Crab Lake WRP Fencing Project Q A.docx
DOCX document 13 KB Posted
- Attached to
- Crab Lake WRP Fencing Project
- Solicitation number
- AG-0546-S-10-0002
About this file
Pre-Bid Conference/Site Visit Questions Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Crab Lake Fencing Amend 001 Pkg.pdf | ||
| Crab Lake Fencing Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CRAB LAKE WRP FENCING PROJECT
SOLICITATION AG-0546-S-10-0002
PRE-BID CONFERENCE/SITE VISIT
July 14, 2010
QUESTIONS & ANSWERS
1. QUESTION: How many feet of fence will need to be removed?
RESPONSE: In Section 1 there is approximately 5856 feet of existing fencing to be removed and disposed of properly and in Section 3 there is approximately 2322 feet of existing fencing to be removed and disposed of properly. Section 2 Fence Rehab includes replacing posts and installing any double H braces, gates, and wildlife crossings as shown in drawings and specifications.
2. QUESTION: Are there any fire hazards?
RESPONSE: Site is what it is –no additional requirements other than usual/normal precautionary measures to be used when driving vehicles/equipment in areas where there is a potential fire hazard.
3. QUESTION: What is the fencing intended to keep out?
RESPONSE: Livestock.
4. QUESTION: Do the “T” posts need to be galvanized?
RESPONSE: No, “T” posts do not need to be galvanized, only the steel posts.
5. QUESTION: Does this project area border private property?
RESPONSE: All work will be performed on private property. The Government has a wetland easement in perpetuity with access for project area.
6. QUESTION: Where/how are the excess materials to be disposed of?
RESPONSE: Disposal of excess materials shall be offsite and will be the responsibility of the contractor in accordance with local laws and regulations.
7. QUESTION: Will there be full machine access to the fence line?
RESPONSE: Yes, may drive the distance along the fence line wherever possible (rock outcroppings may prevent this).
8. QUESTION: Do the post footings need to be removed too?
RESPONSE: Yes
9. QUESTION: At the mudsill, should the wire be on the same side as the wetland easement or opposite?
RESPONSE: All wire is to be on opposite side of posts as the easement as stated in specifications.
10. QUESTION: Can we change the length of the metal “T” posts from 8’ to 6’?
RESPONSE: No, all posts must be 8 feet in length.
11. QUESTION: How is the horizontal brace pipe attached to the post and what is the OD of this post?
RESPONSE: The horizontal brace pipe shall be attached to steel posts either by welding or bolting. All materials/components shall be galvanized. The OD of the post is 2 3/8” Std. steel per drawings.
12. QUESTION: What are the specs of the solar charger?
RESPONSE: Solar charger shall be 12 volt and have the capacity to operate 15 miles of fence. The battery shall operate for a minimum of 10 days without sun.
13. QUESTION: Are CCA treated posts acceptable?
RESPONSE: CCA treatment is acceptable for wood posts in permanent ground contact areas.
14. QUESTION: What are the bonding requirements on this project?
RESPONSE: No bonding is required for this project.