Text version

REQUEST FOR QUOTATION

PAGE OF PAGES

(THIS IS NOT AN ORDER)
THIS RFQ
X
IS
|_|
IS NOT A SMALL BUSINESS SET- ASIDE
1
1. REQUEST NO.
2. DATE ISSUED
3. REQUISITION/PURCHASE REQUEST NO.
4. CERT. FOR NAT.DEF.
RATING
AG-04N7-S-13-0025
May 22, 2013
Req # 640033

AAP # 06SO151356811

UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY
6. DELIVER BY (Date)

USDA Forest Service Rogue River-Siskiyou National Forest 3040 Biddle Road Medford, OR 97504-4119 See Schedule

5b. FOR INFORMATION CALL (NO COLLECT CALLS)
7. DELIVERY
|_|
FOB DESTINATION
NAME
TELEPHONE NUMBER
X
OTHER (See Schedule)
AREA CODE
NUMBER
9. DESTINATION

Eileen Northrop – Contracting Kayli Barber - Umpqua Engineering 618-2017 957-3206

a. NAME OF CONSIGNEE

8. TO:
a. NAME
b. COMPANY
b. STREET ADDRESS
c. STREET ADDRESS
c. CITY
d. CITY
e. STATE
f. ZIP CODE
d. STATE
e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS @ 4:30 p.m.
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the

June 18, 2013 This is not a public opening.

submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(a)
(b)
(c)
(d)
(e)
(f)
WOLF CREEK JOB CORPS LIGHTING UPGRADE

WOLF CREEK JOB CORPS

UMPQUA NATIONAL FOREST

DOUGLAS COUNTY, OREGON

SEE SECTION B – SCHEDULE OF ITEMS
Price Range: Between $100,000 and $250,000
a. 10 CALENDAR DAYS (%)
b. 20 CALENDAR DAYS (%)
c. 30 CALENDAR DAYS (%)
d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT

NUMBER
PERCENTAGE
NOTE: Additional provisions and representations
x
are
|_|
are not attached.
13. NAME AND ADDRESS OF QUOTER
14. SIGNATURE OF PERSON AUTHORIZED TO
15. DATE OF
a. NAME OF QUOTER
SIGN QUOTATION
QUOTATION
b. STREET ADDRESS
16. SIGNER
a. NAME (Type or print)
b. TELEPHONE

c. COUNTY

AREA CODE

d. CITY
e. STATE
f. ZIP CODE
c. TITLE (Type or Print)
NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121
STANDARD FORM 18 (Rev. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AG-04N7-S-13-0025

Umpqua National Forest WCJC Lighting Upgrade Requisition # 640033

TABLE OF CONTENTS

PAGE
Request for Quotation – Standard Form 181
Table of Contents2
Schedule of Items3
Notes to Contractor4
Section C – Description/Specification/Work Statement5-6
Section D – Packaging and Marking7
Section E – Inspection and Acceptance8-10
Section F – Deliveries and Performance11
Section G – Contract Administration Data12
Section H – Special Contract Requirements13-17
Section I – Contract Clauses18-25
Section J – List of Attachments26
Project Specifications27-52

Project Drawings – 16 pages – attached separately

Department of Labor Wage Determination53-60
Technical Questionnaire61-62
Section K – Representations, Certifications and Other Statements of Offerors63-65
Section L – Instructions, Conditions, and Notices to Offerors66-69
Section M – Evaluation Factors for Award70

PART I – THE SCHEDULE

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

BASE ITEM

ITEM NO.
SUPPLIES/SERVICES
UNIT
ESTIMATED QTY
UNIT PRICE
AMOUNT

012000

Mobilization

LS

ALL

1633LL
Perform Work for Building No. 1633 Gym Lower Level
LS
ALL
1633UL
Perform Work for Building No. 1633 Gym Upper Level
LS
ALL
$
$
2101
Perform Work for Building No. 2101 Voc/Warehouse
LS
ALL
$
$
2102
Perform Work for Building No. 2102 Voc Shops
LS
ALL
$
$
2111
Perform Work for Building No. 2111 Dispensary
LS
ALL
$
$
Total Base Items
$

Option Items

1630
Perform Work for Building No. 1630 Theatre
LS
ALL
S
$
1821
Perform Work for Building No. 1821 Sewer Treatment
LS
ALL
$
$
Total Option Items
$
Grand Total [Base Items + Option Items]
$

B-2 NOTE:

Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Item 1 Mobilization.

If Offeror does not intend to charge for an item, a price of "0" or "NO COST" should be shown. If the price is left blank or shown as "No Bid," the entire offer may be considered Non-Responsive.

SECTION A-2 - SCHEDULE OF ITEMS

NOTE: Quoters are urged to inspect work site before submitting quote.

DUNS NUMBER: ______________________________________________________________

TAX IDENTIFICATION NUMBER (TIN): ________________________________________

EMAIL ADDRESS: ____________________________________________________________

NOTES:

1) The Schedule of Items has two Option Items. The Option Items may be exercised separately or together. The Government intends to evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. However, evaluation of options will not obligate the Government to exercise either of the options (See M-3). The Government may exercise the option(s) by written notice to the Contractor within 30 calendar days after contract award. Performance time remains the same whether Option Item(s) are exercised or not.

2) A bid bond is not required for this solicitation. A payment bond (100%) is required within 10 days after contract award. Contractor shall submit either a payment bond or Irrevocable Letter of Credit (ILC) as acceptable payment protections.

3) Offerors MUST register in the Central Contractor Registration (CCR) data base – See FAR 52.204-7 and Online Representations and Certifications Applications (ORCA) – See FAR clause 52.204-8. These are now consolidated at the following site: https://www.sam.gov/portal/public/SAM/

4) Veteran Information: Contractors must register with VETS-100 for contracts awarded in excess of $100,000. Contractors and subcontractors who have received an award of $100,000 or more must use form VETS-100A, Federal Contractor Veterans’ Employment Report, to submit the required reports (see https://webapps.dol.gov/vets100). See also FAR 52.222-37 Employment Reports on Veterans (Incorporated by reference in Section I).

5) ELECTRONIC OFFERS WILL NOT BE ACCEPTED. An offer that is emailed to government account will be rejected.

6) Facsimile quotes will be accepted. See Section L for Fax Number.

7) This is not a public bid opening. All offers submitted are considered confidential. The name of the contractor and the amount of the contract will be disclosed only after an award has been made.

8) COMPLETE AND RETURN THE FOLLOWING DOCUMENTS TO BE CONSIDERED FOR AWARD: Pages 1, 3, and 4; Pages 61-62 Technical Questionnaire and all of Section K.

SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT

C-1 Description of Work:

This project includes all labor, supervision, materials and equipment, supplies and incidental items necessary for the Lighting Upgrade at Wolf Creek Job Corps. The work includes but is not limited to the following:

· Supply and install energy efficient T8 bulbs, ballasts, fixtures, and occupancy sensors, as shown in the Drawings and described in the Specifications.

· Removal and disposal of fixtures identified in the Drawings

· Remove and recycle T-12 bulbs and old ballasts

· Supply prepaid T-12 Florescent Lamp Recycling Boxes

· Supply prepaid Ballast Recycle Pail

· Work will be done on the following buildings: Theatre (#1630), Gymnasium (#1633), Sewer Treatment (#1821), Vocational Warehouse (#2101), Vocational Shops (#2102), and Dispensary (#2111).

All products supplied for this project must be approved products by the Energy Trust of Oregon (ETO) for the Government to be eligible for Rebates provided by the ETO. See Specifications for specific performance criteria.

See Specification Section 011000 Summary of Work for details of work for each building.

C-2 Project Location:

The Wolf Creek Job Corps Center is located north Glide Oregon. The address is 2010 Opportunity Lane, Glide OR 97443.

C-4 Price Range

The magnitude of the Government's estimate is between $100,000 and $250,000.

C-5 AGAR 452.211-72 Statement of Work/Specification (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C-6 Applicable Specifications

The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

E-2 FAR 52.246-12 INSPECTION OF CONSTRUCTION (Aug 1996)

(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not—

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may—

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

E-3
CONFORMITY WITH PLANS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.

SECTION F--DELIVERIES OR PERFORMANCE

F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

F-2 FAR 52.242-14 Suspension of Work (APR 1984)

F-3 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 calendar days after issuance of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

F-4 AGAR 452.236-75 Maximum Work Week – Construction Schedule (NOV 1996)

Work Hours: Work activity under this contract shall be limited to the hours between 7:30 a.m. and 5:00 p.m., Monday through Friday, excluding Federal Holidays, unless other hours are approved in writing by the CO.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G-2 POST AWARD CONFERENCE (USDA 452.215-76)(FEB 1988)

A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award at a mutually agreed upon location.

G-3 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

‘NONE’

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H-1 FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by USFS.

(b) The elevation of the site is approximately 1,000 feet above mean sea level. Spring and Fall are generally mild but the construction site can experience heavy rain in the Summer and freezing temperatures with ice and snow storms in the Winter.

H-2 Use of Premises

a) See Section 011000 Summary of Work in the Specifications

(b) Fuel storage is not allowed within the project site unless noted elsewhere.

H-3 Utilities

(a) Sewer: Not available

(b) Water: Available in reasonable quantities

(c) Electrical: Available in reasonable quantities

H-4 Hazardous Conditions Safety Plan Certification

The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The Contractor shall certify that his/her Safety Plan conforms to the requirements of OSHA. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropriate actions shall be taken by the Contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazard.

x
Access restricted crawl space

Temporary excavation/deep trenching/slope stability

Tree felling

x
Fall hazard from work heights exceeding six feet

Sharp metal edges

Traffic control on limited visibility roads

Heavy equipment operation

x
Suspended loads
x
Power tool use

Fire hazards

x
Hazardous materials exposure
x
Electrical hazard

Hydraulic and/or pneumatic and/or high pressure hazards

Steep slopes and/or downed logs

x
Insects

H-5 Product Substitution, Shop Drawings and Material Certification

(a) Product Substitution. Any modification of other items, designs, materials, products or equipment (including Government Furnished Property or Government Furnished Material), made necessary because of a substitution, shall be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

(b) Shop Drawings and Submittals. The following submittals shall be submitted for approval within 10 calendar days after Notice to Proceed as required by the clause or specification unless noted elsewhere:

Title
Referenced by Contract clause

or Specification No.

Time of Government Approval After Submittal

Hazardous Conditions Safety Plan, where applicable
Accident Prevention clause

[FAR 52.236-13]

N/A

Proposed Progress Schedule
Schedules For Construction Contracts

[FAR 52.236-15]

N/A

Designation of Representative R6-FS-6300-6
Superintendence By The Contractor

[FAR 52.236-6]

N/A

SF1413 - Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers]
Subcontracts (Labor Standards)

[FAR 52.236-11]

N/A

Payroll Record WH347 Certified Payrolls submitted weekly
Payrolls And Basic Records

[FAR 52.222-8]

N/A

Shop Drawings
As required by Specifications
14 days
Product and Material Certifications and Literature
As required by Specifications
7 days

Government has 10 calendar days to review packet of submittals unless noted elsewhere such as in the specifications.

(c) Certifications. Contractor shall provide Certificate of Compliance (1) from manufacturer or fabricator for materials furnished and (2) as required by contract clause or specifications, for the following:

Brief Title Reference Section

H-6
Payments for Incidental Items

The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with plans, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered indirect to and included in the payment for items shown.

H-7 Local Disposal Sites

Debris encountered in the contract and other waste materials generated in the work (cartons, scrap, etc.) shall be removed and disposed off of National Forest Service Land, and as required in the specifications.

H-8 AGAR 452.228-71 Insurance Coverage (NOV 1996)

Pursuant to FAR clause 52.228-5, Insurance – Work on a government Installation, Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer’s Liability. Contractor is required to comply with applicable Federal and State worker’s compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer’s liability section of the insurance policy, except when contract operations are so commingled with a Contractor’s commercial operations that it would not be practical to require this coverage. Employer’s liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker’s compensation to be written by private carriers.

(b) General Liability. Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.

(c) Automobile Liability. Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

H-9 State Electrical Inspection and County Building Permits

Contractor shall arrange for and provide the State Electrical inspection for electrical wiring work. When requesting the inspection inform the Building Permit Department of the federal limitation described below. Contractor shall not obtain any building permits or inspections other than the State Electrical inspection.

Federal law (validated by the State Attorney General, Oregon Department of Justice) verifies that the Federal Government and its Contractors may be exempted from State/Local Building Permits and Fees for projects located on Federal Installations [including all federal lands]. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime Contractor and all subcontractors.

H-10 Project Site Maintenance and Cleanup

Throughout the construction period, Contractor shall maintain the construction site in a neat, clean and orderly manner. Retain all stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the required protection of materials. Do not allow the accumulation of scrap, debris, waste material, and other items not required for construction of this work. Provide adequate storage for all items, awaiting removal from the job site, observing all requirements for fire prevention and protection of the environment.

H-11 Traffic Control, Barricades, Warning Signs and Other Devices

Contractor shall provide, erect and maintain all necessary barricades, construction area fencing, suitable and sufficient lights, danger signals, signs, flaggers, and other traffic devices, and shall take all necessary precautions for the protection of the work and safety of the public, and government employees working or residing in the project area. Barricades and other obstructions shall be illuminated during the hours of darkness, unless otherwise approved by the COR. Suitable warning signs shall be provided to properly control and direct foot and vehicular traffic. All operations shall conform to the current requirements and guidelines of the Occupational Safety and Health Administration (OSHA) and the Manual of Uniform Traffic Control Devices (MUTCD).

Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of walkways, roads, parking areas or trails by foot or vehicular traffic, and at all intermediate points, where the new work crosses or coincides with an existing transportation and parking areas.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

1-2 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (FEB 2012) (Applicable if over $25,000 unless award is to an individual) 52.209-6 Protecting the Government's Interest when Subcontracting

with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) (Applicable if contract exceeds $30,000)
52.211-18Variation in Estimated Quantity (APR 1984)
52.217-7Option for Increased Quantity-Separately Priced Line Item (MAR 1989)
52.219-6Notice of Total Small Business Set-Aside (DEC 2010)
52.219-28Post-Award Small Business Program Representation (APR 2010)
52.222-3Convict Labor (JUN 2003)
52.222-6Davis-Bacon Act (JUL 2005)
52.222-7Withholding of Funds (FEB 1988)
52.222-8Payrolls and Basic Records (JUN 2010)
52.222-9Apprentices and Trainees (JUL 2005)
52.222-10Compliance with Copeland Act Requirements (FEB 1988)
52.222-11Subcontracts (Labor Standards) (JUL 2005)
52.222-12Contract Termination - Debarment (FEB 1988)
52.222-13Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14Disputes Concerning Labor Standards (FEB 1988)
52.222-15Certification of Eligibility (FEB 1988)
52.222-21Prohibition of Segregated Facilities (Applicable if contract exceeds $10,000)
52.222-26Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000)
52.222-27Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if FAR52.222-26 is included)
52.222-36Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds $15,000)
52.222-35Equal Opportunity for Veterans (SEP 2010)
52.222-37Employment Reports on Veterans (SEP 2010)
52.222-50Combating Trafficking in Persons (FEB 2009)
52.223-5Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an
individual)
52.223-18Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.224-1Privacy Act Notification (APR 1984)
52.225-13Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-4Patent Indemnity -- Construction Contracts (DEC 2007)
52.228-13Alternative Payment Protections (JUL 2000)
52.232-5Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-23Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008)

52.232-33Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003)
52.233-1Disputes (JUL 2002)
52.233-3Protest After Award (AUG 1996)
52.233-4Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2Differing Site Conditions (APR 1984)
52.236-3Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5Material and Workmanship (APR 1984)
52.236-6Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984)

52.236-13Accident Prevention (NOV 1991)
Alternate I (NOV 1991)
52.236-14Availability and Use of Utility Services (APR 1984)
52.236-15Schedules for Construction Contracts (APR 1984)
52.236-17Layout of Work (APR 1984)
52.236-21Specifications and Drawings for Construction (FEB 1997)
52.243-5Changes and Changed Conditions (APR 1984)
52.244-6Subcontracts for Commercial Items (DEC 2010)
52.249-1Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)
52.249-10Default (Fixed-Price Construction) (APR 1984)
52.253-1Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-71Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72Use of Premises (NOV 1996)
452.236-73Archeological or Historic Sites (FEB 1988)
452.236-74Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76Samples and Certificates (FEB 1988)

I-3 FAR 52.204-7 CENTRAL CONTRACTOR REGISTRATION (DEC 2012)

(a) Definitions. As used in this clause— “Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The offeror will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic agreement, basic ordering agreement or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and ZIP Code.

(iv) Company Mailing Address, City, State and ZIP Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https: www.acquisition.gov.

I-4 FAR 52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)

Order of Precedence—Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

I-5 FAR 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS

(SEP 2010)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description
Unit of Measure
Quantity
Price (Dollars)*

Item 1:

Foreign construction material
_______
_______
_______
Domestic construction material
_______
_______
_______
Item 2:
_______
_______
_______
Foreign construction material
_______
_______
_______

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I-6 FAR 52.232-99 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (DEVIATION) (AUG 2012) This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.

(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.

(b) Include the substance of this clause, including this paragraph (b), in all subcontracts with small business concerns.

(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

I-7 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (AGAR 452.20-71) (FEB 2012) (ALTERNATE 1)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

(End of Clause)

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

Title

1. Specification List

2. Project Drawings

Sheet No
Description
1
Title Sheet
2
Legend and Pictures
3
Building No. 1630 Theatre Existing Lighting Layout
4
Building No. 1633 Gym Lower Level Existing Lighting Layout
5
Building No. 1633 Gym Upper Level Existing Lighting Layout
6
Building No. 1821 Sewer Treatment Existing Lighting Layout
7
Building No. 2101 Vocational Shops Existing Lighting Layout
8
Building No. 2102 Vocational Warehouse Existing Lighting Layout
9
Building No. 2111 Dispensary Existing Lighting Layout
10
Building No. 1630 Theatre Proposed Lighting Upgrade
11
Building No. 1633 Gym Lower Level Proposed Lighting Upgrade
12
Building No. 1633 Gym Upper Level Proposed Lighting Upgrade
13
Building No. 1821 Sewer Treatment Proposed Lighting Upgrade
14
Building No. 2101 Vocational Warehouse Proposed Lighting Upgrade
15
Building No. 2102 Vocational Shops Proposed Lighting Upgrade
16
Building No. 2111 Dispensary Proposed Lighting Upgrade

4. DOL Wage Decision No. OR130036 dated 4/12/2013, 5 modifications

5 5. Technical Questionnaire

6. Past and Current Contract Information

SECTION 010250

DEFINITION OF BID ITEMS

AND

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.01 SUMMARY

A.The intent of this section is to explain, in general; what is and what is not included in a
bid item; the limits or cut-off points where one bid item ends and another begins; and
method of measurements and basis of payment for work items listed in the Bid Item
Schedule.

B. Work:

1. Furnishing all labor, materials, equipment, and other incidentals necessary to
successfully complete the project or any portion of it, and carrying out all duties
and obligations imposed by the contract on the Contractor.
2. For each individual item listed here and in the Schedule of Items, payment shall
be full compensation for all work related to the particular item in accordance
with these specifications, as shown on the drawings, and as staked in the field.
3. Measurement and payment for contract work shall be made only for and under
those pay items included in the Schedule of Items. All other work and materials
shall be considered incidental or as included in the payment for items shown.

1.02 UNITS OF MEASUREMENT

A.Payment shall be by units defined and determined according to U.S. Standard measure
and by the following:
B.Lump Sum: Do not measure directly. The bid amount is complete payment for all
work described in the contract and necessary to complete the work for that item.

PART 2 - METHOD OF MEASUREMENT

2.01 GENERAL

A.The following method of measurement for determining final payment is designated on
the Schedule of Items for each pay item:
B.LUMP SUM QUANTITIES (LSQ)
1. These quantities denote one complete unit of work as required by or described in
the contract, including necessary materials, equipment, and labor to complete
the job. They shall be measured complete and in-place.

PART 3 – DEFINITION OF BID ITEMS

3.01 SCHEDULE OF ITEMS

A. The project Schedule of Items includes several sections to organize the bid items into
Base Bid Items and Optional Bid Items. When a pay item is described as a Base Bid
Item, the description will be the same when that item or a similar item is included as
an Optional Bid Item. Contractor shall provide item pricing for all items listed in the
Schedule of Items. Contract award will be made for all Base Bid Items. Those items
listed as Optional Bid Items will be awarded based on available project funding. The
Optional Bid Items are not listed in priority order and may be awarded in any
combination of individual items.

3.02 BASE BID ITEMS

Base Bid Item Numbers: 012000 – Mobilization, 1633LL – Perform Work for Building No. 1633 Gym Lower Level, 1633UL – Perform Work for Building No. 1633 Gym Upper Level, 2101 – Perform Work for Building No. 2101 Voc/Warehouse, 2102 – Perform Work for Building No.

2102 Voc Shops, and 2111 – Perform Work for Building No. 2111 Dispensary

A. Measurement: These items are measured as a lump sum quantity.

B. Payment: The contract lump sum shown in the Schedule of Items shall include all
materials, equipment, labor, incidentals required to perform all operations necessary
for supply and installation of energy efficient T8 bulbs, ballasts, fixtures, and
occupancy sensors, as shown on the Drawings and described in the Specifications.
Removal and disposal of fixtures identified in the Drawings and removal and
recycling of T-12 bulbs and old ballasts are also included in this work.

3.03 OPTIONAL BID ITEMS

Optional Bid Item Numbers: 1630 – Perform Work for Building No. 1630 Theatre and 1821 – Perform Work for Building No. 1821 Sewer Treatment

A. Measurement: These items are measured as a lump sum quantity.

B. Payment: The contract lump sum shown in the Schedule of Items shall include all
materials, equipment, labor, incidentals required to perform all operations necessary

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .