C.Drawings.pdf

PDF 5 MB Posted

Attached to
Redmond Air Center Fire Booster Pump Replacement Federal contract opportunity
Solicitation number
AG-04M3-S-16-0066
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

C. Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Redmond Air Center Fire Booster Pump Replacement, newest first.
File Type Posted
Amendment02.pdf PDF
Amendment01.pdf PDF
D.BiddersPackage.doc DOC document
B.FullSpecPackage.pdf PDF
A.FinalRACFirePumpRFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REDMOND AIR CENTER

FIRE BOOSTER PUMP REPLACEMENT

Case, Lowe and Hart, Inc.

2484 Washington Blvd. Ste 510

Ogden, Utah 84401

DRAWING INDEX

G001 TITLE SHEET

MD101 MECHANICAL DEMOLITION PLAN

FP101 FIRE PUMP DEMOLITION PLAN

FP102 FIRE PUMP PLAN & ELEVATIONS

FP103 FIRE ALARM PLAN

E001 ELECTRICAL LEGEND

E100 ELECTRICAL SITE PLAN

E101 ELECTRICAL PLANS

E501 ELECTRICAL DIAGRAM, DETAILS &

SCHEDULES

Protection Consultants, Inc.

1199 S Main Street #101

Centerville, Utah 84014

FIRE PUMP HOUSE

U. S. Department of Agriculture

FOREST SERVICE

Pacific Northwest Region Six Engineering

DESCHUTES NATIONAL FOREST

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DESCRIPTION

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

MARK

123456789

DATE

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

G001

TITLE SHEET

K.J.L.

J.A.C., J.M.S.

K.J.L.

CONTRACTOR

LAY−DOWN AREA

J

T

REMOVE EXHAUST LINE AND

VENTILATED THIMBLE, FILL w/

BATT INSULATION AND PATCH.

REMOVE FUEL LINE AND VENT,

FILL w/ BATT INSULATION AND

PATCH. INSPECTOR’S TEST

TO REMAIN.

(E) 2" VENT LINE TO REMAIN.

REMOVE (E) LINE , FILL w/ BATT

INSULATION AND PATCH.

REMOVE SERVICE SINK AND WATER LINE.

CAP (E) REMAINING WATER LINE AT TEE.

(E) FOR

(E) FOS

REMOVE (E) FUEL

LINES AND FUEL TANK.

SEE HAZARDOUS

MATERIAL REMOVAL

SPEC.

(E) HOSE BIBB TO

REMAIN FUNCTIONAL.

T

(E) MOTORIZED

LOUVER TO REMAIN.

(E) 3 KW HEATER

TO REMAIN.

(E) FUEL LINES TO

BE REMOVED.

(E) WATER LINE

TO REMAIN.

(E) EXHAUST FAN,

MOTORIZED LOUVER AND

T−STAT TO REMAIN.

NOTE:

PROVIDE PAINTED GALVANIZED

SHEET METAL CAP EMBEDDED IN

SEALANT FOR INTERIOR & EXTERIOR

WALL PATCHES.

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 995

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

MD101

MECHANICAL DEMOLITION

PLAN

KJL

JAC

KJL

MD101.DWG

0 2’ 4’1’ 1/2" = 1’−0"1

MECHANICAL

DEMOLITION PLAN

12/31/15 PLAN CHECK CORRECTIONS1

ANN

FIRE PUMP DEMOLITION PLAN

1/4" = 1’-0"

10 11

21 22

Demolition Plan Fire Pump

FP101

FP101.DWG

PIPING AND PATCH REMAINING HOLE IN EXTERIOR WALL.

(D) 4" FIRE PUMP TEST OUTLET WITH FLANGED CAP. REMOVE

(D) - EXISTING TO BE DEMOLISHED

(E) - EXISTING TO REMAIN

FLANGE ABOVE FLOOR SLAB.

FIRE PUMP SYSTEM IN ITS ENTIRETY BACK TO EXISTING 6"

(E) 6" SUPPLY FROM PUBLIC WATER SYSTEM. DEMOLISH EXISTING

FLANGE ABOVE FLOOR SLAB.

PUMP DISCHARGE PIPING IN FIRE PUMP HOUSE UP TO EXISTING 6"

(E) 6" SUPPLY TO FIRE PROTECTION SYSTEMS. DEMOLISH ALL FIRE

(D) 6" FEBCO 805YD DOUBLE CHECK ASSEMBLY

PUMP SUCTION).

(D) 6" OS&Y VALVE FOR PUMP TEST METER LINE (RETURN TO

(D) VENTURI TYPE FLOW METER

VERTICAL PIPING).

(D) 4" OS&Y VALVE FOR FIRE PUMP TEST HEADER (INSTALLED ON

INCREASING TEE ON DISCHARGE FLANGE.

ECCENTRIC REDUCER ON SUCTION FLANGE AND CONCENTRIC

(D) HORIZONTAL, SPLIT CASE, 500 GPM FIRE PUMP WITH

OTHER ENGINE COMPONENTS/APPURTENANCES.

BATTERIES. COOLING SYSTEM PIPING, EXHAUST SYSTEM AND ALL

(D) DIESEL ENGINE FOR FIRE PUMP. REMOVE ENGINE, STARTER,

FOR MOUNTING NEW FIRE PUMP.

(E) CONCRETE PAD FOR FIRE PUMP (3’-0" X 10’-6" X 13"). RE-USE

BETWEEN PUMP AND CONTROLLER.

(D) FIRE PUMP CONTROLLER. REMOVE ALL SENSING LINES

VERTICAL PIPE)

(D) 6" OS&Y VALVE FOR FIRE PUMP TEST/METER LOOP (ON

(D) 6" DISCHARGE PIPING AND SUPPORTS

HOUSE

(E) 1-1/2" RISER FOR FIRE SPRINKLER SYSTEM PROTECTING PUMP

REMAIN AND MAY BE REUSED FOR NEW PUMP.

BETWEEN PUMP AND CONTROLLER. EXISTING POWER CIRCUIT TO

(D) JOCKEY PUMP CONTROLLER. REMOVE SENSING LINES

DISCHARGE PIPING/VALVES.

(D) JOCKEY PUMP. REMOVE PUMP, SUCTION PIPING/VALVES AND

MOUNTING NEW JOCKEY PUMP.

(E) CONCRETE PAD FOR JOCKEY PUMP (8" X 11" X 5"). RE-USE FOR

(D) 6" FIRE PUMP DISCHARGE CHECK VALVE

(D) 6" FIRE PUMP DISCHARGE OS&Y CONTROL VALVE

(D) 6" FIRE PUMP AIR RELEASE VALVE

SYSTEM SHALL REMAIN).

SUPERVISORY AND WATER FLOW SWITCHES FOR FIRE SPRINKLER

ALARM SYSTEM FOR PUMP HOUSE IN ITS ENTIRETY (VALVE

(D) FIRE ALARM CONTROL PANEL. DEMOLISH EXISTING FIRE

SPRINKLER RISER.

CHECK VALVE AND 1-1/2" PIPING BETWEEN FDC AND FIRE

(E) SINGLE INLET FIRE DEPARTMENT CONNECTION (FDC), 1-1/2"

BACK TO FIRE PUMP SUCTION.

(D) 3" CIRCULATION RELIEF VALVE WITH DISCHARGE PIPING

MD101.

PATCH REMAINING HOLES IN EXTERIOR WALLS. SEE SHEET

FUEL RETURN PIPING AND ALL OTHER PIPING APPURTENANCES.

TANK SUPPORTS, FILL PIPING, VENT PIPING FUEL SUPPLY PIPING,

(D) 100 GALLON DIESEL FUEL STORAGE TANK. REMOVE TANK,

REMAINING HOLE IN EXTERIOR WALL. SEE SHEET MD101.

(D) EXHAUST PIPING AND MUFFLER FOR DIESEL ENGINE. PATCH

BUILDING (SEE SHEET FP103)

PUMP HOUSE TO FIRE ALARM SYSTEM IN ADMINISTRATION

REUSED FOR INTERCONNECITON OF NEW FIRE ALARM SYSTEM IN

BETWEEN FIRE PUMP AND ADMINISTRATION BUILDINGS MAY BE

REMAINING HOLE IN WALL. EXISTING CONDUIT AND WIRING

ANNUNCIATOR AND JUNCTION BOXES. PATCH AND PAINT

LOCATED IN ADMINISTRATION BUILDING. REMOVE

(D) REMOTE ANNUNCIATOR PANEL FOR FIRE PUMP CONTROLLER

0 2’ 4’ 8’

SPOOL PIECE.

DEMOLITION/REPLACEMENT. INSTALL TWO 6" ELBOWS AND 6"

SPRINKLER SYSTEMS DURING FIRE PUMP

AND DISCHARGE PIPING TO MAINTAIN WATER SUPPLY TO FIRE

INSTALL TEMPORARY PIPING CONNECTION (6") BETWEEN SUPPLY

MAY BE RE-USED IF COMPATIBLE WITH NEW BEACON.

DEMOLISHED. REMOVE BEACON AND WIRING. EXISTING MAST

(D) RED BEACON INDICATING FIRE PUMP OPERATION TO BE

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DESCRIPTION

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

MARK DATE

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

xxx

GTJ

BAJ

GTJ

12/31/15

1 12/31/15 PLAN CHECK CORRECTIONS

15072

1/4" = 1’-0"

FIRE PUMP ROOM PLAN

1/4" = 1’-0"

FIRE PUMP SECTION - LOOKING WEST 3

1/4" = 1’-0"

FIRE PUMP DISCHARGE PIPING SECTION - EAST

1/4" = 1’-0"

FIRE PUMP BYPASS SECTION - NORTH

1/4" = 1’-0"

TEST HEADER SECTION - EAST

FIRE PUMP ISOMETRIC

NO SCALE

F P

F P

FP102

F P

07 08

14 15

07 27

20 26

FP102

& Elevations Fire Pump Plan

FP102.DWG

(N) - NEW

(E) - EXISTING TO REMAIN

SLAB.

PIPING/DEVICES STARTING AT EXISTING FLANGE ABOVE FLOOR

(E) 6" SUPPLY FROM PUBLIC WATER SYSTEM. INSTALL NEW

(E) 6" SUPPLY TO FIRE PROTECTION SYSTEMS.

REQUIRED (SEE DETAIL 4).

INSTALL ONE CONTROL VALVE ON VERTICAL PIPING AS

VALVES WITH SUPERVISORY SWITCHES AND ONE CHECK VALVE.

(N) 6" FIRE PUMP BYPASS CONSISTING OF TWO BUTTERFLY

MANUFACTURER.

PRESSURE GAUGES, ETC.) RECOMMENDED BY PUMP

APPURTENANCES (RELIEF VALVES, AIR RELEASE VALVES,

SUCTION AND CONCENTRIC INCREASER ON DISCHARGE) AND

REQUIRED PIPING CONNECTIONS (ECCENTRIC REDUCER ON

TO SUPPLY 100 PSI AT A RATED FLOW OF 750 GPM. PROVIDE ALL

(N) HORIZONTAL, SPLIT CASE FIRE PUMP. PUMP SHALL BE RATED

PUMP SUCTION.

(N) OS&Y CONTROL VALVE WITH SUPERVISORY SWITCH FOR

SUPPLY TO PUMP MOTOR.

MANUFACTURER. SEE ELECTRICAL DRAWINGS FOR POWER

BE PROVIDED AS A UNIT INSTALLED ON COMMON BASE BY PUMP

(N) ELECTRIC MOTOR FOR FIRE PUMP. PUMP AND MOTOR SHALL

BETWEEN FIRE PUMP PIPING AND CONTROLLER PER NFPA 20.

CONCRETE PAD. INSTALL COPPER PRESSURE SENSING LINES

STATE, SOFT START TYPE. SECURE CONTROLLER TO EXISTING

(N) FIRE PUMP CONTROLLER. CONTROLLER SHALL BE SOLID

MANUFACTURER’S RECOMMENDATIONS.

EQUIPMENT TO PAD AND GROUT PER FIRE PUMP

AND CONTROLLER ON EXISTING CONCRETE PAD. ANCHOR

(E) CONCRETE PAD (3’-0" X 10’-6" X 13"). MOUNT FIRE PUMP, MOTOR

(N) FIRE PUMP DISCHARGE CHECK VALVE

PIPING.

(N) 6" UP TO FIRE PUMP METER LOOP AND TEST HEADER SUPPLY

STACKED VERTICALLY.

INSTALL TEST HEADER IN CORNER OF BUILDING WITH VALVES

(N) 6" FIRE PUMP TEST HEADER WITH THREE 2-1/2" HOSE VALVES.

(N) FIRE ALARM CONTROL PANEL. SEE SHEET FP103.

REMAIN. CONNECT TO NEW 6" DISCHARGE PIPING FOR FIRE PUMP.

SPRINKLER SYSTEM. EXISTING FIRE SPRINKLER SYSTEM TO

(E) 1-1/2" FIRE SPRINKLER RISER FOR FIRE PUMP BUILDINGS FIRE

BUILDING FIRE SPRINKLER SYSTEM.

(E) SINGLE INLET FIRE DEPARTMENT CONNECTION FOR FIRE PUMP

CONTROLLER PER NFPA 20.

PRESSURE SENSING LINES BETWEEN FIRE PUMP PIPING AND

ELECTRICAL DRAWINGS FOR POWER SUPPLY. INSTALL COPPER

(N) CONTROLLER FOR PRESSURE MAINTENANCE PUMP. SEE

TO PAD PER MANUFACTURER’S RECOMMENDATIONS.

MAINTENANCE PUMP ON EXISTING CONCRETE PAD. SECURE PUMP

(E) CONCRETE PAD (8" X 11" X 5"). MOUNT NEW PRESSURE

DISCHARGE PIPING TO EXISTING FLANGE.

(E) 6" FLANGE ABOVE FLOOR. CONNECT NEW FIRE PUMP

OR HIGHER.

(N) 6" SUPPLY TO FIRE PUMP TEST HEADER. INSTALL AT 7’-0" AFF

SUCTION SUPPLY.

(N) 1-1/4" CONNECTION FOR PRESSURE MAINTENANCE PUMP

(NORMALLY CLOSED) TO ISOLATE FIRE PUMP TEST HEADER.

(N) 6" BUTTERFLY VALVE WITH SUPERVISORY SWITCH

(N) 6" FIRE PUMP SUCTION PIPING

(N) AIR RELEASE VALVE

(N) 6" FIRE PUMP DISCHARGE PIPING

DISCHARGE.

(N) 1-1/4" CONNECTION FOR PRESSURE MAINTENANCE PUMP

FOR FIRE PUMP DISCHARGE.

(N) 6" BUTTERFLY CONTROL VALVE WITH SUPERVISORY SWITCH

BEACON MAY BE INSTALLED ON EXISTING MAST IF COMPATIBLE.

AND PROGRAM TO OPERATE WHEN FIRE PUMP IS RUNNING.

(N) RED BEACON. CONNECT TO NEW FIRE PUMP CONTROLLER

VERTICAL ORIENTATION. AMES C200-OSY OR EQUAL.

OS&Y VALVES WITH SUPERVISORY SWITCHES. INSTALL IN

(N) 6" DOUBLE CHECK ASSEMBLY WITH PRESSURE GAUGES AND

VALVE ON DISCHARGE SIDE OF PUMP.

PRESSURE GAUGES ON BOTH SIDES OF PUMP. PROVIDE CHECK

CONTROL VALVES (WITH SUPERVISORY SWITCHES) AND

(N) PRESSURE MAINTENANCE PUMP. PROVIDE INDICATING TYPE

RECOMMENDATIONS OF METER MANUFACTURER.

METER. LOCATE METER AND CONTROL VALVES PER

SUPERVISORY SWITCHES (NORMALLY CLOSED) ON BOTH SIDES OF

GAUGE. PROVIDE BUTTERFLY PATTERN CONTROL VALVES WITH

VENTURI TYPE FLOW METER WITH INTEGRATED PRESSURE/FLOW

(N) 6" METER LOOP FOR FIRE PUMP. INSTALL FM APPROVED

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DESCRIPTION

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

MARK DATE

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

xxx

GTJ

BAJ

GTJ

12/31/15

1 12/31/15 PLAN CHECK CORRECTIONS

15072

0 2’ 4’ 8’ 0 2’ 4’ 8’ 0 2’ 4’ 8’

0 2’ 4’ 8’ 0 2’ 4’ 8’

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

D. NFPA 72 2013 EDITION

C. NFPA 70 2015 EDITION

B. INTERNATIONAL FIRE CODE (IFC) - 2012 EDITION

A. INTERNATIONAL BUILDING CODE (IBC) - 2012 EDITION

APPLICABLE CODES AND STANDARDS:

IBC, IFC AND NFPA 72.

SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF

DESIGN AND INSTALLATION OF FIRE ALARM SYSTEM

SIMPLEX FACP IN ADJACENT ADMINISTRATION BUILDING.

FIRE PUMP BUILDING AND CONNECTION TO EXISTING

INSTALLATION OF NEW SIMPLEX FIRE ALARM SYSTEM IN

SCOPE OF WORK: WORK SHALL INCLUDE

WITH THE NEW FIRE ALARM CONTROL PANEL (FACP).

ALL INITIATING DEVICES SHALL BE LISTED COMPATIBLE

APPROVED FOR USE IN FIRE PROTECTION SYSTEMS.

SYSTEM INSTALLATION SHALL BE UL LISTED AND/OR FM

MATERIAL AND DEVICES USED FOR THE FIRE ALARM

QUALITY ASSURANCE: ALL NEW EQUIPMENT,

REQUIREMENTS OF NFPA 72.

CONFORM TO THE CONSTRUCTION DOCUMENTS

INSTALLING ANY EQUIPMENT. SUBMITTALS SHALL

REVIEW/APPROVAL PRIOR TO ORDERING OR

AUTHORITIES HAVING JURISDICTION FOR

PREPARE AND SUBMIT SHOP DRAWINGS TO ALL

SUBMITTALS: FIRE ALARM SYSTEM CONTRACTOR SHALL

OFF-PREMISE MONITORING STATION.

IN ADJACENT ADMINISTRATION BUILDING FOR RELAY TO

NOTIFICATION OF STATUS TO EXISTING SIMPLEX FACP

SYSTEMS. SYSTEM PROVIDES OFF-PREMISE

REQUIREMENTS FOR PROTECTED PREMISE FIRE ALARM

SYSTEM TYPE: FIRE ALARM SYSTEM SHALL MEET THE

EQUIVALENT AS PER NFPA 70 ARTICLE 760.

FPL (FIRE POWER LIMITED) WITH 300V INSULATION OR

ALL WIRING USED IN THE FIRE ALARM SYSTEM SHALL BE

FIRE STOPPED WITH A SUITABLE CAULKING COMPOUND.

PENETRATIONS THROUGH RATED PARTITIONS SHALL BE

INSTALLED IN RIGID, EMT OR FLEXIBLE CONDUIT. ALL

OPENS, SHORTS AND GROUNDS. ALL WIRING SHALL BE

NOTED) SHALL BE NEW. WIRING SHALL BE FREE OF

WIRING/CONDUIT: ALL WIRING (UNLESS OTHERWISE

ALARM CIRCUIT".

PERMANENTLY MARKED AND IDENTIFIED AS "FIRE

MECHANICALLY PROTECTED AND SHALL BE

POWER DISTRIBUTION PANEL. CIRCUIT SHALL BE

DEDICATED BRANCH CIRCUIT (20 AMP) FROM NEARBY

ALARM CONTROL EQUIPEMNT SHALL BE PROVIDED BY A

POWER: PRIMARY POWER SUPPLY TO NEW FIRE

MEET THE REQUIREMENTS FOR CLASS B CIRCUITS.

A CIRCUITS. NOTIFICATION APPLIANCE CIRCUITS SHALL

CIRCUITS SHALL MEET THE REQUIREMENTS FOR CLASS

WIRING STYLES (PER NFPA 72): INITIATING DEVICE

PERSONNEL AND REDMOND FIRE DEPARTMENT.

ENGINEER, US FOREST SERVICE MAINTENANCE

72. TESTING SHALL BE WITNESSED BY PROJECT

PERFORM ALL ACCEPTANCE TESTS REQUIRED BY NFPA

TESTING: CONTRACTOR SHALL SCHEDULE AND

SUPERVISORY SWITCHES

E. FIRE SPRINKLER/PUMP CONTROL VALVE

D. FIRE PUMP CONTROLLER MONITORING

C. FIRE SPRINKLER WATER FLOW SWITCH

ABOVE FIRE ALARM CONTROL EQUIPMENT

B. SMOKE DETECTOR: INSTALL SMOKE DETECTOR

A. MANUAL PULL STATION

INITIATING DEVICES:

1/4" = 1’-0"

FIRE ALARM PLAN

FIRE ALARM RISER SCHEMATIC

NO SCALE

FACP

TF

T T

TT

T

M

M

M

T

T

T

T

T

T

B A T T E R

Y

B A T T E R

Y

DEDICATED CIRCUIT

POWER FROM

120 VAC PRIMARY

F

T

ZONE 1: SMOKE DETECTOR ABOVE FACP

ZONE 2: PULL STATION

(SIMPLEX)

CONTROL PANEL

FIRE ALARM

ZONE 3: WATER FLOW - FIRE SPRINKLERS

T

T

T

T

T

T

T

M

M

M

FP103

Fire Alarm Plan

FP103.DWG

SPRINKLERS

ZONE 4: VALVE SUPERVISION - FIRE

PREVENTER

ZONE 5: VALVE SUPERVISION - BACKFLOW

SUCTION

ZONE 6: VALVE SUPERVISION - PUMP

BYPASS

ZONE 7: VALVE SUPERVISION - PUMP

DISCHARGE

ZONE 8: VALVE SUPERVISION - PUMP

TEST HEADER (NC)

ZONE 9: VALVE SUPERVISION - PUMP

METER LOOP (NC)

ZONE 10: VALVE SUPERVISION - PUMP

PUMP

ZONE 11: VALVE SUPERVISION - JOCKEY

RUNNING

ZONE 12: PUMP CONTROLLER - PUMP

POWER FAIL

ZONE 13: PUMP CONTROLLER - AC

POWER PHASE REVERSAL

ZONE 14: PUMP CONTROLLER - AC

0 2’ 4’ 8’

V

D C

V

D C

ZONE 1

ZONE 2

Z O

N E

Z O

N E

ZONE 5

ZONE 6

Z O

N E

Z O

N E

ZONE 8

ZONE 9

ZONE 10

ZONE 12

ZONE 13

ZONE 14

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DESCRIPTION

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

MARK DATE

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

xxx

GTJ

BAJ

GTJ

12/31/15

1 12/31/15 PLAN CHECK CORRECTIONS

15072

FIRE ALARM KEY NOTES

REQUIRED.

REVISE FACP PROGRAMMING OF EXISTING FACP AS

ADMINISTRATION BUILDING. ADD MODULES AND

SIGNALS) AND TROUBLE SIGNALS TO FACP IN

SUPERVISORY (VALVE SUPERVISION, PUMP

(WATER FLOW, MANUAL PULL, SMOKE DETECTOR),

FIRE ALARM SYSTEM SHALL RELAY FIRE ALARM

IF COMPATIBLE WITH NEW FIRE ALARM SYSTEM.

FUNCTIONAL (NO SHORTS OR GROUND FAULTS) AND

BURIED CONDUIT MAY BE RE-USED IF COMPLETELY

SUPPRESSION PER NFPA 70. EXISTING WIRING IN

BUILDINGS. PROVIDE TRANSIENT VOLTAGE

WIRING IN EXISTING BURIED CONDUIT BETWEEN

ADJACENT ADMINISTRATION BUILDING. INSTALL

PUMP BUILDING TO EXISTING SIMPLEX FACP IN

PROVIDE CIRCUITS TO CONNECT NEW FACP IN FIRE

SIGNALS.

PROVIDE MONITORING OF POINTS AS SUPERVISORY

FAIL, AC POWER PHASE REVERSAL) TO FACP TO

FIRE PUMP CONTROLLER (PUMP RUNNING, AC POWER

PUMP. CONNECT FIRE ALARM INTERFACE POINTS OF

CONTROLLER FOR ELECTRIC MOTOR DRIVEN FIRE

A MINIMUM OF 5 MINUTES OF ALARM POWER.

POWER WITH AN ADIDTIONAL RESERVE TO PROVIDE

BATTERIES TO PROVIDE 24 HOURS OF STANDBY

SUPPLIES PER NFPA 70 AND NFPA 72. SIZE

(24VDC USING TWO 12 VDC BATTERIES) POWER

PROVIDE NEW PRIMARY (120 VAC) AND SECONDARY

LOCATION OF EXISTING FACP TO BE DEMOLISHED.

PANEL (FACP). SURFACE MOUNT ON WALL AT

NEW SIMPLEX, ADDRESSABLE FIRE ALARM CONTROL

RUNNING SIGNAL FROM CONTROLLER).

OPERATE UPON ACTIVATION OF FIRE PUMP (PUMP

POWER AND CONTROL. PROGRAM BEACON TO

CONNECT TO NEW FIRE PUMP CONTROLLER FOR

REPLACE EXISTING ROTATING RED BEACON WITH NEW.

AND INSTALLED ON WEATHERPROOF BACK BOX.

FIRE ALARM HORN/STROBE LISTED FOR EXTERIOR USE

FIRE ALARM GENERAL NOTES

FACP

M

T

F

PER NFPA 72 AND GENERAL NOTES

SECONDARY POWER SUPPLY

NAC #1

NAC #2

FIRE ALARM CONTROL PANEL

SMOKE DETECTOR

FIRE ALARM PULL STATION

FIRE SPRINKLER VALVE SUPERVISORY SWITCH

FIRE SPRINKLER WATER FLOW SWITCH

FIRE ALARM HORN/STROBE ON WEATHER-PROOF BACK BOX

MONITOR MODULE

RED BEACON (EXISTING)

EP

UG

1/2

RM

O.H.

CKT

EPS

FLR

FT

GFCI

GFI

IN

MAX

XFMR

O.C.

A−1,3

A

ACSR

AFF

AIC

APPROX

BC

C

CB

CO

CONC

CT

DTC

(E)

EMCS

FA

GND or GRD

HID

HPF

HPS

IC

I/P

KVA

KWH

LPS

MCC

MDP

MH

MIN

MOV

MV

(N)

NEMA

NIC

O/P

PA

PT

RGC

+12"

EXP

WP

W/

W

V

UON

TYP

TTB

TC

IG

LAN

CU

ONE−LINE DIAGRAM

TRANSFORMER

FUSE

MOLDED CASE CIRCUIT BREAKER

DISCONNECT SWITCH

CIRCUIT BREAKER TRIP SETTING

CIRCUIT BREAKER FRAME SIZE

EXTERIOR (NEW)

(E) UNDERGROUND DUCT LINE

PRIMARY CIRCUIT

SECONDARY CIRCUIT

EXPLOSION PROOF

WEATHERPROOF

WITH

WATT

VOLT

UNLESS OTHERWISE NOTED

TYPICAL

TELEPHONE TERMINAL BOARD

TERMINAL CABINET

RIGID GALVANIZED CONDUIT

POTENTIAL TRANSFORMER

PUBLIC ADDRESS

OUTPUT

NOT IN CONTRACT

NATIONAL ELECTRICAL MANUFACTURING

ASSOCIATION

NEW

MERCURY VAPOR

METAL OXIDE VARISTOR

MINIMUM

METAL HALIDE

MOTOR CONTROL CENTER

LOW PRESSURE SODIUM

KILOWATTHOUR

KILOVOLT AMPERE

INPUT

INTERCOM

HIGH PRESSURE SODIUM VAPOR

HIGH POWER FACTOR

HIGH INTENSITY DISCHARGE

GROUND

FIRE ALARM

ENERGY MONITORING & CONTROL SYSTEM

EXISTING

DATA TERMINAL CABINET

CURRENT TRANSFORMER

CONCRETE

CONDUIT ONLY

CIRCUIT BREAKER

CONDUIT

BARE COPPER

APPROXIMATELY

AMPERES INTERRUPTING CAPACITY

ABOVE FINISHED FLOOR

AMPERE

ABBREVIATIONS

BRANCH CIRCUIT HOMERUN TO PANELBOARD; NUMBER

OF ARROWS INDICATE NUMBER OF CIRCUITS. LETTER

AND NUMBER NOTATION IDENTIFIES PANEL AND

CIRCUIT NUMBER(S).

CROSSLINES INDICATE NUMBER OF #12 CONDUCTORS.

GROUND IS REPRESENTED BY CROSSLINE WITH DOT

ON TOP. OTHER CONDUCTORS AND CONDUIT AS

INDICATED.

(E) WIRING

NEW EXPOSED WIRING

CIRCUITING

(E) HAND−OFF−AUTO

MOTOR OUTLET, HORSEPOWER AS INDICATED

SURFACE MOUNTED PANELBOARD AND CABINET

PANELBOARDS AND POWER EQUIPMENT

RECEPTACLES (+18" UNLESS NOTED)

SWITCHES (+48" UNLESS NOTED)

JUNCTION BOX

LIGHTING

ALUMINUM CONDUCTOR, STEEL REINFORCED

CIRCUIT

EMERGENCY POWER SUPPLY

GOVERNMENT FURNISHED,

CONTRACTOR INSTALLED

GROUND FAULT CIRCUIT−INTERRUPTER

INCHES

MAXIMUM

TRANSFORMER

FEET

FLOOR

MAIN DISTRIBUTION PANELBOARD

OVERHEAD

ROOM

MOUNTING HEIGHT ABOVE FINISHED

FLOOR OR GRADE

ON CENTER

ISOLATED GROUND

LOCAL AREA NETWORK

EXTERIOR COMMUNICATIONS

COPPER

(E) SINGLE POLE SWITCH

(E) WALL MOUNTED LIGHT FIXTURE,

NUMBER INDICATES TYPE OF FIXTURE

T

M

UNDERGROUND COMMUNICATION CONDUIT

1/0 BARE COPPER GROUND WIRE PLACED IN OR

ALONGSIDE FOOTINGS

T

G

NIGHT LIGHT ON UNSWITCHED CIRCUIT

NATIONAL ELECTRICAL CODE

NEMA 3R ENCLOSURE

NEMA 12 ENCLOSURE

NEMA 4 ENCLOSURE

NEMA 4X ENCLOSURE

(E) DUPLEX RECEPTACLE, NEMA 5−20R, GROUNDING TYPE

NL

NEC

3R

4X

COMBINATION STARTER & DISCONNECT SWITCH

TRANSFORMER

METER

KEYED NOTE CALLOUT − NUMBER AS INDICATED

AT

AF

GFGI

GOVERNMENT FURNISHED,

GOVERNMENT INSTALLED

(E) FIXTURE − CHAIN, RECESSED, SURFACE OR PENDANT

HUNG. NUMBER INDICATES FIXTURE TYPE

EMT ELECTRICAL METALLIC TUBING

IMC INTERMEDIATE METAL CONDUIT

KVAR KILOVOLT CAPACITANCE

POWER POLE

J

HOA

SPD SURGE PROTECTION DEVICE

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 99 5

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

E001

ELECTRICAL LEGEND

K.J.L.

J.M.S.

K.J.L.

E001.DWG

12/31/15 PLAN CHECK CORRECTIONS1

cache pump house saw shack loft aspen tamar pondero juniperADMIN

EP

EP

EP

EXISTING POWER POLE

EXISTING FENCE

UG

NEW POLE BY

POWER COMPANY

EXISTING FENCE

EXISTING FENCE

EXISTING FENCE

UG

(E) JB5

(E) JB6

(E) JB2

(E) JB3

(E) JB7

(E) JB1

(E) JB8

(E) FIRE PUMP ANNUNCIATOR

SEE FP101 FOR DEMOLITION

REMOVE EXISTING FEEDER CONDUCTORS

FROM SAW SHACK. CAP CONDUIT AT FLOOR.

E501

E501

CONTRACTOR

STAGING AREA

E502

EXISTING SAW

SHACK PANEL

E501

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 99 5

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

E100

ELECTRICAL SITE PLAN

K.J.L.

J.M.S.

K.J.L.

E100.DWG

1" = 30’−0"1 ELECTRICAL SITE PLAN

0 30’ 60’

12/31/15 PLAN CHECK CORRECTIONS1

J

G

FI

GFI

J

J

T

J

J

G

FI

GFI

J

J

T

J

FACP

NEW PRESSURE

PUMP CONTROLLER

NEW FIRE PUMP

(E) ALARM J−BOX

NEW MAIN DISCONNECT

NEW PANEL "FPP"

480Y/277 V.

NEW FIRE PUMP

CONTROLLER

NEW PANEL "P"

240/120 V.

E

E

E

E E

E

HOA

NEW C.T. CABINET

NEW METER

FPP−1

NOTE:

ALL NEW PUMP ROOM WIRING SHALL BE

IN EMT OR LIQUID TIGHT STEEL CONDUIT

EP1

TRANSFORMER "P"

15 KVA

MOUNT ON WALL ABOVE

& TO THE LEFT OF PANEL

T

P−5 P−3

P−7

P−1EP1

P−4EP1

SPD

EP2

EP2

EP2

E501

E501

E501

E501

UG

UG

ED1

ED2

ED6

ED3

ED4

ED5

FACP

PH−7

PH−1

E

E

E

E E

E

JOCKEY PUMP

AND CONTROLLER ED6

ED6

ED6ED6

ED6

(E) PANEL "PH"

60 AMP

120/208 V. 3 PH.

ED2

ED2

PH−3

5 HOA

FIRE PUMP

CONTROL PANEL

ED2

PH−2

1/4

M

M

PH−4

E

ED3

ED3

ED3

ED3

ED3

ED3

ED3

ED3

ALARM J−BOX

ALARM LIGHT

ED3

E

ED2

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 99 5

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

E101

ELECTRICAL PLANS

K.J.L.

J.M.S.

K.J.L.

E101.DWG

1/2" = 1’−0"1 ELECTRICAL POWER PLAN

1/2" = 1’−0"2 ELECTRICAL DEMOLITION PLAN

ELECTRICAL DEMOLITION KEYED NOTES

MARK NOTE

ED1 CUT CONDUITS IN SLAB FLUSH & GROUT.

ED2 TO BE REMOVED.

ED3 TO REMAIN.

ED4 RELOCATED CONDUITS AS NEEDED FOR FIRE LINE

INSTALLATION.

ED5 REMOVE FEEDERS BACK TO PANEL IN SAW SHACK.

ED6 RELAMP (E) 2−LAMP T−8 FIXTURES.

0 1’ 2’1/2’0 1’ 2’1/2’

ELECTRICAL POWER KEYED NOTES

MARK NOTE

EP1 HOMERUN TO NEW PANEL. EXISTING CONDUIT & WIRE

NOT REMOVED TO REMAIN.

EP2 RUBBER FLOOR MAT. SEE SPECIFICATIONS.

12/31/15 PLAN CHECK CORRECTIONS1

PROVIDE 3" MIN. COVER

OF BEDDING SAND

CONDITION:

REPAIR METHOD:

REPAIR TO UTILITY CUT

A CUT FOR UTILITY INSTALLATION OR REPAIR.

OBTAIN A DIGGING PERMIT PRIOR TO ANY

EXCAVATIONS.

BACKFILL

UTILITY CUT

2" WARNING

TAPE WITH

METALLIC

CORE

COMPACTED BACK FILL− 4" COMPACTED TOPSOIL

SOD TO MATCH EXISTING GRADE

" M

IN

M

IN

#10 TRACER

WIRE

TRENCH & BACKFILL

PER UTILITY COMPANY

REQUIREMENTS. UTILITY

MUST INSPECT BEFORE

BACKFILLING

12,470 V.

480Y/277 V.

GROUNDING BY

UTILITY COMPANY

(E) POWER COMPANY

OVERHEAD PRIMARY & POLE

NEW POWER COMPANY

OVERHEAD PRIMARY

NEW POLE BY POWER COMPANY

NEW 4" SCH. 40 PVC PER POWER

COMPANY REQUIREMENTS

NEW POWER COMPANY

PAD MOUNT TRANSFORMER

PAD BY CONTRACTOR

C.T.

CABINET

NEW C.T. CABINET & METER BASE

PER POWER COMPANY REQUIREMENTS

METER

BASE

PNL

"FPP"

100 AMP

M.L.O.

480Y/277 V.

14,000 AIC

(E) WATER LINE

FIRE PUMP

CONTROLLER

FIRE

PUMP

JOCKEY

PUMP

PRESSURE

PUMP

CONTROLLER

3/4" EMT

w/3 − #12 &

1 − #12 GRD.

1 1/4" RIGID

w/3 − #4

& 1 − #6 GRD.

1 1/2" RIGID C. w/3 − 1/0

& 1 − #4 GRD.

1 1/4" RIGID w/4 − #2 & 1 − #6 GRD.

3/4" x 10’−0"

GROUND RODS

MIN. 10’−0" APART

#4 B.C.

2 − 4" SCH. 40 PVC PER POWER

COMPANY REQUIREMENTS

E501

E501

NEW MAIN DISC.

100 AMP, 3−POLE

BREAKER

SPD

3/4" C. w/4 − #10s & 1−

#10 GRD.

3/4" C. w/2 − #10

& 1 − #10 GRD.

PNL

"P"

60 AMP

MAIN BKR

240/120 V.

10,000 AIC

480 V.

240/120 V.

TRANSFORMER "P"

15 KVA

E501

E502

1 1/4" RIGID

w/4 − #2 &

1 − #6 GRD.

#4 B.C.

#10 B.C.

1" C. w/3 − #6

& 1 − #10 GRD.

E502

PROVIDE 3" MIN. COVER

OF BEDDING SAND

CONDITION:

REPAIR METHOD:

REPAIR TO UTILITY CUT

A CUT FOR UTILITY INSTALLATION OR REPAIR.

OBTAIN A DIGGING PERMIT PRIOR TO ANY

EXCAVATIONS.

BACKFILL

UTILITY CUT

2" WARNING

TAPE WITH

METALLIC

CORE

COMPACTED BACK FILL− 4" COMPACTED TOPSOIL

SOD TO MATCH EXISTING GRADE

" M

IN

TRENCH & BACKFILL

PER UTILITY COMPANY

REQUIREMENTS. UTILITY

MUST INSPECT BEFORE

BACKFILLING

3" MIN.

" M

IN

#10 TRACER

WIRE

4" FIBERGLASS ELL

w/48" RADIUS & FITTINGS

PER PACIFICORP DOCUMENT ZG 033

PROVIDE POLE STANDOFF PER

POWER COMPANY REQUIREMENTS

POLE RISER BY POWER COMPANY

STABILIZE POLE BEFORE TRENCHING

UNTIL BACKFILLED & COMPACTED

NEW POLE BY POWER COMPANY

GROUND LEVEL

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 99 5

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

E501

ELECTRICAL DIAGRAM,

DETAILS & SCHEDULES

K.J.L.

J.M.S.

K.J.L.

E501.DWG

SCALE: NONE1 TYPICAL SINGLE UNDERGROUND CONDUIT

NONE3 ELECTRICAL POWER RISER DIAGRAM

SCALE: NONE2 TYPICAL MULTIPLE UNDERGROUND CONDUITS

12/31/15 PLAN CHECK CORRECTIONS1

SCALE: NONE4 POLE RISER DETAIL

ENTIRE SHEET

1/0 COPPER

COUNTERPOISE

3/4" DIAMETER x

10’−0" LONG COPPER−CLAD

STEEL GROUND ROD

17674

RPE

S R

OF

ER ES

L E

K

V

NI J. E W

IS

EG

I

T

D

SIONA

L

IGNE

NEER

OREGON

14,R.

A

M

1 99 5

Case, Lowe & Hart, Inc. 2484 Washington Blvd.

Suite 510 Ogden, Utah 84401

801.399.5821 Fax 801.399.0728 www.clhae.com

SHEET OF

DRAWN BY:

CHECKED BY:

REDMOND AIR CENTER

DESCHUTES

PACIFIC NORTHWEST

DISTRICT RANGER

ISSUE INFORMATION

PROJECT NO:

CAD DWG FILE:

DESIGNED BY:

15072

F0REST SUPERVISOR

FOREST ENGINEER

DATE

DATE

DATE

AGRICULTURE

The Pacific Northwest Region

FOREST SERVICE

UNITED STATES

DEPARTMENT

OF

PROJECT TEAM

Protection Consultants, Inc.

1199 S. Main Street #101 Centerville, Utah 84014

801.295.6070 Fax 801.677.0000

FIRE BOOSTER

PUMP REPLACEMENT

NATIONAL FOREST

REGION 6

MARK DATE DESCRIPTION

E502

ELECTRICAL DETAILS

K.J.L.

J.M.S.

K.J.L.

E502.DWG

NONE2 GROUND ROD DETAIL

NONE1 PACIFICORP TRANSFORMER PAD/VAULT 12/31/15 PLAN CHECK CORRECTIONS1

G001 - TITLE SHEET
Sheets
G001 - TITLE SHEET
MD101 - MECHANICAL DEMOLITION PLAN
MD101 - MECHANICAL DEMOLITION PLAN
Sheets
MD101 - MECHANICAL DEMOLITION PLAN
FP101
FP102
FP103
E001 - ELECTRICAL LEGEND
Sheets
E001 - ELECTRICAL LEGEND
E100 - ELECTRICAL SITE PLAN
E101 - ELECTRICAL PLANS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
E502 - ELECTRICAL DETAILS
E100 - ELECTRICAL SITE PLAN
Sheets
E001 - ELECTRICAL LEGEND
E100 - ELECTRICAL SITE PLAN
E101 - ELECTRICAL PLANS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
E502 - ELECTRICAL DETAILS
E101 - ELECTRICAL PLANS
Sheets
E001 - ELECTRICAL LEGEND
E100 - ELECTRICAL SITE PLAN
E101 - ELECTRICAL PLANS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
E502 - ELECTRICAL DETAILS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
Sheets
E001 - ELECTRICAL LEGEND
E100 - ELECTRICAL SITE PLAN
E101 - ELECTRICAL PLANS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
E502 - ELECTRICAL DETAILS
E502 - ELECTRICAL DETAILS
Sheets
E001 - ELECTRICAL LEGEND
E100 - ELECTRICAL SITE PLAN
E101 - ELECTRICAL PLANS
E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES
E502 - ELECTRICAL DETAILS

File details come from the government source that posted it. Updated .