e.TaskOrderForm.doc

DOC document 43 KB Posted

Attached to
Terrestrial Ecological Unit Inventory Requirements Contract
Solicitation number
AG-04M3-S-13-0019
Issued by

About this file

E. Task Order Form

View the file

Other files

File Type Posted
i.WAwage_determination.mht MHT file
d.TEUI_2013_Umatilla_Contract_area.jpg JPG image
a.offerors_packet.doc DOC document
h.ORwage_determination.mht MHT file
g.taskordermap_Proposed_2.jpg JPG image
b.final_solicitation.doc DOC document
j.wage_determination05-2569.txt TXT text file
f.taskordermap_Proposed_1.jpg JPG image
c.TEUI_2013_Malheur_Contract_area.jpg JPG image
k.FireProtectionandSuppressionr6_fS_6300_52.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK ORDER NO.

IF THIS ORDER IS GREATER THAN $2,500.00, IT IS

NOT VALID UNTIL SIGNED BY THE CONTRACTING OFFICER

Contract No.

Project Name:
Terrestrial Ecological Unit Inventory Task Order 1
County: Garfield, Columbia WA

Contractor:

Issuing and Billing Office:

Wallowa-Whitman National Forest

PO Box 907

Baker City, OR 97814

Item No.

Subitem No.

Description
Job Code
Quantity to date
Quantity

Order

Unit
Unit

Price Amount

New: Map correlate and document map units and components per standards; incl. digitizing, joining of new mapping. Includes population of information in corporate databases for data map units, pedon descriptions, legend(s), ecological types, official series or other data needs.
NFIM14
0
80,000
Ac
$
$

Legacy: correlate map edits and correction –update digital maps and legends, joining, editing quality joins of existing surveys.

2
1
Correlate and update map units, ecological types: digital map and legends;
0
20
EA
$
$
2
2
Update/edit data map unit, pedon descriptions in NASIS or other database
0
22
EA
$
$
2
3
Review, edit/update series descriptions
0
0
$
$
Required Delivery Date or Number of Calendar Days: All work shall be completed by December 31, 2014. Work is estimated to begin October 1, 2013 .
Total Price: $

Contractor: (Name and Signature)

Requested By: (Name and Signature)

DONALD C. JUSTICE

COR

Fund Authorization: (Name and Signature)

DAVID M. HATFIELD

Line Officer

Ordered By: (Name and Signature) Andrea Stanbro, Contracting Officer

Order Date:
Job Code: NFIM14

Original to CO, CC to Contractor, B&F and COR

File details come from the government source that posted it. Updated .