Text version
Proj: Pine Creek Water System Upgrade
Unit: GP National Park
AG-0489-S-10-0443
TABLE OF CONTENTS
Page(s)
PART I - THE SCHEDULE
SECTION A – SOLICITATION/CONTRACT FORM 1
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS 4
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 5
SECTION D – PACKAGING AND MARKING 125
SECTION E - INSPECTION AND ACCEPTANCE 126
SECTION F - DELIVERIES OR PERFORMANCE 129
SECTION G - CONTRACT ADMINISTRATION DATA 130
SECTION H - SPECIAL CONTRACT REQUIREMENTS 132
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES 141
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS 168
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER
STATEMENTS OF OFFERORS OR RESPONDENTS 169
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
OR RESPONDENTS 178
SECTION M - EVALUATION FACTORS FOR AWARD 184
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Solicitation No.
Project Name:
Pine Creek Work Center Water Upgrade
Location:
GP Nat’l Park
Contractor:
Issuing and Billing Office:
USDA Forest Service
EROC-NW
16400 Champion Way
Sandy, OR 97055
Item No.
Sub-item No.
Description
Qty
Unit
Unit Price
Amount
Pine Creek Work C enter - Water System Improvements
1.1 Mobilization LS LS $ $
1.2 Fire Hydrants 2 EA $ $
1.3 Cap Laterals 7 EA $ $
1.4 Remove Standpipe 9 EA $ $
1.5 SP Locking Cap 5 EA $ $
1.6 Replace 3" &4" GV 2 EA $ $
1.7 Tank Plumbing LS LS $ $
1.8 Tank Electrical LS LS $ $
1.9 Pump House Reconstruction LS LS $ $
1.10 Pump House Electrical LS LS $ $
Total
Opt 1 l.11 Tanker Fill LS LS $ $
Opt 2 1.12 Tank Remote Monitor LS LS $ $
Total
Notes
TOTAL PRICE
Contractor Name:
Address:
Signature of Authorized Representative: Date:
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION C - Description/specifications/Statement of Work
Scope of Contract Pine Creek Work Center Water System Improvements. This project involves plumbing and valves to convert two water tanks for independent operation, installation of a pressure transducer well pump control system, a remote monitor for water tank level, reconstruction work at a well house and miscellaneous work on the distribution system. The reconstruction work at the existing well house includes increasing well casing height, routing well discharge out the top of the well instead of a pitless adapter, new above grade plumbing and valves, a concrete floor slab, electrical and new well pump controls.
Project Location
Project is located at Pine Creek Work Center approximately 18 miles East of Cougar, WA on FS Road
90. Lower Compound is located on South side of road.
452.211-72 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications.
SECTION 01 22 00
MEASUREMENT AND PAYMENT
1. PART 1 - GENERAL
1.01 DESCRIPTION
A. This Section specifies measurement and payment for the work of this contract.
1.02 GENERAL
A. The basis for measurement and payment for all work performed under this contract shall be in accordance with the Schedule of Items (Section B). In the event of a conflict Section B shall prevail over this Section (01 22 00).
B. Payment shall be made at the contract prices listed in the Schedule of Items.
1.03 INCIDENTAL WORK
A. Work to be performed which is not specifically called out to be measured and / or paid for shall be incidental to other related items listed in the Schedule of Items. There will be no separate measurement and payment for any work not specifically listed in the Schedule of Items.
B. The summation of all bid items under the Schedule of Items shall equal all work required by the Drawings, Specifications and incidentals to complete a functioning job regardless of whether all the work needed is described in the collective bid items.
1.04 PRICES FOR COMPLETE ITEM
A. The prices listed in the Schedule of Items shall be payment in full for all labor, tools, equipment, materials, etc., which are required to construct respective bid items according to the Contract
Documents, including all work and materials for a fully functioning item.
1.05 UNIT PRICES
A. Bid items calling for unit prices show estimated quantities of work to be performed. These quantities, although shown with as much accuracy as possible, are approximate only and are for bidding purposes only. Payment to the Contractor shall be made on the quantity of work actually performed by the Contractor. Also see variation in quantities FAR clause elsewhere in this contract.
1.06 PARTIAL PAYMENT ON UNIT AND LUMP SUM ITEMS
A. Payment for unit bid items and lump sum bid items only partially completed at the end of monthly invoice periods shall be based on a percentage of work completed as determined by the
Contracting Officer. An example is the construction of pipelines where the unit bid price includes the excavation and backfill of the trenches, installation of pipe, trench compaction, flushing and testing, although the Contractor may have installed certain footage of pipeline, yet has not completed the testing and/or restoration work. The actual payment for that bid item will be reduced to reflect the actual amount of work completed.2/28/2010 Pine Creek Work Center -
Water System Improvements 01 22 00 - 2/7 Measurement and Payment
BID ITEM 01 – MOBILIZATION
B. Measurement
1. When the partial payment estimate of the amount earned to date, not including the amount earned for mobilization, is 6 percent or more of the original total contract amount, 50 percent of the contract bid price for mobilization or 6 percent of the original total contract amount, whichever is the lesser, will be included in the estimate for payment on mobilization.
2. When the partial payment estimate of the amount earned to date, not including the amount earned for mobilization, is 12 percent or more of the original total contract amount, 100 percent of the contract bid price for mobilization or 10 percent of the original total contract amount, whichever is the lesser, will be included in the estimate for payment on mobilization.
3. Upon completion of all the work on the project and acceptance by the Government, payment of 100 percent of the contract bid price for mobilization will be included in the estimate for payment on mobilization.
C. Payment
1. Payment will be considered full compensation for all work preparatory to the start of work including premiums paid by the Contractor to obtain bonds and operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items at the project site.
Payment for mobilization associated with additive bid items is included with those additive items.
2. Payment will be made under:
Pay Item Description Pay Unit
01 Mobilization Lump Sum
1.07 BID ITEM 02 – FIRE HYDRANTS
A. Measurement
1. The quantity to be measured will be the actual number of fire hydrants installed.
B. Payment
1. Payment will be considered full compensation for the complete job of installing the fire hydrant including, but not limited to, the following.
a. Trenching, backfill and compaction for the fire hydrant and appurtenances.
b. Install Tee and thrust block on water main including asphalt coating main as needed.
c. Fire hydrant lateral shut off valve.
d. Fire hydrant itself including drain system and thrust blocking.
e. Concrete pad around fire hydrant.2/28/2010 Pine Creek Work Center - Water
System Improvements 01 22 00 - 3/7 Measurement and Payment
2. Payment will be made under:
02 Fire Hydrants Each
1.08 BID ITEM 03 – CAP LATERALS
1. The quantity to be measured will be the actual number of abandoned laterals capped.
B. Payment
1. Payment will be considered full compensation for the complete job of capping the laterals including, but not limited to, the following.
a. Trenching, backfill and compaction for capping laterals.
b. Cutting or unscrewing and disposing of the abandoned lateral at the water line to remain.
c. Capping the opening from the water line to remain.
d. Asphalt coating existing pipe to remain, as needed.
2. Payment will be made under:
Pay Item Description Pay Unit
03 Cap Laterals Each
1.09 BID ITEM 04 – REMOVE STANDPIPE
A. Measurement
1. The quantity to be measured will be the actual number of standpipes removed.
B. Payment
1. Payment will be considered full compensation for the complete job of removing the standpipes including, but not limited to, the following.
a. Trenching, backfill and compaction for Stand Pipe removal.
b. Removal and disposal of all pipe serving only the stand pipe, removal of valves, drains and the valve box.
c. Capping the end of the water line to remain.
d. Asphalt coating existing pipe to remain, as needed.
2. Payment will be made under:
Pay Item Description Pay Unit
04 Remove Standpipe Each
1.10 BID ITEM 05 – STANDPIPE LOCKING COVER
A. Measurement
1. The quantity to be measured will be the actual number of standpipe locking covers installed or furnished to the Government.
B. Payment
1. Payment will be considered full compensation for the complete job of the Stand Pipe
Locking Covers including, but not limited to, the following.
a. Measuring the existing Stand Pipes, determining the locking cover detailed dimensions and fabricating the Locking Covers including hot dip galvanizing.
b. Installing the locking covers on the stand pipes to remain.
2. Payment will be made under:
Pay Item Description Pay Unit
05 Stand Pipe Locking Cover Each
1.11 BID ITEM 06 – REPLACE 3‖ & 4‖ VALVES
A. Measurement
1. The quantity to be measured will be the actual number of installed underground valves with valve boxes.
B. Payment
1. Payment will be considered full compensation for the complete job of installing the valves and valve boxes including, but not limited to, the following.
a. Trenching, backfill and compaction for the valves.
b. Removing and disposing of existing valves and valve boxes.
c. Installing the new valve and valve box.
d. Any needed thrust blocking.
e. Asphalt coating existing pipe to remain, as needed.
2. Payment will be made under:
06 Replace 3‖ & 4‖ Valves Each
1.12 BID ITEM 07 – TANK PLUMBING
1. The quantity to be measured will be the job of re-plumbing the two water tanks.
1. Payment will be considered full compensation for the complete lump sum job at the tank site except electrical work including, but not limited to, the following.
a. Excavation, backfill and compaction for the tank plumbing.
b. Filling in the hole in front of tanks.
c. Installing bollards.
d. Removing and disposing of all items no longer needed including pipe, fittings, valves and valve boxes.
e. Installing tank supply, discharge, drain, overflow, valves and valve boxes.
f. Asphalt coating connection to existing 4‖ steel pipe to remain, as needed.
g. Modifications to Tank Manhole lids and vent installation.
h. Placing fill to bring the tank cover up to manufacturer‘s 24 Inch requirement.2/28/2010 Pine Creek Work Center - Water System Improvements 01
22 00 - 5/7 Measurement and Payment
i. Any temporary measures needed to keep the water system operational during construction at the tanks.
j. Disinfecting and cleaning the two tanks on completion of all other work.
2. Payment will be made under:
07 Tank Plumbing Lump Sum
1.13 BID ITEM 08 – TANK ELECTRICAL
1. The quantity to be measured will be the job of installing all electrical at the Tank site.
B. Payment
1. Payment will be considered full compensation for the complete lump sum job of installing all electrical at the tank site including, but not limited to, the following.
a. Excavation, backfill and compaction for the tank electrical.
b. Removing and disposing of electrical which will no longer be used.
c. Installing pressure transducers including brackets, cord grips, ―O‖ ring hubs, conduit, etc.
d. Installing new Tank Terminal Box including unistrut frame.
e. Installing ground system.
2. Payment will be made under:
08 Tank Electrical Lump Sum
1.14 BID ITEM 09 – PUMP HOUSE RECONSTRUCTION
1. The quantity to be measured will be the job of constructing all work at the pump house building except electrical.
B. Payment
1. Payment will be considered full compensation for the complete lump sum job for all work at the pump house site except electrical and replacement of the nearby valve. This includes, but is not limited to, the following Compensation for replacing the 3‖ valve near the pump house building is paid under Bid Item 06.
a. Excavation, backfill and compaction for the Pump House Reconstruction.
b. Removing and disposing of the 48 inch diameter concrete pipe, concrete pipe lid, underground valves and pipe.
c. Plugging the well pitless unit. Removing the pitless Unit spool, plumbing the pump discharge to go out the top of the well casing and increasing the casing height
d. New water line under the building and water line to the nearby 3‖ valve.
e. Asphalt coating existing pipe at connection with new pipe, as needed.
f. All plumbing, valves and fittings inside the building.
g. Construction of the concrete floor and foundation.2/28/2010 Pine Creek Work
Center - Water System Improvements 01 22 00 - 6/7 Measurement and Payment
h. Disinfection and bacteriologic testing.
i. Any temporary measures needed to keep the water system operational.
09 Pump House Reconstruction Lump Sum
1.15 BID ITEM 10 – PUMP HOUSE ELECTRICAL
1. The quantity to be measured will be the job of performing all electrical at the pump house site
B. Payment
1. Payment will be considered full compensation for the complete lump sum job of performing all electrical at the pump house site including at the power pole and connecting to the 13KW generator. This includes trenching and backfill which is only for electrical. Also included is any temporary electrical to keep the water system functioning during construction.
2. Payment will be made under:
10 Pump House Electrical Lump Sum
1.16 BID ITEM 11 – TANKER FILL BID OPTION
1. The quantity to be measured will be the job of installing the tanker fill.
B. Payment
1. Payment will be considered full compensation for the complete lump sum job of installing the tanker fill including, but not limited to, the following.
a. Trenching, backfill and compaction for the tanker fill and appurtenances.
b. Connecting to the existing water line and asphalt coating the existing pipe as needed.
c. Installing the new valve, valve box and pipe to the tanker fill enclosure.
d. Any needed thrust blocking.
e. Concrete slab for enclosure.
f. Bollards and pipe support.
g. The enclosure and all work inside or adjacent to it.
2. Payment will be made under:
11 Tanker Fill Additive Bid Option Lump
1.17 BID ITEM 12 – TANK REMOTE MONITOR BID OPTION
1. The quantity to be measured will be the job of installing the Tank Remote Monitor unit.
1. Payment will be considered full compensation for the complete lump sum job of installing the Tank Remote Monitor unit including, but not limited to, the following.
a. Installing the splice vault over the existing control wires.
b. Splicing the existing control wires to the control cable which goes to the
Information Center.
c. Trenching, backfill and compaction for the conduit and control cable to the
Information Center
d. The lightening protection box installation.
e. Fabrication and installation of the Remote Monitoring unit.
f. Running power to a receptacle next to the Remote Monitoring unit.
g. Testing, start up and trouble shooting of the Remote Monitoring system.
12 Tank Remote Monitor Bid Option Lump Sum
2. PART 2 – PRODUCTS (NOT USED)
3. PART 3 – EXECUTION (NOT USED)
END OF SECTION
SECTION 03 10 00
CONCRETE FORMS AND ACCESSORIES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies construction of concrete forms.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Plywood: B-B Plyform.
B. Steel.
1. Prefabricated.
C. Lumber.
1. Standard grade, (concealed surfaces only).
D. Form Release Agent.
1. Colorless mineral oil that will not stain concrete, absorb moisture, impair natural bonding or color characteristics of coating intended for use on concrete.
2. Diesel or oil based release agents shall not be used.
3. PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Construct forms to prevent leakage of mortar, and any shifting or deformation during the placement and finishing of concrete.
B. Wet forms to allow removal without damaging the concrete per manufacturer‘s instructions.
C. Joints – There shall be no joints
3.02 INSPECTION
A. Obtain CO inspection and approval of forms at least 4 hours prior to placing concrete. Notify
CO at least 24 hours in advance of concrete pour that forms will be ready for inspection.
3.03 CLEANING
A. Remove all sawdust, shavings, and other debris from within the forms.
B. Form Removal.
1. Do not disturb forms until concrete has gained enough strength to carry its own weight and such construction loads as may occur.
2. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.
SECTION 03 20 00
CONCRETE REINFORCEMENT
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies concrete reinforcing.
1.02 REFERENCES
A. ACI 301 - Structural Concrete for Buildings.
B. ACI 318 - Building Code Requirements For Reinforced Concrete.
C. ACI SP-66 - American Concrete Institute - Detailing Manual.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Reinforcement Steel.
1. Bar reinforcement - ASTM A615 Grade 40.
B. ACCESSORY MATERIALS
1. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture.
3. PART 3 - EXECUTION
3.01 INSTALLATION
A. Secure reinforcement against displacement caused by construction loads or placing of concrete. Tie all bar intersections with annealed iron wire of not less than 16 gauge.
B. Field bending and cutting will be permitted if performed in accordance with the ACI code.
C. Keep reinforcement free of dirt, oil, paint, grease, mill scale, and loose or thick rust.
D. Place, support and secure reinforcement against displacement. Do not deviate from required position.
E. Do not displace or damage vapor barrier.
F. Accommodate placement of formed openings.
G. Conform to ACI 318 for concrete cover over reinforcement.
SECTION 03 30 00
CAST-IN-PLACE CONCRETE
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies cast-in-place concrete.
1.02 SUBMITTALS
A. Concrete Delivery Ticket – Within three days of concrete pour provide the CO with a copy of the delivery ticket in accordance with ASTM C94 for each load of concrete.
B. Concrete admixtures - Furnish the following information to the CO for approval. Allow at least 7 days for approval.
1. Brand name of the admixtures.
2. Amount of admixture, per cubic yard of concrete to be used.
3. Reason for requesting the use of the admixture.
1.03 REFERENCES
A. ACI 301 - Structural Concrete for Buildings.
B. ACI 304 - Recommended Practice for Measuring, Mixing, Transporting and Placing
Concrete.
C. ACI 308 - Standard Practice for Curing Concrete.
D. ACI 318 - Building Code Requirements for Reinforced Concrete.
E. ASTM C94 - Ready-Mixed Concrete.
F. ASTM C150 - Portland Cement.
G. ASTM C260 - Air Entraining Admixtures for Concrete.
1.04 QUALITY ASSURANCE
A. Perform work in accordance with ACI 301.
B. Acquire cement and aggregate from same source for all work.
C. Use only 1 brand of cement and admixtures unless otherwise approved in writing by the CO.
2. PART 2 - PRODUCTS
2.01 CONCRETE FOR PUMP HOUSE BUILDING FLOOR, THE TANKER FILL ENCLOSURE
SLAB, VALVE CONCRETE COLLAR AND FIRE HYDRANT SLAB
A. Concrete shall be batched off site by a company in the business of batching and mixing concrete for at least 5 years
B. Ingredients
1. Cement.
a. Type I or Type II Portland Cement: ASTM C150. Use only 1 brand of cement.
b. Type III Portland Cement: ASTM C150. For use at the Contractor's option under Cold Weather Concreting and Curing and Proportioning Concrete for Cold
Weather.
2. Aggregate.
a. ASTM C33, "Specifications for Concrete Aggregate,‖ Size Number 57.
3. Admixtures for Concrete.
a. Air-entraining admixtures - ASTM C260.
b. Water-reducing retarding admixtures - ASTM C494, Type D. Water-reducing, retarding admixtures may be used when approved by the CO. The time limit between batching and placing concrete may be extended up to an additional 2 hours. Use a quantity of admixture within the range of the manufacturer's recommendation. The amount of water may be reduced; other proportions shall remain the same.
4. Water.
a. Clear, clean, and suitable for domestic consumption.
C. Mixing Concrete
1. Concrete Types & Finish
a. Proportion concrete in accordance with ACI 318. The strength of concrete (f'c), air entrainment, slump, and finish shall meet the requirements below:
Unit Requirement
Compressive Strength (f'c) (28 day) 3500 psi
Air Entrained 4-6%
Slump (±1 inch) 5‖
Finish Medium Broom finish
D. Add air entraining agent to normal weight concrete mix.
E. Proportioning Concrete for Cold Weather.
1. For concrete placed under "Cold Weather Concreting and Curing" condition, the
Contractor may elect to alter the required proportions in one of the following ways:
a. Type III Portland Cement.
1) Type III Portland Cement may be substituted in equal quantities for
Type I or II Portland Cement.
b. Additional Cement.
1) An additional sack per cubic yard of Type I or Type II Portland Cement may be added.
2.02 CONCRETE FOR THRUST BLOCKS AND BOLLARD SUPPORTS AND WELL ANNULAR
SEAL.
A. Meet Paragraphs 2.01 above or pre-batched bagged concrete mix complying with ASTM C-
387.2
B. Concrete Types & Finish
1. The strength of concrete (f'c), air entrainment, slump, and finish shall meet the requirements below:
Unit Requirement
Compressive Strength (f'c) (28 day) 2500 psi
Slump (±1 inch) 5‖
Finish where exposed smooth finish
2.03 TEMPERATURE LIMITS FOR COLD WEATHER CONCRETE.
A. Provide concrete having a minimum temperature of 50°F and a maximum temperature of
90°F at the time of placing. The temperature of the mixing water shall not exceed 140°F. If aggregates are heated, heat uniformly with steam or water coil. Aggregate temperature shall not exceed 95°F. Aggregate water mix temperature shall not exceed 80°F. Do not use materials containing frost or icy lumps.
3. PART 3 - EXECUTION
3.01 CONCRETE FOR PUMP HOUSE BUILDING FLOOR, THE TANKER FILL ENCLOSURE
SLAB, VALVE CONCRETE COLLAR AND FIRE HYDRANT SLAB
A. Batching and Mixing
1. Plant Batched and Transit Mixed.
a. Batch at a central plant and mix enroute to the project in transit mix trucks in compliance with ASTM C94. (ASTM C94 Sections 3 and 17 shall not apply to this contract).
b. Time interval between placement of batches on the same slab not to exceed 30 minutes.
2. Plant Batched and Project Mixed.
a. Batch aggregates at a central plant and add water, cement, and admixture at the project.
b. Meet all requirements specified for transit mix.
c. Add cement, water, and admixture by accurate measurement, using measuring devices approved by the CO.
3. Project Batched and Mixed
a. Project batched concrete is not allowed.
4. Hand Mixed.
a. Hand mixing shall not be done.
5. Mix concrete long enough to be homogenous with no areas of cement or aggregate not mixed with other ingredients, but in no case shall the mixing period be less than 1-1/2 minutes after all materials are in the drum.
B. Mix Adjustments
1. After the mix period, water may be added once for purposes of acquiring minimum slump, provided specified water-cement ratio is not exceeded. When water is added, an additional 20 revolutions at mixing speed is required.
2. Air-entraining admixtures will not be allowed to be added after the start of mixing for purposes of acquiring minimum air content.
C. Concrete Placement
1. Notify CO a minimum of 24 hours prior to placement.
2. Convey concrete from a mixer to the forms as near final position as practical in a manner which will prevent segregation or loss of materials.
3. Place concrete in maximum 18 inch horizontal layers.
4. Immediately after placing, thoroughly compact concrete with mechanical vibrator.
Hand tamping or "spudding" shall only be performed when approved in writing by the
CO.
5. Place each concrete section in a continuous operation, such as bottom slab, walls, and top slab.
6. Do not drop concrete freely from higher than 4 feet above the surface of concrete being poured.
7. Do not place concrete in water or allow water to rise over freshly placed concrete until a set is sufficient to prevent damage.
D. Protection from Rainfall
1. Protect flat work during periods of precipitation with adequate waterproof covering.
Support covering so that finishing may be performed and initial set obtained without damage. Dragging of tarpaulins or other covering across unset concrete will not be permitted.
E. Curing
1. Commence curing and protection of concrete immediately after placing. Cure Type I and Type II Portland Cement 7 days continuously and Type III Portland Cement 3 days continuously by one of the following methods:
a. Water Curing.
1) Keep all surfaces of concrete and forms left on concrete wet. Shade concrete from sun with covering material or with sand or sawdust on slab, except during periods of required finishing. Use of sprinklers or flooding is permitted on slabs.
b. Membrane Curing.
1) A liquid membrane-forming material may be used for curing at the
Contractor's option, except on slabs receiving resilient floorings. Complete required surface finish prior to application of curing compound; use water curing during finishing period. Spray material to surface at the rate of 1 gallon per 300 square feet in 2 applications, resulting in a coverage of 1 gallon per 150 square feet. Apply first coat immediately after acceptance of finish. Thoroughly wet concrete with water and apply material just as surface film of water disappears. Apply second coat after first application has set. Recoat any rupture to the membrane seal immediately or use water cure method.
F. Cold Weather Concreting and Curing
1. When descending air temperature at the project falls below 40°F the contractor may at their option, continue concreting under conditions stated below. Normal concreting operations may resume when the temperature at the site exceeds 40°F.
2. Provide cover and heating equipment sufficient to maintain the temperature of the concrete at not less than 50°F for a period of 3 days for Type I and Type II cement.
Maintain the temperature at not less than 50 degrees F for a period of 2 days for Type III cement or when one additional sack of Type I or Type II cement is added.
3. Provide additional protection to prevent the concrete temperature from dropping more then 40°F in the 24-hour period following the required protection period.
4. Keep all surfaces of concrete and any forms remaining on concrete wet. Remove and replace any concrete injured by frost and freezing as directed by the CO.
G. Field quality control
1. All tests will be performed by and at the expense of the Government. Concrete for the samples shall be provided by the Contractor at no additional cost to the Government.
Samples for testing will be selected on a random sample basis in accordance with ASTM
C172. If the measured slump or air content falls outside the specified limits, a check test shall be made immediately on another portion of the same load. In the event of a second failure, the concrete shall be considered to have failed the requirements of the specification.
2. The following concrete tests will be taken:
a. Slump.
1) Testing will be in accordance with ASTM C143. If the slump is greater than the specified range, the concrete will be rejected.
b. Air Content.
1) Testing will be in accordance with ASTM C231. If the air content exceeds the specified range, the concrete will be rejected.
c. Compressive Tests.
1) Compressive test cylinders will be molded, cured, prepared and tested in accordance with ASTM C31 and ASTM C39. Cylinders will be taken for testing at 7 and 28 days.
3. Test results of cylinders tested at 28 days will form the basis for acceptance or rejection of concrete strength. Each 28 day compressive test result shall be the average of the compressive test of 2 cylinders from the same batch. No more than 2 samples from each load will be taken. The concrete strength will be evaluated in accordance with ACI
318. The strength level of the concrete will be considered satisfactory if the averages of all sets of 3 consecutive strength test results equal or exceed the required f'c and no individual strength test result falls below the required f'c by more than 500 psi.
H. As soon as forms are stripped, remove to a minimum depth of 1/4 inch, any projecting wire or metal devices used in forming. Remove fins caused by form joints. Patch all holes, depressions, small rock pockets, and form tie cones by first saturating with water and packing stiff patching grout into voids. Repair large holes, rock pockets, spalls, and honeycombs by chipping away all coarse or broken material until a dense uniform surface of concrete remains; saturate with water, apply thin layer of neat cement; pack stiff patching grout, and thoroughly tamp.
I. Preshrink patching grout by mixing approximately 30 minutes before using.
J. Float patches with wooden float before initial setting; provide a neat, well-blended patch.
K. Cure patches for 12 hours by continuous wetting.
3.02 CONCRETE FOR THRUST BLOCKS AND BOLLARD SUPPORTS AND WELL ANNULAR
SEAL.
A. Batching
1. Batched by manufacturer of pre-mixed bagged dry concrete meeting ASTM C-387 or batched in accordance with paragraph 3.01.A or 3.01.B above.
2. Time interval between placement of batches on the same item not to exceed 30 minutes.
B. Mixing
1. Mix at the project site in mechanical cement mixer, project site by hand or mix in accordance with Paragraphs 3.01.A and 3.01.B above.
2. Methods and apparatus used to mix the cement on-site will be reviewed for approval by the CO.
3. Mixer rated capacity not to be less than a 1 bag batch. Batch quantities requiring fractional bags will not be allowed.
4. When mixing cement add water to pre-mixed ingredients in accordance with manufacturer‘s recommendations.
5. Mix concrete long enough to be homogenous with no areas of cement or aggregate not mixed with other ingredients, but in no case shall the mixing period be less than 1-1/2 minutes after all materials are in the mixing container.
C. Mix Adjustments
1. After the mix period additional water can be added for purposes of acquiring minimum slump as long is it is no later than 15 minutes after initially adding the first water to the mix and the manufacturer‘s recommendations for volume of water is not exceeded. When water is added mix the batch additional time such that the water is uniformly mixed into the entire batch. If a mechanical mixer is used mix at least an additional 20 revolutions at mixing speed.
D. Concrete Placement
1. Notify CO a minimum of 24 hours prior to placement.
2. Convey concrete from a mixer to the forms as near final position as practical in a manner which will prevent segregation or loss of materials.
3. Place concrete in maximum 18 inch horizontal layers.
4. Concrete for the well annular seal can be placed inside a cardboard tube with the tube removed after the concrete has set and then backfill thoroughly compacted against the annular concrete outer surface.
5. Immediately after placing, thoroughly compact concrete with mechanical vibrator or rodding.
6. Place the concrete for each item in a continuous operation, such as each thrust block or the well annular seal. Multiple batches shall be placed within 30 minutes of each other and the interface between each batch well mixed in place by vibrator or rodding.
7. Do not drop concrete freely from higher than 5 feet above the surface of concrete being poured.
8. Do not place concrete in water or allow water to rise over freshly placed concrete until a set is sufficient to prevent damage.
E. Protection from Rainfall
1. Protect work during periods of precipitation with adequate waterproof covering. Thrust blocks can be covered with moist dirt after their initial set.
F. Cold Weather Concreting and Curing
1. Protect exposed concrete from freezing conditions. Remove and replace any concrete injured by frost and freezing as directed by the CO.
3.03 FIELD QUALITY CONTROL
A. The Contractor is to take measures to see that the concrete complies with the slump requirement. The Government may perform slump tests on the concrete complying with ASTM
C143. If the concrete fails, then adjustments to the mix shall be made to bring it within the contract requirements.
3.04 PATCHING
A. As soon as forms are stripped remove fins caused by form joints. Patch all holes, depressions and small rock pockets by first saturating with water and packing stiff patching grout into voids.
Repair large holes, rock pockets, spalls, and honeycombs by chipping away all coarse or broken material until a dense uniform surface of concrete remains; saturate with water, apply thin layer of neat cement; pack stiff patching grout, and thoroughly tamp.
B. Preshrink patching grout by mixing approximately 30 minutes before using.
C. Float patches with wooden float before initial setting; provide a neat, well-blended patch.
D. Cure patches for 12 hours by continuous wetting.
SECTION 06 82 00
FIBERGLASS TRANSCLOSURE
1. PART 1 – GENERAL
1.01 SUMMARY
A. This section specifies the fiberglass enclosure for the tanker fill.
1.02 SUBMITTALS
A. Submit for approval shop drawings and equipment catalog data to CO at least 7 days before purchase of Transclosure.
B. Submit manufacturer's installation instructions to CO at least 7 days prior to pouring concrete slab.
C. Submit operating and maintenance instructions to CO prior to final acceptance.
2. PART 2 - PRODUCTS
2.01 FIBERGLASS ENCLOSURE
A. Provide Hot Box Enclosure model LB3E, 70‖L x 26‖W x 55‖H or other size as shown on drawings or approved equal.
1. Hot Box 924 Lane Ave. N., Jacksonville FL 32254, 800-736-0238 www.hot-box.com
B. This specification applies to fiberglass Flip-Top outdoor pad mount enclosures. Unit shall be designed for mounting on a concrete pad by means specified by manufacturer. Enclosure finish shall be in complete conformance with ASSE 1060 Class II certified freeze resistant.
C. Construction
1. Fiberglass laminate shall be ¼‖ nominal thickness except where local reinforcement is required.
2. Fiberglass shall not support combustion and be self-extinguishing.
3. Enclosure exterior shall be gelcoated to .014 inch nominal thickness and be manufacturer‘s standard color or as specified on drawings.
4. Locking device shall provide for padlocking provisions.
5. All hardware shall be made of 316 stainless steel.
6. Enclosure shall be removable without disturbing enclosed equipment.
7. A stainless steel identification plate shall be affixed outside the enclosure, which identifies the manufacturer, model number of the equipment, and date of manufacture.
8. Louvers shall be provided for adequate air flow and heat dissipation as required for enclosed equipment.
9. The enclosure components, dimensions, and construction shall be as shown on the drawings.2
10. Testing & Standards
a. Certified test data for the finished laminate shall be as follows:
b. Tensile Strength ASTM D638 11,120 psi
c. Flexural Strength ASTM D790 25,380 psi
d. Flexural M.O.E. ASTM D790 1.182 x 106
e. Comp Strength ASTM D695 23,980 psi
f. Charpy Impact ASTM D256 4.6 ft lbs/in
g. Impact Resistance ASTM D2444 46 in lbs
h. Water Absorption ASTM D570 0.092%
i. Flammability ANS Z124.2 self-ext‘g
D. ANSI C57.12.28 Pad mounted Equipment Enclosure Integrity Standard. The enclosure shall meet or exceed this standard.
1. Testing per ANSI C57.12.28 was performed on a standard production model of the
2. PE4-86 pad mount enclosure. Tests covering the enclosure security were performed on a unit bolted to a concrete pad. The access doors were closed and locked with a combination of a padlock and a pentahead bolt. The tests were performed on the specified sequence and at the specified values.
3. There was no structural damage to the enclosure from any of the tests. The probing wire was unable to enter the enclosure following either the pry or the pull test. After all tests had been performed, the enclosure was unlocked and opened, then closed and locked. The unit was found to be operating correctly with no damage.
a. The enclosure coating system shall meet or exceed ASTM standards.
2.02 FIBERGLASS TRANSCLOSURE MOUNTING BASE
A. Provide reinforced concrete base to fit enclosure as shown on drawings. Furnish with galvanized steel "C" mounting channels and panel mounting hardware.
B. Provide stainless steel mounting bolts and hardware for mounting.
3. PART 3 - EXECUTION
3.01 INSTALLATION
A. Install transclosure as per manufacturers specifications. Stainless steel concrete anchor and anchor bolts and nuts shall meet or exceed ASTM standards.
SECTION 07 01 20
BUILDING INSULATION
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies building insulation.
1.02 QUALITY ASSURANCE
A. Provide insulation with the manufacturer's name, fiber material, and R-value on the package.
2. PART 2 - PRODUCTS
2.01 INSULATION.
A. Standard fiberglass insulation with non-aluminum paper vapor barrier. Minimum R-15 for exterior walls.
3. PART 3 - EXECUTION
3.01 INSTALLATION
A. Apply with the vapor barrier to the inside of the building. Cut back insulation to provide stapling flanges at each end. Stretch all flanges tight and staple 6 inch on center maximum. Patch all tears, punctures, and make vapor-tight. Do not staple insulation flange to the face of the framing lumber. Lap flanges of adjacent batts and blankets.
B. Hand pack insulation into all cracks rough framing. Place insulation between water pipes, conduit and exterior sheathing, Seal vapor barrier with tape.
SECTION 22 11 12
BUILDING PLUMBING
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies water system work inside the pump house building and the plumbing above ground at the tanker fill.
1.02 SUBMITTALS
A. Valves - Submit to the CO sufficient descriptive literature to demonstrate compliance with these specifications for each type and brand of valve being furnished. Allow 7 days for review.
1.03 DEFINITIONS
A. WOG - Water, Oil and Gas.
B. Pipe Sizes - All references to pipe sizes refer to the nominal diameter.
1.04 PERFORMANCE REQUIREMENTS
A. Working Pressure. –
1. 125 psi minimum for screwed gate valves.
2. 150 psi minimum for flanged valves.
1.01 QUALITY ASSURANCE
A. All piping and components used in contact with drinking water shall comply with ANSI/NSF
61, Drinking Water System Components - Health Effects.
2. PART 2 - PRODUCTS
2.01 GATE VALVES, 3 INCHES AND LESS (ABOVE GROUND USE)
A. Bronze body, threaded connections, hand wheel operation, non-rising stem, Teflon packing.
B. 3 Inch diameter rated at 300 psi Water/ Oil/ Gas
C. Less than 3 Inch diameter rated at 200 Water/ Oil/ Gas
D. Watts Series GV or approved equal.
2.02 BALL VALVE, UNDER 3 INCHES
A. Body of forged or cast bronze, 600 psi WOG, steel operating handle, gland screw of brass, ball chrome plated, Teflon packing, end connections threaded, 100% full port opening, B. Watts model FBV or approved equal.
C. NOTE: THE BALL VALVES ON THE REDUCED PRESSURE BACKFLOW ASSEMPLY
MUST BE THE ONES FURNISHED WITH THE BACKFLOW PREVENTER, OR IT WILL LOOSE
ITS STATE APPROVAL. THOSE BALL VALVES WILL LIKELY BE DIFFERENT THAN THE
ABOVE BALL VALVE SPECIFICATION; WHICH IS ACCEPTABLE.
2.03 CHECK VALVE
A. The check valve in the pump house shall be 3 inch diameter, Globe Style Silent Check valve, iron body, flange connections, epoxy coating, stainless or bronze internal parts, suitable for 200 psi operating pressure. Danfoss Flomatic Model 402BT, part #2241BT or approved equal.
2.04 ECCENTRIC PLUG VALVE.
A. Working Pressure 175 psi, cast iron body, elastomer coated, connections threaded, suitable for potable water, hand lever actuator with dial indicator and open memory stop.
B. Val-Matic or approved equal.
2.05 REDUCED PRESSURE BACKFLOW ASSEMBLY
A. Reduced Pressure Backflow Assembly with Integral Ball Valves, 2 Inch size, cast bronze main body and access covers, stainless steel internal parts, for potable water, meeting AWWA
C511, on Washington State Department of Health current list of approved Reduced Backflow
Assemblies for mounting as shown on the drawings.
B. Wilkins Model 975XL as manufactured by Zurn or approved equal.
2.06 WATER METER.
A. Disc Type, Bronze body, 2 Inch size, frost-proof, meeting AWWA C700, ANSI/NSF
Standard 61 certified, threaded ends, US gallons, straight reading with sweep hand.
B. Neptune T-10, Hersey 500 Series IIS Model 572IIS or approved equal.
2.07 PIPE
A. General
1. All pipe of a given type, material, and size shall be the product of a single manufacturer.
B. Galvanized Steel.
1. ASTM A53, Schedule 40.
2. Threaded and coupled or flanged fittings, ANSI B16.1.
C. PVC Drain Pipe
1. Schedule 80 PVC pipe, solvent welded, 3 Inch diameter, Fittings, D2467, Schedule 80.
2.08 COUPLINGS
A. Use couplings manufactured specifically for the types of pipe being joined and having a minimum pressure rating, or pressure class (as applicable) equal to or greater than the lower pressure rating or class of the pipes being joined.
2.09 BUSHINGS.
A. Where reducing fittings are shown on the Drawings, bushings may be used if space is not available and if approved by the CO.
2.10 PRESSURE GAUGE
A. Glycerin filled, 100mm (4 inch) dial, rated for severe service, 0 to 100 psi range, copper alloy wetted parts, 1/4 Inch NPT, lower mount, forged brass case, 1% of span accuracy.
B. Marsh W9448PE or approved equal.
2.11 THREAD COMPOUND AND TAPE.
A. A lead free, non-hardening/non-corrosive, anti-seize sealing compound or tape approved for use in joints and threaded parts of potable water systems. UPC approved for potable water.
2.12 SCREEN
A. Screen for covering vent openings shall be stainless steel, 24 mesh, unless noted otherwise.
2.13 DRAIN ROCK.
A. Clean gravel or clean crushed rock ranging in size from approximately 1 to 2 inches.
2.14 SODIUM HYPOCHLORITE (CHLORINE)
A. Chlorine added to the water system shall be NSF approved if it remains in the pipeline for domestic consumption. If it will be flushed out then it is not required to be NSF approved, but must free of odorizers or other additives.
3. PART 3 - EXECUTION
3.01 GENERAL
A. Install valve handles vertical unless noted otherwise.
B. Install valves according to manufacturer's installation recommendations.
3.02 CHECK VALVES
A. Verify flow direction is away from well.
B. Use stainless steel bolts on flanges.
3.03 HYDROSTATIC TESTING
A. General
1. Perform hydrostatic test of all new waterlines. Furnish all equipment necessary for tests.
2. Preparation: Brace or backfill couplings, fittings and pipe to prevent movement during testing.
3. Allow all thrust blocks in test section to cure for 48 hours minimum prior to testing.
4. Flush all pipelines.
5. Furnish and install all temporary supports, blocking and plugs, necessary to run the test. Remove after testing and make final connections with existing water lines.
6. All air should be expelled from the pipeline during filling and again before making the pressure test.
7. Perform test in the presence of the CO.
B. Test at Water Tank, Tanker fill lateral, Fire Hydrants and Pump House Area
1. Perform one of the following test methods.
2. Pressurize the pipe and valves at a minimum of 150 psi for a period of at least 30 minutes with no visible leakage at any joints with all joints exposed. 3. Pressurize the pipe at a minimum of 150 psi for 4 hours with leakage less than the following formula:
Maximum allowable overall leakage for a test section is:
L = N*D*P-2 where:
L = Allowable leakage, gph
N = Number of joints in test section
D = Nominal diameter of pipe, inches
P-2 = Square Root of average test pressure, psi
C. Test at Stand Pipe Removal and Capped Laterals
1. Pressurize the pipe and valves for a period of 4 hours at normal operating pressure with no visible leakage with all joints exposed.
3.04 HYDROSTATIC LEAKAGE REPAIRS
A. Repair any visible leakage at joints and repeat the test.
B. If overall leakage is above maximum allowable, repair the pipeline and repeat the test.
C. Continue this procedure until leakage is within the allowable specified.
3.05 DISINFECTION OF NEW WATERLINE.
A. Disinfect all newly laid pipelines and valves after hydrostatic testing is completed in the following manner:
1. Disinfecting Agent: Chlorine as sodium hypochlorite, solution of known strength.
2. Disinfecting Solution Strength and Measurement.
a. Mix the chemical with the water entering the pipeline to obtain a minimum of
50 mg/l, chlorine concentration.
b. Open valves as necessary to allow solution to fill and circulate throughout the entire system.
c. Test all outlets and ends of pipe works to insure chlorine solution has reached entire section.
3. Disinfection Period: Retain chlorine solution in the system for a minimum of 24 hours.
Test for chlorine residual at representative number of outlets. If free chlorine residual is below 10 mg/l, repeat disinfection cycle.
4. During the disinfection period, operate all valves and hydrants in the treated segment of pipeline to disinfect the appurtenances.
B. Final Flushing and Test.
1. Following disinfection, flush pipelines with potable water until the chlorine residual is no higher than one mg/l.
2. The Contractor is to collect 1 bacteriologic sample for each pipeline section, transport and pay a State approved independent laboratory to conduct bacteriological test.
3. If the initial disinfection fails to achieve potable bacteriological quality, repeat the disinfection procedure until satisfactory results are obtained.
C. Disinfection of Existing Lines Repaired.
1. The following disinfecting procedures may be used where segments less than 18 feet long instead of the procedure described under Disinfection Of New Waterlines.
2. Disinfecting Pipeline & valves: Swab replacement pipeline and fittings with a five percent hypochlorite solution before installation.
3. Flushing: As soon as repair or replacement work is completed, flush the pipeline until discolored water is eliminated and the chlorine residual has been reduced to one mg/l or less.
D. AWWA methods
1. All disinfection methods in the current edition of AWWA C-651 are acceptable.
E. Optional Disinfection Method.
1. For disinfection of any work performed with the water system closed for the season the
Contractor may elect to disinfect the entire water system instead of each piece of new work. Such disinfection shall be performed in accordance with Paragraphs 3.09.A, 3.09.B and 3.09.C.
SECTION 26 00 10
GENERAL TECHNICAL PROVISIONS
1. PART 1 - GENERAL
1.01 SUMMARY
A. Furnish all labor and material necessary for the installation, connection, testing and adjustment of all circuits and electrical equipment specified herein, shown, or noted on the drawings, specified or required in other portions of this specification and delivered to the
Government as a complete installation in all respects ready for use.
B. Coordinate all sections of Division 26 within the division and with all other divisions. All general technical provisions apply to all sections of this division.
C. This project consists of:
1. Removing an existing pump control panel on a power pole.
2. Rewiring of an existing pump house for all service entrance, transfer switch lighting, and controls, well pump connections, grounding system and accessories.
3. Reconnecting of an existing pad mount generator
4. Reconnection of overhead service lines to a pump house
5. Furnishing and installation of a new pump control panel, and associated accessories.
6. Rewiring of two water tanks to add level transducers and connection junction boxes
7. Furnishing and installation of a remote level monitoring panel at a visitor information building.
1.02 REFERENCES
A. 260050 - Basic Materials and Methods
B. 260115 - Specialized Electrical Materials
C. 260400 - Underground Control Cable and Power Distribution
D. 260500 – Lighting
E. 2600900 Controls and instrumentation
F. 312333 - Excavation and Backfill for Utilities
1.03 GOVERNMENT AND SERVING UTILITY FURNISHED EQUIPMENT
A. The Government will furnish the following control panels and/or equipment to be installed by the Contractor:
1. Existing 13KW generator for reconnection
2. Existing overhead service for reconnection
B. The Contractor will furnish all labor, equipment, and all other materials required for complete installation of control panels including the repair and restoration of existing facilities required to be modified for the specified electrical installation.
1.04 QUALITY ASSURANCE
A. Codes and Standards: All materials shall conform to the applicable current standards
(standard rules, regulations and specifications), Institute of Electrical and Electronic Engineers
(IEEE), Insulated Power Cable Engineers Association (IPCEA), National Electric Code (NEC).
All materials shall bear the label of, or be listed by, the Underwriter's Laboratory, Inc., (U.L.).
Where conflicts exist between any of the above standards, the standard which is most stringent shall take precedence.
B. Errors and Omissions: Any errors found in plans or specifications shall be brought to the attention of the COR. Contractor is responsible for execution all work to meet applicable codes.
Discovery of errors does not relieve contractor from responsibility to perform all work to meet standards and codes.
C. Resolve all conflicts with applicable regulations. Prepare and submit to the COR all additional clarifying details including substitute methods and materials as needed to secure the required approval and resolve conflicts.
D. All work shall be done by electricians licensed by the state of Washington.
E. Inspections: Arrange for all inspections of the work by the local or state authority having jurisdiction over the construction. Final inspection and acceptance of the work will be made only after all certificates of inspections, including final certificate of acceptance of the work by the inspection authority have been forwarded to the COR.
F. Accepted Manufacturers: Where equipment is specified to be of certain…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .