Amendment_1.pdf
PDF 3 MB Posted
- Attached to
- Toketee Campground Well Installation
- Solicitation number
- AG-04N7-S-13-0055
About this file
Amendment 1 - to add direction for disposal of Drilling Cuttings. The due date for this proposal is extended to September 18 2013 4 30 PST
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SolicitationPackageRFQWell_Install.pdf | ||
| ReturnPacket.docx | DOCX document | |
| Attachments.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Amendment 1 09/16/2013
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Rogue River-Siskiyou National Forest 3040 Biddle Road Medford, OR 97504 Phone: (541) 618-2021
Same as block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-04N7-S-13-0055
9B. DATED (SEE ITEM 11)
8/23/2013
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning -1 - copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Toketee Campground Well Installation, Umpqua National Forest
Solicitation is amended to add direction for disposal of Drill Cuttings – see addendum to specification 02520 – Wells and map.
The due date for proposals is extended. Proposals are DUE September 18, 2013 at 4:30pm PST
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Linda Harmon 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
/s/ Linda C. Harmon 9/16/2013 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Evaluation of Lamprey Habitat Umpqua National Forest, Diamond Lake Ranger District
Amendment #1
Addendum to Specification 02520 – Wells
Disposal of Drill Cuttings Drill cuttings must be removed from drilling site and may be deposited at Slide Creek Quarry (see attached map). Location of disposal area within quarry to be determined on the ground by COR. Alternately, contractor may dispose of cuttings off National Forest Land.
Location of Slide Creek Quarry From Toketee Campground follow Road 34 to Road 3402, take 3402-200 spur to Slide Creek Quarry.
NOTE: No additional line item for Schedule B – Schedule of items (pricing) include in 02520-2 - Drilling to Accommodate Casing 6” inch (0-100 feet).
mkbernard Oval
File details come from the government source that posted it. Updated .