Construction Log
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sf-30-amendment-modification-of-contract.rtf | RTF text file | |
| OR2_dvb.htm | HTM file | |
| R-6_Trail_Specs_Customary_Units__July_05.pdf | ||
| BullPrairie_TRMap.pdf | ||
| 942_Typicals.pdf | ||
| sf25a_e.pdf | ||
| BullPrairie_RFQ.doc | DOC document | |
| TYPICAL STATIONS.docx | DOCX document | |
| VicMap.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Station | Quantity | Unit | Existing Structures | Description of Work | Comments | Pay Item |
| 0+00 | BOP Outhouse | |||||
| 0+59 - 10+49 | 990 | LF | Excavation and Embankment | 912(01) | ||
| 0+00 - 10+49 | 59 | CY | Aggregate Surfacing Grading B Compaction Method B | 941 (02) | ||
| 0+00 - 10+49 | 49 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 2+69 | Turn out left 60"X60" | |||||
| 2+91 | Junction with trail to Fishing Dock | |||||
| 4+14 | Turn out left 60"X60" | |||||
| 4+30 - 4+96 | 6 | CY | Additional 4" Aggregate Surfacing Grading A, Compaction Method B | 941(02)a | ||
| 5+04 | Turn out left 60"X60" | |||||
| 7+03 | Turn out left 60"X60" | |||||
| 9+01 | Turn out left 60"X60" | |||||
| 10+49 - 10+77 | Bridge | No equipment on bridge | ||||
| 10+77 - 12+17 | 140 | LF | Excavation and Embankment | 912(01) | ||
| 10+77 - 12+17 | 9 | CY | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 10+77 - 12+17 | 7 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 10+84 | Turn out right 60"X60" | |||||
| 12+08 | Turn out left and right 60"X60" | |||||
| 12+17 - 12+39 | Bridge | No equipment on bridge | ||||
| 12+39 - 28+36 | 1,597 | LF | Excavation and Embankment | 912(01) | ||
| 12+39 - 28+36 | 91 | CY | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 12+39 - 28+36 | 83 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 14+13 | Turn out right 60"X60" | |||||
| 16+33 | Turn out right 60"X60" | |||||
| 16+64 | Bench | Turn out right 60"X60" | ||||
| 18+31 | Turn out right 60"X60" | |||||
| 20+24 | Turn out right 60"X60" | |||||
| 24+22 | Turn out right 60"X60" | |||||
| 25+24 - 27+56 | 232 | LF | Double lane trail | |||
| 28+36 - 29+04 | Bridge | No equipment on bridge | ||||
| 29+04 - 43+78 | 1474 | LF | Excavation and Embankment | 912(01) | ||
| 29+04 - 43+78 | 101 | CY | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 29+04 - 43+78 | 69 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 31+50 | Turn out left and right 60"X60" | Junction trail left to fishing dock | ||||
| 32+83 - 37+96 | 48 | CY | Additional 4" Aggregate Surfacing Grading A, Compaction Method B | 941(02)a | ||
| 37+96 | Turn out right 60"X60" | |||||
| 39+03 - 39+35 | Rock Bridge | Continue Paving | ||||
| 40+19 | Junction to dock left and road right | |||||
| 41 +86 | Turn out left 60"X60" | |||||
| 42+68 | Turn out left 60"X60" | Junction to dock left | ||||
| 43+78 | End Paving. Trail continues through parking area. Boat ramp left | |||||
| 49+00 - 50+55 | 155 | LF | Excavation and Embankment | 912(01) | ||
| 49+00 - 50=55 | 9 | cy | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 49+00 - 50+55 | 7 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 50+55 - 50+83 | Bridge | No equipment on bridge | ||||
| 50+83 - 59+77 | 894 | LF | Excavation and Embankment | 912(01) | ||
| 50+83 - 59+77 | 69 | CY | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 50+83 - 59+77 | 42 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 51+87 | Turn out right 60"X60" | |||||
| 52+20 - 58+27 | 56 | CY | Additional 4" Aggregate Surfacing Grading A, Compaction Method B | 941(02)a | ||
| 59+77 | End of Loop | |||||
| TRAIL Fishing Dock | ||||||
| 0+00 - 1+150 | 150 | LF | Excavation and Embankment | 912(01) | ||
| 0+00 - 1+50 | 9 | CY | Aggregate Surfacing Graking B Compaction Method B | 941(02) | ||
| 0+00 - 1+50 | 7 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 1+50 | Turnaround 60" dimeter | |||||
| TRAIL Overlook | ||||||
| 0+00 - 1+66 | 166 | LF | Excavation and Embankment | 912(01) | ||
| 0+00 - 1+66 | 10 | CY | Aggregate Surfacing Grading B Compaction Method B | 941(02) | ||
| 0+00 - 1+66 | 8 | TON | Hot Bituminous Plant Mix Surfacing | 942(02) | ||
| 1+66 | Turnaround 60" diameter |