C.Drawings.pdf
PDF 5 MB Posted
- Attached to
- Redmond Air Center Fire Booster Pump Replacement Federal contract opportunity
- Solicitation number
- AG-04M3-S-16-0066
About this file
C. Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment02.pdf | ||
| Amendment01.pdf | ||
| D.BiddersPackage.doc | DOC document | |
| B.FullSpecPackage.pdf | ||
| A.FinalRACFirePumpRFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REDMOND AIR CENTER
FIRE BOOSTER PUMP REPLACEMENT
Case, Lowe and Hart, Inc.
2484 Washington Blvd. Ste 510
Ogden, Utah 84401
DRAWING INDEX
G001 TITLE SHEET
MD101 MECHANICAL DEMOLITION PLAN
FP101 FIRE PUMP DEMOLITION PLAN
FP102 FIRE PUMP PLAN & ELEVATIONS
FP103 FIRE ALARM PLAN
E001 ELECTRICAL LEGEND
E100 ELECTRICAL SITE PLAN
E101 ELECTRICAL PLANS
E501 ELECTRICAL DIAGRAM, DETAILS &
SCHEDULES
Protection Consultants, Inc.
1199 S Main Street #101
Centerville, Utah 84014
FIRE PUMP HOUSE
U. S. Department of Agriculture
FOREST SERVICE
Pacific Northwest Region Six Engineering
DESCHUTES NATIONAL FOREST
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DESCRIPTION
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
MARK
123456789
DATE
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
G001
TITLE SHEET
K.J.L.
J.A.C., J.M.S.
K.J.L.
CONTRACTOR
LAY−DOWN AREA
J
T
REMOVE EXHAUST LINE AND
VENTILATED THIMBLE, FILL w/
BATT INSULATION AND PATCH.
REMOVE FUEL LINE AND VENT,
FILL w/ BATT INSULATION AND
PATCH. INSPECTOR’S TEST
TO REMAIN.
(E) 2" VENT LINE TO REMAIN.
REMOVE (E) LINE , FILL w/ BATT
INSULATION AND PATCH.
REMOVE SERVICE SINK AND WATER LINE.
CAP (E) REMAINING WATER LINE AT TEE.
(E) FOR
(E) FOS
REMOVE (E) FUEL
LINES AND FUEL TANK.
SEE HAZARDOUS
MATERIAL REMOVAL
SPEC.
(E) HOSE BIBB TO
REMAIN FUNCTIONAL.
T
(E) MOTORIZED
LOUVER TO REMAIN.
(E) 3 KW HEATER
TO REMAIN.
(E) FUEL LINES TO
BE REMOVED.
(E) WATER LINE
TO REMAIN.
(E) EXHAUST FAN,
MOTORIZED LOUVER AND
T−STAT TO REMAIN.
NOTE:
PROVIDE PAINTED GALVANIZED
SHEET METAL CAP EMBEDDED IN
SEALANT FOR INTERIOR & EXTERIOR
WALL PATCHES.
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 995
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
MD101
MECHANICAL DEMOLITION
PLAN
KJL
JAC
KJL
MD101.DWG
0 2’ 4’1’ 1/2" = 1’−0"1
MECHANICAL
DEMOLITION PLAN
12/31/15 PLAN CHECK CORRECTIONS1
ANN
FIRE PUMP DEMOLITION PLAN
1/4" = 1’-0"
10 11
21 22
Demolition Plan Fire Pump
FP101
FP101.DWG
PIPING AND PATCH REMAINING HOLE IN EXTERIOR WALL.
(D) 4" FIRE PUMP TEST OUTLET WITH FLANGED CAP. REMOVE
(D) - EXISTING TO BE DEMOLISHED
(E) - EXISTING TO REMAIN
FLANGE ABOVE FLOOR SLAB.
FIRE PUMP SYSTEM IN ITS ENTIRETY BACK TO EXISTING 6"
(E) 6" SUPPLY FROM PUBLIC WATER SYSTEM. DEMOLISH EXISTING
FLANGE ABOVE FLOOR SLAB.
PUMP DISCHARGE PIPING IN FIRE PUMP HOUSE UP TO EXISTING 6"
(E) 6" SUPPLY TO FIRE PROTECTION SYSTEMS. DEMOLISH ALL FIRE
(D) 6" FEBCO 805YD DOUBLE CHECK ASSEMBLY
PUMP SUCTION).
(D) 6" OS&Y VALVE FOR PUMP TEST METER LINE (RETURN TO
(D) VENTURI TYPE FLOW METER
VERTICAL PIPING).
(D) 4" OS&Y VALVE FOR FIRE PUMP TEST HEADER (INSTALLED ON
INCREASING TEE ON DISCHARGE FLANGE.
ECCENTRIC REDUCER ON SUCTION FLANGE AND CONCENTRIC
(D) HORIZONTAL, SPLIT CASE, 500 GPM FIRE PUMP WITH
OTHER ENGINE COMPONENTS/APPURTENANCES.
BATTERIES. COOLING SYSTEM PIPING, EXHAUST SYSTEM AND ALL
(D) DIESEL ENGINE FOR FIRE PUMP. REMOVE ENGINE, STARTER,
FOR MOUNTING NEW FIRE PUMP.
(E) CONCRETE PAD FOR FIRE PUMP (3’-0" X 10’-6" X 13"). RE-USE
BETWEEN PUMP AND CONTROLLER.
(D) FIRE PUMP CONTROLLER. REMOVE ALL SENSING LINES
VERTICAL PIPE)
(D) 6" OS&Y VALVE FOR FIRE PUMP TEST/METER LOOP (ON
(D) 6" DISCHARGE PIPING AND SUPPORTS
HOUSE
(E) 1-1/2" RISER FOR FIRE SPRINKLER SYSTEM PROTECTING PUMP
REMAIN AND MAY BE REUSED FOR NEW PUMP.
BETWEEN PUMP AND CONTROLLER. EXISTING POWER CIRCUIT TO
(D) JOCKEY PUMP CONTROLLER. REMOVE SENSING LINES
DISCHARGE PIPING/VALVES.
(D) JOCKEY PUMP. REMOVE PUMP, SUCTION PIPING/VALVES AND
MOUNTING NEW JOCKEY PUMP.
(E) CONCRETE PAD FOR JOCKEY PUMP (8" X 11" X 5"). RE-USE FOR
(D) 6" FIRE PUMP DISCHARGE CHECK VALVE
(D) 6" FIRE PUMP DISCHARGE OS&Y CONTROL VALVE
(D) 6" FIRE PUMP AIR RELEASE VALVE
SYSTEM SHALL REMAIN).
SUPERVISORY AND WATER FLOW SWITCHES FOR FIRE SPRINKLER
ALARM SYSTEM FOR PUMP HOUSE IN ITS ENTIRETY (VALVE
(D) FIRE ALARM CONTROL PANEL. DEMOLISH EXISTING FIRE
SPRINKLER RISER.
CHECK VALVE AND 1-1/2" PIPING BETWEEN FDC AND FIRE
(E) SINGLE INLET FIRE DEPARTMENT CONNECTION (FDC), 1-1/2"
BACK TO FIRE PUMP SUCTION.
(D) 3" CIRCULATION RELIEF VALVE WITH DISCHARGE PIPING
MD101.
PATCH REMAINING HOLES IN EXTERIOR WALLS. SEE SHEET
FUEL RETURN PIPING AND ALL OTHER PIPING APPURTENANCES.
TANK SUPPORTS, FILL PIPING, VENT PIPING FUEL SUPPLY PIPING,
(D) 100 GALLON DIESEL FUEL STORAGE TANK. REMOVE TANK,
REMAINING HOLE IN EXTERIOR WALL. SEE SHEET MD101.
(D) EXHAUST PIPING AND MUFFLER FOR DIESEL ENGINE. PATCH
BUILDING (SEE SHEET FP103)
PUMP HOUSE TO FIRE ALARM SYSTEM IN ADMINISTRATION
REUSED FOR INTERCONNECITON OF NEW FIRE ALARM SYSTEM IN
BETWEEN FIRE PUMP AND ADMINISTRATION BUILDINGS MAY BE
REMAINING HOLE IN WALL. EXISTING CONDUIT AND WIRING
ANNUNCIATOR AND JUNCTION BOXES. PATCH AND PAINT
LOCATED IN ADMINISTRATION BUILDING. REMOVE
(D) REMOTE ANNUNCIATOR PANEL FOR FIRE PUMP CONTROLLER
0 2’ 4’ 8’
SPOOL PIECE.
DEMOLITION/REPLACEMENT. INSTALL TWO 6" ELBOWS AND 6"
SPRINKLER SYSTEMS DURING FIRE PUMP
AND DISCHARGE PIPING TO MAINTAIN WATER SUPPLY TO FIRE
INSTALL TEMPORARY PIPING CONNECTION (6") BETWEEN SUPPLY
MAY BE RE-USED IF COMPATIBLE WITH NEW BEACON.
DEMOLISHED. REMOVE BEACON AND WIRING. EXISTING MAST
(D) RED BEACON INDICATING FIRE PUMP OPERATION TO BE
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DESCRIPTION
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
MARK DATE
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
xxx
GTJ
BAJ
GTJ
12/31/15
1 12/31/15 PLAN CHECK CORRECTIONS
15072
1/4" = 1’-0"
FIRE PUMP ROOM PLAN
1/4" = 1’-0"
FIRE PUMP SECTION - LOOKING WEST 3
1/4" = 1’-0"
FIRE PUMP DISCHARGE PIPING SECTION - EAST
1/4" = 1’-0"
FIRE PUMP BYPASS SECTION - NORTH
1/4" = 1’-0"
TEST HEADER SECTION - EAST
FIRE PUMP ISOMETRIC
NO SCALE
F P
F P
FP102
F P
07 08
14 15
07 27
20 26
FP102
& Elevations Fire Pump Plan
FP102.DWG
(N) - NEW
(E) - EXISTING TO REMAIN
SLAB.
PIPING/DEVICES STARTING AT EXISTING FLANGE ABOVE FLOOR
(E) 6" SUPPLY FROM PUBLIC WATER SYSTEM. INSTALL NEW
(E) 6" SUPPLY TO FIRE PROTECTION SYSTEMS.
REQUIRED (SEE DETAIL 4).
INSTALL ONE CONTROL VALVE ON VERTICAL PIPING AS
VALVES WITH SUPERVISORY SWITCHES AND ONE CHECK VALVE.
(N) 6" FIRE PUMP BYPASS CONSISTING OF TWO BUTTERFLY
MANUFACTURER.
PRESSURE GAUGES, ETC.) RECOMMENDED BY PUMP
APPURTENANCES (RELIEF VALVES, AIR RELEASE VALVES,
SUCTION AND CONCENTRIC INCREASER ON DISCHARGE) AND
REQUIRED PIPING CONNECTIONS (ECCENTRIC REDUCER ON
TO SUPPLY 100 PSI AT A RATED FLOW OF 750 GPM. PROVIDE ALL
(N) HORIZONTAL, SPLIT CASE FIRE PUMP. PUMP SHALL BE RATED
PUMP SUCTION.
(N) OS&Y CONTROL VALVE WITH SUPERVISORY SWITCH FOR
SUPPLY TO PUMP MOTOR.
MANUFACTURER. SEE ELECTRICAL DRAWINGS FOR POWER
BE PROVIDED AS A UNIT INSTALLED ON COMMON BASE BY PUMP
(N) ELECTRIC MOTOR FOR FIRE PUMP. PUMP AND MOTOR SHALL
BETWEEN FIRE PUMP PIPING AND CONTROLLER PER NFPA 20.
CONCRETE PAD. INSTALL COPPER PRESSURE SENSING LINES
STATE, SOFT START TYPE. SECURE CONTROLLER TO EXISTING
(N) FIRE PUMP CONTROLLER. CONTROLLER SHALL BE SOLID
MANUFACTURER’S RECOMMENDATIONS.
EQUIPMENT TO PAD AND GROUT PER FIRE PUMP
AND CONTROLLER ON EXISTING CONCRETE PAD. ANCHOR
(E) CONCRETE PAD (3’-0" X 10’-6" X 13"). MOUNT FIRE PUMP, MOTOR
(N) FIRE PUMP DISCHARGE CHECK VALVE
PIPING.
(N) 6" UP TO FIRE PUMP METER LOOP AND TEST HEADER SUPPLY
STACKED VERTICALLY.
INSTALL TEST HEADER IN CORNER OF BUILDING WITH VALVES
(N) 6" FIRE PUMP TEST HEADER WITH THREE 2-1/2" HOSE VALVES.
(N) FIRE ALARM CONTROL PANEL. SEE SHEET FP103.
REMAIN. CONNECT TO NEW 6" DISCHARGE PIPING FOR FIRE PUMP.
SPRINKLER SYSTEM. EXISTING FIRE SPRINKLER SYSTEM TO
(E) 1-1/2" FIRE SPRINKLER RISER FOR FIRE PUMP BUILDINGS FIRE
BUILDING FIRE SPRINKLER SYSTEM.
(E) SINGLE INLET FIRE DEPARTMENT CONNECTION FOR FIRE PUMP
CONTROLLER PER NFPA 20.
PRESSURE SENSING LINES BETWEEN FIRE PUMP PIPING AND
ELECTRICAL DRAWINGS FOR POWER SUPPLY. INSTALL COPPER
(N) CONTROLLER FOR PRESSURE MAINTENANCE PUMP. SEE
TO PAD PER MANUFACTURER’S RECOMMENDATIONS.
MAINTENANCE PUMP ON EXISTING CONCRETE PAD. SECURE PUMP
(E) CONCRETE PAD (8" X 11" X 5"). MOUNT NEW PRESSURE
DISCHARGE PIPING TO EXISTING FLANGE.
(E) 6" FLANGE ABOVE FLOOR. CONNECT NEW FIRE PUMP
OR HIGHER.
(N) 6" SUPPLY TO FIRE PUMP TEST HEADER. INSTALL AT 7’-0" AFF
SUCTION SUPPLY.
(N) 1-1/4" CONNECTION FOR PRESSURE MAINTENANCE PUMP
(NORMALLY CLOSED) TO ISOLATE FIRE PUMP TEST HEADER.
(N) 6" BUTTERFLY VALVE WITH SUPERVISORY SWITCH
(N) 6" FIRE PUMP SUCTION PIPING
(N) AIR RELEASE VALVE
(N) 6" FIRE PUMP DISCHARGE PIPING
DISCHARGE.
(N) 1-1/4" CONNECTION FOR PRESSURE MAINTENANCE PUMP
FOR FIRE PUMP DISCHARGE.
(N) 6" BUTTERFLY CONTROL VALVE WITH SUPERVISORY SWITCH
BEACON MAY BE INSTALLED ON EXISTING MAST IF COMPATIBLE.
AND PROGRAM TO OPERATE WHEN FIRE PUMP IS RUNNING.
(N) RED BEACON. CONNECT TO NEW FIRE PUMP CONTROLLER
VERTICAL ORIENTATION. AMES C200-OSY OR EQUAL.
OS&Y VALVES WITH SUPERVISORY SWITCHES. INSTALL IN
(N) 6" DOUBLE CHECK ASSEMBLY WITH PRESSURE GAUGES AND
VALVE ON DISCHARGE SIDE OF PUMP.
PRESSURE GAUGES ON BOTH SIDES OF PUMP. PROVIDE CHECK
CONTROL VALVES (WITH SUPERVISORY SWITCHES) AND
(N) PRESSURE MAINTENANCE PUMP. PROVIDE INDICATING TYPE
RECOMMENDATIONS OF METER MANUFACTURER.
METER. LOCATE METER AND CONTROL VALVES PER
SUPERVISORY SWITCHES (NORMALLY CLOSED) ON BOTH SIDES OF
GAUGE. PROVIDE BUTTERFLY PATTERN CONTROL VALVES WITH
VENTURI TYPE FLOW METER WITH INTEGRATED PRESSURE/FLOW
(N) 6" METER LOOP FOR FIRE PUMP. INSTALL FM APPROVED
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DESCRIPTION
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
MARK DATE
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
xxx
GTJ
BAJ
GTJ
12/31/15
1 12/31/15 PLAN CHECK CORRECTIONS
15072
0 2’ 4’ 8’ 0 2’ 4’ 8’ 0 2’ 4’ 8’
0 2’ 4’ 8’ 0 2’ 4’ 8’
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
D. NFPA 72 2013 EDITION
C. NFPA 70 2015 EDITION
B. INTERNATIONAL FIRE CODE (IFC) - 2012 EDITION
A. INTERNATIONAL BUILDING CODE (IBC) - 2012 EDITION
APPLICABLE CODES AND STANDARDS:
IBC, IFC AND NFPA 72.
SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF
DESIGN AND INSTALLATION OF FIRE ALARM SYSTEM
SIMPLEX FACP IN ADJACENT ADMINISTRATION BUILDING.
FIRE PUMP BUILDING AND CONNECTION TO EXISTING
INSTALLATION OF NEW SIMPLEX FIRE ALARM SYSTEM IN
SCOPE OF WORK: WORK SHALL INCLUDE
WITH THE NEW FIRE ALARM CONTROL PANEL (FACP).
ALL INITIATING DEVICES SHALL BE LISTED COMPATIBLE
APPROVED FOR USE IN FIRE PROTECTION SYSTEMS.
SYSTEM INSTALLATION SHALL BE UL LISTED AND/OR FM
MATERIAL AND DEVICES USED FOR THE FIRE ALARM
QUALITY ASSURANCE: ALL NEW EQUIPMENT,
REQUIREMENTS OF NFPA 72.
CONFORM TO THE CONSTRUCTION DOCUMENTS
INSTALLING ANY EQUIPMENT. SUBMITTALS SHALL
REVIEW/APPROVAL PRIOR TO ORDERING OR
AUTHORITIES HAVING JURISDICTION FOR
PREPARE AND SUBMIT SHOP DRAWINGS TO ALL
SUBMITTALS: FIRE ALARM SYSTEM CONTRACTOR SHALL
OFF-PREMISE MONITORING STATION.
IN ADJACENT ADMINISTRATION BUILDING FOR RELAY TO
NOTIFICATION OF STATUS TO EXISTING SIMPLEX FACP
SYSTEMS. SYSTEM PROVIDES OFF-PREMISE
REQUIREMENTS FOR PROTECTED PREMISE FIRE ALARM
SYSTEM TYPE: FIRE ALARM SYSTEM SHALL MEET THE
EQUIVALENT AS PER NFPA 70 ARTICLE 760.
FPL (FIRE POWER LIMITED) WITH 300V INSULATION OR
ALL WIRING USED IN THE FIRE ALARM SYSTEM SHALL BE
FIRE STOPPED WITH A SUITABLE CAULKING COMPOUND.
PENETRATIONS THROUGH RATED PARTITIONS SHALL BE
INSTALLED IN RIGID, EMT OR FLEXIBLE CONDUIT. ALL
OPENS, SHORTS AND GROUNDS. ALL WIRING SHALL BE
NOTED) SHALL BE NEW. WIRING SHALL BE FREE OF
WIRING/CONDUIT: ALL WIRING (UNLESS OTHERWISE
ALARM CIRCUIT".
PERMANENTLY MARKED AND IDENTIFIED AS "FIRE
MECHANICALLY PROTECTED AND SHALL BE
POWER DISTRIBUTION PANEL. CIRCUIT SHALL BE
DEDICATED BRANCH CIRCUIT (20 AMP) FROM NEARBY
ALARM CONTROL EQUIPEMNT SHALL BE PROVIDED BY A
POWER: PRIMARY POWER SUPPLY TO NEW FIRE
MEET THE REQUIREMENTS FOR CLASS B CIRCUITS.
A CIRCUITS. NOTIFICATION APPLIANCE CIRCUITS SHALL
CIRCUITS SHALL MEET THE REQUIREMENTS FOR CLASS
WIRING STYLES (PER NFPA 72): INITIATING DEVICE
PERSONNEL AND REDMOND FIRE DEPARTMENT.
ENGINEER, US FOREST SERVICE MAINTENANCE
72. TESTING SHALL BE WITNESSED BY PROJECT
PERFORM ALL ACCEPTANCE TESTS REQUIRED BY NFPA
TESTING: CONTRACTOR SHALL SCHEDULE AND
SUPERVISORY SWITCHES
E. FIRE SPRINKLER/PUMP CONTROL VALVE
D. FIRE PUMP CONTROLLER MONITORING
C. FIRE SPRINKLER WATER FLOW SWITCH
ABOVE FIRE ALARM CONTROL EQUIPMENT
B. SMOKE DETECTOR: INSTALL SMOKE DETECTOR
A. MANUAL PULL STATION
INITIATING DEVICES:
1/4" = 1’-0"
FIRE ALARM PLAN
FIRE ALARM RISER SCHEMATIC
NO SCALE
FACP
TF
T T
TT
T
M
M
M
T
T
T
T
T
T
B A T T E R
Y
B A T T E R
Y
DEDICATED CIRCUIT
POWER FROM
120 VAC PRIMARY
F
T
ZONE 1: SMOKE DETECTOR ABOVE FACP
ZONE 2: PULL STATION
(SIMPLEX)
CONTROL PANEL
FIRE ALARM
ZONE 3: WATER FLOW - FIRE SPRINKLERS
T
T
T
T
T
T
T
M
M
M
FP103
Fire Alarm Plan
FP103.DWG
SPRINKLERS
ZONE 4: VALVE SUPERVISION - FIRE
PREVENTER
ZONE 5: VALVE SUPERVISION - BACKFLOW
SUCTION
ZONE 6: VALVE SUPERVISION - PUMP
BYPASS
ZONE 7: VALVE SUPERVISION - PUMP
DISCHARGE
ZONE 8: VALVE SUPERVISION - PUMP
TEST HEADER (NC)
ZONE 9: VALVE SUPERVISION - PUMP
METER LOOP (NC)
ZONE 10: VALVE SUPERVISION - PUMP
PUMP
ZONE 11: VALVE SUPERVISION - JOCKEY
RUNNING
ZONE 12: PUMP CONTROLLER - PUMP
POWER FAIL
ZONE 13: PUMP CONTROLLER - AC
POWER PHASE REVERSAL
ZONE 14: PUMP CONTROLLER - AC
0 2’ 4’ 8’
V
D C
V
D C
ZONE 1
ZONE 2
Z O
N E
Z O
N E
ZONE 5
ZONE 6
Z O
N E
Z O
N E
ZONE 8
ZONE 9
ZONE 10
ZONE 12
ZONE 13
ZONE 14
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DESCRIPTION
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
MARK DATE
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
xxx
GTJ
BAJ
GTJ
12/31/15
1 12/31/15 PLAN CHECK CORRECTIONS
15072
FIRE ALARM KEY NOTES
REQUIRED.
REVISE FACP PROGRAMMING OF EXISTING FACP AS
ADMINISTRATION BUILDING. ADD MODULES AND
SIGNALS) AND TROUBLE SIGNALS TO FACP IN
SUPERVISORY (VALVE SUPERVISION, PUMP
(WATER FLOW, MANUAL PULL, SMOKE DETECTOR),
FIRE ALARM SYSTEM SHALL RELAY FIRE ALARM
IF COMPATIBLE WITH NEW FIRE ALARM SYSTEM.
FUNCTIONAL (NO SHORTS OR GROUND FAULTS) AND
BURIED CONDUIT MAY BE RE-USED IF COMPLETELY
SUPPRESSION PER NFPA 70. EXISTING WIRING IN
BUILDINGS. PROVIDE TRANSIENT VOLTAGE
WIRING IN EXISTING BURIED CONDUIT BETWEEN
ADJACENT ADMINISTRATION BUILDING. INSTALL
PUMP BUILDING TO EXISTING SIMPLEX FACP IN
PROVIDE CIRCUITS TO CONNECT NEW FACP IN FIRE
SIGNALS.
PROVIDE MONITORING OF POINTS AS SUPERVISORY
FAIL, AC POWER PHASE REVERSAL) TO FACP TO
FIRE PUMP CONTROLLER (PUMP RUNNING, AC POWER
PUMP. CONNECT FIRE ALARM INTERFACE POINTS OF
CONTROLLER FOR ELECTRIC MOTOR DRIVEN FIRE
A MINIMUM OF 5 MINUTES OF ALARM POWER.
POWER WITH AN ADIDTIONAL RESERVE TO PROVIDE
BATTERIES TO PROVIDE 24 HOURS OF STANDBY
SUPPLIES PER NFPA 70 AND NFPA 72. SIZE
(24VDC USING TWO 12 VDC BATTERIES) POWER
PROVIDE NEW PRIMARY (120 VAC) AND SECONDARY
LOCATION OF EXISTING FACP TO BE DEMOLISHED.
PANEL (FACP). SURFACE MOUNT ON WALL AT
NEW SIMPLEX, ADDRESSABLE FIRE ALARM CONTROL
RUNNING SIGNAL FROM CONTROLLER).
OPERATE UPON ACTIVATION OF FIRE PUMP (PUMP
POWER AND CONTROL. PROGRAM BEACON TO
CONNECT TO NEW FIRE PUMP CONTROLLER FOR
REPLACE EXISTING ROTATING RED BEACON WITH NEW.
AND INSTALLED ON WEATHERPROOF BACK BOX.
FIRE ALARM HORN/STROBE LISTED FOR EXTERIOR USE
FIRE ALARM GENERAL NOTES
FACP
M
T
F
PER NFPA 72 AND GENERAL NOTES
SECONDARY POWER SUPPLY
NAC #1
NAC #2
FIRE ALARM CONTROL PANEL
SMOKE DETECTOR
FIRE ALARM PULL STATION
FIRE SPRINKLER VALVE SUPERVISORY SWITCH
FIRE SPRINKLER WATER FLOW SWITCH
FIRE ALARM HORN/STROBE ON WEATHER-PROOF BACK BOX
MONITOR MODULE
RED BEACON (EXISTING)
EP
UG
1/2
RM
O.H.
CKT
EPS
FLR
FT
GFCI
GFI
IN
MAX
XFMR
O.C.
A−1,3
A
ACSR
AFF
AIC
APPROX
BC
C
CB
CO
CONC
CT
DTC
(E)
EMCS
FA
GND or GRD
HID
HPF
HPS
IC
I/P
KVA
KWH
LPS
MCC
MDP
MH
MIN
MOV
MV
(N)
NEMA
NIC
O/P
PA
PT
RGC
+12"
EXP
WP
W/
W
V
UON
TYP
TTB
TC
IG
LAN
CU
ONE−LINE DIAGRAM
TRANSFORMER
FUSE
MOLDED CASE CIRCUIT BREAKER
DISCONNECT SWITCH
CIRCUIT BREAKER TRIP SETTING
CIRCUIT BREAKER FRAME SIZE
EXTERIOR (NEW)
(E) UNDERGROUND DUCT LINE
PRIMARY CIRCUIT
SECONDARY CIRCUIT
EXPLOSION PROOF
WEATHERPROOF
WITH
WATT
VOLT
UNLESS OTHERWISE NOTED
TYPICAL
TELEPHONE TERMINAL BOARD
TERMINAL CABINET
RIGID GALVANIZED CONDUIT
POTENTIAL TRANSFORMER
PUBLIC ADDRESS
OUTPUT
NOT IN CONTRACT
NATIONAL ELECTRICAL MANUFACTURING
ASSOCIATION
NEW
MERCURY VAPOR
METAL OXIDE VARISTOR
MINIMUM
METAL HALIDE
MOTOR CONTROL CENTER
LOW PRESSURE SODIUM
KILOWATTHOUR
KILOVOLT AMPERE
INPUT
INTERCOM
HIGH PRESSURE SODIUM VAPOR
HIGH POWER FACTOR
HIGH INTENSITY DISCHARGE
GROUND
FIRE ALARM
ENERGY MONITORING & CONTROL SYSTEM
EXISTING
DATA TERMINAL CABINET
CURRENT TRANSFORMER
CONCRETE
CONDUIT ONLY
CIRCUIT BREAKER
CONDUIT
BARE COPPER
APPROXIMATELY
AMPERES INTERRUPTING CAPACITY
ABOVE FINISHED FLOOR
AMPERE
ABBREVIATIONS
BRANCH CIRCUIT HOMERUN TO PANELBOARD; NUMBER
OF ARROWS INDICATE NUMBER OF CIRCUITS. LETTER
AND NUMBER NOTATION IDENTIFIES PANEL AND
CIRCUIT NUMBER(S).
CROSSLINES INDICATE NUMBER OF #12 CONDUCTORS.
GROUND IS REPRESENTED BY CROSSLINE WITH DOT
ON TOP. OTHER CONDUCTORS AND CONDUIT AS
INDICATED.
(E) WIRING
NEW EXPOSED WIRING
CIRCUITING
(E) HAND−OFF−AUTO
MOTOR OUTLET, HORSEPOWER AS INDICATED
SURFACE MOUNTED PANELBOARD AND CABINET
PANELBOARDS AND POWER EQUIPMENT
RECEPTACLES (+18" UNLESS NOTED)
SWITCHES (+48" UNLESS NOTED)
JUNCTION BOX
LIGHTING
ALUMINUM CONDUCTOR, STEEL REINFORCED
CIRCUIT
EMERGENCY POWER SUPPLY
GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
GROUND FAULT CIRCUIT−INTERRUPTER
INCHES
MAXIMUM
TRANSFORMER
FEET
FLOOR
MAIN DISTRIBUTION PANELBOARD
OVERHEAD
ROOM
MOUNTING HEIGHT ABOVE FINISHED
FLOOR OR GRADE
ON CENTER
ISOLATED GROUND
LOCAL AREA NETWORK
EXTERIOR COMMUNICATIONS
COPPER
(E) SINGLE POLE SWITCH
(E) WALL MOUNTED LIGHT FIXTURE,
NUMBER INDICATES TYPE OF FIXTURE
T
M
UNDERGROUND COMMUNICATION CONDUIT
1/0 BARE COPPER GROUND WIRE PLACED IN OR
ALONGSIDE FOOTINGS
T
G
NIGHT LIGHT ON UNSWITCHED CIRCUIT
NATIONAL ELECTRICAL CODE
NEMA 3R ENCLOSURE
NEMA 12 ENCLOSURE
NEMA 4 ENCLOSURE
NEMA 4X ENCLOSURE
(E) DUPLEX RECEPTACLE, NEMA 5−20R, GROUNDING TYPE
NL
NEC
3R
4X
COMBINATION STARTER & DISCONNECT SWITCH
TRANSFORMER
METER
KEYED NOTE CALLOUT − NUMBER AS INDICATED
AT
AF
GFGI
GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
(E) FIXTURE − CHAIN, RECESSED, SURFACE OR PENDANT
HUNG. NUMBER INDICATES FIXTURE TYPE
EMT ELECTRICAL METALLIC TUBING
IMC INTERMEDIATE METAL CONDUIT
KVAR KILOVOLT CAPACITANCE
POWER POLE
J
HOA
SPD SURGE PROTECTION DEVICE
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 99 5
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
E001
ELECTRICAL LEGEND
K.J.L.
J.M.S.
K.J.L.
E001.DWG
12/31/15 PLAN CHECK CORRECTIONS1
cache pump house saw shack loft aspen tamar pondero juniperADMIN
EP
EP
EP
EXISTING POWER POLE
EXISTING FENCE
UG
NEW POLE BY
POWER COMPANY
EXISTING FENCE
EXISTING FENCE
EXISTING FENCE
UG
(E) JB5
(E) JB6
(E) JB2
(E) JB3
(E) JB7
(E) JB1
(E) JB8
(E) FIRE PUMP ANNUNCIATOR
SEE FP101 FOR DEMOLITION
REMOVE EXISTING FEEDER CONDUCTORS
FROM SAW SHACK. CAP CONDUIT AT FLOOR.
E501
E501
CONTRACTOR
STAGING AREA
E502
EXISTING SAW
SHACK PANEL
E501
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 99 5
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
E100
ELECTRICAL SITE PLAN
K.J.L.
J.M.S.
K.J.L.
E100.DWG
1" = 30’−0"1 ELECTRICAL SITE PLAN
0 30’ 60’
12/31/15 PLAN CHECK CORRECTIONS1
J
G
FI
GFI
J
J
T
J
J
G
FI
GFI
J
J
T
J
FACP
NEW PRESSURE
PUMP CONTROLLER
NEW FIRE PUMP
(E) ALARM J−BOX
NEW MAIN DISCONNECT
NEW PANEL "FPP"
480Y/277 V.
NEW FIRE PUMP
CONTROLLER
NEW PANEL "P"
240/120 V.
E
E
E
E E
E
HOA
NEW C.T. CABINET
NEW METER
FPP−1
NOTE:
ALL NEW PUMP ROOM WIRING SHALL BE
IN EMT OR LIQUID TIGHT STEEL CONDUIT
EP1
TRANSFORMER "P"
15 KVA
MOUNT ON WALL ABOVE
& TO THE LEFT OF PANEL
T
P−5 P−3
P−7
P−1EP1
P−4EP1
SPD
EP2
EP2
EP2
E501
E501
E501
E501
UG
UG
ED1
ED2
ED6
ED3
ED4
ED5
FACP
PH−7
PH−1
E
E
E
E E
E
JOCKEY PUMP
AND CONTROLLER ED6
ED6
ED6ED6
ED6
(E) PANEL "PH"
60 AMP
120/208 V. 3 PH.
ED2
ED2
PH−3
5 HOA
FIRE PUMP
CONTROL PANEL
ED2
PH−2
1/4
M
M
PH−4
E
ED3
ED3
ED3
ED3
ED3
ED3
ED3
ED3
ALARM J−BOX
ALARM LIGHT
ED3
E
ED2
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 99 5
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
E101
ELECTRICAL PLANS
K.J.L.
J.M.S.
K.J.L.
E101.DWG
1/2" = 1’−0"1 ELECTRICAL POWER PLAN
1/2" = 1’−0"2 ELECTRICAL DEMOLITION PLAN
ELECTRICAL DEMOLITION KEYED NOTES
MARK NOTE
ED1 CUT CONDUITS IN SLAB FLUSH & GROUT.
ED2 TO BE REMOVED.
ED3 TO REMAIN.
ED4 RELOCATED CONDUITS AS NEEDED FOR FIRE LINE
INSTALLATION.
ED5 REMOVE FEEDERS BACK TO PANEL IN SAW SHACK.
ED6 RELAMP (E) 2−LAMP T−8 FIXTURES.
0 1’ 2’1/2’0 1’ 2’1/2’
ELECTRICAL POWER KEYED NOTES
MARK NOTE
EP1 HOMERUN TO NEW PANEL. EXISTING CONDUIT & WIRE
NOT REMOVED TO REMAIN.
EP2 RUBBER FLOOR MAT. SEE SPECIFICATIONS.
12/31/15 PLAN CHECK CORRECTIONS1
PROVIDE 3" MIN. COVER
OF BEDDING SAND
CONDITION:
REPAIR METHOD:
REPAIR TO UTILITY CUT
A CUT FOR UTILITY INSTALLATION OR REPAIR.
OBTAIN A DIGGING PERMIT PRIOR TO ANY
EXCAVATIONS.
BACKFILL
UTILITY CUT
2" WARNING
TAPE WITH
METALLIC
CORE
COMPACTED BACK FILL− 4" COMPACTED TOPSOIL
SOD TO MATCH EXISTING GRADE
" M
IN
M
IN
#10 TRACER
WIRE
TRENCH & BACKFILL
PER UTILITY COMPANY
REQUIREMENTS. UTILITY
MUST INSPECT BEFORE
BACKFILLING
12,470 V.
480Y/277 V.
GROUNDING BY
UTILITY COMPANY
(E) POWER COMPANY
OVERHEAD PRIMARY & POLE
NEW POWER COMPANY
OVERHEAD PRIMARY
NEW POLE BY POWER COMPANY
NEW 4" SCH. 40 PVC PER POWER
COMPANY REQUIREMENTS
NEW POWER COMPANY
PAD MOUNT TRANSFORMER
PAD BY CONTRACTOR
C.T.
CABINET
NEW C.T. CABINET & METER BASE
PER POWER COMPANY REQUIREMENTS
METER
BASE
PNL
"FPP"
100 AMP
M.L.O.
480Y/277 V.
14,000 AIC
(E) WATER LINE
FIRE PUMP
CONTROLLER
FIRE
PUMP
JOCKEY
PUMP
PRESSURE
PUMP
CONTROLLER
3/4" EMT
w/3 − #12 &
1 − #12 GRD.
1 1/4" RIGID
w/3 − #4
& 1 − #6 GRD.
1 1/2" RIGID C. w/3 − 1/0
& 1 − #4 GRD.
1 1/4" RIGID w/4 − #2 & 1 − #6 GRD.
3/4" x 10’−0"
GROUND RODS
MIN. 10’−0" APART
#4 B.C.
2 − 4" SCH. 40 PVC PER POWER
COMPANY REQUIREMENTS
E501
E501
NEW MAIN DISC.
100 AMP, 3−POLE
BREAKER
SPD
3/4" C. w/4 − #10s & 1−
#10 GRD.
3/4" C. w/2 − #10
& 1 − #10 GRD.
PNL
"P"
60 AMP
MAIN BKR
240/120 V.
10,000 AIC
480 V.
240/120 V.
TRANSFORMER "P"
15 KVA
E501
E502
1 1/4" RIGID
w/4 − #2 &
1 − #6 GRD.
#4 B.C.
#10 B.C.
1" C. w/3 − #6
& 1 − #10 GRD.
E502
PROVIDE 3" MIN. COVER
OF BEDDING SAND
CONDITION:
REPAIR METHOD:
REPAIR TO UTILITY CUT
A CUT FOR UTILITY INSTALLATION OR REPAIR.
OBTAIN A DIGGING PERMIT PRIOR TO ANY
EXCAVATIONS.
BACKFILL
UTILITY CUT
2" WARNING
TAPE WITH
METALLIC
CORE
COMPACTED BACK FILL− 4" COMPACTED TOPSOIL
SOD TO MATCH EXISTING GRADE
" M
IN
TRENCH & BACKFILL
PER UTILITY COMPANY
REQUIREMENTS. UTILITY
MUST INSPECT BEFORE
BACKFILLING
3" MIN.
" M
IN
#10 TRACER
WIRE
4" FIBERGLASS ELL
w/48" RADIUS & FITTINGS
PER PACIFICORP DOCUMENT ZG 033
PROVIDE POLE STANDOFF PER
POWER COMPANY REQUIREMENTS
POLE RISER BY POWER COMPANY
STABILIZE POLE BEFORE TRENCHING
UNTIL BACKFILLED & COMPACTED
NEW POLE BY POWER COMPANY
GROUND LEVEL
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 99 5
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
E501
ELECTRICAL DIAGRAM,
DETAILS & SCHEDULES
K.J.L.
J.M.S.
K.J.L.
E501.DWG
SCALE: NONE1 TYPICAL SINGLE UNDERGROUND CONDUIT
NONE3 ELECTRICAL POWER RISER DIAGRAM
SCALE: NONE2 TYPICAL MULTIPLE UNDERGROUND CONDUITS
12/31/15 PLAN CHECK CORRECTIONS1
SCALE: NONE4 POLE RISER DETAIL
ENTIRE SHEET
1/0 COPPER
COUNTERPOISE
3/4" DIAMETER x
10’−0" LONG COPPER−CLAD
STEEL GROUND ROD
17674
RPE
S R
OF
ER ES
L E
K
V
NI J. E W
IS
EG
I
T
D
SIONA
L
IGNE
NEER
OREGON
14,R.
A
M
1 99 5
Case, Lowe & Hart, Inc. 2484 Washington Blvd.
Suite 510 Ogden, Utah 84401
801.399.5821 Fax 801.399.0728 www.clhae.com
SHEET OF
DRAWN BY:
CHECKED BY:
REDMOND AIR CENTER
DESCHUTES
PACIFIC NORTHWEST
DISTRICT RANGER
ISSUE INFORMATION
PROJECT NO:
CAD DWG FILE:
DESIGNED BY:
15072
F0REST SUPERVISOR
FOREST ENGINEER
DATE
DATE
DATE
AGRICULTURE
The Pacific Northwest Region
FOREST SERVICE
UNITED STATES
DEPARTMENT
OF
PROJECT TEAM
Protection Consultants, Inc.
1199 S. Main Street #101 Centerville, Utah 84014
801.295.6070 Fax 801.677.0000
FIRE BOOSTER
PUMP REPLACEMENT
NATIONAL FOREST
REGION 6
MARK DATE DESCRIPTION
E502
ELECTRICAL DETAILS
K.J.L.
J.M.S.
K.J.L.
E502.DWG
NONE2 GROUND ROD DETAIL
NONE1 PACIFICORP TRANSFORMER PAD/VAULT 12/31/15 PLAN CHECK CORRECTIONS1
| G001 - TITLE SHEET |
| Sheets |
| G001 - TITLE SHEET |
| MD101 - MECHANICAL DEMOLITION PLAN |
| MD101 - MECHANICAL DEMOLITION PLAN |
| Sheets |
| MD101 - MECHANICAL DEMOLITION PLAN |
| FP101 |
| FP102 |
| FP103 |
| E001 - ELECTRICAL LEGEND |
| Sheets |
| E001 - ELECTRICAL LEGEND |
| E100 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL PLANS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| E502 - ELECTRICAL DETAILS |
| E100 - ELECTRICAL SITE PLAN |
| Sheets |
| E001 - ELECTRICAL LEGEND |
| E100 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL PLANS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| E502 - ELECTRICAL DETAILS |
| E101 - ELECTRICAL PLANS |
| Sheets |
| E001 - ELECTRICAL LEGEND |
| E100 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL PLANS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| E502 - ELECTRICAL DETAILS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| Sheets |
| E001 - ELECTRICAL LEGEND |
| E100 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL PLANS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| E502 - ELECTRICAL DETAILS |
| E502 - ELECTRICAL DETAILS |
| Sheets |
| E001 - ELECTRICAL LEGEND |
| E100 - ELECTRICAL SITE PLAN |
| E101 - ELECTRICAL PLANS |
| E501 - ELECTRICAL DIAGRAM, DETAILS & SCHEDULES |
| E502 - ELECTRICAL DETAILS |
File details come from the government source that posted it. Updated .