Amendment-01.docx
DOCX document 27 KB Posted
- Attached to
- Cove II Stewardship Federal contract opportunity
- Solicitation number
- AG-04KK-S-15-0012
About this file
Amendment No. 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| c.VolumeSummary.docx | DOCX document | |
| b.ScheduleofItems.doc | DOC document | |
| d.PreproposalMeetingNotes.docx | DOCX document | |
| a._Appendix_A.docx | DOCX document | |
| h._WD_77.pdf | ||
| g.traffic-control-plan-gt-3-3.docx | DOCX document | |
| e.3_Drawing_T-839_WB-12.pdf | ||
| c._Appendix_A.docx | DOCX document | |
| e.5_Road_Mtce_TSpecs_9-19-12.docx | DOCX document | |
| b.BiddersPackage.doc | DOC document | |
| e.1_Drawing_T-838_WB-6.pdf | ||
| a._Solicitation.doc | DOC document | |
| f.CoveII_HELI_Stew_Map_2015.pdf | ||
| e.4_RD_MTC_TABLES_9-25-12.docx | DOCX document | |
| e.2_Drawing_T-839_EB-2.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
2 AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
6/3/2015
4. REQUISITION/PURCHASE REQ. NO
5. PROJECT NO.(IF APPLICABLE)
6. ISSUE BY CODE
7. ADMINISTERED BY (if other than item 6) CODE
Blue Mountain Acquisition Management 72510 Coyote Road Pendleton, OR 97801
| 8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) |
| X |
| 9A. Amend Solicitation No. |
AG-04KK-S-15-0012, Cove II Heli Stewardship Project
| X |
| 9B. Dated 5/28/2015 |
10A. Modification of Contract/Order #
10B. Dated
| code |
| facility code |
11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION
[ X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [X ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to; (specify authority):
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..
C. This supplemental agreement is entered into pursuant to authority of:
D Other: (Specify type of modification and authority):
E. IMPORTANT: Contractor [] is not [X] is required to sign this document and return 1 Original to the issuing office.:
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible DELETE: 52.217-7 Page 34 Option for Increased Quantity from main solicitation DELETE: 52.212-2 5.(h) Page 40 Options from main solicitation DELETE: Under Contract Documents, Exhibits, or Documents, Page 16, No. 10 Schedule & Reports, in table, the requirement to submit 2 copies of the Soil Erosion and Water Control Plan REPLACE: Appendix A (attached) in its entirety REPLACE: SF1449 and B.1 Schedule of Service Items on Bidders Package (attached) ADD: Volume Summary in Appendix B behind Page 3 AT.4 Schedule of Payment Units (attached) CHANGE: Wording on Page 16 of main solicitation Schedule of Work No. 2 from from “outside this period” to “within this period.
CHANGE: Wording on Page 34 Appendix C to Road Maintenance Specs, Drawings, and T Specifications 22 pages ADD: Pre-Proposal Meeting Notes (attached) dated June 2, 2015
SOLICITATION DUE DATE AND TIME HAS NOT CHANGED.
By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER
Gary Dillavou, Contracting Officer
15B. CONTRACTOR/OFFEROR
By (Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
By______________________________ (Signature of Contracting Officer)
16C. DATE SIGNED
Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243
File details come from the government source that posted it. Updated .