About this file

e. Drawing Rd Maintenance Table

View the file

Other files for this federal contract opportunity

Other files attached to Cove II Stewardship, newest first.
File Type Posted
c.VolumeSummary.docx DOCX document
b.ScheduleofItems.doc DOC document
Amendment-01.docx DOCX document
d.PreproposalMeetingNotes.docx DOCX document
a._Appendix_A.docx DOCX document
h._WD_77.pdf PDF
g.traffic-control-plan-gt-3-3.docx DOCX document
e.3_Drawing_T-839_WB-12.pdf PDF
c._Appendix_A.docx DOCX document
e.5_Road_Mtce_TSpecs_9-19-12.docx DOCX document
b.BiddersPackage.doc DOC document
e.1_Drawing_T-838_WB-6.pdf PDF
a._Solicitation.doc DOC document
f.CoveII_HELI_Stew_Map_2015.pdf PDF
e.2_Drawing_T-839_EB-2.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:

Contract Road Maintenance Requirements Summary

Road
Termini
Miles
Applicable PREHAUL Road Maintenance Specifications
From
To
T-811F
T-813F
T-831F
T-832F
T-834F
T-836F
T-838F
T-839F
T-854F
T-891F
6220
Mill Creek Lane
6220

P

6220
END

UNIT 106

P

P

END

P
P

*6220

6220
END OF

USE

P

P = Contractor Performance Item, D = Deposit to Forest Service, D3 = Deposit to Third Party

Special Requirements

* Work required ONLY if Contractor elects to open and use the road

Road
Termini
Miles
Applicable DURING HAUL Road Maintenance Specifications
From
To
T-811F
T-812F
T-813F
T-831F
T-834F
T-836F
T-838F
T-839F
T-854F
T-89F1
6220
Mill Creek Lane
6220

P

6220
END

UNIT

P

P

END

P
P

*6220

END OF

P
P
Road
Termini
Miles
Applicable POST HAUL Road Maintenance Specifications
From
To
T-811F
T-831F
T-834F
T-836F
T-838F
T-839F
T-891F
6220
Mill Creek Lane
6220
1.0
P

P

P

6220
END

UNIIT 106

3.0

P

END
.5

P

*6220

6220
END OF

.25

P

COVE II HELI STEWARDSHIP – APPENDIX C

ROAD MAINTENANCE REQUIREMENTS DETAILS (2012)

1
2
3
4
5
6
7
8
9

Special

Dust

Post

Road No.
Project
Travel Way
Brush
Abatement
Seasonal

Haul

and
Specifi-

X

And

Applic

Mainte-
Snow
Termini
cation
Width
Slope
Comp
Log Out
Surfacing
Product
Rate
Width
nance
Removal
Block
Treat
6220
T811F
EX
AI
B

P

T854F

6220200
T836F

Drawing

EX
AI

U

#UD-1

P

#UD-1

T854F

6220205
T839F

Drawing

EX
AI

W

#WB-12

P

#WB-12, #EB-2

T854F

6220240
T839F

Drawing

EX
AI

W

#WB-12

P

#WB-12, #EB-2

T854F

ABBREVIATIONS for ROAD MAINTENANCE REQUIREMENTS TABLE

Column No.
Heading
Entry
Explanation
Any
Blank
Except as otherwise described, no entry indicates Contractor is not authorized or required to perform the work item(s).
Any
RC
This work requirement applies only when haul of project related construction materials occurs.
2
Special Project Specification
Number
Entry indicates Special Project Specification which applies.
3
Travel Way
EX
Contractor shall maintain the traveled way to the width existing upon entry, or at the completion of Specified Road work.
Numbers
Contractor shall maintain the traveled way to the standard width indicated by the entry, plus curve widening, in accordance with Section T-811. If required, the road template shall be shaped to this width and to the designated cross slope before haul and during recurring maintenance.
IS, C, OS, F, or AI
Cross slopes are designated as:

IS (Inslope), C (Crown), OS (Outslope), F (Flat), AI (As Is).

A or B
If compaction is required.
4
Brush and Log Out
Numeric & R and or L
Contractor shall remove brush for specified width on either or both the right (R) side or left (L) side of road.
As Staked
Limits of brushing are as staked or marked in the field.
OPT
Contractor may use hand or mechanical means of brushing.
H
Only hand brushing may be used.
5
Surfacing
Aggregate Grading
Contractor shall place surfacing on roads listed according to the grading indicated.
D
Contractor is to make deposits for listed road maintenance, including surface rock replacement.
Column No.
Heading
Entry
Explanation
6
Dust Abatement
OPT
Product selection is Contractor's choice from those listed in Section T-812.
ALL
All products are available for contractor selection. Contractor may also choose water or varying the time of day haul occurs.
Product Abbr.
Unless otherwise agreed, Contractor is restricted to product listed corresponding to the abbreviation shown in Section T-812; (i.e., LigS = Lignon Sulfonate) Application rates are estimated amounts.
EX
Contractor shall abate dust on the existing width
Numbers
Contractor shall abate dust to the width indicated by entry.
7
Seasonal Maintenance
W
Waterbars and/or crossditching shall be required prior to expected seasonal precipitation.
U
Utah dip shall be required prior to expected seasonal precipitation.
B
Entrance barriers shall be installed by Contractor prior to nonuse periods.
8
Snow Removal
TS
Snowplowing authorized for Contractor's Operations without recreation access being provided per Section T-803 requirements.
JU
Snowplowing authorized, but must provide for recreation joint use per Section T-803 requirements.
Blank
Snowplowing is not authorized. Forest Service may authorize plowing by permit when not in conflict with other uses.
9
Post Haul
P
P denotes that work is Contractor's Responsibility to perform.