RAC ALARM SPECS.pdf

PDF 2 MB Posted

Attached to
Redmond Air Center Fire Alarm
Solicitation number
AG-04GG-S-08-0028
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
08-0028_RAC_Fire Alarm_RFQ.doc DOC document
08-0028_RAC_Fire Alarm_SCA.doc DOC document
RAC ALARM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REDMOND AIR CENTER FIRE ALARM ’08 SPECIFICATIONS

TABLE OF CONTENTS

SECTION TITLE NO. OF PAGES

01000 GENERAL REQUIREMENTS

01100 SUMMARY 3

01290 PAYMENT PROCEDURES 4

01310 PROJECT MANAGEMENT & COORDINATION 6

01320 CONSTRUCTION PROGRESS DOCUMENTATION 3

01330 SUBMITTAL PROCEDURES – GENERAL 6

01420 REFERENCES 3

01500 TEMPORARY FACILITIES AND CONTROLS 1

01600 PRODUCT REQUIREMENTS 6

01731 CUTTING AND PATCHING 4

01732 SELECTIVE DEMOLITION 4

01770 CLOSEOUT PROCEDURES 6

01780 WARRANTIES AND BONDS 3

16000 ELECTRICAL

16010 GENERAL TECHNICAL PROVISIONS 16

16050 BASIC MATERIALS AND METHODS 9

16721 FIRE ALARM AND DETECTION SYSTEM 23

USDA Forest Service Project Specifications

May 16, 2008 R.A.C. Fire Alarm ‘08 01100 - 1

SECTION 01100 – SUMMARY

PART 1 - GENERAL

1.1 PROJECT IDENTIFICATION

A. REDMOND AIR CENTER FIRE ALARM ‘08

B. LOCATION: 2 miles east of Redmond, Oregon, at the Roberts Field/Redmond Municipal Airport.

C. Project Summary Description: The project includes, but is not limited to the following Work:

Provide design services, supply and installation of all materials and equipment necessary for a fully func-tional fire alarm system. The new fire alarm system consists of three separate barracks networked into a centralized control panel located in the Administration Building. Site work has been completed with fiber optics service for these buildings. Features of the fire alarm system shall include:

• “Backward compatibility” of all components for future upgrades and expansion.

• Future distributed network expansion capabilities for the entire site.

• Global addressability

• Enhance diagnostics: including remote on-line, troubleshooting and status verification.

Design services shall include site evaluation, design and drafting services in “AutoCAD” format. Provide technical support services for one year after completion, and continue with maintenance and monitoring services thereafter. Work in the administration building is limited to the amount necessary to provide a centralized control panel, and utilizing the existing Administration Building’s fire alarm system where possible . The new control panel will be networked into the three barracks providing the features as de-scribed above. The barracks will require all new fire alarm components, materials and equipment.

D. The Government Technical Contact for the project is:

Doug Seaman Deschutes National Forest 1001 S.W. Emkay Dr.

Bend OR, 97702 Phone: (541) 383-5614 E-Mail: dseaman@fs.fed.us

1.2 TYPE OF CONTRACT

A. Project will be constructed under a single prime contract.

1. Lump Sum with Schedule of Values per Government’s Specifications.

a. Refer to Division 1, Section “Payment Procedures” for explanation of the method of Schedule of Values and for sample form.

May 16, 2008 R.A.C. Fire Alarm ‘08 01100 - 2

1.3 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations as specified.

B. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to areas as identified by the C.O.R. If these areas are not adequate, the contractor may submit a written proposal for approval by the C.O.R. for use of other areas for construction activity.

2. Government Occupancy: Allow for Government occupancy of Project site and use by the public.

3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Use of Existing Buildings: Maintain existing building in a weathertight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.4 GOVERNMENT'S OCCUPANCY REQUIREMENTS

A. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's operations. Maintain existing exits, unless otherwise indicated.

1. The Redmond Air Center will normally operate from 9:00 AM to 5:30 PM Monday through Friday for Public and Forest Service Staff Use. Maintain safe access for the public and the Forest Service Staff during the normal operating time.

2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.

3. Provide not less than 72 hours' notice to C.O.R. of activities that will affect Government's operations.

4. Unless agreed otherwise by the C.O.R. in writing, parking for the contractor will be limited to an area designated

B. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy buildings, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work.

May 16, 2008 R.A.C. Fire Alarm ‘08 01100 - 3

1. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.

1.5 MISCELLANEOUS PROVISIONS

A. Work in the extension of existing conditions shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.

B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract.

1. Replacements of existing conditions that are removed shall match similar existing conditions.

2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer.

3. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

C. Existing structures will remain in place.

D. Existing utility services with related meters and equipment will remain in place.

E. Outside Utility Connections: Underground and overhead utility services shall be provided complete to all points of connection indicated, and any "Limit of Contract" lines or other general limits indicated shall not apply to utility services and connections outside of these lines or limits.

F. Removed items indicated to remain the property of the Government shall be stored on site where directed by the Contracting Officer.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01100

May 2008 R.A.C. Fire Alarm ‘08 01290 - 1

SECTION 01290 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.

1.3 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following.

a. Application for Payment forms

b. Submittals Schedule.

c. Contractor's Construction Schedule.

2. Submit the Schedule of Values to C.O.R. at earliest possible date but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

B. Format and Content: Refer to sample form at the end of this section as a guide for the contractor’s schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the Schedule of Values:

a. Project name and location.

b. Name of Contractor’s Representative

c. Contract number.

d. Contractor's name and address.

e. Date of submittal.

2. Submit draft of Government’s Payment Application Form.

3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.

4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

5. Provide a separate line item in the Schedule of Values for each part of the Work where

Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

May 2008 R.A.C. Fire Alarm ‘08 01290 - 2

6. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.

7. Where practical for schedule of values line items include break down in unit costs; such as, cost per square yard, per board feet, per liner feet, per each, etc.

8. Each item in the Schedule of Values and Applications for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.

9. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.

1.4 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by C.O.R. and paid for by the Government.

1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.

B. Payment Application Times: The date for each progress payment is as specified by the Government in the Agreement between Government and Contractor. The period of construction Work covered by each Application for Payment is the period indicated in the Agreement.

C. Payment Application Forms: Use forms provided by the Government, as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. C.O.R. will return incomplete applications without action.

1. Entries shall match data on the Schedule of Values and Contractor's Construction Schedule. Use updated schedules if revisions were made.

2. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

E. Transmittal: Submit 3 signed and notarized original copies of each Application for Payment to C.O.R. by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

F. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

May 2008 R.A.C. Fire Alarm ‘08 01290 - 3

2. Schedule of Values.

3. Contractor's Construction Schedule (preliminary if not final).

4. Submittals Schedule (preliminary if not final).

5. Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.

6. Initial progress report.

7. Report of preconstruction conference.

G. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificates of Partial Substantial Completion issued previously for Government occupancy of designated portions of the Work.

H. Final Payment Application: Submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.

3. Updated final statement, accounting for final changes to the Contract Sum.

4. Contractor's Affidavit of Payment of Debts and Claims.

5. Contract Release Form.

6. Consent of Surety to Final Payment.

7. Evidence that claims have been settled.

PART 2 - PRODUCTS (Not Used)

May 2008 R.A.C. Fire Alarm ‘08 01290 - 4

PART 3 - EXECUTION

3.1 SAMPLE SCHEDULE OF VALUES

JUNIPER BARRACKS

QUANTITY DESCRIPTION EXTENDED

PRICE

9 HORN/STROBES

4 STROBES

27 SMOKE DETECTORS

2 CONTROL RELAYS

7 PULL STATIONS

1 HEAT SENSORS

1 LCD ANNUNCIATOR

4 RELAYS

1 SUPERVISED IAM

2 DUCT SENSOR HOUSING

2 SAMPLING TUBE

1 ADDRESSABLE CONTROLLER

1 FACP BACK BOX

1 WEATHER PROOF BOX

12 SMOKE DETCTORS W/SOUNDER

12 PHOTO SENSOR

1 LABOR FOR ELECTRICAL

1 PRECONFIG MASTER PANEL

1 POWER DISTRIBUTION

MODULE

1 NETWORK CARD

DESIGN SERVICES

1 LABOR

1 CAD LABOR

1 TECHNICAL SERVICE

1 FREIGHT

NET PRICE =

END OF SECTION 01290

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 1

SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes certain administrative provisions for managing and coordinating construction operations, including but not limited to the following:

1. General project coordination.

2. Coordination drawings.

3. Conferences and meetings.

4. Utility service interruptions.

5. Project Site Usage Consideration

6. Cleaning and protection.

1.2 GENERAL PROJECT COORDINATION

A. Coordination of Trades: Coordinate construction operations included in the various sections of the Specifications to provide an efficient and orderly installation of each part of the Work.

Coordinate construction operations included under different sections of the Specifications that depend on each other for proper installation, connection or operation.

1. Schedule construction operations in the sequence required to obtain the best results where the installation of one part of the Work depends on installation of other components before or after that part.

2. Coordinate installation of different components to provide maximum accessibility for required maintenance, service, testing and repair.

3. Accommodate items scheduled for later installation.

B. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and promote orderly progress of the Work.

Administrative procedures include but are not limited to the following:

1. Preparation of schedules.

2. Installation and removal of temporary facilities.

3. Delivery and processing of submittals.

4. Progress meetings.

5. Project closeout activities.

1.3 COORDINATION DRAWINGS

A. Prepare coordination drawings where careful coordination is needed for installation of products and materials fabricated by separate entities, and prepare coordination drawings where limited space availability necessitates maximum utilization of the space for efficient installation of different components.

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 2

1. Show the relationship of components shown on separate shop drawings.

2. Indicate required installation sequences.

3. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.

4. Comply with shop drawing requirements for sheet size and submittal methods specified in Division 1 Section "Submittal Procedures."

B. Refer to Division 16 Section "Basic Electrical Requirements" for specific coordination drawing requirements for mechanical and electrical installations.

C. Provide coordination drawings for equipment and system installations in mechanical and electrical rooms and spaces where two or more entities will provide the work and separate shop drawings are insufficient to show coordination.

1.4 CONFERENCES AND MEETINGS

A. Preconstruction Conference: The Contracting Officer shall schedule a preconstruction conference before starting construction at a time and place convenient to the Contractor.

Conference shall review responsibilities and personnel assignments.

1. Attendees: Participants at the conference shall be familiar with the project, shall be authorized to conclude matters relating to the Work, and shall minimally include representatives of the following parties:

a. Contracting Officer.

b. Contracting Officer’s Representative

c. Contractor.

d. Contractor’s Representative

e. Subcontractors.

f. Other concerned parties.

2. Agenda: Subjects for discussion shall include items of significance that could effect progress, including but not limited to the following:

a. Tentative construction schedule.

b. Critical work sequencing.

c. Designation of responsible personnel.

d. Procedures for processing field decisions and Change Orders.

e. Procedures for processing Applications for Payment.

f. Distribution of Contract Documents.

g. Submittal of Shop Drawings, Product Data, and Samples.

h. Preparation of Record Documents.

i. Use of the premises.

j. Parking availability.

k. Office, work, and storage areas.

l. Equipment deliveries and priorities.

m. Safety procedures.

n. First aid.

o. Security.

p. Housekeeping and progress cleaning.

q. Working hours.

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 3

3. Reporting: No later than 3 calendar days after the conference, the Contractor shall distribute minutes of the conference to each party present and to other concerned parties, including the Contracting Officer.

B. Preinstallation Conferences: The Contractor shall conduct a preinstallation conference at the Project Site.

1. Attendees: In addition to the Contractor's representative, the installer and representatives of manufacturers and fabricators involved in or affected by the installation, and its coordination or integration with other materials and installations that have preceded or will follow, shall attend. Prior to conferences, advise the Contracting Officer of scheduled conference dates.

2. Agenda: Review the progress of other construction activities and preparations for the particular activity under consideration at each preinstallation conference, including requirements for the following.

a. Contract Documents.

b. Options.

c. Related Change Orders, including accepted Value Engineering proposals.

d. Purchases.

e. Deliveries.

f. Submittals.

g. Possible conflicts.

h. Compatibility problems.

i. Time schedules.

j. Weather limitations.

k. Manufacturer's recommendations.

l. Warranty requirements.

m. Compatibility of materials.

n. Acceptability of substrates.

o. Temporary facilities and controls.

p. Space and access limitations.

q. Governing regulations.

r. Safety.

s. Testing and inspecting requirements.

t. Required performance results.

u. Protection.

3. Reporting: Record significant discussions and agreements and disagreements of each conference. No later than 3 calendar days after the conference, the Contractor shall distribute minutes of the conference to each party present and to other concerned parties, including the Contracting Officer.

4. Do not proceed with the installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to the performance of the work, and reconvene the conference at the earliest feasible date.

C. Progress Meetings: The Contracting Officer's Representative shall conduct progress meetings at the Project Site at regular intervals. Dates of meetings shall be coordinated with preparation of the payment request.

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 4

1. Attendees: In addition to the Contractor's and Contracting Officer's representatives, each subcontractor, supplier, or other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented. All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of the previous progress meeting.

Review other items of significance that could affect progress. Include topics for discussion as appropriate to the status of the Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine where each activity is in relation to the Contractor's Construction Schedule, whether on time or ahead or behind schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to insure that current and subsequent activities will be completed within the Contract Time.

b. Review the present and future needs of each entity present, including but not limited to the following:

1) Interface requirements.

2) Time.

3) Sequences of operations.

4) Status of submittals.

5) Deliveries.

6) Off-site fabrication.

7) Access.

8) Site utilization.

9) Temporary facilities and controls.

10) Hours of work.

11) Hazards and risks.

12) Housekeeping and progress cleaning.

13) Quality and work standards.

14) Change Orders.

15) Documentation of information for payment requests.

16) Updating of Record Documents.

3. Reporting: No later than 3 calendar days after each meeting, the Contractor shall distribute minutes of the meeting to each party present and to other concerned parties, including the Contracting Officer. Include a brief summary, in narrative form, of progress since the previous meeting and report.

4. Schedule Updating: The Contractor shall revise the Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. The revised schedule shall be issued concurrently with the report of each meeting.

1.5 UTILITY SERVICE INTERRUPTIONS

A. Utility Service Interruption Plan: Contractor shall submit a utility service interruption plan for the project. Plan shall include dates and times of each scheduled interruption, with estimated

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 5 period of outage, list of existing equipment that will be affected by the interruption, proposed sequence of equipment shut-down and start-up, and responsible personnel.

1. Keep interruptions and periods of interruption to a minimum.

2. Schedule interruptions during times when the facility is unoccupied.

3. Plan must be approved in writing by the the Contracting Officer or the Contracting

Officer's representative.

B. Coordination of Interruptions: Sufficiently in advance of each scheduled utility in terruption, the Contractor shall issue a notice to all affected parties, confirming each provision of the interruption, or canceling and rescheduling. Coordinate with the Building Manager and Contracting Officer's representative, and confirm that the responsible personnel are prepared to execute the shut-down and start-up of affected existing equipment, prior to each interruption.

1.6 MATERIAL STORAGE

A. Stockpile debris, materials, and supplies in such a manner as to minimize impacts to the site and disruption to the public use and Forest Service Staff.

B. Maintain packaged materials with seals unbroken and labels intact until time of use. Promptly remove construction debris, damaged material, and unsuitable items from the job site. Replace unsuitable items with material meeting the specified requirements, at no additional cost to the Government. The C.O.R. may reject as non-complying such material and products that do not bear identification as to manufacture, grade, quality and other pertinent information.

1.7 SUBMITTALS

A. Coordination Drawings: Comply with the shop drawing requirements specified in Division 16.

Staff Names: Within 15 calendar days after commencement of construction, submit a list of principal staff assignments, including the superintendent and other primary personnel at the Project site. Identify individuals by name, duties and responsibilities, home address, and business and home telephone numbers.

B. Utility Service Interruptions: No later than 15 calendar days prior to the first planned interruption, submit the utility service interruption plan, followed by confirmed scheduled shut-down notices at least 3 calendar days prior to each interruption.

C. Submit Stockpile and Storage Plan at least 15 days prior to construction activities for approval by the C.O.R.

D. Submit Work Schedule Plan at least 15 days prior to construction activities for approval by the C.O.R.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION

May 16, 2008 R.A.C. Fire Alarm ‘08 01310 - 6

3.1 GENERAL COORDINATION PROVISIONS

A. Inspection of Conditions: Prior to installations, require the installer to inspect both the substrate and conditions under which work is to be performed.

1. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.

2. Coordinate temporary enclosures with required inspections and tests to minimize the necessity of uncovering completed construction for that purpose.

B. Construction in Progress: Keep construction in progress, and adjoining materials in place, clean during handling and installation. Apply protective coverings where required for protection from damage or deterioration.

C. Completed Construction: Clean completed construction, and provide maintenance, as frequently as necessary to prevent damage or soiling or other deterioration through the remainder of the construction period. Adjust operable components as necessary to assure operability without damage.

D. Limiting Exposures: Supervise construction operations to prevent exposure of any part of construction, completed or in progress, to harmful, dangerous, damaging or otherwise deleterious conditions during the construction period.

3.2 STOCKPILE AND STORAGE PLAN

A. The stockpile and storage plan shall identify the areas and length of time of all stored materials, debris, or supplies needed for the performance of this contract. Identify any anticipated impacts to the site or existing traffic patterns of the public during the normal operating time and propose mitigation measures. Implement the approved plan at no cost to the government. Approval of the plan shall not relieve the contractor from any responsibility to the safety of the public or damage to the site during the performance of the contract.

3.3 WORK SCHEDULE PLAN

A. The work schedule plan shall include the estimated time to complete work items, the names of the employees, subcontractors, and suppliers, and their anticipated time on site. Identify any potential impacts to vegetation or existing structures by accessing the work, when it may occur, and propose appropriate mitigation measures. Implement the approved plan at no cost to the government. Unless agreed otherwise in writing by the C.O.R., the contractor will be responsible for the repair of any damage incurred from the performance of the contract.

END OF SECTION 01310

May 16, 2008 R.A.C. Fire Alarm ‘08 01320 - 1

SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. This section includes certain schedules and reports required for documenting the progress of construction during performance of the Work.

B. Requirements for construction progress scheduling are included in this Section.

C. Coordinate the timing for preparation and processing of schedules and reports with the performance of other construction activities, and maintain a consistent and logical correlation between updated schedules and reports.

1.2 CONSTRUCTION PROGRESS SCHEDULING

A. Preliminary Construction Schedule: Prepare a preliminary horizontal bar-chart-type construction schedule for the project. Submit the Preliminary Construction Schedule to the Contracting Officer within 7 calendar days after the date established for commencement of the Contract, unless otherwise required by the Construction Contract Clauses.

1. Provide a separate time bar for each significant construction activity. Coordinate each element on the schedule with other construction activities. Schedule each construction activity in proper sequence.

2. Schedule shall be time-scaled in not more than weekly increments, with the dates of the first day of each week indicated.

3. Completion of the Work shall be indicated in advance of the date established for completion of the Contract.

4. With the submission of the Preliminary Construction Schedule, include tabulation by date of submittals required during the first 90 calendar days of construction, or show the submittals on the schedule. Include the submittals required to maintain orderly progress of the Work and those required early because of long lead-time for manufacture or fabrication.

B. Contractor's Construction Schedule: Prepare and periodically update a comprehensive, fully developed, horizontal bar-chart-type construction schedule. Base the Contractor's Construction Schedule on the preliminary construction schedule and whatever updating and feedback received since the start of construction.

1. Submit the initial Contractor's Construction Schedule within 30 calendar days after the date established for commencement of the Contact.

2. Within each construction activity's time bar, indicate estimated completion percentages in not more than 10 percent increments and, as work progresses, place marks in the bars to indicate actual completion percentages.

May 16, 2008 R.A.C. Fire Alarm ‘08 01320 - 2

3. Cost Correlation: If requested by the Contracting Officer, provide a cost correlation line at the head of the schedule to indicate planned and actual cost. As work progresses, show dollar volume of Work performed as of the dates used for applications for payment.

4. Updating: Provide an updated schedule in conjunction with each project meeting specified in Division 1 Section "Project Management and Coordination." In addition, revise the schedule after each event or activity that causes a significant change in the planned progress of the Work. Highlight or otherwise emphasis revisions for ease of identification.

5. Distribution: Print and distribute copies of the initial Contractor's Construction Schedule, and each updated or revised schedule, to the Contracting Officer, as well as to subcontractors and other parties required to comply with upcoming scheduled dates. Post copies in the project meeting room and temporary field office.

1.3 SUBMITTAL SCHEDULE

A. The submittal schedule shall list all submittals required by the specifications, listed in order by the specification section in which they are required. Coordinate the Submittal Schedule with the Contractor's Construction Schedule and other related documents. The Submittal Schedule shall include the following information:

1. Submittal Number.

2. Submittal Description.

3. Related specification section and paragraph numbers.

4. Category of Submittal (Sample, Shop Drawing, Certified Test Report, etc.)

5. Name of Subcontractor, if applicable.

6. Description of the part of the Work covered by the submittal.

7. Corresponding activity or event number on the Contractor's Construction Schedule, if applicable.

8. Scheduled date for first submittal (planned and actual dates).

9. Schedule dates for resubmittal of disapproved submittals (planned and actual dates).

10. Type of action by Contracting Officer's Representative (approved; approved as noted; not approved, revise and resubmit).

11. Date of action by Contracting Officer's Representative (planned and actual dates).

B. Schedule a resubmittal for each submittal. Except where specified otherwise in the contract documents, provide not less than 14 calendar days for the review of each submittal and resubmittal.

C. Distribution: Initially submit 3 copies of the Submittal Schedule to the Contracting Officer for review. After the Contracting Officer's response, print and distribute revised copies to the Contracting Officer and entities designated by the Contracting Officer, and to subcontractors and other parties required to comply with upcoming submittal dates.

1. Post copies in the project meeting room and temporary field office.

2. When the submittal schedule is updated, repeat distribution and posting.

D. Updating: The Submittal Schedule shall be kept up-to-date by the Contractor. A current updated copy of the Submittal Schedule shall be submitted with each Contractor payment request, and at other times as requested by the Contracting Officer, until all submittals are

May 16, 2008 R.A.C. Fire Alarm ‘08 01320 - 3 approved. Failure to provide the requested information, or delay in submitting required submittals may result in the payment request being returned to the Contractor until the required schedule or submittals are received.

1.4 REPORTS

A. Material Location Reports: At not more than weekly intervals, prepare a comprehensive list of materials delivered to and stored at the site. The list shall be cumulative, showing materials previously reported plus items recently delivered. Include a statement of progress on and delivery dates for materials or items or equipment fabricated or stored away from the site.

Submit copies of the list to the Contracting Officer or Contracting Officer's representative.

B. Field Correction Reports: When the need to take corrective action requires a departure from the Contract Documents, prepare a detailed report. Include a statement describing the problem and recommended changes. Indicate reasons the Contract Documents cannot be followed. Submit a copy to the Contracting Officer or Contracting Officer's Representative for approval.

C. Unusual Event Reports: When an event of an unusual and significant nature occurs at the site, prepare a detailed report. List the chain of events, persons participating, response by the Contractor's personnel, evaluation of the results or effects, and similar pertinent information.

Submit a copy to the Contracting Officer or Contracting Officer's representative immediately.

Advise the Contracting Officer or Contracting Officer's representative in advance when such events are known or predictable.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION (Not applicable)

1.1 SUBMITTAL FORMAT

A. All schedules, notes and reports regarding construction progress documentation that are submitted to the government need to be provided electronically and in hard copy. All electronic files submitted in Microsoft Word or Excel as appropriate.

END OF SECTION 01320

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 1

SECTION 01330 - SUBMITTAL PROCEDURES – GENERAL

1.1 SUMMARY

A. This Section includes certain administrative and procedural requirements for shop drawings, coordination drawings, schedules, samples and certain other quality assurance submittals.

B. This section does not include requirements for the following submittals:

1. Warranties specified in Division 1 Section "Product Requirements."

2. Closeout submittals specified in Division 1 Section "Project Closeout."

C. For clarity purposes, shop drawings, coordination drawings and schedules are further categorized as follows:

1. Shop drawings include drawings and schedules specifically prepared for the project, except for coordination drawings.

2. Coordination drawings are specified in Division 1 Section "Project Management and Coordination."

3. Product data includes manufacturer's standard catalogs, pamphlets and other printed materials, and includes but is not limited to the following:

a. Product specifications.

b. Installation instructions.

c. Catalog cuts.

d. Rough-in diagrams and templates.

e. Wiring diagrams.

f. Operational range diagrams.

D. Samples may include samples of such scale to allow delivery for review, as well as field samples or mock-ups of full-size physical examples erected on-site or elsewhere, or establish a true-scale standard by which the corresponding work will be judged or a standard for compliance testing.

E. Other quality assurance submittals include materials specifically prepared for the project, except drawings and schedules, and include but are not limited to the following:

1. Design data and calculations.

2. Certifications of compliance or conformance.

3. Manufacturer's instructions and field reports.

1.2 GENERAL SUBMITTAL REQUIREMENTS

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities and with the Submittal Schedule specified in Division 1 Section "Construction Progress Documentation". Submittals shall be transmitted to the Contracting Officer's designated representative within 30 calendar days after receipt of notice to proceed, unless the approved Submittal Schedule specifically provides for a later submission. Transmit

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 2 each submittal sufficiently in advance of the scheduled performance of related construction activities to avoid delaying the Work, allowing for the review times specified for submittals in Division 1 Section "Construction Progress Documentation" and elsewhere in the Contract documents.

1. Coordinate each submittal with other submittals and related activities that require sequential scheduling, to allow for testing, purchase, fabrication and product delivery in a timely manner.

2. Schedule transmittal of different categories of submittals for the same element of Work and for different elements of related parts of the Work at the same time.

3. Allow sufficient time for submittal review, corrections following the initial review and resubmittal review before activities scheduled after the submittal approval.

4. Any resubmission required after Government review shall be made within 10 calendar days after return of the submittal, unless specifically authorized otherwise by the Contracting Officer.

5. Submittals which are determined to be incomplete or otherwise substandard will be returned to the Contractor with no further review. Delays due to incomplete or rejected submittals will not be excused.

6. Construction will not be allowed to proceed if submittals are not received in a timely manner. Failure by the Contractor to provide the required submittals in a timely manner will not result in an extension to the Contractor's Construction Schedule.

7. Failure by the Contractor to provide the required submittals in a timely manner may result in progress payment requests being returned to the Contractor until submittals are up-to-date.

B. Submittal Preparation: Identify and prepare drawings and samples as specified in the Construction Contract Clauses. Minimally include the following on a permanent label for other submittals:

1. Project name and number.

2. Date.

3. Name, address and telephone number of firm or entity that prepared the submittal.

4. Name and address of the Contractor.

5. Name of the manufacturer.

6. Number and title of appropriate specification section.

7. Drawing number and detail references, as appropriate.

8. Space to record Contractor's review and approval markings, and for Contracting Officer's or Contraction Officer's Representative's action; approximately 5 by 5 inches.

C. Submittal Transmittal: Package each submittal for transmission and handling. Transmit each submittal from the Contractor to the Contracting Officer or Contracting Officer's representative by use of a transmittal form. Minimally include the following information on the transmittal form.

1. Project name and number.

2. Date.

3. Destination (To:).

4. Source (From:).

5. Names of subcontractor, manufacturer and supplier, as applicable.

6. Category of submittal.

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 3

7. Description of submittal

8. Number and title of appropriate specification section.

9. Submittal number, including means to separately identify initial submittal and each resubmittal.

10. Certification by Contractor stating that submittal complies with the Contract Documents, or statement of deviations from the requirements of the Contract Documents including minor variations and limitations. Deviations may be listed on an attached sheet referenced on the transmittal form.

11. Signature of transmitter.

1.3 SHOP DRAWINGS AND COORDINATION DRAWINGS

A. Submit originally prepared information, drawn accurately to scale. Do not reproduce Contract Documents or copy standard printed materials as the basis for Shop Drawings and Coordination Drawings.

B. Minimally include the following information on Shop Drawings and Coordination Drawings:

1. Dimensions.

2. Identification of products and materials.

3. Compliance with specified standards.

4. Notation of coordination requirements.

5. Notation of dimensions established by field measurements, if any.

6. Highlighted or encircled deviations from the Contract Documents, if any.

C. Sheet size: Except for templates, patterns and similar full-size drawings, submit Shop Drawings and Coordination Drawings on sheets of at least 8-1/2 by 11 inches but no larger than 30 by 40 inches.

D. Submittals: Unless otherwise indicated, submit three black & white prints of each drawing submittal. Reproducible print will be marked with action taken and returned.

E. Distribution: When submittal is approved, Contractor shall prepare final black & white print copies from the approved reproducible print, for the following purposes.

1. One print shall be marked and retained as a "Record Document."

2. Unless otherwise requested, two prints shall be provided to the Contracting Officer.

3. Additional prints shall be provided to the entities involved in the effected construction.

1.4 PRODUCT DATA

A. Collect Product Data into a single submittal for each system or element of construction. Mark each copy to show specific product choices and options applicable to the project. Product Data shall include the following information, where applicable:

1. Manufacturer's printed recommendations.

2. Compliance with recognized trade association standards.

3. Compliance with recognized testing standards.

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 4

4. Applicability of testing agency labels and seals.

5. Notation of dimensions verified for fit by field measurements.

6. Notation of coordination requirements.

B. Preliminary Submittal: Prior to submittal of complete Product Data, submit a preliminary single copy of that part of Product Data when selection of options is required, such as for color charts.

Preliminary submittal will be returned, with selection noted, for the Contractor's use in subsequent submittals.

C. Submittals: Unless otherwise indicated, submit not less than 4 copies of each Product Data submittal. Two copies will be retained, and the remaining copies will be marked with action taken and returned.

D. Distribution: When submittal is approved, Contractor shall distribute approved copies for the following purposes:

1. One copy shall be marked and retained as a "Record Document."

2. Additional copies shall be provided to the manufacturers, subcontractors, suppliers, installers, governing authorities and others as required for performance of the applicable construction activities.

1.5 OTHER QUALITY ASSURANCE SUBMITTALS

A. Submit other quality assurance submittals in compliance with requirements in the individual specification sections.

B. Certifications: Submit notarized certifications from the party certifying compliance with specified requirements. Certifications shall be signed by an officer or other individual authorized to sign documents on behalf of the company certifying compliance.

1.6 REVIEW ACTION ON SUBMITTALS

A. Except for submittals for the record or for information or for another purpose where no action and return is required, the Contracting Officer or the Contracting Officer's authorized representative will review submittals and mark returned copies to indicate action taken.

B. Compliance with specified characteristics is the Contractor's responsibility, and is not part of the Contracting Officer's review and indication of action taken. No matter what review action is taken, final acceptance will depend on full compliance with the Contract Documents.

C. Submittals that do not contain an appropriate marking of approval by the Contracting Officer or Contracting Officer's representative shall not be used for construction.

D. Action Stamp: Each submittal will be stamped with a uniform action stamp. The stamp shall be marked to indicate one of the following actions taken:

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 5

1. Final Unrestricted Release: Where marked "Approved", the work covered by the submittal may proceed, provided it complies with the requirements of the Contract Documents.

2. Final But Restricted Release: Where marked "Approved As Noted", the work covered by the submittal may proceed, provided it complies with the notations or corrections on the submittal and with the requirements of the Contract Documents.

3. Return for Resubmittal: Where marked "Not Approved, Revise and Resubmit", do not proceed with the work covered by the submittal, including purchasing, fabrication, delivery or any other activity. Revise or prepare a new submittal according to the notations on the submittal or on the return transmittal. Resubmit without delay, repeating as necessary to obtain a final release action mark.

4. No Action: Where a submittal is for the record or for information or for another purpose not requiring review action, the submittal may not be returned or may be returned and marked "Action Not Required."

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 SUBMITTALS

A. This list is for reference only, refer to individual sections for product specific submittal requirements. Submittals not listed below will require a 7 Day review period.

B. Submittals List:

Product Submittal Requirements Review Period

DIVISION 01: GENERAL

01290 PAYMENT PROCEDURES

Schedule of Values 7 Days

01310 PROJECT MANAGEMENT

Coordination Drawings 7 Days Staff Names Conference & Meeting Minutes 7 Days Utility Service Interuptions 14 Days Stockpile and Storage Plan 14 Days Work Schedule Plan 14 Days

01320 CONSTRUCTION PROGRESS DOCUMENTATION

Preliminary Construction Schedule 14 Days Contractor’s Construction Schedule 7 Days Submittal Schedule 7 Days Material Location Reports 7 Days Field Correction Reports 7 Days Unusual Event Reports 7 Days

July 29, 2005 Lava Lands Visitor Center Upgrade 01330 - 6

01600 PRODUCT REQUIREMENTS

Substitution Requests 14 Days Written Warranties

01731 CUTTING AND PATCHING

Cutting and Patching Proposals 7 Days

01732 SELECTIVE DEMOLITION

Preconstruction Photographs 7 Days

01770 PROJECT CLOSEOUT

Substantial Completion Request 7 Days Punch List 14 Days Record Documents Operation and Maintenance Manual 14 days

01780 WARRANTIES AND BONDS

Warranties and Bonds Manual 7 Days

16010 GENERAL TECHNICAL REQUIREMENTS

Shop Drawings, Product info 14 Days O & M Manuals 14 Days As- builts 14 Days Test forms 30 Days

16050 BASIC MATERIALS

Shop Drawings, Product info 21 Days

16271 FIRE ALARM AND DETECTION SYSTEM

Shop Drawings, Product info 21 Days

END OF SECTION 01330

May 16, 2008 R.A.C. Fire Alarm ‘08 01420 - 1

SECTION 01420 – REFERENCES

PART 1 - GENERAL

1.1 DEFINITIONS

A. General Explanation: Specification language often includes terms that are defined elsewhere in the Contract Documents, including the Construction Contract Clauses. Certain terms are defined in this section. These definitions or explanations are not necessarily complete or exclusive, but are general for the Work and may be explained more explicitly in other Sections.

B. "General Conditions" refer collectively to the Construction Contract Clauses, Labor Standards and the U.S. Department of Labor Wage Decision bound into the specifications.

C. "Indicated" refers to graphic representations, notes or schedules on the Drawings, or to requirements elsewhere in the Specifications or other Contract Documents. Terms such as "shown", "noted", "scheduled" and "specified" have the same meaning as "indicated" and are used to further help locate the reference, but no limitation on location is intended except as specifically stated.

D. Where "directed", "authorized", "selected", "approved", or a similar term is used in conjunction with the Contractor's submittals, applications, requests and other activities, and the specifications state that an individual other than the Contracting Officer, such as the Architect or Construction Engineer, shall provide this action, it is understood that only the Contracting Officer has this authority unless the individual stated is so authorized in writing by the Contracting Officer.

1. When the individual is so authorized by the Contracting Officer, the Contractor may still appeal the action to the Contracting Officer.

2. The Contracting Officer's decision will be final.

3. In no case shall the Contracting Officer's action be interpreted as releasing the Contractor from responsibility to fulfill the requirements of the Contract Documents.

E. "Regulations" include laws, ordinances, statutes and lawful orders issued by authorities having jurisdiction, as well as rules,…

This is the start of the file's text. The full file is on GovTribe.