Specifications.pdf
PDF 1 MB Posted
- Attached to
- Grants Pass Interagency Fire Center Water System Improvements Federal contract opportunity
- Solicitation number
- AG-04N7-S-17-0014
About this file
Specifications-AG-04N7-S-17-0014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Return_Documents.doc | DOC document | |
| Solicitation_AG-04N7-S-17-0014.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USFS Grants Pass Interagency Fire Center (GPIFC) Water System Improvements
Technical Specifications
Table of Contents
011250 - Measurement and Payment 011900 – Mobilization 013300 – Submittal Procedures 015000 - Contractor Facilities and Temporary Controls 017000 - Project Closeout 021000 - Site Preparation 022000 - Earthwork 025000 - Paving and Surfacing 027000 - Site Piping
013300 - 1
USDA FOREST SERVICE
GOLD BEACH RANGER STATION WATER SYSTEM IMPROVEMENTS
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 – GENERAL
SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop
Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification sections within this package for additional requirements on submittals.
SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
013300 - 2
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract
Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless
CO Officer observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
PART 2 – PRODUCTS
ACTION SUBMITTALS – (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification
Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
013300 - 3
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification
Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100
"Quality Control."
B. Contractor's Construction Schedule: The contractor shall submit a Construction
Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
013300 - 4
C. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
D. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
E. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures."
F. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
PART 3 – EXECUTION
GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.
013300 - 5
Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTAL SCHEDULE – Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive – additional submittals may be required by specific specifications:
TABLE 013000-1
Spec. Section Section Title Subsection Required Submittal 01700 Project Closeout 1.04 (1) Final Inspection Reports 01700 Project Closeout 1.04 (2) Warrantees and Guaranties 01700 Project Closeout 1.04 (3) Certificate of Compliance and Request for
Final Inspection 01700 Project Closeout 1.04 (4) Final Red Lined Drawings 02200 Earthwork 2.01 Bedding and Backfill Certification 02200 Earthwork 2.03 Material Source, Gradation and Properties 02200 Earthwork 3.02 (4) Erosion Control Plan 02500 Paving and
Surfacing
2.01 Material Source, Gradation and Properties
02500 Paving and Surfacing
2.02 Asphalt Mix Design, Material Source, Gradation and Properties
02500 Paving and Surfacing
2.03 Aggregate Base – Source, Gradation, Material Properties
02700 Site Piping 1.02 Shop Drawings for all Required Pipe and Appurtenances in Part 2 - Products
02700 Site Piping 3.05(1) Bacteria Test Results
END OF SECTION 013300
, if needed.
021000-1
GRANTS PASS INTERAGENCY FIRE CENTER WATER SYSTEM IMPROVEMENTS
SECTION 021000 - SITE PREPARATION
PART 1 - GENERAL
1.01 DESCRIPTION
A. This section includes labor, materials, equipment and provisions for clearing, grubbing, demolition and disposal of all objectionable material and related work necessary to prepare the site for trench construction. This includes but is not limited to old water system valves, appurtenances, above ground piping and hose bibs.
1.02 COORDINATION
A. The CONTRACTOR shall coordinate his operations with the GOVERNMENT and utilities likely to be impacted by his construction. A partial listing of agencies and utilities follows:
1. One Call System: Phone 1-800-332-2344
2. Grants Pass Airport: Phone (541) 955-4535; Contact - Larry Graves
3. Pacific Power (888) 221-7070
B. The CONTRACTOR shall be responsible for coordinating his activities with affected utilities and property owners and other adjacent contractors. No additional costs are allowed for delays resulting from a lack of such coordination by the
CONTRACTOR.
1.03 PROPERTY PROTECTION
A. All structures, utilities, and properties, whether inside or outside the project limits, shall be protected from damage or interruption by the CONTRACTOR'S activities.
Responsibility for safety and protection of buildings near or in the project limits are the CONTRACTOR'S. The CONTRACTOR shall repair or replace damaged structures, utilities, and/or properties to the satisfaction of the GOVERNMENT.
B. The location of underground utilities; power, telephone, cable, gas, etc., if shown on the Design Drawings are approximate. The actual locations may vary from those shown. The CONTRACTOR is responsible for verifying all utility locations. No extra costs are allowed for delays resulting from utility conflicts for which the CONTRACTOR is responsible. On questions regarding the disposition of existing utilities, improvements or buildings, the CONTRACTOR shall contact the CONTRACTING OFFICER for advisement.
PART 2 - PRODUCTS - NOT USED
021000-2
PART 3 - EXECUTION
3.01 CLEARING AND GRUBBING
A. Portions of the project site where excavation is to be made shall be cleared of all objectionable material such as trees, brush, stumps and roots, grass and other vegetation, decayed vegetable matter, topsoil, rubbish, pavement, and other materials that may interfere with the proper execution of the work.
B. No vegetation or debris shall be covered or filled or be a part of any structural embankment.
3.02 DEMOLITION
A. Demolition will be as shown on the Drawings.
B. Any pavement to be removed will be saw cut in straight clean lines. Any sidewalks and curbs shall be removed to the nearest contraction joint or clean saw cut line.
C. Existing water lines shall be abandoned in place after the new water main has been constructed, tested and accepted by the CONTRACTING OFFICER. Abandoned pipe ends are to be plugged with concrete (typ.) or sealed with an MJ cap. This work shall be incidental to water line installation. Abandoned valves, shall be closed and valve boxes removed. Existing service lines shall have corporation stops closed and ends plugged with concrete. All valves, hydrants or any other salvaged appurtenances from the existing water system shall be given by the CONTRACTOR to the GOVERNMENT unless otherwise directed.
D. Site restoration shall include topsoil, seeding and mulching all disturbed areas as required to restore them to existing condition. All disturbed structures shall be reinstalled and/or replaced to match existing condition, including but not limited to asphalted surfaces, paved or concrete walkways and driveways, graveled and/or landscaped surfaces, fencing, and any other structures encountered during the performance of the work.
3.03 DISPOSAL OF WASTE MATERIAL
Demolished and waste material shall be disposed of by the CONTRACTOR in accordance with all federal, state, and local regulations.
END OF SECTION 021000
022000 - 1
GRANTS PASS INTERAGENCY FIRE CENTER WATER SYSTEM IMPROVEMENTS
SECTION 022000 - EARTHWORK
PART 1 - GENERAL
1.01 DESCRIPTION
This section includes all labor, materials, equipment and methods to be used to perform all excavation, foundation preparation and compaction as shown on the Drawings and as specified herein.
PART 2 - PRODUCTS
2.01 BEDDING AND PIPE ZONE MATERIAL
The pipe bedding and pipe zone material shall be crushed rock, 3/4 or 1 inch minus in size or compacted granular Class A 1 inch minus backfill, uniformly graded from coarse to fine.
The materials shall predominate in the fine sizes and shall present no isolated points which would cause fracture or damage to the pipe. All materials shall be subject to the CONTRACTING OFFICER’s approval.
2.02 NATIVE BACKFILL
Native backfill shall be native material which is free of organic materials, non-plastic (no clay), reasonably evenly graded and capable of being compacted with 100% of the material passing a 1" screen.
2.03 CRUSHED ROCK BACKFILL (NON-TRENCH)
All backfill shall be crushed rock with a maximum size of 1-1/2", uniformly graded from coarse to fine. All materials shall be subject to the CONTRACTING OFFICER’s approval.
PART 3 - EXECUTION
3.01 GENERAL
A. The CONTRACTOR shall perform all excavation of every description and of whatever materials encountered to the depth indicated on the Drawings or as specified below.
B. The CONTRACTOR shall make proper allowance for the pipe thickness, pipe bedding and, if required, foundation stabilization.
3.02 PREPARATION
022000 - 2
A. As specified in Section 02100, Site Preparation, clearing and grubbing shall be completed and existing pavement shall be removed prior to excavating soils.
B. Erosion Control
1. The CONTRACTOR is responsible for developing and maintaining an erosion control plan to prevent the transport of soil off-site via wind or rain for the duration of the project. The erosion control measures shall remain in place until all vegetation is established.
2. Best Management Practices shall be utilized to control runoff at the site and to protect existing and proposed storm drain facilities. These methods include but are not limited to: hay bales, bio bags, silt fences, berms, stockpile covers, gravel construction entrances, etc. Erosion control measures shall be in conformance with local, state, and federal regulations.
3. Temporary erosion control measures shall be provided until the placement of permanent features and/or the establishment of grass. The temporary erosion control measures shall include ground cover or other acceptable means of all disturbed areas caused by the CONTRACTOR’S activities. Temporary erosion control measures shall be in conformance with local, state, and federal regulations.
4. An erosion control plan shall be submitted by the Contractor prior to commencing work as set forth in Section 013300.
3.03 COMMON EXCAVATION
A. Excavations shall be classified as either common or rock excavation.
B. Common excavation is defined as the removal of all material which is not classified as rock excavation.
C. The limits of excavation shall be kept to a minimum.
D. The CONTRACTOR shall take necessary precautions to prevent damage to adjacent structures or utilities.
E. Sheeting and shoring may be necessary or may be required by regulatory authorities in accordance with safety laws.
F. CONTRACTOR shall also make provisions to prevent soil or water intrusion into the pipelines prior to completion of installation.
3.04 PIPE TRENCHES
022000 - 3
A. It is the intent of these specifications that the excavation and/or trench width at the surface of the ground be kept to a minimum necessary to install the pipe in a safe manner. In all cases, excavations or trenches must be of sufficient width to allow for shoring, if required, and permit proper joining of the pipe and backfilling of material along the sides of the pipe. The CONTRACTOR shall exercise special care when construction is adjacent to existing structures to avoid damage.
B. The length of the trench excavated shall always be kept to a minimum. The CONTRACTING OFFICER shall be the sole judge of the amount of open trench allowed based upon work conditions of the area. In normal cases, the open trench length shall not exceed 200 feet.
C. The CONTRACTOR shall excavate the trench to the lines and grades shown or as established by the CONTRACTING OFFICER, with proper allowance for the pipe thickness, pipe bedding and foundation stabilization as required. The subgrade upon which the bedding is to be placed shall be firm, undisturbed and true to grade. If the trench is over-excavated, the CONTRACTOR shall restore it to grade with pipe bedding material and compact material as specified for bedding, all at no expense to the
GOVERNMENT.
3.05 DEWATERING
A. Removal and disposal of storm water from the excavation shall be the responsibility of the CONTRACTOR as approved by the CONTRACTING OFFICER. Such approval shall not imply any liability of the CONTRACTING OFFICER or GOVERNMENT for damage or extra costs incurred by the CONTRACTOR in handling or disposing of storm or runoff surface water.
B. Groundwater
1. Contractor shall perform dewatering as needed to complete the construction. Costs for dewatering activities shall be considered incidental to the contract.
2. Water generated from dewatering activities shall be properly disposed of in accordance with the requirements of the Contract Documents, herein, and local, state, and federal regulations.
3.06 HANDLING EXCAVATED MATERIAL
Excavated material not required for backfilling shall be promptly removed and disposed of by the CONTRACTOR in accordance with governing regulations.
3.07 PIPE BEDDING AND ZONE MATERIAL
A. Pipe bedding consists of leveling the bottom of the trench or the top of the foundation material and placing bedding material to the horizontal centerline of the pipe. Bedding material shall be as specified hereinbefore and as shown on the plan and placed in at
022000 - 4 least two lifts. Place the first lift to provide the minimum depth of bedding material as shown in the Contract Drawings before the pipe is installed. The CONTRACTOR shall spread the bedding smoothly to proper grade so that the pipe is uniformly supported along the barrel and excavate bell holes at each joint to permit proper assembly and inspection of the entire joint. Bedding under the pipe shall provide a firm, unyielding support along the entire pipe length. Particular attention must be given to the area from the flow line to the horizontal centerline of the pipe to insure that firm support is obtained to prevent any lateral movement of the pipe during the final backfilling of the pipe zone. Pipe bedding shall be placed the full width of the trench and shall be a minimum of 6 inches in compacted depth below the pipe.
B. The CONTRACTOR shall place the specified pipe zone material carefully around the pipe. The CONTRACTOR shall prevent pipe from movement either horizontally or vertically during placement and compaction of pipe zone material. The pipe zone material shall be a minimum of 12 inches in compacted depth above the pipe.
3.08 BACKFILLING
A. The CONTRACTOR shall take reasonable precautions to prevent any native backfill material from becoming saturated beyond the critical moisture limits.
B. Take all necessary precautions to protect the structure or pipe from any damage, movement or shifting. Take special care when compacting materials adjacent to existing structures to avoid damage.
C. Trench backfill shall be select material in all areas under sidewalks and AC surfacing or in areas identified for structural fill.
D. All excavations and trenches shall be backfilled in maximum 12 - 18 inch lifts to the densities described below.
1. Native backfill material shall be compacted to a minimum 90% of maximum density as determined by AASHTO T-180. Backfill shall terminate below finish grade to allow for placement of top soil.
2. Select backfill material shall be compacted to a minimum 95% of maximum density as determined by AASHTO T-180. Backfill shall terminate below finish grade to allow for placement of AC or concrete.
END OF SECTION 022000
025000 - 1
GRANTS PASS INTERAGENCY FIRE CENTER WATER SYSTEM IMPROVEMENTS
SECTION 025000 - PAVING AND SURFACING
PART 1 - GENERAL
1.01 DESCRIPTION
This Section covers the work and materials for all surface restoration including asphaltic concrete surfaces where shown on the Drawings and as necessary to replace existing surfaces disturbed by construction activities.
1.02 QUALITY ASSURANCE
Work provided under this section shall conform to the latest edition of the American Public Works Association (APWA)/Oregon Department of Transportation (ODOT) Oregon Standard Specifications for Construction.
PART 2 - PRODUCTS
2.01 BASE COURSE MATERIAL
Base course material shall be 25 mm - 0 (1" minus). Base course material shall conform to the requirements of APWA/ODOT Standard Specifications.
2.02 ASPHALT CONCRETE
Asphalt Concrete for waterline trench repairs shall be 12.5 mm (½") dense mix complying with the requirements of APWA/ODOT Standard Specifications, with a level 2 mix design and PG 70 - 22 Binder.
2.03 CRUSHED ROCK SURFACING
Crushed Rock for surface restoration shall be 1" minus complying with ODOT/APWA standards.
PART 3 - EXECUTION
3.01 ASPHALT CONCRETE PAVEMENT
A. Preparation and placement shall comply with the APWA/ODOT Standard Specifications.
B. Trench repair and overlay shall be machine laid, as practicable, by experienced workman on a compacted crushed rock base or tack coated existing surfaces to receive an overlay. Special care shall be taken to avoid segregation of materials and to maintain specified grades, thickness and smoothness.
025000 - 2
C. If the alternative horizontal directional drilling pipe installation bid is accepted, AC restoration of the bore pit may be placed with a pull box as opposed to machine laid.
D. All valve boxes, manhole frames, catch basin gratings and other utility appurtenances located within paved areas shall be set or raised to finish grade, unless otherwise noted. All appurtenances shall be tack coated prior to paving.
E. The final surface shall be smooth, true to grade, free draining and free of all defects.
F. Repairs to cut or damaged asphaltic concrete surfaces shall be repaired as follows:
1. All AC joints shall be saw cut, tack coated and sealed and sanded upon completion.
2. Unless directed otherwise by the CONTRACTING OFFICER, the new pavement shall have the same plan dimensions and grade as the pavement that existed prior to construction.
3. Overlays and patches shall conform to adjacent existing pavement and provide a smooth, continuous surface.
3.02 CRUSHED ROCK SURFACING
A. On all traveled surfaces impacted by construction that are not paved, the contractor shall backfill the trenches and all disturbed areas to be flush with the surrounding road surface as part of the pipe and trench backfill pay items.
B. Upon completion of all pipe work, additional crushed rock surfacing may be required ONLY AS DIRECTED BY THE CONTRACTING OFFICER to restore access driveways and road surfaces outside of the immediate construction areas as needed.
END OF SECTION 025000
027000 - 1
GRANTS PASS INTERAGENCY FIRE CENTER WATER SYSTEM IMPROVEMENTS
SECTION 027000 - SITE PIPING
PART 1 - GENERAL
1.01 DESCRIPTION
A. This section includes purchase, storage, installation and testing of all water lines and fittings normally used for water distribution systems in conformance with the 2015 ODOT/APWA Standard Specifications for Construction unless otherwise noted herein.
B. All water work construction shall also comply with the requirements of Oregon
Administrative Rules, Chapter 333, Division 61, “Public Water System” latest edition.
C. All waterline construction shall comply with the Oregon Chapter of the American
Water Works Association (AWWA) Standard Specifications.
D. Waterline vertical and horizontal deflections as shown on the construction plans shall not exceed the manufacturer’s recommendations. The waterline cover shall be 36-inches but not less than 30-inches and no more than 60-inches where constraints are encountered unless approved otherwise by the ENGINEER or the GOVERNMENT.
Variations from these cover limits will be considered incidental work at no cost to the
GOVERNMENT.
1.02 SUBMITTALS
Submit shop drawings in accordance with Section 013300, Submittal Procedures, for all items specified in Part 2 herein.
1.03 QUALITY ASSURANCE
Work within this section shall conform to the latest edition of the American Public Works Association (APWA) Standard Specifications for Public Works Construction unless otherwise noted herein. All products shall be NSF/ANSI-61 compliant.
PART 2 - PRODUCTS
2.01 PIPE MATERIALS
A. Polyvinyl Chloride (PVC) Pipe 4" through 12" shall comply with ASTM-D 1784, AWWA C-900 Pressure Class 235 DR 18 with elastomeric gasket seal meeting the requirements of ASTM F477. Joints shall be AWWA Standard C-111 latest revision;
end conditions as shown on the Drawings.
027000 - 2
B. Polyvinyl Chloride (PVC) Pipe for waterline pipe less than 4 inches in diameter shall be Schedule 80, color black.
C. Ductile Iron (DI) Pipe shall be minimum Class 350, ANSI/AWWA Standard C151, latest revision, cement-lined and bitumastic-coated meeting the requirement of AWWA C104. Joints shall be rubber gasketed either push on or mechanical joint per AWWA Standard
C 111 latest revision; end conditions as shown on the Drawings.
D. Water service pipe shall be crossed linked polyethylene (PEX-a) and shall comply with AWWA 904, ASTM F876, F877, F2023, CSA B137.5 and NSF 14 and 61 Standards. IPEX BLUE 904 or equal. Minimum pressure rating 160 psi at 73 degrees. Stainless steel liners shall be used with all compression fittings.
2.02 PIPE VALVES AND FITTINGS
A. All fittings shall be of comparable pressure rating and construction as the main pipeline material and must be approved by National Sanitation Foundation (NSF) or equivalent.
B. Fittings for Polyvinyl Chloride (PVC) pipe 4 through 12-inches shall be ductile iron fittings meeting the requirements of AWWA C110 or AWWA C153, and shall have a minimum working pressure rating of 250 psi. Joints shall meet the requirements of AWWA C111. Fittings shall be cement mortar lined and seal coated, meeting the requirements of AWWA C104. Fittings shall have elastomeric gasketed (rubber ring) joints with end conditions as specified on the construction Drawings.
C. Valves 8" and smaller shall be resilient seat or resilient wedge gate valves conforming to AWWA C500 or AWWA C509, cast iron, epoxy-coated per AWWA C550, NRS, rated for 200 psi working pressure for pipe 2 inches to 10 inches in diameter. Valves must be approved by National Sanitation Foundation (NSF) or equivalent. Valves shall have cast iron body with ductile iron disc, epoxy coated per AWWA C-550, or approved equal. Valve Manufactures shall be Mueller, American Flow Control or Equal.
D. Compression couplings shall be ductile iron fusion bonded epoxy, with rubber rings and high strength low alloy steel bolts and nuts conforming to AWWA C219, Smith Blair model 441, or equal. 2" and smaller shall be PVC.
E. Red brass fittings shall have threaded fittings of comparable material and strength as the main pipeline.
F. Grooved end joints are acceptable alternatives to that specified or shown on the plans upon approval of the CONTRACTING OFFICER. Grooves shall conform to AWWA C606.
027000 - 3
G. Galvanized fittings shall have threaded fittings of comparable material and strength as the main pipeline.
2.03 PIPELINE MATERIAL DESIGNATIONS
Pipelines shall be constructed with the materials designated on the Drawings.
2.04 THRUST RESTRAINT
A. All pressure rated pipelines (including pressure rated pipe used in a gravity application) shall have thrust restraint systems capable of restraining a minimum of one and one half times the maximum line pressure, including all joints and fittings, with a minimum rating of 150 psi.
B. On all pressure rated pipelines, thrust restraint shall be by mechanical thrust restraint devices or stainless steel tie rods where shown. Mechanical thrust restraint systems shall consist of flanged joints or mechanical thrust restraint devices placed at fitting and pipe joints as necessary to accommodate twice the maximum line pressure, with a minimum of 150 psi. Mechanical thrust restraint devices shall be MJ Gripper Gland, Megalug, or approved equal.
Gasket joint restraint systems for use with AWWA C111 joints is an acceptable alternative to mechanical thrust restraint devices. Gasket joint restraint systems shall meet the material requirements of AWWA C111, have a 250 psi working pressure, and be constructed with stainless steel components. Gasket joint restraint systems shall be Fast-Grip as manufactured by American Ductile Iron Pipe, Field Lock 350 as manufactured by US Pipe, or equal.
Minimum required mechanical restrained length shall be as shown in the following table:
MINIMUM REQUIRED RESTRAINED LENGTH (FEET)
Test Pressure 150 psi, min 30" cover Pipe Size
Sand/Silt Sand/Clay
11-1/4 22-1/2 45 90 Valve/Plug 11-1/4 22-1/2 45 90 Valve/Plug
4 3 6 14 33 74 3 5 11 24 54
6 5 9 18 45 103 3 8 15 35 75
8 6 12 24 59 135 4 9 18 45 99
10 8 14 29 69 160 6 11 23 54 120
12 8 17 33 81 189 6 12 26 63 114
14 10 23 45 110 260 8 16 35 86 155
16 14 30 59 144 336 10 21 46 112 203
027000 - 4
C. Thrust blocks shall only be provided where shown on the drawings. Thrust blocks shall be minimum 3,000 psi concrete. Thrust blocking shall be poured against undisturbed earth in accordance with the following tables:
THRUST PER 150PSI TEST PRESSURE, LBS.
Pipe Size 11-1/4o 22-1/2o 45o 90o Valve/Tee/Plug
4 370 740 1,450 2,670 1,900
6 1,060 2,110 4,140 7,640 5,400
8 1,480 2,950 5,770 10,700 7,600
10 2,310 4,600 9,020 16,700 11,800
12 3,330 6,620 13,000 24,000 17,000
14 4,530 9,010 17,700 32,700 23,100
16 5,920 11,800 23,100 42,700 30,200
TYPICAL SOIL BEARING VALUES, LBS/SF
SAND 1,000 lbs/sf
SAND and GRAVEL 1,500 lbs/sf
SAND and GRAVEL with CLAY 2,000 lbs/sf
D. Full sized Hydrants shall be secured to the mainline valves with stainless steel tie rods and star bolts. Two 3/4" 304 SS all tread shall be installed on each hydrant.
2.05 MISCELLANEOUS APPURTENANCES
A. Valve boxes shall be three-piece, adjustable length, slip extension, 5-1/4 inches diameter, cast iron. All buried valves shall be supplied with valve boxes.
B. Saddles, corp stops, curb stops, sample cocks and meter fittings shall be all brass, Ford, Mueller or equal.
C. Meter boxes shall be polyethelene material, minimum 10" x 20", 12" deep, by Armorcast, model A6000486 with P6000483RCI traffic rated lids, or equal.
D. All non-metallic pipelines, including service lines, shall have a 12 gauge, insulated copper clad steel toning wire placed in the trench and connected to all pipeline appurtenances for future location. Continuity testing must be completed by the contractor to demonstrate the toning wire is intact, prior to approval of final payment and release of retainage.
E. All 1" frostproof lever operated yard hydrants shall be Merrill C-1000 Series Yard hydrant or Equal.
027000 - 5
PART 3 - EXECUTION
3.01 INSTALLATION
A. All material shall be installed in accordance with these specification and the APWA
Standard Specifications.
B. All material shall be handled with care to avoid damage. Whether moved by hand, skid, or hoists, material shall not be dropped, bumped, or allowed to impact. The CONTRACTOR shall provide safe storage for material until it has been incorporated into the completed project. The interior of all pipe, couplings, rings, fittings, and other accessories shall be kept free from dirt and other foreign matter at all times.
Valves and hydrants shall be drained and stored in a manner that will protect them from damage by freezing.
C. All pipelines shall be laid to and maintained at lines and grades required by the plans.
Fittings, valves and air vents shall be installed at the required locations with joints centered, spigots home, and valve stems plumb and straight.
D. Pipes, fittings and mechanical restraint systems shall be installed in accordance with manufacturer's recommendations unless otherwise specified. Valves, fittings, plugs, and caps shall be set and joined to the pipe supported in such a manner as to prevent stress on the valve, fitting or pipe.
E. All casing pipes installed for service crossings shall be perpendicular to the mainline from the meter box location. Casing pipes shall have a 1" concrete grout or expanding foam plug in the annular space at each end following service line installation.
F. Valve boxes and vaults shall be installed so as not to transmit shock or stress to the valve with the box cover flush with the surface of the finished area or such other level as may be specified. The valve operating nut shall be readily accessible for operation through the opening in the box or vault. Valve stem extensions shall be provided wherever the depth of the operator is over 48".
G. All fittings, valves etc., where thrust is developed, shall have thrust restraint to prevent movement. Mechanical restraint systems shall be installed in accordance with manufacturer’s recommendations. Concrete thrust blocks shall be poured against undisturbed earth and shall have a bearing area as described above in Part 2.
H. The Contractor shall be responsible to repair damage to any utility crossing encountered.
I. Where connections are made to existing pipe or work is in close proximity to existing pipe CONTRACTOR shall verify location of existing pipe prior to work. Conflicts shall be brought to the attention of the CONTRACTING OFFICER.
027000 - 6
J. All pipeline shall be flushed to run clear prior to testing.
3.02 TESTING
A. Hydrostatic Pressure Test
1. All waterlines shall be hydrostatically tested at a minimum pressure of 150 psi.
When hydrants are in the test section, the test shall be made against the hydrant with the isolation valve open. All visible leaks at the hydrants are to be repaired regardless of the amount of leakage.
2. Hydrostatic testing for DI or PVC pipe shall shall conform to the requirements of
AWWA C-600 and 2008 APWA Standard Specifications for Construction. Test pressure shall be held for a minimum of two (2) hours with the maximum leakage defined by the following equation:
L = SD(P)
133,200 Where: L = allowable leakage in gallons per hour
S = length of pipe in test section D = diameter in inches of section being tested P = average test pressure in psi
3. Hydrostatic testing shall conform to the requirements of ASTM F 2164 standards.
A pressure of 10 psi over the designated test pressure shall be established and maintained with the additional water, for a minimum of 4 hours prior to the actual leakage test. After four hours pressure shall be reduced by 10 psi to the target test pressure of 150 psi, and monitored for a minimum of one hour. If test pressure remains within 5% of target test pressure, leakage test shall be acceptable. The maximum leakage defined by the following equation:
P(T) = 2 x HDS x F (t) x H (t)
(DR-1)
Where: P(T) = allowable leak test pressure, psi, for leak test time T = leak test time, hours HDS = PE material hydrostatic design stress for water at 73F, psi F(t) = PE material temperature reduction factor H(t) = leak test duration factor for leak test time, T DR = pipe dimension ratio
4. All pressure testing shall be completed before making any physical connection to the mainline. CONTRACTOR shall be responsible to determine methods of isolating the test section and ultimate connection to the mains, and to provide any temporary or permanent fittings required except as shown on the plans, without additional cost to the GOVERNMENT.
027000 - 7
5. The CONTRACTOR shall pay for all testing costs. Sections not passing the above leakage criteria shall be repaired and retested at the CONTRACTOR’S expense.
6. The CONTRACTING OFFICER shall witness all testing in this section.
3.03 DISINFECTION & CLEANING
1. All potable water lines, including the mainline and new service lines, shall be disinfected prior to completion and placing on-line. Disinfection shall be in conformance with AWWA C-651-C654 Standards. The CONTRACTOR shall notify the CONTRACTING OFFICER to complete bacteriological testing prior to final acceptance. The CONTRACTOR shall make provisions as required to pressure test and sample the lines, including installation of additional taps if required, and pay all costs related to disinfection.
2. Upon completion, the system shall be thoroughly flushed with fresh water, and retested to verify the disinfectant chlorine level has been reduced to potable drinking water concentrations in all mainline and service line pipes.
END OF SECTION 027000