Amendment01.pdf
PDF 21 KB Posted
- Attached to
- Redmond Air Center Fire Booster Pump Replacement Federal contract opportunity
- Solicitation number
- AG-04M3-S-16-0066
About this file
A. Amendment 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment02.pdf | ||
| C.Drawings.pdf | ||
| B.FullSpecPackage.pdf | ||
| A.FinalRACFirePumpRFP.pdf | ||
| D.BiddersPackage.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
CONTRACT ID CODE PAGE 1 OF 2 PAGES
2 AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06/16/2016
4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE
Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814
8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. AG-04M3-S-16-0066
* 9B.Dated 05/23/2016
* 10A.Mod Contract/Order #
* 10B.Dated (see Item 13) code facility code
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [x ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specifiy authority)
The changes set forth in item 14 are made in the Contract/Order # in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION
Project Name and Location: RAC FIRE BOOSTER PUMP REPLACEMENT
This amendment addresses the following (see attached addendum)
1. Pre-Bid Inquiries (PBI’s) for Contract Bidding
2. Preproposal Attendee List (see attached addendum)
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A.NAME AND TITLE OF SIGNER (Type or print)
16A.NAME AND TITLE OF CONTRACTING OFFICER
Contracting Officer
15B.CONTRACTOR/OFFEROR
By ______________________________ (Signature of person authorized to sign)
15C.DATE SIGNED 16B.UNITED STATES OF AMERICA
By______________________________ (Signature of Contracting Officer)
16C.DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
Addendum to Amendment 1
REVISIONS, PRE-BID INQUIRIES, REQUEST FOR INFORMATION RAC FIRE BOOSTER PUMP REPLACEMENT
REVISIONS
None
Pre-Bid Inquiries (PBI’s) for Contract Bidding
PBI-001
Note 28 on sheet FP101 was discussed. The by-pass or temporary piping conection should be installed past the existing 6” double check assembly to ensure backflow protection to the supply during construction.
PBI-002
Power company information is as follows:
Pacific Power, Co Dan McDevitt, 541-388-7132, daniel.mcdevitt@pacificorp.com Work Order # 6018555 (work order was closed due to inactivity, it will need to be reopened or a new one established by the Contractor)
Coordination and payment with the power company for all required work including utility upgrading fees is the responsibility of the Construction Contractor.
PBI-003
It was discussed and confirmed that the existing concrete pump pads for both the fire pump and the jockey pump are to remain and be utilized with the new pumps as long as they fully support the new pumps.
PBI-004
It was discussed and confirmed that all plumbing associated with the existing fire booster pump is to be removed. The plumbing for the existing building fire sprinkler system and the outside hose bibb are to remain.
Requests for Information (RFI’s) for Plans and Specifications
None
Preproposal Attendee List
Vic Andermatt, DSL Builders 503 363-0202 (vica@dsl_builders.com) Chuck Hegele, American Sprinklers 541 948-0679 (chuck@chuckasi.com) Matt Freeman, CS Construction 541 517-5912 (mattf@csconstruction.com)