AG-04KK-S-14-0011.rtf

RTF text file 31 MB Posted

Attached to
John Day Helibase Type I Helipad Construction and Site Work Federal contract opportunity
Solicitation number
AG-04KK-S-14-0011
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation Document--PLEASE NOTE THERE IS A SITE VISIT SCHEDULED FOR AUGUST 20TH AT 1000. PLEASE SEE THE SOLICITATION FOR DETAILS.

Text of this file

AG-04KK-S-14-0011 John Day Helibase Type I Helipad Construction and Site Work Page | 1 of 34 file_0.emf file_1.wmf file_2.emf file_3.wmf file_4.emf file_5.wmf

HYPERLINK \l "_Toc395161548" SECTION B - Supplies or Services and Prices/Costs Schedule of Items6
HYPERLINK \l "_Toc395161549" SECTION C - Description/Specifications/Statement of Work7
HYPERLINK \l "_Toc395161553" SECTION D - Packaging and Marking8
HYPERLINK \l "_Toc395161554" SECTION E - Inspection and Acceptance9
HYPERLINK \l "_Toc395161556" SECTION F - Deliveries or Performance10
HYPERLINK \l "_Toc395161559" SECTION G - Contract Administration Data11
HYPERLINK \l "_Toc395161567" SECTION H - Special Contract Requirements13
HYPERLINK \l "_Toc395161579" SECTION I - Contract Clauses18
HYPERLINK \l "_Toc395161586" SECTION J - List of Documents, Exhibits, and Other Attachments25
HYPERLINK \l "_Toc395161587" SECTION K - Representations, Certifications, and Other Statements of Offerors26
HYPERLINK \l "_Toc395161593" SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents32
HYPERLINK \l "_Toc395161599" SECTION M - Evaluation Factors for Award35

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

ITEM NO.

SUPPLIES/SERVICES

QUANTITY

PAY

UNIT

UNIT

PRICE

AMOUNT

AG-04KK-S-14-0011

Helipad Constuction Site Work

LS

Includes mobilzation,bonding, all labor, transportation, equipment, materials and incidentals shown in the plans and supplementals

TOTAL ALL ITEMS

SECTION C - Description/Specifications/Statement of Work

C-1 Description of Work: Contractor shall demolish and remove old concrete warehouse slab, backfill, compact and re-grade area. Place and re-grade fill material at two existing helipads and at the new helipad. Install new concrete helipad. Paint new helipad and the two existing helipads and place solar lights on all three pads. Contractor shall provide all labor, material, transportation, equipment, and incidentals necessary to complete the requirements of the project successfully.

C-2 Project Location: Grant County Regional Airport., graveled surfaced area to South of airport terminal being used by Forest Service for helicopter operations; Go South on West Bench Rd. at intersection with Highway US-26. Continue 3 miles to the intersection with Airport Rd. Turn left on Airport Rd and continue on for 0.7 miles. Turn left into airport then continue South along airport access road to gated FS heliport area.

Grant County Regional Airport 720 Airport Road John Day, OR, 97845

Provide the project location along with detailed driving instructions.

C-3 Price Range Project is estimated to be between $25,000 and $100,000

C-4 AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C-5 AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D - Packaging and Marking

No clauses included in this section.

SECTION E - Inspection and Acceptance

E-1 FAR 52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/" http://www.acquisition.gov/far/

FAR 52.246-1 Contractor Inspection Requirements. (APR 1984) FAR 52.246-12 Inspection of Construction. (APR 1996)

SECTION F - Deliveries or Performance

F-1 FAR 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/" http://www.acquisition.gov/far/

FAR 236.15 Schedules for Construction Contracts (APR 1984) FAR 52.242-14 Suspension of Work. (APR 1984)

F-2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 275 calendar days. The time stated for completion shall include final cleanup of the premises.

NOTE: Work is estimated to begin September 15, 2014.

SECTION G - Contract Administration Data

G-1 FAR 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for August 20, 2014 at 10:00 am.

Name: Zeke Langum

Address: 431 Patterson Bridge Road; John Day, OR 97845

Telephone: 541-575-3022

(c) Participants will meet at – Malheur National Forest—Supervisor’s Office; 431 Patterson Bridge Road; John Day, OR 97845

G-2 AGAR 452.215-73 Postaward Conference. (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: 431 Patterson Bridge Road; John Day, OR 97845.

NOTE: The Contractor shall bring the following to the meeting for discussion and/or approval:

Contract, Specifications, Drawings

Safety Plan Fire Plan Work Schedule

G-3 INVOICE PROCESSING PLATFORM (IPP)

The “Submit Invoice-to” address for USDA orders is the Department of Treasury’s Invoice Processing Platform (IPP). The Contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasure. All invoices shall be submitted via the electronic Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.

Vendors register at: https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account.

G-4 FINAL CLEANUP

Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all contractor’s rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.

G-5 CONTRACT RELEASE

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations: _____________"

G-6 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G-7 APPROVAL OF SUBCONTRACTING

The Contractor shall request approval from the Contracting Officer prior to entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

A.The name, address, and telephone number of the subcontractor.
B.The date upon which the subcontract was entered into and its duration
C.A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.
D.Documentation of the subcontractor's representative authority.

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

SECTION H - Special Contract Requirements

H-1 FAR 52.236-4 Physical Data (APR 1984) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by [insert a description of investigational methods used, such as surveys, auger borings, core borings, test pits, probings, test tunnels].

(b) Weather conditions-- Weather conditions for the months of September and October usually range from cooler mornings with frost to highs of around 70 degrees. There generally isn’t a lot of precipitation during these months, but rain showers are possible during this time. The months of May and June generally have cooler temperatures in the morning with high temperatures between 70 and 80 degrees in the afternoon. Rain showers are possible during these months. The months of November through April commonly have colder temperatures throughout the day with possibilities of rain or snow.

(c) Transportation facilities-- Access to this site is blocked by a lock gate, a key will need to be temporarily issued during construction.

(d) Contractor must work with and stay in contact with airport administrator.

H-2 Additional Requirements or Restrictions Work site at pads will be closed to the public. Contractor shall work with the Forest Service to work around fire operations.

Electrical and water are available on site for Contractor use during contract performance.

H-3 SUBMITTALS

The following shall be submitted on this project:

Title Referenced By Specification No.

Time of Government Approval after Submittal Work Schedule 01009 - 1.9 10 days All submitalls in 01009 03306 – 1.2 10 days Concrete Mix Design 03306 – 1.2 10 days Manufactures data for admixtures 03306 – 1.2 10 days Proctor Results 02220 – 1.3 10 days

SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Title Referenced By Specification No.

Time of Government Approval after Submittal Shop drawings for reinforcements used on this project 03306 - 1.2 10 days

MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title Referenced By Specification No.

All Warranties for a given product 01009 3.4 Mill Test Reports 03306 – 1.2 Batch Certificates for each load of ready mix 03306 – 1.2 Air Content Test 03306 – 3.4 Compression Tests 03306 – 3.4 Slump Tests 03306 – 3.4 All testing required in 01009 01009

H-4 Product Substitution Any modification of other items, designs, materials, products or equipment (including Government-furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

H-5 Conformity with Drawings and Specifications Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.

A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

C.Government inspections and tests are for the sole benefit of the Government and do not--
1.Relieve the Contractor of responsibility for providing adequate quality control measures;
2.Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
3.Constitute or imply acceptance; or
4.Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.

D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

H-6Construction Stakes, Lines, and Grades
(a)Unless a Pay Item for Construction Staking is included in the Schedule of Items, the Government will set initial construction stakes establishing lines, slopes, and continuous control points, reference lines, and bench marks for other structures and improvements and will furnish the Contractor with all necessary information relating to lines, slopes, and grades.

(b) These stakes and control points shall constitute the field control from which the Contractor shall establish other necessary controls and execute the work. The Contractor shall furnish, without additional compensation, all additional stakes, all templates, batter boards, and other materials and supplies necessary for marking and maintaining points and lines established. If any construction control points have been destroyed or displaced or are erroneous, the Contractor shall promptly notify the Contracting Officer.

(c) The Contractor is responsible for the preservation of all stakes and control points. The cost of replacing them will be charged to the Contractor when destroyed due to Contractor's negligence or operation.

(d) In the case of alterations which involve any changes in construction staking, the Contractor shall cooperate with the Contracting Officer and facilitate the prompt re-establishment of the field control for the altered or adjusted work.

H-7 Contractor’s Use of Existing Roads The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.

The roads authorized for use will be subject to the following general conditions:

(1) State laws governing traffic rules and equipment requirements on State and County Highways.

(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.

The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.

H-8 Traffic Control The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administrations and applicable safety codes.

The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings.

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

H-9 Control of Material Rights In and Use of Materials

(a) The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of the work which was originally contemplated to be constructed with such material.

(b) Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.

Material Sources

(a) Designated Sources - Sources of local materials are designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with Clauses 52.243-5, Changes and Changed Conditions or Clause 52.236-2, Differing Site Conditions.

(b) Contractor Furnished Sources - When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor furnished source material result in financial disadvantage to the Government. Quality Testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

Storage Stockpiling of Materials

Materials shall be stored to assure the preservation of quality and fitness for the work. Stored materials shall be located to facilitate their prompt inspection. Sites on Forest Service administered land, approved by the Forest Service, may be used for storage purposes and for the placing of Contractor's plant equipment. All storage sites provided by the Forest Service shall be restored at Contractor's expense. Contractor shall be responsible for making arrangements for storage on other than Forest Service administered lands.

Earthwork Tolerance

Changes within specified tolerances (such as adjustment of horizontal or vertical alignment) shall be made as necessary to maintain earthwork quantities substantially as designed within balance points. Such adjustments shall not be considered as "Changes" under Clause 52.243-5.

H-10 Safety Contractor shall submit a project specific safety plan, addressing at a minimum the information below; including an accident prevention plan; and mitigation procedures, to the Contracting Officer for review and approval at the post award meeting. Contractor shall also address company policy on cell phone use while driving vehicles and operating machinery.

Contractor will be working next to a working airport. Contractor will be required to stay in contact with the airport administrator throughout the project to ensure public and Contractor employee safety. This work environment could include stepping/tripping hazards, flying material while demolishing existing slab, working around machinery, exposure and multiple other risks that are inherent in this type of work.

Driving to the project will take the Contractor through agricultural and residential areas with public and commercial use.

Safety signing, barricades, fencing, and traffic control in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) shall be required.

Inherent hazards of working in remote locations of National Forests include, but are not limited to:

Traffic hazards
Heavy equipment operations

Air Traffic and taxiing airplanes Pedestrian and government traffic in airport Backing into objects

High db noise Steep side slopes or soft ground for rollovers Refueling hazards Exceeding equipment limitations Unsafe equipment / lack of safety equipment Operator fatigue

SECTION I - Contract Clauses

I-1 FAR 52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/" http://www.acquisition.gov/far/
http://www.dm.usda.gov/procurement/policy/agar.htm" http://www.dm.usda.gov/procurement/policy/agar.htm

FAR 52.204-7 System for Award Management. (JUL 2013) FAR 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) FAR 52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011) FAR 52.222-3 Convict Labor. (JUN 2003) FAR 52.222-6 Construction Wage Rate Requirements. (MAY 2014) FAR 52.222-7 Withholding of Funds. (MAY 2014) FAR 52.222-8 Payrolls and Basic Records. (MAY 2014) FAR 52.222-9 Apprentices and Trainees. (JUL 2005) FAR 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) FAR 52.222-11 Subcontracts (Labor Standards). (MAY 2014) FAR 52.222-12 Contract Termination - Debarment. (MAY 2014) FAR 52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014) FAR 52.222-14 Disputes Concerning Labor Standards. (FEB 1988) FAR 52.222-15 Certification of Eligibility. (MAY 2014) FAR 52.222-21 Prohibition of Segregated Facilities. (FEB 1999) FAR 52.222-26 Equal Opportunity. (MAR 2007) FAR 52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999) FAR 52.222-36 Affirmative Action for Workers with Disabilities. (OCT 2010) FAR 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) FAR 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) FAR 52.228-2 Additional Bond Security. (OCT 1997) FAR 52.228-11 Pledges of Assets. (JAN 2012) FAR 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) FAR 52.228-14 Irrevocable Letter of Credit. (MAY 2014) FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014) FAR 52.232-23 Assignment of Claims. (MAY 2014) FAR 52.232-27 Prompt payment for construction contracts. (MAY 2014) FAR 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013) FAR 52.233-1 Disputes. (MAY 2014) FAR 52.233-3 Protest after Award. (AUG 1996) FAR 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) FAR 52.236-2 Differing Site Conditions. (APR 1984) FAR 52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984) FAR 52.236-5 Material and Workmanship. (APR 1984) FAR 52.236-6 Superintendence by the Contractor. (APR 1984) FAR 52.236-7 Permits and Responsibilities. (NOV 1991) FAR 52.236-8 Other Contracts. (APR 1984) FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984) FAR 52.236-11 Use and Possession Prior to Completion. (APR 1984) FAR 52.236-12 Cleaning Up. (APR 1984) FAR 52.236-13 Accident Prevention. (NOV 1991) FAR 52.236-14 Availability and Use of Utility Services. (APR 1984) FAR 52.236-15 Schedules for Construction Contracts. (APR 1984) FAR 52.236-17 Layout of Work. (APR 1984) FAR 52.236-21 Specifications and Drawings for Construction. (FEB 1997) - Alternate I (APR 1984) FAR 52.243-5 Changes and Changed Conditions. (APR 1984) FAR 52.246-21 Warranty of Construction. (MAR 1994) FAR 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984) FAR 52.249-10 Default (Fixed-Price Construction). (APR 1984)

AGAR 452.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996) AGAR 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996) AGAR 452.236-72 Use of Premises. (NOV 1996) AGAR 452.236-73 Archaeological or Historic Sites. (FEB 1988) AGAR 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) AGAR 452.236-76 Samples and Certificates. (FEB 1988) AGAR 452.236-77 Emergency Response. (NOV 1996)

I-2 FAR 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (JUN 1988) The specifications cited in this solicitation may be obtained from:

Specification Address

Or you may access them from: http://www.fs.fed.us/database/acad/welcome.htm.

Specification Address AASHTO Standards American Association of State Highway and Transportation Officials 341 National Press Building Washington, DC 20024

ACI

American Concrete Institution Box 19150 Redford Station Detroit, MI 48219 ASTM Standards American Society for Testing Materials 1916 Race Street Philadelphia, PA 19103

(215) 199-5462

FS

Federal Specifications (GSA) Building 197, Washington Navy Yard, SE Washington, DC 20407

MUTCD

Manual on Uniform Traffic Control Devices Superintendent of Documents U.S. Government Printing Office Washington, DC 20402

The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.

I-3 FAR 52.225-9 Buy American - Construction Materials. (MAY 2014)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means-

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if-

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of Quantity Price measure (dollars)* Item 1:

Foreign construction material ________ ________ ________ Domestic construction material ________ ________ ________ Item 2:

Foreign construction material ________ ________ ________ Domestic construction material ________ ________ ________

* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

I-4 FAR 52.228-13 Alternative Payment Protections. (JUL 2000)

(a) The Contractor shall submit one of the following payment protections: []

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within [] days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I-5 FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)

(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

I-6 FAR 52.244-6 Subcontracts for Commercial Items. (MAY 2014)

(a) Definitions. As used in this clause-

Commercial item has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.

Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509), if the subcontract exceeds $5,000,000 and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.219-8, Utilization of Small Business Concerns (May 2014) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212(a));

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

(ix) 52.225-26, Contractors PerformingPrivate Security Functions Outside the United States JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.

(xi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

I-7 AGAR 452.228-70 Alternative Forms of Security. (NOV 1996) If furnished as security, money orders, drafts, cashiers checks, or certified checks shall be drawn payable to: USDA Forest Service.

I-8 AGAR 452.209 – 71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS Alternate 1 (Feb 2012).

(a) This award is subject to the provisions contained in sections 433 and 434 of the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, as amended and/or subsequently enacted, regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it -

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434, amended and/or subsequently enacted.

SECTION J - List of Documents, Exhibits, and Other Attachments

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages

1. Project Drawings—Title Sheet

2. Project Drawings—Proposed Work, Plan View

3. Project Drawings—Plan View

4. Specifications—General Information and Requirements; Section 01009

5. Specifications—Excavation, Backfill, and Embankment; Section 02220

6. Specifications—Minor Concrete; Section 03306

7. DOL Wage Decision No.: OR140001, OR1; Rev.: 07/11/2014

8. Fire Protection and Suppression (R6-FS-6300-52)

9. Experience Questionnaire

SECTION K - Representations, Certifications, and Other Statements of Offerors

K-1 FAR 52.204-8 Annual Representations and Certifications. (MAY 2014) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237310.

(2) The small business size standard is $33.5 million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[] (i) Paragraph (d) applies.

[] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless-

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include provision at 52.204-7, System for Award Management.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, 2010, or 2012.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xvi) 52.225-2, Buy American Certificate.

This is the start of the file's text. The full file is on GovTribe.

Other files for this federal contract opportunity

Other files attached to John Day Helibase Type I Helipad Construction and Site Work, newest first.
File Type Posted
SECTION_01009.docx DOCX document
g.02220_-_Excvation ABC.doc DOC document
a._amend1.doc DOC document
i.OR1_dvb.mht MHT file
d.2.pdf PDF
AG-04KK-S-14-0011.docx DOCX document
b.AG-04KK-S-14-0011_bidders.docx DOCX document
g.02220_-_Excvation ABC.doc DOC document
k.__Experience.Questionnaire.doc DOC document
c.1.pdf PDF
AG-04KK-S-14-0011_bidders.rtf RTF text file
d.2.pdf PDF
e.3.pdf PDF
j._19_r6_fs_6300_52.doc DOC document
i.OR1_dvb.mht MHT file
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .