Addendum_to_Amendment_3_-_RFIs_FINAL_(002).docx
DOCX document 19 KB Posted
- Attached to
- Goose & Soda Creek Drainage Reconstruction Federal contract opportunity
- Solicitation number
- AG-04GG-S-16-0001
About this file
Addendum to Amendment 3 - RFIs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Goose_Culvert_Main_3-8-16_10_7th_Mt__M_S.pdf | ||
| Goose_Culvert_Main_3-8-16_9_7th_Mt__M_S.pdf | ||
| Goose_Soda_Amendment_2.pdf | ||
| Addendum_to_Amendment_2_-_RFIs.docx | DOCX document | |
| Addendum_to_Amendment_1_-_RFIs_1.docx | DOCX document | |
| Goose_Soda_Amendment_1.pdf | ||
| Soda_ _Goose_Specifications.pdf | ||
| Goose_and_Soda_Solicitation_FINAL.pdf | ||
| Soda_and_Goose_Creek_Signed_Drawings.pdf | ||
| Goose_and_Soda_Solicitation_FINAL.pdf | ||
| Soda_and_Goose_Creek_Signed_Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to Amendment 3
REQUESTS FOR INFORMATION GOOSE & SODA CREEK DRAINAGE RECONSTRUCTION PROJECT
RFI’s
RFI-010
Can creek or lake water be used for planting, Dust Control, Compaction requirements and Fire protection?
Answer – Yes, according to FP-03 Specification 725.01 Water:
725.01 Water. Conform to the following:
(a) Water for mixing or curing cement concrete, mortar, or grout. Conform to AASHTO M 157. Potable water of known quality may be used without testing according to AASHTO T 26. Potable water is safe for human consumption as defined by the public health authority having jurisdiction.
(b) Water for planting or care of vegetation. Furnish water that is free of substances injurious to plant life such as oils, acids, alkalies, or salts.
(c) Water for earthwork, pavement courses, dust control, and incidental construction. Furnish water free of substances detrimental to the work.
RFI-011
If water from creek or lake is available could you provide location for takeout, providing we have the correct fish screens in place prior to suction?
Answer - Yes, location for takeout will be staked or flagged by the C.O. or his Representative to provide an area that will produce the least resource damage.
RFI-012
Would like bottom elevations on both ends of the existing culverts at Soda and Goose.
Answer - Goose Creek Existing Culvert Elevations: Culvert Inlet = 4996.82’, Culvert Outlet = 4994.99’. Soda Creek Existing Culvert Elevations: Culvert Inlet = 4991.32’, Culvert Outlet = 4990.07’
RFI-013
Does the contractor require proof of Bond ability for this project? If so, what is required?
Answer - Bonding Requirements are covered in – Block 12A and 12B (Required Performance and Payment Bonds) along with I-5, Performance and Payment Bonds - Construction
RFI-014
Is the AC disposal site only for AC Grindings or will AC chunks be accepted at the Seven Mt. Pit?
Answer - The contractor is responsible for disposing of all asphalt that is removed during the construction of Soda and Goose Creek drainage construction off of Government/Forest Service lands. Sheets # 9 of 84 & # 10 of 84 have been revised and are attached to this solicitation amendment.
RFI-015
Goose Creek has a diversion plan for the upstream side, is there a plan for the downstream side?
Answer - The Diversion Plan for the downstream side of Goose Creek is located on sheet #73 of 84. The quantities for the diversion roadway section were based on providing enough material to construct the upstream side diversion roadway so that the pile caps and culvert placement/construction could be completed on the downstream side. Once the pile caps and culvert placement/construction is completed on the downstream side, the pile caps and culvert structure would then be backfilled and asphalt pavement placed on top of the downstream section in order pass 2-way traffic on the downstream side. This will allow for the construction of the upstream side of the pile caps and culvert. The complete Diversion Plan for the Goose Creek drainage construction is located on sheet numbers # 71-73 of 84.
RFI-016
Pay Item 20404 takes care of the upstream division road, Center line shoring will take up to 4 to 5 feet of the road, therefore, addition area on the downstream side will require additional fill material in order to place the upstream section of the culvert. Will this be paid for under Pay Item 20404 also?
Answer – If it is deemed that additional material is necessary to provide for shoring then a contract modification will be executed for the additional material.
RFI-017
Goose Creek center line excavation is 12 feet deep, therefore temporary traffic barriers should be required to protect traffic during construction of both half of the culvert, (taking up more room), how would this be paid for?
Answer – Carsonite Marking Posts have been listed on the Temporary Traffic Control Plan to serve as temporary traffic barriers. These markers require a smaller width to install than Drums, so this will reduce the amount of roadway width needed to pass traffic safely. If it is deemed that Carsonite marking posts are not appropriate and barriers are required then a contract modification will be issued.
RFI-018
Is there a designated Access point or location for equipment to enter the creeks at Goose and Soda, (for placement of logs, stream and fish rocks)?
Answer – There will be two entrance points at each site, one upstream and one downstream of the project. Exact locations will be determined in the field by the Contracting Officer’s Representative.
RFI-019
Does the technical Information for qualification or will it be assigned a point system and the same for price/costs schedule?
Answer –Technical Proposal evaluation - See L-16 Evaluation Criteria.
Business Proposal (Price/Cost) will be evaluated to determine the reasonableness of the proposed price. See page 96 of the solicitation.
RFI-020
How will the contractor be selected?
Answer - See Section M – Evaluation Factors for Award
RFI-021
What is the thickness of the existing asphalt is on the existing road? Should we assume 3” since the new road gets 3” of asphalt? Since this pays by the SY it would be nice to know.
Answer – According to the Drill/Boring Logs taken at the Soda and Goose Creek crossings with Cascade Lakes Hwy/County Road 46, the thickness of the asphalt is 5 inches.
RFI-022
Sheet R-6 indicates that asphalt grindings can be disposed of in the 7th Mountain Gravel Pit, Sheet R-6 item 20303 remarks say to dispose of off govt land. Please clarify.
Answer - The contractor is responsible for disposing of all asphalt that is removed during the construction of Soda and Goose Creek drainage construction off of Government/Forest Service lands. The 7th Mountain Gravel Pit drawing sheets # 9 & # 10 of 84 have been revised and are attached to this solicitation amendment.
RFI-023
Item 20401 says there is 425 in place CY’s for the diversion on Soda Cr. Item 20404 says in the remarks column that there is 910 in place CY for the diversion. Please clarify the difference in these two items.
Answer – The 425 CY’s identified in Item 20401 are quantities of onsite material to be excavated. The 910 CY’s in Item 20404 are additional material needed to construct the Diversion Roadway
RFI-024
Remarks on items 20404 say to “obtain from an approved commercial source”. It also says to borrow material from the Todd Pit. Please clarify. Where do we get material from?
Answer – Concerning Item 20404 - For Goose Creek borrow material it is to be obtained from and approved commercial source. For Soda Creek the borrow material is to be obtained from the Todd Pit.
File details come from the government source that posted it. Updated .