613233 Seed & Mulch62501 625071.58Acres
45+80Construct Closure Berm650041Each
45+80 - 0+00Roadway Obliteration, Method 221106B4580Feet
6+12Spur left
1+00Spur left same road a previous
0+00EOP

Jct. 1613266

Legal DescriptionRoad NumberLength
1613266 Spur 2 Spur 10.4 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
20+87BOP, Jct. 1613266 Spur 2
20+87 - 0+00Seed & Mulch62501 625070.72Acres
20+87 - 18+25Roadway Obliteration, Method 321106C262Feet
18+25 - 15+60Roadway Obliteration, Method 221106B265Feet
15+60 - 12+75Roadway Obliteration, Method 321106C285Feet
12+75 - 0+00Roadway Obliteration, Method 221106B1275Feet
0+00EOP

Jct 1613266 and 1613266 Spur 2

1613613

WORK DESCRIPTION LIST
Legal DescriptionRoad NumberLength
16136134.1 miles
LOCATION (MP)DESCRIPTIONPAY ITEMESTIMATED QUANTITYUnitEst Fill Ht.
0+00 - 215+10BOP - Jct. 1613270 Seed and mulch62501 625077.4Acres
0+00 - 1+50Roadway Obliteration, Method 221106B150Feet
1+50 - 4+00Roadway Obliteration, Method 321106C300Feet
4+00 - 215+10Roadway Obliteration, Method 221106B21110Feet
44+35Remove 15" x 50' Length CMP20301A1Each1' Inlet

4' Outlet 76+15 Remove 15" x 30' Length CMP 20301A 1 Each 1' Inlet 6' Outlet 86+65 Remove 15" x 30' Length CMP 20301B 1 Each 1' Inlet 2' Outlet 113+40 Remove 24" x 40' Length CMP 20301A 1 Each 1' Inlet 6' Outlet

136+15Re-Construct Draw204201Each
140+00Re-Construct Draw204201Each
143+60Remove 24" x 40' Length CMP20301A1Each1' Inlet

3' Outlet

149+20Re-Construct Draw204201Each
153+20Re-Construct Draw204201Each
158+35Re-Construct Draw204201Each
166+60Re-Construct Draw204201Each
203+50Re-Construct Draw204201Each
214+80Re-Construct Draw204201Each
215+10Construct Ditchline for 50 feet along 1613303040.01 (50')Mile
215+10EOP - Jct with 1613